Loading...
HomeMy WebLinkAbout20230427 Ver 1_Site Plan_20230323 (2)2/13/23, 6:51 AM Scan 8.jpeg CATAWBA RIPARIAN BUFFER NOTIFICATION FORM Project Marne/address: w"i� �.:� J' r"i +//'Ana)iCounty: Print Signature contractor/agent; _ 2. Print J f ^` -g re The approval is for the purpose and design described in your aporkation. impacts not indicated in the application is a violation of the Buffer Rule. Site spPcifir- work should be provided in the application. (15A NCAC 02H .0506 and 15A NCAC 02B .0243(8)) Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation), unless approved. Exception, those trees that are severely undermined along the immediate shoreline can be removed. Minimal shaping and sloping along the immediate shoreline is allowed. (15A NCAC 028 .0243(6)) Benching, grading in the buffer is not allowed. Excessive disturbance of ground cover. (15A NCAC 02B .0243 (6)} Beaches, impervious paGm, impervious walkways, etc. are not allowed in the buffer unless specifically approved by the Division. There are limitation on size for decks. 115A NCAC 02B ,0243(4) and (6)j Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The work corridor should be described. The approved access corridor small be restored. Staging, spoil, construction material must be outside the buffer. [15A NCAC 02H .0502 and 15A NCAC 02B .0243 (4), (6), (6)I Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater discharges must be at the natural elevation anti discharged prior to entering the buffer directed as diffuse or sheet flow at non -erosive velocities to the lake. [15A NCAC 02B .0243(5), (6)( ACknowkdrgemenr OjJttvtif1,C=h30 hereby state that i have been informed of the Catawba Riparian Buffer Rule. Any work conducted in the buffer, not specific -Ally stater} in the application and approved by the Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be taken such that the construction Kill be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plan(s) and specifiration(s), and other supporting materials - Date. a urr vi4r:er Date:..'_L.' https://maiI.google.com/mai1/u/0/#inbox?projector=1 1/1