Loading...
HomeMy WebLinkAbout20230425 Ver 1_Trollingwood Townes_USACE PCN Submittal_3.21.23_20230321FATr' 4. N•:3-�1 H CARD-INA EUArGnme �Qua4iy WaiV REeEuJrLes Office Use Only Corps Action ID no. SAW-2022-00799 Date received: [Click to enter.] DWR project no. 'lick enter.] Date received: [Click to enter.] Site Coordinates: Latitude (DD.DDDDDD): 36.085381' Longitude (DD.DDDDDD): 79.352765' Form Version 4.3, April 20, 2022 Pre -Construction Notification (PCN) Form (Ver. 4.2, January31, 2022)J For Nationwide Permits and Regional General Permits and corresponding Water Quality Certifications Please note: fields marked with a red asterisk are required. The form is not considered complete until all mandatory questions are answered. The PCN help document may be found at this link: httas://edocs.dea.nc.aov/WaterResources/DocView.asax?dbid=0&id=2196924&cr=1 Please ensure you have submitted a pre -filing meeting request at least 30 days prior to submitting this form, as DWR will not be able to accept your application without documentation of this important first step. The Division has developed a Pre -filing Meeting Request email address 401 PreFile(a)ncdenr.clov to accept the federally required pre -filing meeting request and provide confirmation receipt of submittal . This receipt or similar documentation will satisfy 40 C.F.R. Section 121.4(a) which states "At least 30 days prior to submitting a certification request, the project proponent shall request a pre -filing meeting with the certifying agency." In accordance with 40 C.F.R. Section 121.5(b)(7), and (c)(5), all certification requests must include documentation that a pre -filing meeting request was submitted to the certifying authority at least 30 days prior to submitting the certification request. Attach documentation of Pre -Filing Meeting Request to this Application. Date of Pre -filing Meeting Request (MM/DD/YYYY) : 9/27/2022 Page 1 of 21 PCN Form Version 4.3- April 20, 2022 A. Processing Information County (counties) where project is located: * Alamance Additional (if needed). Is this a NCDMS project? * (Click yes only if NCDMS is the applicant or co- ❑ Yes 0 No applicant) Is this a public transportation project? (Publicly funded municipal, state, or federal road, rail, ❑ Yes N No or airport project) Is this a NCDOT project? ❑ Yes N No If yes, NCDOT TIP or state project number: Click to enter. If yes, NCDOT WBS number: Click to ente N Section 404 Permit (wetlands, streams, waters, Clean Water Act) la. Type(s) of approval sought from the Corps: ❑ Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Has this PCN previously been submitted? * ❑ Yes N No Please provide the date of the previous submission. * Click to enter a date. N Nationwide Permit (NWP) 1 b. What type(s) of permit(s) do you wish to seek ❑ Regional General Permit (RGP) authorization? ❑ Standard (IP) This form may be used to initiate the standard/ individual permit process with the USACE. Please contact your Corps representative concerning submittals for standard permits. All required items can be included as attachments and submitted with this form. 1 c. Has the NWP or GP number been verified by the Corps? * ❑ Yes N No NWP number(s) (list all numbers ): NWP 29 RGP number(s) (list all numbers ): Click to enter. Are you a federal applicant? ❑ Yes N No If yes, please provide a statement concerning compliance with the Coastal Zone Management Act Click to enter text 1d. Type(s) of approval sought from DWR (check all that apply): N 401 Water Quality Certification — Regular ❑ 401 Water Quality Certification— Express ❑ Non-404 Jurisdictional General Permit ❑ Riparian Buffer Authorization ❑ Individual 401 Water Quality Certification Is this a courtesy copy notification ❑ Yes 0 No 1e. Is this notification solely for the record because written approval is not required? * For the record only for DWR 401 Certification: ❑ Yes N No For the record only for Corps Permit: ❑ Yes N No 1f. Is this an after -the -fact permit/certification application? ❑ Yes N No Page 2 of 21 PCN Form Version 4.3-April 20, 2022 1 g. Is payment into a mitigation bank or in -lieu fee program proposed for ❑ Yes 0 No mitigation of impacts? If yes, attach the acceptance letter from mitigation bank or in -lieu fee program. 1 h. Is the project located in any of NC's twenty coastal counties? * ❑ Yes N No 1i. Is the project located within an NC DCM Area of Environmental ❑ Yes N No ❑ Unknown Concern (AEC)? * 1j. Is the project located in a designated trout watershed? ❑ Yes N No If yes, you must attach a copy of the approval letter from the appropriate Wildlife Resource Commission Office. Trout information may be found at this link: httr)://www.saw.usace.army.miI/Missions/Regulatory-Permit- Program/Agency-Coordination/Trout.aspx Page 3 of21 PCN Form Version 4.3-April 20, 2022 B. Applicant Information 1 a. Who is the primary contact? * Brian Ford 1b. Primary Contact Email: * bford.lomonacoinvestments@gmail.com 1c. Primary Contact Phone: * (###)###-#### 336-707-0480 1d. Who is applying for the permit/certification? * (check all that apply) ❑ Owner 0 Applicant (other than owner) 1 e. Is there an agent/consultant for this project?* ® Yes ❑ No 2. Landowner Information 2a. Name(s) on Recorded Deed: * Garrison King Family Trust - Susan Elaine Garrison 2b. Deed Book and Page No.: 2935/0175 2c. Contact Person (for corporations): Nolan Prestwood 2d. Address * Street Address: 183 Shadow Moss Parkway Address line 2: Click to enter. City: Charleston State/ Province/ Region: South Carolina Postal/ Zip Code: 29414 Country: United States 2e. Telephone Number: (###)###-#### 843-614-1785 2f. Fax Number: (###)###-#### Click to enter. 2g. Email Address: * Shadow183p@comcast.net 3. Applicant Information (if different from owner) 3a. Name: * Brain Ford 3b. Business Name (if applicable): Lomonaco Investments 3c. Address: * Street Address: P.O. Box 474 Address line 2: Click to enter. City: Summerville State/ Province/ Region: North Carolina Postal/ Zip Code: 27358 Country U.S. 3d. Telephone Number: * (###)###-#### 336-707-0480 3e Fax Number: (###)###-#### Click to enter. 3f. Email Address: * bford.lomonacoinvestments@gmail.com Page 4 of 21 PCN Form Version 4.3-April 20, 2022 4. Agent/ Consultant (if applicable) 4a. Name: David Brame 4b. Business Name: Pilot Environmental, Inc. 4c. Address: Street Address: 743 Park Lawn Court Address line 2: Click to entr City: Kernersville State/ Province/ Region: North Carolina Postal/ Zip Code: 27284 Country: United States 4d. Telephone Number: (###)###-#### 336-708-4617 4e Fax Number: (###)###-#### Click to entr 4f. Email Address: dbrame@pilotenviro.com Agent Authorization Letter: Attach a completed/signed agent authorization form or letter. A sample form may be found at this link: https://www.saw.usace.army. mil/Missions/Reg ulatory-Permit-Program/Permits/2017-Nationwide-Permits/Pre- construction-Notification/ Page 5 of21 PCN Form Version 4.3-April 20, 2022 C. Project Information and Prior Project History 1. Project Information 1 a. Name of project: * Trollingwood Townes 1 b. Subdivision name (if appropriate): Click to enter. 1c. Nearest municipality/town: * Haw River 2. Project Identification 2a. Property identification number (tax PIN or parcel ID): 8895609141 2b. Property size (in acres): 32 2c. Project Address: Street Address: Trollingwood Road Address line 2: Click to enter. City: Haw River State/ Province/ Region: North Carolina Postal/ Zip Code: 27258 Country: United States 2d. Site coordinates in decimal degrees (using 4-6 digits after the decimal point): * Latitude (DD.DDDDDD): * 36.085381 ° Longitude (-DD.DDDDDD): *-79.352765° 3. Surface Waters 3a. Name of nearest body of water to proposed project: * Haw River 3b. Water Resources Classification of nearest receiving WS V; NSW water: * The Surface Water Classification map may be found at this link: https://ncdenr.maps.arcqis.com/apps/webappviewer/index.html?id=6e125ad7628f494694e259c80dd64265 Cape Fear 3c. In what river basin(s) is your project located? Choose additional (if needed) 3d. Please provide the 12-digit HUC in which the project is 030300020408 located: * The Find Your HUC map may be found at this link: https://ncdenr.maps.arcgis.com/apps/Publiclnformation/index.html?appid=ad3a85aOc6d644aOb97cdO69db238ac3 Page 6 of 21 PCN Form Version 4.3- April 20, 2022 4. Project Description and History 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: * The site consists of undeveloped agricultural fields and wooded land. A stream crosses the central portion of the site. The surrounding properties contain an industrial facilty, wooded land and residential development. 4b. Have Corps permits or DWR certifications been obtained for this ❑ Yes X No ❑ Unknown project (including all prior phases) in the past? If yes, please give the DWR Certification number and/or Corps SAW-2022-00799 Action ID (ex. SAW-0000-00000): lick to enter.] Attach any pertinent project history documentation 4b2. Is any portion of the work already complete? * ❑ Yes X No If yes, describe the completed work. Click to enter te> 4c. List of other certifications or approvals/denials received from other federal, state or local agencies for work described in this application not related to the 404 or 401. NA 4d. Attach an 8'h x 11" excerpt from the most recent version of the USGS topographic map indicating the location of the project site. 4e. Attach an 8'h x 11" excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. 