Loading...
HomeMy WebLinkAbout20150334 Ver 1_Record Drawings_20150415Strickland, Bev From: Arranue,Keven <kanance@hazenandsawyer.com> Sent: Wednesday, April l5'ZUl5l:Z5PK4 To: Strickland, Bev Subject: RE: DVVR#l5U334' Taggart Creek OutfaU and Paw Creek Force Main Attachments: HOPE VIRECORD DRAVVNGSU7'Ul'ZUl4.pdf I have three separate files, and each of them is large enough to possibly not make it through our respective m servers. Please let me know if you do not receive all three emails. i Principal Scientist I Hazen and Sawyer 4011 WestChase Blvd., Suite 500, Raleigh, NC 27607 919 863-9350 (direct) From: Strickland, Bev Sent: Wednesday, April 1S,ZU1S1Z:SSPM To: Arranae,Keven Subject: RE: DWR# 150334- Taggart Creek Outfall and Paw Creek Force Main 9.4m,�� Beve�dy Striddarid, Laserfid� ie AdrrflrflstraU)r NCDENR Division of Water Resources Physical: Suite 1229,512N Salisbury, N[ Mailing: Mail Service Center 1617, Raleigh, N[ 27699'1617 Phone#919'7O7f8789 Email Address: Bev.Strickland@ncdenr.go From:Arnance, Keven Sent: Wednesday, April 15,2O15 12:54 PM To: Strickland, Bev Subject: RE: DWR# 150334- Taggart Creek Clutfall and Paw Creek Force Main Principal Scientist I Hazen and Sawyer 4011 WestChase Blvd., Suite 500, Raleigh, NC 27607 919 863-9350 (direct) Wi From: Strickland, Bev [mailto :bev.strickland @ncdenr.gov] Sent: Wednesday, April 15, 2015 10:33 AM To: Arrance, Keven Subject: DWR# 150334- Taggart Creek Outfall and Paw Creek Force Main Mr. Arrance, Could you please send /email /ftp site me a pdf copy of the above site plans? Thanks Bev Beve�dy Storii llldarm , Laser fi lmg rniirmii torgtc°)r NCDENR - Division of Water Resources Physical: Suite 1219, 512 N Salisbury, NC Mailing: Mail Service Center 1617, Raleigh, NC 27699 -1617 Phone# 919 - 707 -8789 Email Address: Bev.strickland@ncdenr.gov COMPLETION - JUNE, 2014 DESIGN COMPANY: PLANS PREPARED BY: HAZEN AND SAWYER, P.C. ADDRESS: 4944 PARKWAY PLAZA BLVD., SUITE 375, CHARLOTTE, NC 28217 PHONE: (704) 357 -3150 DATE DESIGN COMPLETED: FEBRUARY 2013 SURVEY COMPANIES: SURVEYED BY: BARRY D. DAVIS SURVEYING ADDRESS: 2620 WEST MAIN STREET, ALBEMARLE, NC 28001 PHONE: (704) 986 -6505 DATE SURVEY COMPLETED: FEBRUARY 2013 SURVEYED BY: AVIOIMAGE MAPPING SERVICES ADDRESS: 4455 MORRIS PARK DRIVE, SUITE B, CHARLOTTE, NC 28227 PHONE: (704) 573 -7080 DATE SURVEY COMPLETED: 2011 DEVELOPER: LAUREL STREET RESIDENTIAL ADDRESS: 1300 BAXTER STREET, SUITE 