Loading...
HomeMy WebLinkAbout20230426 Ver 1_Site Plan_20230323 (2)Print /Signature - Print The approval is for the purpose and design described in your application. Impacts not indicated in the application is a violation of the Buffer Rule. Site specific work should be provided in the application. [15A NCAC Trees are not allowed to be removed from Zone I of the Buffer (within 30 ft of the full pond elevation), unless approved Exception, those trees that are severely undermined along the immediate shoreline can be removed. Minimal shaping and sloping along theimmediate shoreline is allowed. [15A NCAC 02B 0243(6)] Benching, grading inthe buffer bnot allowed Excessive disturbance ofground cover. [15ANCAC0313.0243(6)] Beaches impervious patios, impervious walkways, etc. are not allowed inthe buffer unless specifically approved by the Division. There are limitation on size for decks. [15A NCAC 02B.0243(4) and (6)] Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction material must be outside the buffer. [15A NCAC 02H OS02 and 15A NCAC 02B.0243 (4), (6), (8)] Stnrmwater cannot be piped or channeled for direct discharge to the lake. All constructed stormvxatar discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or sheet flow at non -erosive velocities to the lake. [15A NCAC 02B.0243(5), (6)] , hereby state that | have been informed ofthe Catawba Riparian Buffer Rule. Any work conducted in the buffer, not specifically stated in the application and approved by the Division ofWater Resources (DVVR), ismvkdmtkonand subject toenfnrcementDue diligence will be taken such that the construction will be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plan(s) and specification (s), and other supporting materials.