4f. List the total estimated acreage of all existing wetlands on the 0.010 acres property: 4g. List the total estimated linear feet of all existing streams (intermittent 1,435 linear feet and perennial) on the property: 4g1. List the total estimated acreage of all existing open waters on the 0 acres property: 4h. Explain the purpose of the proposed project: The purpose of the proposed project is to construct a retail center. 4i. Describe the overall project in detail, including the type of equipment to be used: The overall project includes the proposed construction of a townhome development. The development will consist of 194 townhome units, 500 parking spaces and associated roads and common lawn spaces. The site will utilize municipal sewer services already located on the site. The development will be accessed from Trollingwood Road and Fran Drive. One culverted stream crossing is required to facilitate the proposed roadway and development. To facilitate the development of the site, clearing and grading the site is necessary. Graders, haulers, excavators and other heavy equipment will be used during grading and construction of the site. 4j. Attach project drawings/site diagrams/depictions of impact areas for the proposed project. 4k. Will this activity involve dredging in wetlands or waters? * i] Yes X No If yes, describe the type of dredging, the composition of the dredged material, and the locations of disposal area. Click to enter text Page 7 of21 PCN Form Version 4.3-April 20, 2022 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or in ® Yes ❑ No ❑ Unknown proposed impact areas? Comments: ,lick to enter text 5b. If the Corps made a jurisdictional determination, ❑ Preliminary ❑ Approved 0 Emailed concurrence what type of determination was made? ❑ Not Verified ❑ Unknown ❑ n/a Corps AID number (ex. SAW-0000-00000): SAW-2022-00799 Name (if known): David Brame/Michael Brame 5c. If 5a is yes, who delineated the jurisdictional Agency/Consultant Company: Pilot Environmental areas? Other: Click to enter 5d. List the dates of the Corps jurisdictional determination or State determination if a determination was made by either agency. USACE E-Mail Concurrence dated June 2, 2022 provided by Chris Hopper is attached 5d1. Attach jurisdictional determinations. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes 0 No 6b. If yes, explain. Click to enter. Are any other NWP(s), regional general permit(s), or individual permit(s) used, or intended to be used, to authorize any part of the proposed project or related activity? This includes other separate and distant crossings for linear projects that require Department of the Army authorization but don't require pre -construction notification. No 7. Addresses of adjoining property owners, lessees, etc. whose property adjoins the waterbody (if more than can be entered here, please attach a supplemental list) HONEYCUTT RICHARD LEE 909 STONE ST HAW RIVER, NC 27258 MARTIN JAMES T JR 625 STONE ST HAW RIVER, NC 27258 8. Scheduling of activity: To be completed within the next 1 to 2 years. Page 8 of21 PCN Form Version 4.3-April 20, 2022 D. Proposed Impacts Inventory Impacts Summary ❑ Wetlands 0 Streams - tributaries 1 a. Where are the impacts associated with your project 0 Buffers ❑ Open Waters (check all that apply): ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, complete this table for each wetland area impacted. 2a. Site # ` 2a1. Impact Reason/Type 2b. Impact Duration 2c. Wetland Type 2d. Wetland Name 2e. Forested ? 2f. Jurisdiction Type* 2g. Impact Area (ac) W1 Choose one emp/ Perm Choose one Click to enter Y/N ;hoose one Click to enter W2 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W3 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W4 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W5 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W6 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W7 Choose one Temp/ Perm Choose one Click to enter Y/N choose one Click to enter W8 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W9 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W10 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W11 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W12 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W13 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W14 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W15 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter 2g1. Total temporary wetland impacts Click to enter. ac 2g2. Total permanent wetland impacts Click to enter. ac 2g3. Total wetland impacts Click to enter. ac 2h. Type(s) of material being discharged and the amount of each type in cubic yards: Click to enter text. 2i. Comments: Wetland impacts are not proposed. Page 9 of21 PCN Form Version 4.3-April 20, 2022 3. Stream Impacts If there are perennial or intermittent stream/ tributary impacts (including temporary impacts) proposed on the site, complete this table for all stream/ tributary sites impacted. ** All Perennial or Intermittent streams must be verified by DWR or delegated local government 3a 3b. 3c. 3d. 3e. 3f. 3g. 3h. Site Impact Reason* Impact Impact Stream Stream Jurisdiction Stream Impact #* Duration* Type* Name* Type* Type* Width length (avg ft) (linear * ft)* S1 Culvert/headwall/endwall/RipRap/Channel Permanent Crossing/ SC2 Perennial Both 2.5 235.3 Culvert S2 Up and downstream pump around coffer Temporary Dewatering SC2 Perennial Both 2.5 10 dams S3 Click to enter Temp/ Choose Click to Per/Int Choose Click to Click to Perm one enter one enter enter S4 Click to enter Temp/ Choose Click to Per/Int Choose Click to Click to Perm one enter one enter enter S5 Click to enter Temp/ Choose Click to Per/Int Choose Click to Click to Perm one enter one enter enter S6 Click to enter Temp/ Choose Click to Per/Int Choose Click to Click to Perm one enter one enter enter S7 Click to enter Temp/ Choose Click to Per/Int Choose Click to Click to Perm one enter one enter enter S8 Click to enter Temp/ Choose Click to Per/Int Choose Click to Click to Perm one enter one enter enter S9 Click to enter Temp/ Choose Click to Per/Int Choose Click to Click to Perm one enter one enter enter S10 Click to enter Temp/ Choose Click to Per/Int Choose Click to Click to Perm one enter one enter enter S11 Click to enter Temp/ Choose Click to Per/Int Choose Click to Click to Perm one enter one enter enter S12 Click to enter Temp/ Choose Click to Per/Int Choose Click to Click to Perm one enter one enter enter S13 Click to enter Temp/ Choose Click to Per/Int Choose Click to Click to Perm one enter one enter enter S14 Click to enter Temp/ Choose Click to Per/Int Choose Click to Click to Perm one enter one enter enter S15 Click to enter Temp/ Choose Click to Per/Int Choose Click to Click to Perm one enter one enter enter S16 Click to enter Temp/ Choose Click to Per/Int Choose Click to Click to Perm one enter one enter enter S17 Click to enter Temp/ Choose Click to Per/Int Choose Click to Click to Perm one enter one enter enter S18 Click to enter Temp/ Choose Click to Per/Int Choose Click to Click to Perm one enter one enter enter S19 Click to enter Temp/ Choose Click to Per/Int Choose Click to Click to Perm one enter one enter enter Page 10 of 21 PCN Form Version 4.3- April 20, 2022 S20 Click to enter Temp/ Choose Click to Per/Int Choose Click to Click to Perm one enter one enter enter 3i1. Total jurisdictional ditch impact: 0 linear ft 3i2. Total permanent stream impacts: 235.3 linear ft M. Total temporary stream impacts: 10 linear ft 34. Total stream and ditch impacts: 245.3 linear ft 3j. Comments: S1 — Stream location 1 includes 235.3 LF (588 SF) of permanent impact for installation of the culvert, headwalls, endwalls, riprap dissipater and channel realignment. The riprap dissipater will be keyed into the realigned channel. S2 - Stream location 2 includes 10 LF (25 SF) of temporary fill for coffer dam and pump located upstream of the culvert and downstream from the work area. Page 11 of21 PCN Form Version 4.3-April 20, 2022 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S., individually list all open water impacts in the table below. 4a. Site #* 4a1. Impact Reason 4b. Impact Duration* 4c. Waterbody Name* 4d. Activity Type* 4e. Waterbody Type* 4f. Impact area (ac)* 01 Click to enter. Temp/ Perm Click to enter. Choose one Choose one Click to enter. 02 Click to enter. Temp/ Perm Click to enter. Choose one Choose one Click to enter. 03 Click to enter. Temp/ Perm Click to enter. Choose one Choose one Click to enter. 04 Click to enter. Temp/ Perm Click to enter. Choose one Choose one Click to enter. 05 Click to enter. Temp/ Perm Click to enter. Choose one Choose one Click to enter. 4g. Total temporary open water impacts Click to enter. ac 4g. Total permanent open water impacts Click to enter. ac 4g. Total open water impacts Click to enter. ac 4h. Comments: Open water impacts are not proposed. 5. Pond or Lake Construction If pond or lake construction is proposed, complete the table below. (*This does NOT include offline stormwater management ponds.) 5a. 5b. 5c. 5d. 5e. Pond ID Proposed use or Wetland Impacts (ac) Stream Impacts (ft) Upland # purpose of pond Impacts (ac) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one Click to Click to Click to Click to Click to Click to Click to enter. enter. enter. enter. enter. enter. enter. P2 Choose one Click to Click to Click to Click to Click to Click to Click to enter. enter. enter. enter. enter. enter. enter. P3 Choose one Click to Click to Click to Click to Click to Click to Click to enter. enter. enter. enter. enter. enter. enter. 