Loading...
HomeMy WebLinkAbout20150364 Ver 1_Application_20150416S R (16 0 6 ) G e o rg e W r ig h t Ro a d S R (16 0 0) Roc k y Mt. Ch urc h Rd SR (1603)Thomas Rd SR (1703)Ferry RdStanback SR (1604)Bennett Martin Rd Highway 742 State High way 742 State C reek R ichardson CreekBranchBig Logging RoadPine S R ( 14 5 9 ) B l o n n i e Ro s s Rd SR (1706) Gleace Rd SR (1460) Ross Road Blonnie SR 1608Burnsville Church Rd S R 1 4 5 4 P o plin R d END PROJECT BEGIN PROJECT 0 PROFILE (HORIZONTAL) RIGHT OF WAY DATE: LETTING DATE: STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO. TOTAL SHEETS N.C. SHEET 1 2012 STANDARD SPECIFICATIONS PROJECT ENGINEER GRAPHIC SCALES PLANS PROFILE (VERTICAL) D E P A R T MEN T O F TRAN SPORTA T IO N S T A TE OF NORT H CAR O LI N A 1020 20 2001020 4 2 0 4 8 PLANS PREPARED FOR THE NCDOT BY: VICINITY MAP N.T.S. DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA 40 P.E. 40 NCDOT CONTACT: PROJECT LENGTH DHV D T V = = = = =MPH ADT N/A N/A =ADT DESIGN DATA 6% SIGNATURE: P.E. P.E. ENGINEER HYDRAULICS SIGNATURE: ENGINEER DESIGN ROADWAY 4 2011 45 DETOUR Division Bridge Manager MAAMOON K. ABDELAZIZ NIKKI T. HONEYCUTT, PE PROJECT DESIGNER 17BP.10.R.55 17BP.10.R.55 220 2025 440 P R O J E C T W B S : 1 7 B P . 10 . R . 5 5 LOCAL FUNC. CLASSIFICATION: -L- STA. 11+00.00 BEGIN PROJECT WBS 17BP.10.R.55 NOVEMBER 6, 2014 TYPE OF WORK: GRADING, PAVING, DRAINAGE, & STRUCTURE m a b d e la z i z R : \ H y d r a u li c s \ P E R M IT S _ E n v i o r n m e n t a l \ D r a w i n g s \ P r m S H T \ 10 R 5 5 _ H y d _ P r m _ t s h . d g n 2 / 6 / 2 0 15 900 West Trade St., Ste. 715 Charlotte, NC 28202 NC License Number F-0991 C O N T R A C T : TO THE LIMITS ESTABLISHED BY METHOD II. CLEARING ON THIS PROJECT SHALL BE PERFORMED -L- STA. 14+45.00 END PROJECT WBS 17BP.10.R.55 APRIL 15, 2015 ANSON COUNTY LOCATION: BRIDGE #201 OVER ON SR 1600 (ROCKY MOUNT CHURCH RD.) SR 1600 (ROCKY MOUNT CHURCH ROAD) -L- -L- STA. 12+22.50 BEGIN BRIDGE -L- STA. 12+85.50 END BRIDGE GARLAND HAYWOOD, PE TOTAL LENGTH OF PROJECT WBS 17BP.10.R.55 = 0.065 MILES LENGTH OF STRUCTURE PROJECT WBS 17BP.10.R.55 = 0.010 MILES LENGTH OF ROADWAY PROJECT WBS 17BP.10.R.55 = 0.055 MILES NORTH CAROLINA TO SR 1607 TO SR 1608 17BP.10.R.55 /R W / UTILITIES Scale : 80 STREAM IMPACTS ofSheet Permit Drawing SITE 1 SITE 1 FIGURE SEE NAD 83 NSRS 2007 EXISTING PEE DEE ELECTRIC EASEMENT LINE EXISTING PEE DEE ELECTRIC EASEMENT LINE T EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W N.B.BLACK HEIRS OF DB 190 PG 548 JACK TURNER DB 75 PG 549 N.B.BLACK HEIRS OF DB 190 PG 548 JACK TURNER DB 75 PG 549 JOANNA E. DAVIS ROGER A. DAVIS, JR DB 935 PG 90 4 0 . 