370, CHARLOTTE, NC 28204 PHONE: (704) 561 -5234 CONTRACTOR: BRS, INC. RICHFIELD, NC INSPECTOR: JASON GRIFFITH, CMUD INSIDE CHARLOTTE: ( ) YES ( ) NO: TOPO NO: 59, 60, 61, 95, 96, 97 CHARLOTTE-MECKL N113URG I oa� � !I1111111mgimils-12 �111111YI11�1 io c IN I m- 2014 DRAWINIUOS BIRMINGHAM O� A � NoRFOLK RD RAI �RO4'JD N _ QD J J \� m CHARLOTTE DOUG INTERNATIONAL AIR \ r � L r �r I 2 v� Itly �Ir11111� �= HOPE VI DEVELOPMENT 0 0 � c z z � o r VICINITY MAP NO SCALE SEWER i IRWIN CREEK WWTP PIPE MANUFACTURE: FRP GRAVITY SEWER BY: HOBAS STIFFNESS: SN46 DI GRAVITY SEWER BY: U.S. PIPE PRESSURE CLASS: 350 W /PROTECTO 401 (10"/12 ") MANHOLES BY: DELLINGER PRECAST COATING: 2X6OMILS RAVEN 405 USACE 404 PERMIT NO. 2013 -01301 NCDOT ENCROACHMENT NO. 10 -158 -P NCDENR PERMIT NO. WQ 13 -0356 NCDENR LAND QUALITY PERMIT NO. DEVELOPER PROJECT DISTURBED AREAS: DISTURBED AREA - 1.40 ACRES RECORD DRAWING THIS DRAWING HAS BEEN MODIFIED TO REFLECT FIELD CHANGES REPORTED BY THE CONTRACTOR OR ANOTHER PARTY, BUT NOT VERIFIED BY THE CERTIFYING ENGINEER oOrCA NC ONECALL\ BEFORE YOU DIG STOP 1- 800 - 632 -4949 .AVOID UTILITY DAMAGEA CONSTRUCTION SHALL BE IN ACCORDANCE WITH CHARLOTTE MECKLENBURG UTILITY DEPARTMENT STANDARD SPECIFICATIONS. APPROVALS (SEALS) THIS DOCUMENT ORIGINALLY ISSUED FOR CONSTRUCTION AND SEALED BY JAMES N. STRUVE, SEAL NUMBER 18179. N.C.P.E. �N CARo � y y � �F ESS / '� SEAS 025221 � eft INE�� W S N.C.P.E. SUMMARY OF SEWER MAINS & MANHOLES SIZE LENGTH SIZE LENGTH 42" 1609LFf 10" 56LFf 12" 6OLFf TOTAL NO. OF MANHOLES: 8 TOTAL NO. LOTS SERVED: 2 PROJECT NAME: PAW CREEK FORCE MAIN REPLACEMENT PH3 - HOPE VI SECTION JOB NO: 804 -10 -516 DATE OF ACTIVATION: N/A DATE AS BUILT. JULY 2014 BY: H &S V) z 0 I /1 L„ lz SHEET INDEX ss � BILLY GRAHAM PARKWAY 1 CO VER MATERIAL TYPE OF JOINT 2 INDEX SHEET AND SCHEDULING 3 GENERAL NOTES, LEGEND AND A BBRE VIA TIONS PLAN AND PROFILE TYPE SIZE VENT EL 4 STA 103 +00 TO STA 110 +00 5 STA 110 +00 TO STA 119 +08.97 6 CONNECTION NO. 1 & NO. 2 DETAILS 7 MISCELLANEOUS DETAILS 9 CMUD STANDARD DETAILS 10 CMUD STANDARD DETAILS ss ml 0 y'�- c,S 0 PLAN 1 " =400' PIPE SCHEDULE PIPE MATERIAL TYPE OF JOINT MANHOLE SCHEDULE IDENTIFICATION 42" STATION TYPE SIZE VENT EL INTERIOR COATING RING & COVER BOOT 103 +39.34 MONOBEND PRECAST 6FT DIA. — 2X60 MILS RAVEN 405 30" A —LOK 106 +14.69 MONOBEND PRECAST 6FT DIA. 630.0 2X60 MILS RAVEN 405 30" A —LOK 108 +69.15 MONOBEND PRECAST 6FT DIA. - 2X60 MILS