5f. Total Click to Click to Click to Click to Click to Click to Click to enter. enter. enter. enter. enter. enter. enter. 5g. Comments: Click to enter. 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no.: Click to enter. 5i. Expected pond surface area (acres): Click to enter. 5j. Size of pond watershed (acres): Click to enter. 5k. Method of construction: Pond or lake construction is not proposed. Page 12 of 21 PCN Form Version 4.3- April 20, 2022 6. Buffer Impacts (DWR requirement) If project will impact a protected riparian buffer, then complete the chart below. Individually list all buffer impacts. 6a. Project is in which protected basin(s)? (Check all that apply.) ❑ Neuse ❑ Tar -Pamlico ❑ Catawba ❑ Jordan ❑ Goose Creek ❑ Randleman ❑ Other: Click to ente Site #* 6b. Impact Type* 6c. Impact Duration* 6d. Stream Name* 6e. Buffer Mitigation Required?* 6f. Zone 1 Impact* (sq ft) 6g. Zone 2 Impact* (sq ft) 131 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. B2 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. 133 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. 134 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. B5 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. 136 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. 137 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. 138 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. B9 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. B10 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. 1311 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. B12 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. B13 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. B14 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. B15 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. B16 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. B17 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. B18 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. B19 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. B20 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. 6h. Total temporary impacts: Zone 1: Click to enter sq ft Zone 2: Click to enter. sq ft 6h. Total permanent impacts: Zone 1: Click to enter sq ft Zone 2: Click to enter. sq ft 6h. Total combined buffer impacts: Zone 1: Click to enter. sq ft Zone 2: Click to enter. sq ft 6i. Comments: Buffer impacts are allowable. They will be provided to Haw River for review and approval separate of this PCN request. Please attach supporting documentation (impact maps, plan sheets, etc.) for the proposed project. Page 13 of21 PCN Form Version 4.3-April 20, 2022 E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts through project design: The applicant has designed the proposed development to avoid impacts to the remaining streams and wetland located on the site. In order to develop the site and provide access across the stream, the proposed impact could not be avoided. Civil design, such as reducing the length of pipe by use of headwalls and endwalls were used to further reduce impacts to streams and wetlands. 1 b. Specifically describe measures taken to avoid or minimize proposed impacts through construction techniques: The clearing limits will be surveyed, staked and silt fencing and clearing limit fencing will be used. Disturbed areas will be promptly seeded and mulched to limit sediment from entering downgradient waters. Slope matting will be used on steep slopes. 2. Compensatory Mitigation for Impacts to Waters of the U.S., Waters of the State, or Riparian Buffers 2a. If compensatory mitigation is required, by whom is it required? * ❑ DWR ❑ Corps (check all that apply) 2b. If yes, which mitigation option(s) will be used for this ❑ Mitigation Bank project? (check all that apply) ❑ In Lieu Fee Program ❑ Permittee Responsible Mitigation 3. Complete if using a Mitigation Bank (Must satisfy NC General Statute143-214.11 (d1).) 3a. Name of mitigation bank: Click to ente, 3b. Credits purchased/requested: Type: Choose one Quantity Click to enter. Type: Choose one Quantity Click to enter. Type: Choose one Quantity Click to enter. Attach receipt and/or approval letter. 3c. Comments: Click to enter 4. Complete if Using an In Lieu Fee Program 4a. Attach approval letter from in lieu fee program. 4b. Stream mitigation requested: Click to ente. linear feet 4c. If using stream mitigation, what is the stream temperature: Choose one NC Stream Temperature Classification Maps can be found under the Mitigation Concepts tab on the Wilmington District's RIBITS website: (Please use the filter and select Wilmington district) https://ribits. usace.army. miI/ribits apex/f?p=107:27:2734709611497::NO: RP:P27 BUTTON KEY:O 4d. Buffer mitigation requested (DWR only): Click to enter. square feet 4e. Riparian wetland mitigation requested: Click to enter. acres 4f. Non -riparian wetland mitigation requested: Click to enter. acres 4g. Coastal (tidal) wetland mitigation requested: Click to enter. acres Page 14 of21 PCN Form Version 4.3-April 20, 2022 4h. Comments: Click to enter. 5. Complete if Providing a Permittee Responsible Mitigation Plan 5a. If proposing a permittee responsible mitigation plan, provide a description of the proposed mitigation plan, including mitigation credits generated. ,lick to enter 5b. Attach mitigation plan/documentation. 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — DWR requirement 6a. Will the project result in an impact within a protected riparian buffer ❑ Yes X No that requires buffer mitigation? If yes, please complete this entire section — please contact DWR for more information. 6b. If yes, identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required in the table below. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 Click to enter. Click to enter. Choose one Click to enter. Zone 2 Click to enter. Click to enter. Choose one Click to enter. 6f. Total buffer mitigation required Click to enter. 6g. If buffer mitigation is required, is payment to a mitigation bank or ❑ Yes ❑ No NC Division of Mitigation Services proposed? 6h. If yes, attach the acceptance letter from the mitigation bank or NC Division of Mitigation Services. 6i. Comments: Buffer mitigation is not proposed. Page 15 of21 PCN Form Version 4.3-April 20, 2022 F. Stormwater Management and Diffuse Flow Plan (DWR requirement) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers ® Yes ❑ No identified within one of the NC Riparian Buffer Protection Rules? 1 b. All buffer impacts and high ground impacts require diffuse flow or other form of stormwater treatment. If the project is subject to a state implemented riparian buffer protection program, include a plan that fully documents how diffuse/dispersed flow will be maintained. All Stormwater Control Measures (SCM) must be designed in accordance with the NC Stormwater Design Manual (https://deg.nc.,qov/about/divisions/energy-mineral-land-resources/energy-mineral-land-permit- guidance/stormwater-bmp-manual). Associated supplement forms and other documentation must be provided. ❑ Level Spreader What Type of SCM are you 0 Vegetated Conveyance (lower seasonal high water table- SHWT) providing? ❑ Wetland Swale (higher SHWT) (Check all that apply) ❑ Other SCM that removes minimum 30% nitrogen ❑ Proposed project will not create concentrated stormwater flow through the buffer For a list of options to meet the diffuse flow requirements, click here. Attach diffuse flow documentation. 2. Stormwater Management Plan 2a. Is this an NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? ❑ Yes 0 No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? * ❑ Yes ❑x No To look up low density requirements, click here: http://reports.oah.state. nc.us/ncac/title%2015a%20-%20environmental%20guaIity/chapter%2002%20- %20environmental%20manage ment/subchapter%20h/15a%20ncac%2002h%20.1003.pdf 2c. Does this project have a stormwater management plan (SMP) ❑x Yes ❑ No reviewed and approved under a state stormwater program or state - approved local government stormwater program? ❑ n/a — project disturbs < 1 acre Note: Projects that have vested rights, exemptions, or grandfathering from state or locally implemented stormwater programs or projects that satisfy state or locally -implemented stormwater programs through use of community in -lieu programs should answer "no" to this question. 2d. Which of the following stormwater management program(s) apply? X Local Government (Check all that apply.) ❑ State If you have local government approval, please include the SMP on their overall impact map. Local Government Stormwater Programs x❑ Phase II ❑ USMP X NSW X Water Supply Page 16 of21 PCN Form Version 4.3-April 20, 2022 Please identify which local government stormwater program you are using. Haw River Local Program State Stormwater Programs ❑ Phase II ❑ HQW or ORW ❑ Coastal Counties ❑ Other Comments: Stormwater plans have been prepared for review and approval by Haw River. Page 17 of21 PCN Form Version 4.3-April 20, 2022 G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) ❑ Yes X No funds or the use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental ❑Yes X No Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the ❑ Yes X No NEPA or SEPA final approval letter.) Comments: The project does not require a NEPA or SEPA. 