0 0 ' 4 0 . 0 0 ' 1 2 2 3 1 -L- 11+ 0 0 12 + 0 0 13 + 0 0 14 + 0 0 15 + 0 0 10 + 0 0 P O T S t a . 9 + 3 5 .0 0 P C S t a . 10 + 5 3 .8 4 P T S t a . 14 + 4 5 .6 1 P O T S t a . 15 + 2 8 .0 0 SR 1600 ROCKY MOUNT CHURCH RD. TS TS TS S TS TSTS S TS TS TSTSTS TS TS TS TSTSTSTS TS TS TS TS TS S TS TS S TS TS TS S TS TS TS TS S S S SS TS TS TS TS 4 HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. R :\ H y d r a u l i c s \ P E R M IT S _ E n v i o r n m e n t a l \ D r a w i n g s \ P r m S H T \ 10 R 5 5 _ H y d _ P r m _ p s h 0 4 .d g n 2 / 6 / 2 0 15 12+50 285 290 295 300 305 310 315 13+00 13+50 NAD 83 NSRS 2007 10+50 11+00 11+50 12+00 17BP.10.R.55 315 310 305 300 295 290 285 14+00 14+50 15+0010+00 15+50 900 West Trade St., Ste. 715 Charlotte, NC 28202 NC License Number F-0991 Scale : 40 ofSheet Permit Drawing GRAPHIC SCALE 0'40'40' SITE 1 SITE 1 FIGURE SEE LEGEND SURFACE WATER DENOTES IMPACTS IN IMPACTS IN SURFACE WATER DENOTES TEMPORARY S TS S TS STREAM PERMIT IMPACT SW IMPACTS PERMANENT SW IMPACTS TEMPORARY AREA (AC)LENGTH (FT) < 0.01 0.03 51 70 BEGIN PROJECT WBS 17BP.10.R.55 EL = 302.26' -L- STA 11+00.00 EL = 307.68' -L- STA 14+45.00 END PROJECT WBS 17BP.10.R.55 DS = 25 MPH PI = 13+65.00 EL = 302.25' (+)0.5081% (+)6.6500% VC = 160' K = 26 DESIGN DISCHARGE DESIGN FREQUENCY BASE DISCHARGE CFS YRS YRS BASE FREQUENCY OVERTOPPING ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE CFS CFS YRS FT FT FT DESIGN HW ELEVATION BASE HW ELEVATION BRIDGE HYDRAULIC DATA = 800 = 25 = 296.2 = 1100 = 100 = 297.0 = 1600 = >500 = >301.5 BL-1 * E L = 2 9 9 .4 5 ' P I = 11+ 5 0 .0 0 R T *NOTE: SPEED PER SUB-REGIONAL TIER DESIGN GUIDELINES. IS UP TO 20 MPH LESS THAN OVERALL DESIGN DESIGN SPEED SHOWN FOR VERTICAL CURVES DS = 30 MPH PI = 11+80.00 EL = 301.31' (-)1.1875%(+)0.5081% VC = 75' K = 44 -L- STA 12+85.50 END BRIDGE -L- STA 12+22.50 BEGIN BRIDGE LOW POINT ELEV. 301.44' STA. 11+95.03 * BL-2 (TOTAL BOTH SIDES) STRUCTURE EXCAVATION ESTIMATED 270 CY UNCLASSIFIED (-)1.6974% E L = 2 9 8 .2 2 ' P I = 12 + 2 6 .0 0 R T TO BE REMOVED EXIST BRIDGE PROPOSED GRS WALL ROCK LINE AGGREGATE BASE F F F C F F F F F F F F F C C C C C C CC F F 2 9 0 2 9 0 2 9 1 2 9 1 2 9 1 2 9 1 2 9 2 2 9 2 2 9 2 2 9 3 293 293 293 293 293 2 9 4 2 9 4 294 2 9 4 2 9 4 295 2 9 5 295 2 9 5 295 295 295 295 295 295 2 9 5 2 9 5 296 2 