RAVEN 405 30" A -LOK 111 +37.10 MONOBEND PRECAST 6FT DIA. - 2X60 MILS RAVEN 405 30" A -LOK 115 +18.42 MONOBEND PRECAST 6FT DIA. 634.0 2X60 MILS RAVEN 405 30" A —LOK 116 +10.36 MONOBEND PRECAST 6FT DIA. — 2X60 MILS RAVEN 405 30" A —LOK 116 +93.87 MONOBEND PRECAST 6FT DIA. - 2X60 MILS RAVEN 405 30" A -LOK 118 +69.85 MONOBEND PRECAST 6FT DIA. - 2X60 MILS RAVEN 405 30" A -LOK PIPE SCHEDULE PIPE MATERIAL TYPE OF JOINT CLASS /DESIGN IDENTIFICATION 42" FRPM DOUBLE BELL SN -72 COUPLING 12" & DUCTILE IRON PUSH ON CL -350 W/ SMALLER P401 s N 3 107/141 JOG RECORD DRAWINGS 4� i RECORD DRAWING THIS DRAWING HAS BEEN MODIFIED TO REFLECT FIELD CHANGES REPORTED BY THE CONTRACTOR OR ANOTHER PARTY, BUT NOT VERIFIED BY THE CERTIFYING ENGINEER rlw%sv Kn w what'- b SOW, 2 ARKWAY THIS DOCUMENT ORIGINALLY ISSUED FOR CONSTRUCTION AND SEALED BY JAMES N. STRUVE, SEAL NUMBER 18179. Z O U w w ABBREVIATIONS SYMBOLS M O % PERCENT OHE OR OE OVERHEAD ELECTRIC & AND OHT OVERHEAD TELEPHONE MISCELLANEOUS AT OHTV OVERHEAD CABLE TV MONUMENT A N p ABAN ABANDON /ED PED PEDESTAL ADD ADDENDUM PG PAGE APPROX APPROXIMATE PKWY PARKWAY ARV AIR RELEASE VALVE PL OR R PROPERTY LINE ASPH ASPHALT PNG PIEDMONT NATURAL GAS 60 OF NITROGEN OF DITCHES, PP POWER POLE EXIST R/W B PV PLUG VALVE 500 OF USE CHANNEL OR DITCH LINING PVMT PAVEMENT BFV BUTTERFLY VALVE 500 4000 10 -10 -10 (WHERE SPECIFIED) TO COVER BOTTOM PWR POWER BLDG BUILDING -- -�- TOP OF BANK /SLOPE BLVD BOULEVARD R .TOE. C R/W OR RW RIGHT OF WAY 500 OF USE CHANNEL OR DITCH LINING R RADIUS CB CATCH BASIN 500 4000 10 -10 -10 (WHERE SPECIFIED) TO COVER BOTTOM RCP REINFORCED CONCRETE PIPE CDIA CHARLOTTE - DOUGLAS y STORM DRAIN /CATCH BASIN 60 OF NITROGEN OF DITCHES. RD ROAD N/A INTERNATIONAL AIRPORT 750 -100D 4000 N/A OVER SEED WITH TYPE P SEED MIXTURE RJ RESTRAINED JOINT CL OR CENTERLINE SEDIMENT LOG INLET PROTECTION DURING NEXT PLANTING SEASON RR RAILROAD CLF CHAIN LINK FENCE 750 -1000 4000 CMP CORRUGATED METAL PIPE S CMU CHARLOTTE - MECKLENBURG UTILITIES CMUD CHARLOTTE - MECKLENBURG UTILITY DEPARTMENT SD STORM DRAIN N/A DEPARTMENT SF SILT FENCE CO CLEANOUT SHT SHEET CONC CONCRETE SSMH SANITARY SEWER MANHOLE DURING NEXT PLANTING SEASON SS SANITARY SEWER D STA STATION STD STANDARD DI DUCTILE IRON SWR SEWER DI OR 0 DIAMETER DIM DIMENSION T DIP DUCTILE IRON PIPE DWG DRAWING TBM TEMPORARY BENCH MARK TCE TEMPORARY CONSTRUCTION E EASEMENT TD TEMPORARY DIVERSION EIP EXISTING IRON PIN TEL