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), Federally Non -Jurisdictional Wetlands /Classified Surface Waters ❑ Yes X No (15A NCAC 2H. 1400) DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. If you answered "yes" to the above question, provide an explanation of the violation(s): AICK to enter. 3. Cumulative Impacts (DWR Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby ❑ Yes X No downstream water quality? 3b. If you answered "no", provide a short narrative description: Click to enter. 3c. If yes, provide a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWR policy. (Attach .pdf) 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project? I ® Yes ❑ No ❑ N/A 4b. If yes, describe in detail the treatment methods and dispositions (non -discharge or discharge) of wastewater generated from the proposed project. If the wastewater will be treated at a treatment plant, list the capacity available at that plant. Wastewater will be discharged into the existing municipal system that currently crosses the site. Page 18 of21 PCN Form Version 4.3-April 20, 2022 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected ❑ Yes 0 No species or habitat? (IPAC weblink: https://www.fws.gov/ipac/ ffws.govl) 5b. Have you checked with the USFWS concerning Endangered Species ❑ Yes 0 No Act impacts? * 5c. If yes, indicate the USFWS Field Office you have contacted. Choose one 5d. Is another federal agency involved? ❑ Yes 0 No ❑ Unknown If yes, which federal agency? Click to enter. 5e. Is this a DOT project located within Divisions 1-8? * ❑ Yes 0 No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? * 0 Yes 0 No 5g. Does this project involve bridge maintenance or removal? * ❑ Yes 0 No 5g1. If yes, have you inspected the bridge for signs of bat use such as staining, guano, bats, etc.? Representative photos of signs of bat use ❑ Yes 0 No can be found in the NLEB SLOPES, Appendix F, pages 3-7. Representative photos of signs of bat use can be found in the NLEB SLOPES, Appendix F, pages 3-7. Link to NLEB SLOPES document: http://saw-reg.usace.army.mil/NLEB/1-30-17-signed NLEB-SLOPES&apps.pdf If you answered yes to 5g1, did you discover any signs of bat use? * ❑ Yes ❑ No ❑ Unknown If yes, please show the location of the bridge on the permit drawings/ project plans 5h. Does this project involve the construction/ installation of a wind turbine(s)? ❑ Yes 0 No If yes, please show the location of the wind turbine(s) on the permit drawings/ project plans (attach .pdf) 5i. Does this project involve blasting and /or other percussive activities that will be conducted by machines, such as jackhammers, ❑ Yes 0 No mechanized pile drivers, etc.? If yes, please provide details to include type of percussive activity, purpose, duration, and specific location of this activity on the property (attach .pdf) 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? US Department of the Interior — Fish and Wildlife Service Official Species List from IPaC One proposed endangered species and one candidate species are identified on the IPaC report (attached). The Tri-Colored bat and Monarch butterfly are included by the IPaC as federally listed species identified within the project area. Bat hibernacula is not located on the site. Trees that could afford suitable summer roosting habitat are present within wooded stream buffers and will remain in the buffer areas on the site. Limited clearing will be required to install the culvert. Additionally, known occurrences are not identified within 2 miles of the site. Based on the lack of known occurrences proximate to the site and the presence of similar habitat on nearby properties, the proposed project is not likely to adversely affect bat species that occur in the area. The Monarch butterfly is a candidate species that is not subject to provisions of the ESA or consultation with the service. The proposed project is not likely to adversely impact this species. Page 19 of21 PCN Form Version 4.3-April 20, 2022 Attach consultation documentation. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat? * ❑ Yes X No Is there submerged aquatic vegetation (SAV) around the project vicinity? ❑Yes 0 No ❑Unknown Will this project affect submerged aquatic vegetation? * ❑ Yes X No ❑ Unknown Explain: Click to enter. 6b. What data source(s) did you use to determine whether your site would impact Essential Fish Habitat? Essential Fish Habitat Mapper — NOAA Fisheries 7. Historic or Prehistoric Cultural Resources (Corps Requirement) Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data): http://g is. ncdcr.,qov/h powe b/ 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or ❑ Yes X No properties significant in North Carolina history and archaeology)? 7b. What data source(s) did you use to determine whether your site would impact historic or archeological resources? NC Historic Preservation Office's HPOWEB 2.0. Historic properties that are listed or are eligible for listing on the National Register for Historic Places were not identified on the site or proximate to stream and wetland impacts. A copy of the SHPO Map is included as an attachment. 7c. Attach historic or prehistoric documentation. 8. Flood Zone Designation (Corps Requirement) Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search 8a. Will this project occur in a FEMA-designated 100-year floodplain? ❑ Yes X No 8b. If yes, explain how the project meets FEMA requirements. ,lick to enter. 8c. What source(s) did you use to make the floodplain determination? FEMA Firm Map (Drawing 4 of JD request) H. Miscellaneous Comments: Click to enter. Page 20 of21 PCN Form Version 4.3-April 20, 2022 Attach pertinent documentation or attachments not previously requested I. Signature * X By checking the box and signing below, I, as the project proponent, certify to the following: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete, to the best of my knowledge and belief; • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time; • The project proponent hereby agrees that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • The project proponent hereby agrees to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • The project proponent hereby understands that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • As the project proponent, I intend to electronically sign and submit the PCN/online form. Full Name: * David S. Brame Signature: * �2-0� 3/21 /2023 Page 21 of 21 PCN Form Version 4.3- April 20, 2022 Proposal for Environmental Services Pilot Proposal7809.2 September 27, 2022 AGENT AUTHORIZATION This form authorizes Pilot to act as our agent in stream/wetland matters including U.S. Army Corps of Engineers and North Carolina Division of Water Resources field verification and permitting. Property Address: -71 IFMWI � 6bd Y� lZue- t- , 2ID59 Applicant Information: Name: �_ov.",orG Address: V sew,J )DON O 1 Telephone Number: 33U —701 — 09-b Fax Number: E-mail Address:Qc�• `bm�rvco�nvt S}rru.�s p�„� •� bvy� Signature: Date:_a�� a3 Created With Tiny Scanner DocuSign Envelope ID: C8B5DBD2-B093-4C4F-B345-D60410A08841 Proposal for Environmental Services Pilot Proposal 7809 March 9, 2022 AGENT AUTHORIZATION This form authorizes Pilot to act as our agent in stream/wetland matters including U.S. Army Corps of Engineers and North Carolina Division of Water Resources field verification and permitting. Property Address: Trollingwood Road, PID# 153848 Haw River, NC 27298 Nolan Prestwood, Susan Elaine Garrison, Owner Information: Garrison -King Family Trust Address: 183 Shadow Moss Parkway Charleston, SC 29414 Telephone Number: 843-614-1785 (Nolan Prestwood) Fax Number: E-mail Address: shadowl83p@comcast.net JURISDICTIONAL DETERMINATION REQUEST D. PROPERTY ACCESS CERTIFICATION By signing below, I authorize representatives of the Wilmington District, U.S. Army Corps of Engineers (Corps) to enter upon the property herein described for the purpose of conducting on - site investigations, if necessary, and issuing a jurisdictional determination pursuant to Section 404 of the Clean Water Act and/or Section 10 of the Rivers and Harbors Act of 1899. I, the undersigned, am either a duly authorized owner of record of the property identified herein, or acting as the duly authorized agent of the owner of record of the property. Nolan Prestwood, Susan Elaine Garrison, Dennis King Print Name Capacity: X Owner —Authorized Agent 3 10 2022 3 10 2022 Date DocuSigned by: FpbL' �Vc SfWbb� DocuSigned by: DocuSigned by: �ttiSAl�cul7ic GAV�ISbIn Signature 11411176311111E0 30439602C9B24B2 FE713E76C582481 . 