9 6 296 296 2 9 6 2 9 6 2 9 6 2 9 6 2 9 6 2 9 7 297 297 2 9 7 2 9 7 297 297 297 298 298 298 298 298 2 9 8 299 299 299 299 2 9 9 300 300 3 0 0 300 300 300 3 0 0 300 3 0 0 3 0 0 300 301 301 301 301 301 301 3 0 1 302 302 3 0 2 3 0 2 302 3 0 2 303 303 303 303 303 304 304 304 3 0 4 305 305 305 305 305 305 305 305 306 3 0 6 3 0 6 3 0 6 307 30 7 307 3 0 7 308 308 3 0 8 3 0 8 309 3 0 9 309 309310 310 310 310 310 310 3 1 1 311 311 3 11 312 312 312 3 13 313 3 1 3 313 314 314 3 14 314 315 315 3 1 5 315 315 315 3 16 316 3 1 6 316 317 3 1 7 3 1 7 317 3 18 318 319 319 3 2 0 320 320 3 20 3 2 0 321 321 3 2 2 3 2 2 3 2 2 323 324 325 325 327 3 3 0 EXISTING PEE DEE ELECTRIC EASEMENT LINE EXISTING PEE DEE ELECTRIC EASEMENT LINE T EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W N.B.BLACK HEIRS OF DB 190 PG 548 JACK TURNER DB 75 PG 549 N.B.BLACK HEIRS OF DB 190 PG 548 JACK TURNER DB 75 PG 549 JOANNA E. DAVIS ROGER A. DAVIS, JR DB 935 PG 90 4 0 . 0 0 ' 4 0 . 0 0 ' 1 2 2 3 1 -L- 11+ 0 0 12 + 0 0 13 + 0 0 14 + 0 0 15 + 0 0 10 + 0 0 P O T S t a . 9 + 3 5 .0 0 P C S t a . 10 + 5 3 .8 4 P T S t a . 14 + 4 5 .6 1 P O T S t a . 15 + 2 8 .0 0 SR 1600 ROCKY MOUNT CHURCH RD. TS TS TS S TS TSTS S TS TS TSTSTS TS TS TS TSTSTSTS TS TS TS TS TS S TS TS S TS TS TS S TS TS TS TS S S S SS TS TS TS TS 4 HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. R :\ H y d r a u l i c s \ P E R M IT S _ E n v i o r n m e n t a l \ D r a w i n g s \ P r m S H T \ 10 R 5 5 _ H y d _ P r m _ p s h 0 4 A .d g n 2 / 6 / 2 0 15 12+50 285 290 295 300 305 310 315 13+00 13+50 NAD 83 NSRS 2007 10+50 11+00 11+50 12+00 17BP.10.R.55 315 310 305 300 295 290 285 14+00 14+50 15+0010+00 15+50 900 West Trade St., Ste. 715 Charlotte, NC 28202 NC License Number F-0991 Scale : 40 ofSheet Permit Drawing GRAPHIC SCALE 0'40'40' SITE 1 SITE 1 FIGURE SEE LEGEND SURFACE WATER DENOTES IMPACTS IN IMPACTS IN SURFACE WATER DENOTES TEMPORARY S TS S TS STREAM PERMIT IMPACT SW IMPACTS PERMANENT SW IMPACTS TEMPORARY AREA (AC)LENGTH (FT) < 0.01 0.03 51 70 BEGIN PROJECT WBS 17BP.10.R.55 EL = 302.26' -L- STA 11+00.00 EL = 307.68' -L- STA 14+45.00 END PROJECT WBS 17BP.10.R.55 DS = 25 MPH PI = 13+65.00 EL = 302.25' (+)0.5081% (+)6.6500% VC = 160' K = 26 DESIGN DISCHARGE DESIGN FREQUENCY BASE DISCHARGE CFS YRS YRS BASE FREQUENCY OVERTOPPING ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE CFS CFS YRS FT FT FT DESIGN HW ELEVATION BASE HW ELEVATION BRIDGE HYDRAULIC DATA = 800 = 25 = 296.2 = 1100 = 100 = 297.0 = 1600 = >500 = >301.5 BL-1 * E L = 2 9 9 .4 5 ' P I = 11+ 5 0 .0 0 R T *NOTE: SPEED PER SUB-REGIONAL TIER DESIGN GUIDELINES. IS UP TO 20 MPH LESS THAN OVERALL DESIGN DESIGN SPEED SHOWN FOR VERTICAL CURVES DS = 30 MPH PI = 11+80.00 EL = 301.31' (-)1.1875%(+)0.5081% VC = 75' K = 44 -L- STA 12+85.50 END BRIDGE -L- STA 12+22.50 BEGIN BRIDGE LOW POINT ELEV. 301.44' STA. 11+95.03 * BL-2 (TOTAL BOTH SIDES) STRUCTURE EXCAVATION ESTIMATED 270 CY UNCLASSIFIED (-)1.6974% E L = 2 9 8 .2 2 ' P I = 12 + 2 6 .0 0 R T TO BE REMOVED EXIST BRIDGE PROPOSED GRS WALL ROCK LINE AGGREGATE BASE F F F C F F F F F F F F F C C C C C C CC F F T JACK TURNER DB 75 PG 549 N.B.BLACK HEIRS OF DB 190 PG 548 JOANNA E. DAVIS ROGER A. DAVIS, JR DB 935 PG 90 JACK TURNER DB 75 PG 549 N.B.BLACK HEIRS OF DB 190 PG 548 2 1 1 3 2 1 12 + 0 0 13 + 0 0 -L- SR 1600 CHURCH RD. ROCKY MOUNT TS TS TS S TS TSTS S TS TS TSTSTS TS TS TS TSTSTSTS TS TS TS TS TS STS TS S TS TS TS S TS TS TS TS S S S SS TS TS TS TS S S S TS TSTSTS TS TS TS TSTS TS TSTSTSTS S S S TS TS TS TS TS TS TSTSTS SCALE 1"=20' SITE 1 GRAPHIC SCALE 0'20'20' ofSheet Permit Drawing IN SURFACE WATER TEMPORARY IMPACTS IN SURFACE WATER TEMPORARY IMPACTS DIVISION OF HIGHWAYS 2/6/2015SHEET 1 OF 1 # NCDOT PROJECT: 17BP.10.R.55 ANSON COUNTY (ROCKY MOUNT CHURCH ROAD) ON SR 1600 BRIDGE 201 OVER NAD 83 NSRS 2007 LEGEND SURFACE WATER DENOTES IMPACTS IN IMPACTS IN SURFACE WATER DENOTES TEMPORARY S TS S TS IN SURFACE WATER PERMANENT IMPACTS IN SURFACE WATER PERMANENT IMPACTS STREAM PERMIT IMPACT SW IMPACTS PERMANENT SW IMPACTS TEMPORARY AREA (AC)LENGTH (FT) < 0.01 0.03 51 70 F F C C C C C C CC F F F C C C C F F NAMES AND ADDRESSES PARCEL NO.NAMES ADDRESS 1 2 SCALE 1"=10' DIVISION OF HIGHWAYS 2/6/2015SHEET 1 OF 1 # NCDOT PROJECT: 17BP.10.R.55 PROPERTY OWNERS ANSON COUNTY (ROCKY MOUNT CHURCH ROAD) ON SR 1600 BRIDGE 201 OVER 2 HEIRS OF N.B. BLACK JACK TURNER JOANNA E. DAVIS ROGER A. DAVIS, JR POLKTON, NC 28135 ROCKY MOUNT CHURCH ROAD POLKTON, NC 28135 700 ROCKY MOUNT CHURCH ROAD POLKTON, NC 28135 1981 BURNSVILLE CHURCH ROAD Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No.(From/To)Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp.Design (ac)(ac)(ac)(ac)(ac)(ac)(ac)(ft)(ft)(ft) 1 -L- 12+22 to 12+85 60' Cored Slab Bridge < 0.01 0.03 51 70 with GRS TOTALS:0.01 0.03 51 70 ATN Revised 3/31/05 SHEET WETLAND PERMIT IMPACT SUMMARY SURFACE WATER IMPACTSWETLAND IMPACTS ANSON COUNTY NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 17BP.10.R.55 2/6/2015