Loading...
HomeMy WebLinkAboutUC_IBT_EIS_Scoping_MeetingsUNION COUNTY YADKIN RIVER WATER SUPPLY PROJECT Presented by: & Outline WHO is Union County, NC? WHAT is the process? WHY does Union County need water? WHERE can we find a solution? WHEN will we need it? HOW can you participate? Next Steps Purpose and Need Purpose: Union County is requesting an Interbasin Transfer (IBT) for a maximum daily amount of 28 million gallons per day (mgd) from the Yadkin River Sub-Basin to the Rocky River Sub-Basin, both of which are part of the Yadkin River Basin. Need: The requested amount is based on 2050 water demand projections in the County’s Yadkin River Basin service area. WHO IS UNION COUNTY? This is Union County, NC This is Union County, NC (Est. 1892) Located in south central piedmont of NC Population estimated at just over 200,000 Approx. 643 square miles of land In the last decade Union County has been: One of the fastest growing counties in NC, due to economic growth, education, and regional location A top 20 fastest growing county in the nation Land Use Western portion is suburban Eastern portion is more rural with farms and open spaces Flourishing economic growth due to agriculture, business, and proximity to jobs This is Union County, NC Fairview Hemby Bridge Indian Trail Lake Park Marshville Marvin Mineral Springs Monroe (County Seat) Stallings Unionville Waxhaw Weddington Wesley Chapel Wingate Incorporated towns and villages: WHAT IS THE PROCESS? The Process Flow Projections/Flow Balance Determination Develop Agreement with Anson/Norwood File Notice of Intent (IBT) Identify Preliminary Infrastructure Requirements Conduct Hydraulic & Hydrologic Modeling and Confirm Available Supply Conduct EIS Petition EMC Petition Duke Energy Progress for FERC Amendment File FERC Amendment Key Initial Permitting Requirements SEPA - EIS Interbasin Transfer (IBT) Certificate Duke EnergyProgress FERC Amendment IBT Certification Process ∼0.5 years ∼2-3 years ∼0.5 - 1 year Total Time ∼3-5 years EIS Integrated Process WHY DOES UNION COUNTY NEED WATER? Union County Water Service Areas The Need for Water: Future Land Use The Need for Water: Suburban Development WHERE CAN WE FIND A SOLUTION? Union County Water Supply: The Status An existing authorized IBT limits the amount of Catawba River water the County can use outside the basin Only 30% of Union County is in the Catawba Basin but 83% of the water currently comes from this source County is currently limited to an IBT of 5 MGD from the Catawba Basin Union County Water Supply: The Solution? CATAWBA RIVER BASIN ROCKY RIVER SUB-BASIN (YADKIN RIVER BASIN) YADKIN RIVER SUB-BASIN (YADKIN RIVER BASIN) Catawba to Yadkin Transfer Year Water Supply (mgd) 2012 6.0 2050 7.3 Transfer From Yadkin Back to Catawba Year Water Supply (mgd) 2012 1.0 2050 4.5 Catawba River Water Supply Project to Union County Year Water Supply (mgd) 2012 16.5 2050 35.4 Anson County’s Water Supply to Union County Yadkin River Service Area Year Water Supply (mgd) 2012 3.0 2050 0.0 Proposed Water Transfer from Lake Tillery to Union County’s Yadkin River Service Area Year Water Supply (mgd) 2012 0.0 2050 28.0 Union County The Solution: Alternatives To Consider 1)Lake Tillery IBT to UC 2)Tuckertown Reservoir IBT to UC 3)Blewett Falls Lake IBT to UC 4)Main Stem Yadkin River IBT to UC 5)Rocky River Withdrawal in UC 6)Catawba River Water Supply Project Expansion 7)Interconnection with CMUD 8)Groundwater Supply 9)Demand Management/Conservation 10)Direct Potable Reuse 11)No Action 12)Water returns to the Yadkin Basin (must be evaluated) The Solution – Alternatives To Consider 7 6 2 1 3 4 5 Blewett Falls Lake IBT to UC Lake Tillery IBT to UC Tuckertown Reservoir IBT to UC Main Stem Yadkin River IBT to UC Rocky River Withdrawal in UC Interconnection with CMUD Catawba River Water Supply Project Expansion Groundwater Supply Demand Management / Conservation Direct Potable Reuse 9 10 8 Do Nothing 11 Yadkin Returns 12 WHEN WILL WE NEED IT? The Timeline: Union County Yadkin Water Needs The Timeline: Union County Yadkin Water Needs 2013 Anson Supply + Catawba Transfer 2022 New Yadkin Water Supply Needed to Meet Demand = 12 mgd 2033 Yadkin Water Supply Used to Meet Demand = 20 mgd 2044 Yadkin Water Supply Used to Meet Demand = 28 mgd 2050 Yadkin Water Supply Used to Meet Demand = 28 mgd HOW CAN YOU PARTICIPATE? How Can You Participate? EIS Scoping Input 10/3/2013 4:30 PM •Public Meeting #1 10/14/2013 5:00 PM •Public Meeting #2 10/15/2013 5:00 PM •Public Meeting #3 11/15/2013 •Deadline for Submission of Public Comments (30 days after last meeting) Stanly County Public Library 133 East Main Street Albemarle, NC 28001 Rowan-Cabarrus Community College – Salisbury Campus 1333 Jake Alexander Blvd. South Salisbury, NC 28146-1595 Northeast Technical College – Cheraw Campus 1201 Chesterfield Highway Cheraw, SC 29520 EN G A G E RE S P O N D How Can You Participate? Comments Written comments should be mailed to: Union County – YRWSP – IBT Comments HDR Engineering Inc. of the Carolinas Attn: Mr. Kevin Mosteller, PE 440 South Church Street Charlotte, NC 28202 Handwritten comments turned in tonight on official forms. Comments may also be submitted electronically to: unioncountyYRWSP@hdrinc.com How Can You Participate? Comments Mailed and emailed comments will be given equal consideration Public comment period for this phase of the project closes on November 15, 2013 Future opportunities to provide input during the overall IBT certificate request process Next Steps…