7 David Brame From: Hopper, Christopher D CIV USARMY CESAW (USA) <Christopher.D.Hopper@usace.army.mil> Sent: Thursday, June 2, 2022 9:38 AM To: David Brame; shadow183p@comcast.net Subject: SAW-2022-00799 / Trollingwood Road / Haw River / Alamance County, NC - DELINEATION CONCURRENCE Attachments: SAW-2022-00799 Aquatic Resources Exhibit.pdf Dear David, Reference is made to SAW-2022-00799, please reference this number on any correspondence regarding this action. On April 1, 2022, we received information from you requesting the Wilmington District, Regulatory Division review and concur with the boundaries of an aquatic resource delineation. We have reviewed the information provided by you concerning the aquatic resources, and by copy of this e- mail, are confirming that the aquatic resources delineation has been verified by the Corps to be a sufficiently accurate and reliable representation of the location and extent of aquatic resources within the identified review area. The location and extent of these aquatic resources are shown on the delineation map, labeled "Wetland Map Trollingwood Road" and dated March 28, 2022 without revisions. Regulatory Guidance Letter (RGL) 16-01 https://usace.contentdm.ocic.or_ utils/getfile/collectiopZpl602lco119/id/1256 provides guidance for Jurisdictional Determinations (JD) and states "The Corps generally does not issue a JD of any type where no JD has been requested". At this time we are only verifying the delineation. This delineation may be relied upon for use in the permit evaluation process, including determining compensatory mitigation. "This verification does not address nor include any consideration for geographic jurisdiction on aquatic resources and shall not be interpreted as such. This delineation verification is not an Approved Jurisdictional Determination (AJD) and is not an appealable action under the Regulatory Program Administrative Appeal Process (33 CFR Part 331). However, you may request an AJD, which is an appealable action. If you wish to receive a Preliminary Jurisdictional Determination (PJD), or an Approved Jurisdictional Determination (AJD) please respond accordingly, otherwise nothing further is required and we will not provide any additional documentation. Christopher D. Hopper Regulatory Specialist U.S. Army Corps of Engineers Regulatory Division 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 O: (919) 554-4884, Ext. 35 M: (919) 588-9153 We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey can be accessed by copying and pasting the following link into your web browser: https:Hregulatory.ops.usace.army.mil/customer-service-survey/. Thank you for taking the time to visit this site and complete the survey. WB 1-3 SA 280 LF 105 LF SB / 35 LF LEGEND Site Boundary AM � Perennial Stream Intermittent Stream Wetland WA 1-5 Flag Number DP-1 O Data Point rl THE LOCATIONS OF FEATURES SHOWN ON THIS MAP HAVE BEEN VERIFIED BY MR. CHRISTOPHER HOPPER WITH THE USACE (SAW-2022- 00799). A BUFFER DETERMINATION SITE VISIT WAS COMPLETED BY MR. PHIL ROSS, REPRESENTATIVE FOR THE TOWN OF HAW RIVER, ON APRIL 11, 2022. THIS EXHIBIT INCLUDES GPS LOCATIONS OF JURISIDICTIONAL FEATURES. DELINEATION CONDUCTED BY PILOT PERSONNEL ON MARCH 25, 2022. Drawing 5 Wetland Map Satellite Imagery from ESRI ��; Trollingwood Road and Pilot GPS Data �, ; ry ,�, Approximate 32-Acre Tract Scale: 1" = 300' -� • Haw River, Alamance County, NC P� Date: 3.28.22 Pilot Project 7809 ►Il9 i i ti 5' AV YHlN 1lL l-1MC TROLLINGWOOD TOWNES �,DRAWING INDEX TOWN OF HAW RIVER PROPOSED STREAM CROSSING COVER SHEET STREAM CROSSING C= I ALAMANCE COUNTY, NORTH CAROLINA o EZ D I z O m � C I ANGvS DR\VE 81.ACK �1 � r BASED OI AN AVERAGE `— — / WIDTH OF 2.5' TOTAL AREA: 588 S.F. HONEYCUTT RICHARD LEE p I D m MARTIN JAMESTJR& 0.013 ACRES HONEYCUT PENNY JOHNSON PARCEL I D: 153818 ALCO DEVELOPMENT INC A C L I : 1 382 \ < o m Z o Nmp>� PARCEL ID: 153409 P.G.894 n n I n m I m ti V D.B.2193, P.G. 774.B.2397, / D.B.DB41S6 P P.G. 462 I P.B. 78, P.G. 223 G.2 W ti, n m I 0 r � N m w n n O o p 9 P.B. 66, P.G. 169 ' 7nN, _ _ z. Al --z--�� X I WHDD LLC PIN: 154011 D.13.3891, P.G. 989 P.B. 68 PG. 458 ZONED: R-12 I r-- I TYN DALL ST TYNDALLST L CUMMINGS DEVELOPMENTS INC. PIN: 154009 D.B.2290, P.G. 3S1 P.B. 16 PG. 74 II ZONED: R-12 Ii 0 0 r � r 03 z W Gl n Od oo m bANIELLE (�. GREENE O JON M.GREENE PIN:154009 D.B.4148, P.G.992 P.B. 16 PG. 74 ZONED: R-12 \ J S A. ROBLES o I GONZALEZ ETUX L PIN:152991 D.B.3677, P.G.47 P.B. 16 PG. 74 ZONED: R-12 � Il II �I f � — SHIRLEY W PIOE PARCEL I D: 152998 D.B. 488, PG. 169 ZONED: R-12 — RICHARD ALLEN KARA ASHLE PIN: 1529 D.B.438S, P., P.B. 28 PG. ANNIE BURKI PIN: 1! D.B. 3935, ZONE[ BRL PI na: LOOKS CR R ZLHAYWOODST 0 0 0 0 z 0 VICINITY MAP 1" = 1,000' CO NOTES: Q �y THIS MAP DOES NOT MEET G.S. 47-30 AND IS NOT FOR RECORDING. THIS PROPERTY IS SUBJECT TO ANY EASEMENTS, AGREEMENTS, OR RIGHTS -OF -WAY OF RECORD Co PRIOR TO THE DATE OF THIS MAP AND WHICH WERE NOT VISIBLE AT THE TIME OF INSPECTION. W DEVELOPER TO BE RESPONSIBLE FOR PURCHASING AND INSTALLING ALL STREET AND TRAFFIC SIGNS 0. WITHIN DEVELOPMENT. STREET NAMES HAVE BEEN APPROVED BY KATIE HARPER WITH ALAMANCE COUNTY. DEVELOPER TO COORDINATE INDIVIDUAL STREET ADDRESSES WITH ALAMANCE COUNTY DURING DESIGN PHASE OF THE PROJECT. THIS MAP WAS PREPARED WITH OUT THE BENEFIT OF A TITLE REPORT AND DOES NOT NECESSARILY INDICATE ALL ENCUMBRANCES UPON THIS PROPERTY. TOPOGRAPHIC INFORMATION TAKEN FROM SURVEY BY ALLRED LAND SURVEYING. BOUNDARY INFORMATION TAKEN FROM SURVEY BY ALLRED LAND SURVEYING. NO SURVEYING OR SUBSURFACE INVESTIGATIONS PERFORMED BY STOLTZFUS ENGINEERING, INC. STREAMS AND WETLANDS DELINEATED BY PILOT ENVIRONMENTAL, INC. PROPOSED PLAN TO UTILIZE CENTRALIZED SOLD WASTE PICK-UP AT AMENITY AREA. PIN # 8895609141 TOTAL ACREAGE: AC. 28.16 +/- DEED REF: DB. 2935 PG. 175 PLAT REF: PB. 77 PG. 129 CURRENT ZONING: CD-RG EXISTING USE: VACANT PROPOSED USE: TOWNHOMES LM bwna kIN101MO•"mki # OF UNITS: 194 SHOWN (MAXIMUM 210, FINAL NUMBER OF UNITS AND FINAL UNIT CONFIGURATION SUBJECT TO CIVIL/BUILDING DESIGN DRAWINGS AND SITE TOPOGRAPHIC CONSTRAINTS DENSITY: 6.89 UNITS/AC SHOWN (MAX. 7.46 UNITS/AC) LFSTREETS: 3,863 LF OPEN SPACE REQUIRED: 2.816 AC. (10%) OPEN SPACE PROVIDED: 589,759 SF, 13.539 AC. +/- LOT AREA: 440,119 SF, 10.104 AC. +/- BUILDING AREA MAXIMUM: 11.264AC. (40%) BUILDING AREA PROVIDED: 178,071 SF, 4.09 AC. +/- (14.52%) R/W ACREAGE: 196,769 SF, 4.517 AC. +/- FRONT: 20' MIN. DRIVEWAY DISTANCE FROM BACK OF SIDEWALK TO FRONT OF GARAGE TO BE A MIN. OF 25'. SIDE: 20' REAR: 20' SIDE STREET: 20' PARKING REQUIREMENTS 1.5 SPACES FOR EACH ONE OR TWO BEDROOM UNIT & TWO SPACES FOR EACH THREE OR MORE BEDROOM UNIT. EACH UNIT TO HAVE AT LEAST A SINGLE CAR GARAGE. 194 UNITS X 2 = 388 SPACES REQUIRED PARKING SPACES PROVIDED: EXTERIOR UNITS W/ 3 SPACES (1 GARAGE+2 DRIVEWAY)=58 UNITS X 3 SPACES= 174 SPACES INTERIOR UNITS W/ 2 SPACES (1 GARAGE+1 DRIVEWAY)=136 UNITS X 2 SPACES=272 SPACES OVERFLOW PARKING=54 SPACES TOTAL PARKING PROVIDED=500 WATERSHED INFORMATION: THIS PROPERTY IS NOT LOCATED IN A WATER SUPPLY WATERSHED. FLOOD INFORMATION: THIS PROPERTY IS NOT LOCATED IN A FLOODPLAIN PER MAPS NUMBER 3710889400K, PANEL 8894; 3710889500K, PANEL8895, BOTH DATED 2017-11-17 LEGEND WATER METER BOX (WM) ® WATER VALVE (WV) OSTORM MANHOLE (STMH) UTILITY POLE LIGHT POLE GROUND LIGHT • GUY WIRE ® YARD INLET (YI) Gv GAS VALVE CHU OVERHEAD POWER LINE ---G-----G--- GAS LINE —N _— WATER LINE Ue UNDERGROUND ELECTRICAL FENCE LINE WOODSLINE (TYP.) vFIRE HYDRANT (HYD) O SANITARY SEWER MANHOLE (SSMH) O CLEAN OUT DB DEED BOOK PB PLAT BOOK PG PAGE R/W RIGHT-OF-WAY E/P EDGE OF PAVEMENT E/G EDGE OF GRAVEL CONC CONCRETE RCP REINFORCED CONCRETE PIPE DI DROP INLET CI CURB INLET FFE FINISH FLOOR ELEVATION BSMT BASEMENT TPED TELEPHONE PEDESTAL THH TELEPHONE HAND HOLD DMUE DRAINAGE MAINTENANCE & UTILITY EASEMENT ® = FOUND IRON PIPE ® = SET IRON PIN • = COMPUTED POINT p = CONCRETE MONUMENT CH = CHORD R/W = RIGHT OF WAY P.B. = PLAT BOOK D.B. = DEED BOOK PG. = PAGE DE = DRAINAGE ESMT. CE = COMMON ELEMENTS GRAPHIC SCALE 100 0 50 100 200 400 fV or' E O IZI, m y 00 U M 4- f-4 C w I\ LU 0 f V rq N U Z hA p a) 0 CD N N N M m rr) 00 -0 Q V 0) C: Ln N a� 0)V C: Ol rmLu c N Q) Q) N � }' w O 4 -+ > C/) u z W O O O J LL N 2 Y c_c z LL' G � cc/ < Q O w Q �zz.0 W \ w z �"'o4z oz,, >� z wz o V wa z 0�zmo d V1 Y U � c-I O c) H O U Z O o 2 a c O G oz 00 LL w m z� ^ N W w w z > �z o O O n F K Z Q w z 0Om2 O �oC5L w w 0 ,yz^J F W \ a z z w / w � 1. O z z C 0 U Q U a=�= <uF-g.. O Cr Q LL �z>� w z z 0 F- =;oo cL nUH z O w a w a w U O z O 75 a Lu 0� V) ozaaaaaa DRAWN BY: WVC CHECKED BY: ARS DATE: 03/14/2023 PROJECT NO.: 60S.04 REF. NO.: SCALE: 1"=100' P Ss�� E _ 026461 9�FNGI NE�J`�� 03/21/2023 C 1 ( IN FEET) 1 inch =100 ft. For'-Ojl PROPOSED EARTH BERMPnETEMPORARY (TYP. CONSTRUCTION STREAM CROSSING CLASS "I" U tjA 4 -+ N � � a) � f FLOW RIP RAP W •L O a) N vi O N z 5' MIN NdA O ' a) TEMP. SANDBAG PRECAST CONCRETE ENDWALL 4N- �m LCOFFERDAM O ,� (D N TEMP IMPACT NCDOT STD. 838.80 ~ss\ ^ 4' N r) f'O L N 5 LF, 12.5 SF SS\ \ M 00 L 1 Sr \ � \ ass \ CULVERT TO BE \ ss INSTALLED BY � ^ INV.: 530.00' PUMP -AROUND \ S3 ° 7 _ I STREAM FLOW - a) -0 -0 (0 Q METHOD (SEE 14.3 L.F.'s 35.5 S.F. PERMANENT ~'' DETAIL THIS SHEET) 169_ 174 5' -------MIN----- STREAM IMPACT ss �ssZPROP. SAND BAGS V 20 L.F. EXISTIG 30" C P \ PROPOSED DISTURBANCE LIMITS HYD EARTH BERM PLAN (TYP.) � C: in s ss Q �� ss�'ss T �lGA ° , \ 10' TILT ES T. PROPOSED POLYETHYLENE FABRIC EARTH BERM ON FACE (8 ML. THICK) 3' (TYP.) MIN. FROM TO PUMP TOP OF PUMP P i c N r x i c mu 11+00 — 12+0 400'R / 66, s'� — �s 13+00 -BAN --- ----- �" �" �" `�" �" �" —ag LU o� 221 L.F. 552.5 S.F. PERMANENT \ 00 ss } 14+00 Rq N p R CL-150'R STREAM N Q) STREAM IMPACT15+c FLOW �— —. _....�. 50' PUBLIC R/W _,... ` Lu � s � — PROP.8'WATERLINE "'°� , . . EX. INV. j� TEMPORARY CREEK/ STONE DAM O - REMOVE SANDBAGS & FABRIC TO ALLOW FLOW THROUGH POLYETHYLENE FABRIC Ln V \ s ass PROP. WHEN NOT PUMPING AROUND. ON FACE (8 ML. THICK) SECTION A -A ♦ %. RIP -RAP OUTLET ~ ♦"�; PRECAST CONCRETE ENDWALL NCDOTSTD.838.80 \ \ ~`ss`�. ss\ss \HYD TEMPORARY CROSSING - "PUMP AROUND" FOR CULVERT PROTECTION TO \ \ EX. 25' SAN. INSTALLATION BE KEYED IN NSEWER TEMP. STONE DAM ESMT. V ass^ A NOTES --- 1 0 INV.: 526.20' -10 7 TEMP IMPACT F — \� \ ss\ss\s \ \ 1) EROSION STONE TO BE "CLASS I" RIP -RAP UNLESS DESIGNATED DIFFERENTLY ON RIP RAP TO BE PLACED -•-_ __ SUCH THAT THE STREAM - / F , 1 r \ s \ \ \s \ CONSTRUCTION PLAN. 2) PUMP AND LINE SIZE TO BE DETERMINED BY THE CONTRACTOR USING THE BASE FLOW ; _ WILL FLOW ON TOP OF _ _ THE RIP -RAP EVEN IN �-�--- LOW FLOW CONDITIONS I �ST�'Fq i /�j - ` s EX. 15. SAN. SEWER \ \` ss \ ''�. \ ss'-. SHOWN ON THE CONSTRUCTION PLANS. 