Loading...
HomeMy WebLinkAbout20220685 Ver 2_ePCN Application_20230321DW R DHlsloo of Water Resources Pre -Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) April 13, 2022 Ver 4.3 Initial Review Has this project met the requirements for acceptance in to the review process? Yes No Is this project a public transportation project?* Yes No Change only If needed. Pre -Filing Meeting Date Request was submitted on: 1 /13/2023 BIMS # Assigned 20220685 Is a payment required for this project?* No payment required Fee received Fee needed - send electronic notification Reviewing Office* Mooresville Regional Office - (704) 663-1699 Information for Initial Review 1a. Name of project: Research Park Phase 2 1a. Who is the Primary Contact?* Daniel Kuefler 1b. Primary Contact Email: * daniel. kuefler@wetlands-epg.com Date Submitted 3/21/2023 Nearest Body of Water Doby Creek Basin Yadkin-PeeDee Water Classification C Site Coordinates Latitude: 35.2905 A. Processing Information Is this project connected with ARPA funding? Yes No County (or Counties) where the project is located: Mecklenburg Is this a NCDMS Project Yes No Longitude: -80.7743 Version#* 2 What amout is owed?* $240.00 $570.00 Select Project Reviewer* Andrew Pitner:andrew.pitner@ncdenr.gov 1c. Primary Contact Phone:* (336)554-2728 Is this project a public transportation project?* Yes No 1a.Type(s)of approval sought from the Corps: Section 404 Permit (wetlands, streams and waters, Clean Water Act) Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Has this PCN previously been submitted?* Yes No Please provide the date of the previous submission. 5/16/2022 1b. What type(s) of permit(s) do you wish to seek authorization? Nationwide Permit (NWP) Regional General Permit (RGP) Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? Yes No Nationwide Permit (NWP) Number: Nationwide Permit (NWP) Number: Nationwide Permit (NWP) Number: NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: 401 Water Quality Certification - Regular Non-404 Jurisdictional General Permit Individual 401 Water Quality Certification 14 - Linear transportation 18 - Minor Discharges 58 - Utility Line Activities for Water and Other Substances (frequently used) le. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: 1f. Is this an after -the -fact permit application? * Yes No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No 1h. Is the project located in any of NC's twenty coastal counties? Yes No 1j. Is the project located in a designated trout watershed? Yes No B. Applicant Information 1d. Who is applying for the permit? Owner Applicant (other than owner) le. Is there an Agent/Consultant for this project? Yes No 2. Owner Information 2a. Name(s) on recorded deed: Elan University City c/o Greystar 2b. Deed book and page no.: 2c. Contact Person: Josh Glover 401 Water Quality Certification - Express Riparian Buffer Authorization * Yes No Yes No 2d. Address Street Address 521 E Morehead Street Address Line 2 Suite 400 city Charlotte Postal / Zip Code 28202 2e. Telephone Number: (704)379-1868 2g. Email Address:* jglover@greystar.com 4. Agent/Consultant (if applicable) 4a. Name: Daniel Kuefler 4b. Business Name: Wetlands & Environmental Planning Group, PLLC 4c.Address Street Address 10612-D Providence Road Address Line 2 PMB 550 city Charlotte Postal / Zip Code 28277 4d. Telephone Number: (336)554-2728 4f. Email Address:* amber.lipsky@wetlands-epg.com C. Project Information and Prior Project History 1. Project Information 1b. Subdivision name: (if appropriate) 1c. Nearest municipality / town: Charlotte 2. Project Identification 2a. Property Identification Number: 04708214,04739110 2c. Project Address Street Address Address Line 2 city Postal / Zip Code 3. Surface Waters 3a. Name of the nearest body of water to proposed project: Doby Creek 3b. Water Resources Classification of nearest receiving water: C 3c. What river basins) is your project located in?* Yadkin-PeeDee State / Province / Region NC Country USA 2f. Fax Number: State / Province / Region NC Country USA 4e. Fax Number: 2b. Property size: 68.78 State / Province / Region Country 3d. Please provide the 12-digit HUC in which the project is located. 030401050103 4. Project Description and History 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The Research Park Ph 2 site is located just south of University City Boulevard, and just west of Interstate Hwy 85, in Charlotte, Mecklenburg County, North Carolina. The topography consists of moderate slopes and stream corridor with the elevation ranging from 700 to 780 ft. (Figure 1). This site is in a semi -urbanized setting. It is surrounded by residential neighborhoods and features disturbed, mixed hardwood covered slopes and drainages. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past? Yes No Unknown If yes, please give the DWR Certification number or the Corps Action ID (exp. SAW-0000-00000). SAW-2021-01204, DWR#22-0685 This PCN was approved in October 2022. Due to a City required multi -use path (MUP), additional impacts are required. These have been reduced to the extent possible by using 2:1 slopes. 4f. List the total estimated acreage of all existing wetlands on the property: 7.35 4g. List the total estimated linear feet of all existing streams on the property: 3600 4h. Explain the purpose of the proposed project: * The proposed development will include impacts associated with road crossings for connectivity and associated grading. 4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used: Fill and grading of the site will use standard equipment, excavator, dump truck, track hoe, etc. 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* Yes No Unknown Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made? Preliminary Approved Not Verified Unknown N/A Corps AID Number: 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Nic Nelson Agency/Consultant Company: WEPG Other: 5d. List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR The site was field verified by the USACE in June 2021 and by NCDEQ in August 2021 and a PJD was issued in June 2021. A copy of the signed JD approval is included in the Jurisdictional Determination Information section. 6. Future Project Plans 6a. Is this a phased project?* Yes O No 6b. If yes, explain. Phase 1 had no impacts to aquatic resources. Remaining phases and proposed impacts are included in this application. Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? NA D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): Wetlands Streams -tributaries Buffers Open Waters Pond Construction 2. Wetland Impacts 2a1 Reason (?) 2b. Impact type (?) 