Loading...
HomeMy WebLinkAbout20230436 Ver 1_Site Plan_20230323PMOO Natwaddrew Print = "tmcuw/awt: C'�C_ 5-�on - nt The approval is for the purpose and design described in yoVr application. Impacts not indiCated in the A.pPiicat On is s violation of the Buffer Rule_ Site specific work sh6uld be provided In the application. ( L5A NCAC 02H .0506 and IS.A NCAC 028.0243(fi)) frees are neat allaw ed to be removed from done 1 of the .Buffer (tn'ithin 30 ft of the full pond +eievationl, unless Approved. Exce;Ilon, those trees that are s+e+r,srel y undermined along the Irrtrnergat* slra� ,,no can be rcrrr3tly $; Minimal shaNAX and sloping along the :rnrr,vdiate shoreline is a 10wed, 115A NCAC 02,8 .0243(6)1 Benching grading in the buffer is not allowed. Excessive disturbance of ground cover. (15A NCAC 028.0243 (611 Peaches, impervious patios, impervious walkw o, etc. are not allowed In the buffer unit," specifically approved by the Division. There are limitation on size for d*ckr, (ISA NCAC 02B ,0243(d) and 16)) Work to be conducted from land must Ind'kate an access and indicate any trees that are to be removed. The work corridor should be described. The approved access corridor shall be restored. Staging, spoil, constructlor, material must be outside the buffer. 115A IMCAC 02H .0502 and 15A NCAC 028.0242 (4), (6), (8)) Stormwater cannot be ,piped or chantaled for direct discharge to the lake, All constructed stoat water discharges must be at the natural clewnion and discharged Drier too enuring the buffer directed as diffuse or sheen flaw at non -erosive velocities to the lake. 11.5A NCAC 028 ,0243(5), (b)I ACr Notffkabm I, _— EQAr m �sa �'l.� _ h e"01 state that l how been informed of the Catawba Riparian Buffer Rule. Any work conducted In the buffer, not specifically stated in the application and ataproved by the Division of VWattf #les�ur Fi), is a vloiation and subject to enforcement. Due diligence will he taken such that the cons; uct will.` buRi within subst I compliance and intent aaf the 401 Water Quality Certification and Buff Rut the a (s) a SpOcification{s), and other supporting materials � signature {owner Date;