TELEPHONE ELEV OR EL ELEVATION TEMP TEMPORARY EMH EXISTING MANHOLE TYP TYPICAL ESMT EASEMENT EXIST EXISTING U F UG UNDERGROUND UGE UNDERGROUND ELECTRIC FES FLARED END SECTION UGT UNDERGROUND TELEPHONE FH FIRE HYDRANT UGTV UNDERGROUND CABLE TV FM FORCE MAIN FOC FIBER OPTIC CABLE V FRPM FIBERGLASS REINFORCED PLASTIC MORTAR VERT VERTICAL G W G GAS GR GRADE W WATER GV GATE VALVE OR GAS VALVE WL WATER LINE WM WATER METER H W/ WI TH W/0 WITHOUT HORZ HORIZONTAL WV WATER VALVE HW HEADWALL HWY HIGHWAY HYD HYDRANT I IN INCHES INV INVERT J JT JOINT L LF LINEAR FOOT LOC LIMITS OF CONSTRUCTION LP LIGHT POLE 20140701 9:43A H: \32070- 000 \Drawings \Taggart Creek \GEN \X2 - HOPE -Adwg By: JGREENE Last Saved By. lgreene XREFs= H: \32070 -D00 \Drawings \Taggart Creek \MISC \HOPE- VI_GS_TB GENERAL AND EROSION CONTROL NOTES: 1. CONTACT CH ARLOTTE- MECKLENBURG UTILITY DEPARTMENT PROJECT MANAGER (JULIE MCLELLAND) AND INSPECTOR BY PHONE OR IN PERSON A MINIMUM OF 40 BUSINESS HOURS PRIOR TO BEGINNING LAND DISTURBING ACTIVITY. JULIE MCLELLAND CAN BE REACHED AT 704 - 634 -8562. 2. ALL WORK SHALL COMPLY WITH CONTRACT DOCUMENTS AND THE SPECIAL PROVISIONS AS DESCRIBED IN THE PROJECT MANUAL. CONTRACT DOCUMENTS SUPERCEDE CMUD STANDARDS. 3. CONTACT THE LOCAL PUBLIC UTILITIES LOCATING SERVICE TO LOCATE UTILITIES IN THE AREA BEFORE ANY EXCAVATION. ALL EXISTING UTILITIES MAY NOT SHOWN ON THE DRAWINGS. CONTRACTOR IS RESPONSIBLE FOR LOCATING AND PROTECTING EXISTING UTILITIES, WHETHER SHOWN OR NOT, AND REPAIRING ALL DAMAGE TO UTILITIES AT HIS OWN EXPENSE. CONTACT NC ONE CALL AT 811 OR 800 - 632 -4949. 4. THE TOPOGRAPHIC MAPS WERE PREPARED FROM AN AERIAL SURVEY - CONTOUR INTERVAL OF 1 FOOT. GRID SYSTEM AND COORDINATES ARE NC STATE PLANE COORDINATE SYSTEM (1983 DATUM). 5. DISTURBANCE SHALL BE LIMITED TO THE TEMPORARY AND PERMANENT CMUD RIGHT -OF -WAY, AREAS FOR WHICH ENCROACHMENT AGREEMENTS HAVE BEEN OBTAINED, AND STAGING AREAS PROCURED BY THE CONTRACTOR. CONTRACTOR SHALL REMOVE ALL TREES WITHIN THE LIMITS OF THE PERMANENT CMUD RIGHT -OF -WAY, EXCEPT WHERE TREE PROTECTION IS SHOWN ON THE DRAWINGS, 6. LIMITS OF CONSTRUCTION (LOC) TO BE EDGE OF TEMPORARY CONSTRUCTION EASEMENT (TCE), EDGE OF PAVEMENT (EOP) OR SILT FENCE LINE (OPEN AREAS) AS INDICATED ON INDIVIDUAL DRAWINGS. 