2c. Type of W. 2d. W. name 2e. Forested" rf.) Type of Jurisdcition * W1 Fill P Bottomland Hardwood Forest Wetland FW Yes Corps 0.333 (acres) W2 Fill P Ftt-mland Hardwood Forest Wetland FW Yes Corps 0.059 (acres) W3 Bore Pit T Fttomland Hardwood Forest Wetland FW Yes Corps 0.010 (acres) W4 Fill 1p Ftomland Hardwood Forest Wetland FW Yes Corps 0.010 (acres) 29. Total Temporary Wetland Impact 0.010 2g. Total Wetland Impact 0.412 2i. Comments: NWP 18 to be applied to W1, W2, W4 NWP 58 to be applied to W3 3. Stream Impacts 2g. Total Permanent Wetland Impact 0.402 F I 3a. Reason for impact (?) 3b.lmpact type* 3c. Type of impact" 3d. S. name` 3e. Stream Type' 3f. Type of 3g. S. width 3h. Impact (?) Jurisdiction* length* S1 Road Crossing Permanent Culvert Stream A Perennial Corps 142 Average (feet) (linear feet) g2 Road Crossing Temporary Workpad/Causeway J Stream A Perennial Corps 15 Average ((eeQ (linear feet) S3 Road Crossing Temporary Workpad/Causeway Stream A Perennial Corps 15 Average (feet) (linear feet) 31. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 142 3i. Total stream and ditch impacts: 172 3j. Comments: NWP 14 to be applied to S1, S2, S3 S 1- 0.027 AC S2- 0.011 AC Dewatering S3- 0.011 AC Dewatering E. Impact Justification and Mitigation 1. Avoidance and Minimization 3i. Total temporary stream impacts: 30 la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: Impacts associated with the proposed development were limited through site selection, design, and location/orientation of the proposed lots & access routes. Impact minimization was implemented during design to preserve site hydrology & limit adverse effects to existing natural habitat. The culverts were designed with headwalls as close to the sidewalks as possible. Grading for a City -required MUP uses 2:1 slopes.The applicant has demonstrated avoidance & minimization efforts by dedicating 42.5 % of the Phase 2 area to open space, avoiding 95 % of onsite streams & 94 % of onsite wetlands. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Construction techniques will implement approved erosion control methods to avoid/minimize impacts to onsite/adjacent offsite receiving conveyances. Where possible, 2:1 slopes and the maximum allowable headwalls will be used to minimize crossing impacts. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? Yes No 2c. If yes, mitigation is required by (check all that apply): D W R Corps 2d. If yes, which mitigation option(s) will be used for this project? Mitigation bank Payment to in -lieu fee program Permittee Responsible Mitigation 0 u 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: Upper Rocky Umbrella Mitigation Bank 3b. Credits Purchased/Requested (attach receipt and letter) Type: Quantity: Stream 142 Riparian wetland 0.402 3c. Comments Please see attached letter of availability F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? Yes No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? Yes No 2c. Does this project have a stormwater management plan (SMP) reviewed and approved under a state stormwater program or state -approved local government stormwater program? Yes No N/A - project disturbs < 1 acre 2d. Which of the following stormwater management program(s) apply: Local Government State Local Government Stormwater Programs Phase II NSW USMP Water Supply Please identify which local government stormwater program you are using. City of Charlotte Comments: Storm water on the site will be handled by facilities shown on the attached plans. The stormwater plan has not yet been submitted to City of Charlotte but will be designed to meet their criteria. G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes No 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * Yes No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality? Yes No 3b. If you answered "no," provide a short narrative description. No additional phases are proposed. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project? Yes No N/A 01 4b. Describe, in detail, the treatment methods and dispositions (non -discharge or discharge) of wastewater generated from the proposed project. If the wastewater will be treated at a treatment plant, list the capacity available at that plant. Wastewater generated on the site will be transported to the nearest treatment facility via sewer lines. 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?" Yes No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts? Yes No 5c. If yes, indicate the USFWS Field Office you have contacted. Asheville 5d. Is another Federal agency involved? Yes No Unknown 5e. Is this a DOT project located within Division's 1-8? Yes No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? Yes No 5g. Does this project involve bridge maintenance or removal? Yes No 5h. Does this project involve the construction/installation of a wind turbine(s)?* Yes No 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? Yes No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? A threatened and endangered species assessment was conducted in which no species were identified. Habitat may occur for the Northern long-eared bat but the project is except as described in the attached T&E report. FWS's response is included in this package. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* Yes No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?'� No essential habitat in this region. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status? " Yes No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?" SHPO's website: https:/Inc.maps.aregis.com/ Report from R.S. Webb & Associates 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? * Yes No 8b. If yes, explain how project meets FEMA requirements: Any fill within the floodplain proposed as a part of this project will be designed to meet any requirements of a floodplain development permit as determined by the City of Charlotte and/or FEMA. 8c. What source(s) did you use to make the floodplain determination?" www.fema.gov https://polaris3g.mecklenburgcountync.gov/ Miscellaneous Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred. Click the upload button or drag and drop files here to attach document Research Park Phase 2 PCN.pdf 10.16MB File must be PDF or KMZ Comments A complete updated PCN application is attached. This PCN was originally approved in October 2022. Due to a City required multi -use path (MUP), additional impacts are required. These have been reduced to the extent possible by using 2:1 slopes. Signature p By checking the box and signing below, I certify that: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief'; and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Daniel Kuefler Signature Date 3/21 /2023