3) MATERIAL SPECIFICATIONS SANDBAGS: SANDBAGS SHALL CONSIST OF MATERIALS WHICH ARE RESISTANT TO o \ \ ss \ ULTRAVIOLET RADIATION, TEARING AND PUNCTURE, AND WOVEN TIGHTLY ENOUGH TO a s PREVENT LEAKAGE OF FILL MATERIAL. (i.e. SAND, FINE GRAVEL, ETC.) g EXISTING \ WETLANDS � � ss \ CONSTRUCTION SEQUENCE FOR CULVERT CROSSING -PUMP AROUND 0 0 J STREAM AREA OF IMPACT (PERMANENT) \ `' 1) INSTALL PUMP AND LINE TO PUMP FLOW FROM AREA UPSTREAM OF TEMPORARY STREAM CROSSING TO AREA DOWNSTREAM OF CONSTRUCTION AREA. BEGIN PUMPING AND Z = < o 00 w ¢ LL b z t7 z z m BASED ON AN AVERAGE EX. SSMH R z 0'E z WIDTH OF 2.5' CONTINUING PUMPING WHILE WORKING WITHIN THE STREAM. W 0 L > ~ TOTAL AREA: 588 S.F. 0.013 ACRES 2) INSTALL DOWNSTREAM TEMPORARY STONE DAM AND FILTER FABRIC TO PREVENT BACKFLOW INTO CONSTRUCTION AREA. > � d — Ln m w < w o 3) INSTALL PROPOSED EARTH BERMS ALONG TOP OF BANK ON EACH SIDE OF THE z _ a a STREAM AREA OF CONSTRUCTION AREA. 4) INSTALL DEWATERING BASIN OR SILT BAG AT TOP OF BANK. DEWATER CONSTRCTION GRAPHIC SCALE LLI xza O 3:_ x IMPACT (TEMPORARY) BASED ON AN AVERAGE AREA BETWEEN TEMPORARY DAM USING TEMP. SEDIMENTTRAP. 5) UPON CONSTRUCTION COMPLETION, REMOVE TEMPORARY DAMS, FILTER FABRIC. 40 0 20 40 80 160 ILL W O O DEPRESS TEMPORARY DAM BOTTOMS INTO STREAM BED UNTIL TOP OF Ur WIDTH OF 2.5' RIP RAP IS LEVEL WITH STREAM BOTTOM. z TOTAL AREA: 25 S.F. 0.0006 ACRES 6) UPON STABILIZATION OF CLEARED AREAS, REMOVE TEMPORARY EARTH BERM, SEDIMENT ( IN FEET) TRAP, AND DEWATERING BASIN. z 1 inch =40 ft. O J o � DC a W O cU z G �� LL m � N uj OW POINT EL V = 545. 08 DC I- o z t O ^ J u a VI E EV. 54 .05 m w o m a 0 2 a � = 3 .00 LO POINT TA. 12 58.3 z W a o a 5.00 VC LOWPOINT LEV = 5 2.46 J O � PVI STA. = 13 33. 2 0 P I ELAE 39.6 J Li 550 N N .= 5 0 570 O J O +� K-30. 0 i� � vi V > n V V > m w � Obi m o a z w ow> W 'RolOS > m > °u<a E u�J= pOs 2.0o D _ OOaa O �z}x TR z z °a00 x� 010o- a v U H 1 540 ENDWALL 5 0 3 NCDOT STD 838.E 560 PR 8" v��� t� 71 40 O m m Z O �P P/ 4 + V) PRECAST CONCRETE ENDWALL F� m ii " w `n w 1O NCDOT STD. 838.80 w m Q w a w w U Z a CP p0 530 .8 0 5 0 0 �F ' " 550 w 20 R� + n cn Oil Q ~ Lu w w N m z<a<a DRAWN BY:WVC CHECKED BY:ARS RIP -RAP APRON TOP OF APRON TO BE DATE: 03/14/2022 PROJECT NO.: 605.04 FLUSH WITH INVERT SO NOT TO OBSTRUCT REF. NO.: STREAM FLOW 520 540 SCALE:1"=40' CULVERT 1 """""""' F RAN DRIVE .. N CA R ,, o�°%;' CROSS SECTION STA. 10+00 TO STA 15+00 ;4E 26461 /V,R,,,S,,,,,,,, -�,,, . 03/21/2023 C2- 510 1 1 1 530 10+00 11+00 12+00 13+00 14+00 -1+00 0+00 1+00 2+00 0 12 United States Department of the Interior FISH AND WILDLIFE SERVICE Raleigh Ecological Services Field Office Post Office Box 33726 Raleigh, NC 27636-3726 Phone: (919) 856-4520 Fax: (919) 856-4556 In Reply Refer To: Project Code: 2023-0058153 Project Name: Trollingwood Townes March 21, 2023 Subject: List of threatened and endangered species that may occur in your proposed project location or may be affected by your proposed project To Whom It May Concern: The enclosed species list identifies threatened, endangered, proposed and candidate species, as well as proposed and final designated critical habitat, that may occur within the boundary of your proposed project and/or may be affected by your proposed project. The species list fulfills the requirements of the U.S. Fish and Wildlife Service (Service) under section 7(c) of the Endangered Species Act (Act) of 1973, as amended (16 U.S.C. 1531 et seq.). If your project area contains suitable habitat for any of the federally -listed species on this species list, the proposed action has the potential to adversely affect those species. If suitable habitat is present, surveys should be conducted to determine the species' presence or absence within the project area. The use of this species list and/or North Carolina Natural Heritage program data should not be substituted for actual field surveys. New information based on updated surveys, changes in the abundance and distribution of species, changed habitat conditions, or other factors could change this list. Please feel free to contact us if you need more current information or assistance regarding the potential impacts to federally proposed, listed, and candidate species and federally designated and proposed critical habitat. Please note that under 50 CFR 402.12(e) of the regulations implementing section 7 of the Act, the accuracy of this species list should be verified after 90 days. This verification can be completed formally or informally as desired. The Service recommends that verification be completed by visiting the ECOS-IPaC website at regular intervals during project planning and implementation for updates to species lists and information. An updated list may be requested through the ECOS-IPaC system by completing the same process used to receive the enclosed list. The purpose of the Act is to provide a means whereby threatened and endangered species and the ecosystems upon which they depend may be conserved. Under sections 7(a)(1) and 7(a)(2) of the Act and its implementing regulations (50 CFR 402 et seq.), Federal agencies are required to utilize their authorities to carry out programs for the conservation of threatened and endangered 03/21/2023 species and to determine whether projects may affect threatened and endangered species and/or designated critical habitat. A Biological Assessment is required for construction projects (or other undertakings having similar physical impacts) that are major Federal actions significantly affecting the quality of the human environment as defined in the National Environmental Policy Act (42 U.S.C. 4332(2) (c)). For projects other than major construction activities, the Service suggests that a biological evaluation similar to a Biological Assessment be prepared to determine whether the project may affect listed or proposed species and/or designated or proposed critical habitat. Recommended contents of a Biological Assessment are described at 50 CFR 402.12. If a Federal agency determines, based on the Biological Assessment or biological evaluation, that listed species and/or designated critical habitat may be affected by the proposed project, the agency is required to consult with the Service pursuant to 50 CFR 402. In addition, the Service recommends that candidate species, proposed species and proposed critical habitat be addressed within the consultation. More information on the regulations and procedures for section 7 consultation, including the role of permit or license applicants, can be found in the "Endangered Species Consultation Handbook" at: http://www.fws.gov/endangered/esa-library/pdf/TOC-GLOS.PDF Migratory Birds: In addition to responsibilities to protect threatened and endangered species under the Endangered Species Act (ESA), there are additional responsibilities under the Migratory Bird Treaty Act (MBTA) and the Bald and Golden Eagle Protection Act (BGEPA) to protect native birds from project -related impacts. Any activity, intentional or unintentional, resulting in take of migratory birds, including eagles, is prohibited unless otherwise permitted by the U.S. Fish and Wildlife Service (50 C.F.R. Sec. 10.12 and 16 U.S.C. Sec. 668(a)). For more information regarding these Acts see https://www.fws.gov/birds/policies-and-regulations.php. The MBTA has no provision for allowing take of migratory birds that may be unintentionally killed or injured by otherwise lawful activities. It is the responsibility of the project proponent to comply with these Acts by identifying potential impacts to migratory birds and eagles within applicable NEPA documents (when there is a federal nexus) or a Bird/Eagle Conservation Plan (when there is no federal nexus). Proponents should implement conservation measures to avoid or minimize the production of project -related stressors or minimize the exposure of birds and their resources to the project -related stressors. For more information on avian stressors and recommended conservation measures see https://www.fws.gov/birds/bird-enthusiasts/threats-to- birds.php. In addition to MBTA and BGEPA, Executive Order 13186: Responsibilities of Federal Agencies to Protect Migratory Birds, obligates all Federal agencies that engage in or authorize activities that might affect migratory birds, to minimize those effects and encourage conservation measures that will improve bird populations. Executive Order 13186 provides for the protection of both migratory birds and migratory bird habitat. For information regarding the implementation of Executive Order 13186, please visit https://www.fws.gov/birds/policies-and-regulations/ executive-orders/e0-13186. php. 03/21/2023 3 We appreciate your concern for threatened and endangered species. The Service encourages Federal agencies to include conservation of threatened and endangered species into their project planning to further the purposes of the Act. Please include the Consultation Code in the header of this letter with any request for consultation or correspondence about your project that you submit to our office. Attachment(s): • Official Species List • Migratory Birds 03/21/2023 OFFICIAL SPECIES LIST This list is provided pursuant to Section 7 of the Endangered Species Act, and fulfills the requirement for Federal agencies to "request of the Secretary of the Interior information whether any species which is listed or proposed to be listed may be present in the area of a proposed action". This species list is provided by: Raleigh Ecological Services Field Office Post Office Box 33726 Raleigh, NC 27636-3726 (919) 856-4520 03/21/2023 VA PROJECT SUMMARY Project Code: 2023-0058153 Project Name: Trollingwood Townes Project Type: Residential Construction Project Description: The site is being developed with a residential subdivision. A stream crossing and USACE permit are required to construct the project. The project will be constructed within the next 1-2 years. Project Location: The approximate location of the project can be viewed in Google Maps: https: www. google.com/maps/(a)36.085203050000004,-79.35204727895166,14z TS IrP":" Bra k R'•1"' 3 YfYlpl� Counties: Alamance County, North Carolina 03/21/2023 3 ENDANGERED SPECIES ACT SPECIES There is a total of 2 threatened, endangered, or candidate species on this species list. Species on this list should be considered in an effects analysis for your project and could include species that exist in another geographic area. For example, certain fish may appear on the species list because a project could affect downstream species. IPaC does not display listed species or critical habitats under the sole jurisdiction of NOAA Fisheriesi, as USFWS does not have the authority to speak on behalf of NOAA and the Department of Commerce. See the "Critical habitats" section below for those critical habitats that lie wholly or partially within your project area under this office's jurisdiction. Please contact the designated FWS office if you have questions. 1. NOAA Fisheries, also known as the National Marine Fisheries Service (NMFS), is an office of the National Oceanic and Atmospheric Administration within the Department of Commerce. MAMMALS NAME STATUS Tricolored Bat Perimyotis subflavus Proposed No critical habitat has been designated for this species. Endangered Species profile: https:Hecos.fws.gov/ecp/species/10515 INSECTS NAME STATUS Monarch Butterfly Danaus plexippus Candidate No critical habitat has been designated for this species. Species profile: https:Hecos.fws.gov/ecp/species/9743 CRITICAL HABITATS THERE ARE NO CRITICAL HABITATS WITHIN YOUR PROJECT AREA UNDER THIS OFFICE'S JURISDICTION. 03/21/2023 MIGRATORY BIRDS Certain birds are protected under the Migratory Bird Treaty Act! and the Bald and Golden Eagle Protection Actz. Any person or organization who plans or conducts activities that may result in impacts to migratory birds, eagles, and their habitats should follow appropriate regulations and consider implementing appropriate conservation measures, as described below. 1. The Migratory Birds Treat. Act of 1918. 2. The Bald and Golden Eagle Protection Act of 1940. 3. 50 C.F.R. Sec. 10.12 and 16 U.S.C. Sec. 668(a) The birds listed below are birds of particular concern either because they occur on the USFWS Birds of Conservation Concern (BCC) list or warrant special attention in your project location. To learn more about the levels of concern for birds on your list and how this list is generated, see the FAQ below. This is not a list of every bird you may find in this location, nor a guarantee that every bird on this list will be found in your project area. To see exact locations of where birders and the general public have sighted birds in and around your project area, visit the E-bird data mapping tool (Tip: enter your location, desired date range and a species on your list). For projects that occur off the Atlantic Coast, additional maps and models detailing the relative occurrence and abundance of bird species on your list are available. Links to additional information about Atlantic Coast birds, and other important information about your migratory bird list, including how to properly interpret and use your migratory bird report, can be found below. For guidance on when to schedule activities or implement avoidance and minimization measures to reduce impacts to migratory birds on your list, click on the PROBABILITY OF PRESENCE SUMMARY at the top of your list to see when these birds are most likely to be present and breeding in your project area. BREEDING NAME SEASON Bald Eagle Haliaeetus leucocephalus Breeds Sep 1 to This is not a Bird of Conservation Concern (BCC) in this area, but warrants attention Jul 31 because of the Eagle Act or for potential susceptibilities in offshore areas from certain types of development or activities. Chimney Swift Chaetura pelagica Breeds Mar 15 This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA t0 Aug 25 and Alaska. Prairie Warbler Dendroica discolor Breeds May 1 This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA to Jul 31 and Alaska. 03/21/2023 BREEDING NAME SEASON Prothonotary Warbler Protonotaria citrea Breeds Apr 1 to This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA Jul 31 and Alaska. Red-headed Woodpecker Melanerpes erythrocephalus Breeds May 10 This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA to Sep 10 and Alaska. Rusty Blackbird Euphagus carolinus Breeds This is a Bird of Conservation Concern (BCC) only in particular Bird Conservation Regions elsewhere (BCRs) in the continental USA Wood Thrush Hylocichla mustelina Breeds May 10 This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA to Aug 31 and Alaska. PROBABILITY OF PRESENCE SUMMARY The graphs below provide our best understanding of when birds of concern are most likely to be present in your project area. This information can be used to tailor and schedule your project activities to avoid or minimize impacts to birds. Please make sure you read and understand the FAQ "Proper Interpretation and Use of Your Migratory Bird Report" before using or attempting to interpret this report. Probability of Presence (■) Each green bar represents the bird's relative probability of presence in the 10km grid cell(s) your project overlaps during a particular week of the year. (A year is represented as 12 4-week months.) A taller bar indicates a higher probability of species presence. The survey effort (see below) can be used to establish a level of confidence in the presence score. One can have higher confidence in the presence score if the corresponding survey effort is also high. How is the probability of presence score calculated? The calculation is done in three steps: The probability of presence for each week is calculated as the number of survey events in the week where the species was detected divided by the total number of survey events for that week. For example, if in week 12 there were 20 survey events and the Spotted Towhee was found in 5 of them, the probability of presence of the Spotted Towhee in week 12 is 0.25. 2. To properly present the pattern of presence across the year, the relative probability of presence is calculated. This is the probability of presence divided by the maximum probability of presence across all weeks. For example, imagine the probability of presence in week 20 for the Spotted Towhee is 0.05, and that the probability of presence at week 12 (0.25) is the maximum of any week of the year. The relative probability of presence on week 12 is 0.25/0.25 = 1; at week 20 it is 0.05/0.25 = 0.2. 03/21/2023 3 3. The relative probability of presence calculated in the previous step undergoes a statistical conversion so that all possible values fall between 0 and 10, inclusive. This is the probability of presence score. Breeding Season( ) Yellow bars denote a very liberal estimate of the time -frame inside which the bird breeds across its entire range. If there are no yellow bars shown for a bird, it does not breed in your project area. Survey Effort (1) Vertical black lines superimposed on probability of presence bars indicate the number of surveys performed for that species in the 10km grid cell(s) your project area overlaps. The number of surveys is expressed as a range, for example, 33 to 64 surveys. No Data (—) A week is marked as having no data if there were no survey events for that week. Survey Timeframe Surveys from only the last 10 years are used in order to ensure delivery of currently relevant information. The exception to this is areas off the Atlantic coast, where bird returns are based on all years of available data, since data in these areas is currently much more sparse. probability of presence breeding season I survey effort — no data SPECIES JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Bald Eallon-BCCe 1111 ha 1111 -4­ 1111111 Vulnerable Chimney Swift +� ++ —III F1l1 1' '1 1i11 Jill J77_1 11-1 1--- ---- ---+ BCC Rangewide (CON) Prairie Warbler BCC Rangewide IIII 111 (CON) Prothonotary +—+— ++++ ---+ ��• - Iq Warbler 11 Jill Jill —+-- ---- +--- — — — — ---+ BCC Rangewide (CON) Woodpecker BCC Rangewide III Jill Jill Jill IF +--- --�--+ (CON) Rusty Blackbird ++++ ---+ —+—+ ++-- — — — — — — — — —+-- ---- +--- — — — — ---+ BCC-BCR 03/21/2023 4 Wood Thrush +—+— ++++ ---+ —+—+ ++-- — — — — +--- — — — — ---+ V BCC Rangewide V- (CON) Additional information can be found using the following links: • Birds of Conservation Concern https://www.fws.gov/program/migratory-birds/species • Measures for avoiding and minimizing impacts to birds https://www.fws.gov/library collections/avoiding-and-minimizing-incidental-take-migratory-birds • Nationwide conservation measures for birds https://www.fws.gov/sites/default/files/ documents/nationwide-standard-conservation-measures.Ddf MIGRATORY BIRDS FAQ Tell me more about conservation measures I can implement to avoid or minimize impacts to migratory birds. Nationwide Conservation Measures describes measures that can help avoid and minimize impacts to all birds at any location year round. Implementation of these measures is particularly important when birds are most likely to occur in the project area. When birds may be breeding in the area, identifying the locations of any active nests and avoiding their destruction is a very helpful impact minimization measure. To see when birds are most likely to occur and be breeding in your project area, view the Probability of Presence Summary. Additional measures or permits may be advisable depending on the type of activity you are conducting and the type of infrastructure or bird species present on your project site. What does IPaC use to generate the list of migratory birds that potentially occur in my specified location? The Migratory Bird Resource List is comprised of USFWS Birds of Conservation Concern (BCQ and other species that may warrant special attention in your project location. The migratory bird list generated for your project is derived from data provided by the Avian Knowledge Network (AKN). The AKN data is based on a growing collection of survey, bandim and citizen science datasets and is queried and filtered to return a list of those birds reported as occurring in the 10km grid cell(s) which your project intersects, and that have been identified as warranting special attention because they are a BCC species in that area, an eagle (Eagle Act requirements may apply), or a species that has a particular vulnerability to offshore activities or development. Again, the Migratory Bird Resource list includes only a subset of birds that may occur in your project area. It is not representative of all birds that may occur in your project area. To get a list of all birds potentially present in your project area, please visit the Rapid Avian Information Locator (RAIL) Tool. What does IPaC use to generate the probability of presence graphs for the migratory birds potentially occurring in my specified location? 03/21/2023 5 The probability of presence graphs associated with your migratory bird list are based on data provided by the Avian Knowledge Network (AKN). This data is derived from a growing collection of survey, banding, and citizen science datasets. Probability of presence data is continuously being updated as new and better information becomes available. To learn more about how the probability of presence graphs are produced and how to interpret them, go the Probability of Presence Summary and then click on the "Tell me about these graphs" link. How do I know if a bird is breeding, wintering or migrating in my area? To see what part of a particular bird's range your project area falls within (i.e. breeding, wintering, migrating or year-round), you may query your location using the RAIL Tool and look at the range maps provided for birds in your area at the bottom of the profiles provided for each bird in your results. If a bird on your migratory bird species list has a breeding season associated with it, if that bird does occur in your project area, there may be nests present at some point within the timeframe specified. If "Breeds elsewhere" is indicated, then the bird likely does not breed in your project area. What are the levels of concern for migratory birds? Migratory birds delivered through IPaC fall into the following distinct categories of concern: 1. "BCC Rangewide" birds are Birds of Conservation Concern (BCC) that are of concern throughout their range anywhere within the USA (including Hawaii, the Pacific Islands, Puerto Rico, and the Virgin Islands); 2. "BCC - BCR" birds are BCCs that are of concern only in particular Bird Conservation Regions (BCRs) in the continental USA; and 3. "Non -BCC - Vulnerable" birds are not BCC species in your project area, but appear on your list either because of the Eagle Act requirements (for eagles) or (for non -eagles) potential susceptibilities in offshore areas from certain types of development or activities (e.g. offshore energy development or longline fishing). Although it is important to try to avoid and minimize impacts to all birds, efforts should be made, in particular, to avoid and minimize impacts to the birds on this list, especially eagles and BCC species of rangewide concern. For more information on conservation measures you can implement to help avoid and minimize migratory bird impacts and requirements for eagles, please see the FAQs for these topics. Details about birds that are potentially affected by offshore projects For additional details about the relative occurrence and abundance of both individual bird species and groups of bird species within your project area off the Atlantic Coast, please visit the Northeast Ocean Data Portal. The Portal also offers data and information about other taxa besides birds that may be helpful to you in your project review. Alternately, you may download the bird model results files underlying the portal maps through the NOAA NCCOS Integrative Statistical Modeling and Predictive Mapping of Marine Bird Distributions and Abundance on the Atlantic Outer Continental Shelf project webpage. 03/21/2023 6 Bird tracking data can also provide additional details about occurrence and habitat use throughout the year, including migration. Models relying on survey data may not include this information. For additional information on marine bird tracking data, see the Diving Bird Study and the nanotag studies or contact Caleb Spiegel or Pam Lorin. What if I have eagles on my list? If your project has the potential to disturb or kill eagles, you may need to obtain a permit to avoid violating the Eagle Act should such impacts occur. Proper Interpretation and Use of Your Migratory Bird Report The migratory bird list generated is not a list of all birds in your project area, only a subset of birds of priority concern. To learn more about how your list is generated, and see options for identifying what other birds may be in your project area, please see the FAQ "What does IPaC use to generate the migratory birds potentially occurring in my specified location". Please be aware this report provides the "probability of presence" of birds within the 10 km grid cell(s) that overlap your project; not your exact project footprint. On the graphs provided, please also look carefully at the survey effort (indicated by the black vertical bar) and for the existence of the "no data" indicator (a red horizontal bar). A high survey effort is the key component. If the survey effort is high, then the probability of presence score can be viewed as more dependable. In contrast, a low survey effort bar or no data bar means a lack of data and, therefore, a lack of certainty about presence of the species. This list is not perfect; it is simply a starting point for identifying what birds of concern have the potential to be in your project area, when they might be there, and if they might be breeding (which means nests might be present). The list helps you know what to look for to confirm presence, and helps guide you in knowing when to implement conservation measures to avoid or minimize potential impacts from your project activities, should presence be confirmed. To learn more about conservation measures, visit the FAQ "Tell me about conservation measures I can implement to avoid or minimize impacts to migratory birds" at the bottom of your migratory bird trust resources page. 03/21/2023 IPAC USER CONTACT INFORMATION Agency: Pilot Environmental, Inc Name: David Brame Address: 743 Park Lawn Court City: Kernersville State: NC Zip: 27284 Email dbrame@pilotenviro.com Phone: 3363104527 NCHPO HPOWEB f J Pine$IJ 9 lot AM 1596 Comer Gas' #/ to u' v a AN2407 flora Mill # E t �S AM1593 Sue-LynnTextiles Inc. Warehouse, a 4- Th 4 us of Ar pwnNv AM412T Pleasant Dixon ALAMAN E 19* "O� , s 3/21/2023, 1:22:33 PM Local individual resources & centerpoints * Surveyed Area, No designation Local Landmark DOE districts & boundaries Surveyed Only individual resources & centerpoints Q Determined Eligible Boundary Surveyed Only Surveyed in NRHD Surveyed Only, Gone Surveyed in NRHD, Gone 0 f 1:18,056 0 0.13 0.25 0.5 mi 0 0.2 0.4 0.8 km Alamance County, State of North Carolina DOT, Esri, HERE, Garmin, INCREMENT P, NGA, USGS North Carolina State Historic Preservation Office Alamance County, State of North Carolina DOT, Esri, HERE, Garmin, INCREMENT P, NGA, USGS David Brame From: Heather LaGamba Sent: Tuesday, September 27, 2022 4:30 PM To: 401 PreFile@ncdenr.gov Subject: Pre -File Notice - Trollingwood Road (7809.2) We would like to submit a Pre -filing Notice for the following project: Project Name: Trollingwood Road (7809.2) Project Owner: Lomanoco Investments Project Owner's Address: 7 Corporate Center Court, Greensboro, North Carolina Project County: Alamance Type of project/Approval Sought: 401 WQC, Pre -Application Request Meeting Declined Thank you and have a wonderful day! Sincerely, Heather LaGamba 336.345.9536 (c) 336.310.4527 (o) P.O. Box 128 Kernersville, NC 27285 www.pilotenviro.com hlagamba@pilotenviro.com