7. CONTRACTOR IS RESPONSIBLE FOR PROCURING ALL MOBILIZATION, STORAGE, AND STAGING AREAS AS WELL AS ACCESS TO THE CONSTRUCTION SITES WITHIN THE TEMPORARY AND PERMANENT CMUD RIGHT -OF -WAY NOT ALREADY ACQUIRED. EROSION CONTROL DEVICES SHALL BE INSTALLED AND MAINTAINED AT ALL WORK SITES, STAGING AREAS AND OFF SITE SPOILS AREAS. CONTRACTOR SHALL FOLLOW ALL LOCAL REGULATIONS REGARDING THE WORK, INCLUDING KEEPING MUD AND DIRT OFF OF PUBLIC ROADS AND PRIVATE ENTRANCES, AND REHABILITATING STAGING, STORAGE OR STOCKPILING AREAS TO EQUAL OR BETTER THAN EXISTING CONDITION. CONTRACTOR SHALL TAKE ALL REASONABLE MEASURES TO PREVENT TRACKING MUD /SOIL ONTO ADJACENT ROADWAYS. ANY MUD /SOIL TRACKED ON ROADWAYS SHALL BE CLEANED DAILY. FOLLOWING COMPLETION OF CONSTRUCTION, RESTORE ALL CONSTRUCTION SITE ACCESS AREAS TO A CONDITION EQUAL TO OR BETTER THAN ORIGINAL. 8. EROSION AND SEDIMENTATION CONTROL FACILITIES SHALL BE INSTALLED PRIOR TO CLEARING OR AS SOON AS PRACTICAL THEREAFTER BEFORE PERFORMING EXCAVATION IN ANY AREA, MAINTAINED DURING WORK, AND REMOVED WHEN WORK IS COMPLETED. TEMPORARY AND PERMANENT STABILIZATION SHALL BE PERFORMED AS SPECIFIED IN SECTION 02276. CONTRACT DOCUMENTS SUPERCEDE CMUD DESIGN STANDARDS. 9. SOIL EXPLORATION WORK WAS PERFORMED BY S &ME. SOILS EXPLORATION WORK IS SOLELY TO ASSIST BIDDERS IN ASSESSING THE NATURE AND EXTENT OF TESTING PROCEDURES REQUIRED TO MAKE THEIR OWN DETERMINATION OF ACTUAL SUBSURFACE CONDITIONS THAT WILL BE ENCOUNTERED DURING THE COURSE OF THE WORK. NO REPRESENTATION IS MADE OR WILL BE GIVEN BY THE ENGINEER CONCERNING ACTUAL CONDITIONS THAT WILL BE ENCOUNTERED. ALL BIDDERS ARE DIRECTED PRIOR TO BIDDING TO CONDUCT ALL INVESTIGATIONS AND TESTING THEY DEEM NECESSARY TO ARRIVE AT THEIR OWN CONCLUSIONS REGARDING SUCH CONDITIONS. SOIL BORING PROFILE ELEVATIONS ARE APPROXIMATE. 10. ALL AREAS WITH OPEN EXCAVATIONS, OPEN VAULTS OR MANHOLES, OR EQUIPMENT SHALL BE FENCED WITH TEMPORARY SAFETY FENCING AT LEAST 4 FEET HIGH AT END OF EACH WORK DAY. 11. WHEN DEWATERING TRENCHES, TURBID WATER SHALL BE PUMPED THROUGH A FILTER BAG. 12. ADDITIONAL SILT FENCE AND SILT FENCE STONE OUTLETS MAY BE REQUIRED BASED ON FIELD CONDITIONS AS DIRECTED BY ENGINEER. 13. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY WASTEWATER SPILLS THAT OCCUR DURING CONSTRUCTION AND ASSOCIATED FINES FROM STATE REGULATORY AGENCIES. 14. ANY LAND CORNER, PROPERTY MONUMENTATION, OR BENCHMARK WITHIN THE LIMITS OF CONSTRUCTION SHALL BE PROTECTED. IF A CORNER MONUMENT IS IN DANGER OF BEING DESTROYED, THE CONTRACTOR SHALL NOTIFY THE OWNER IMMEDIATELY. ANY CORNER MONUMENT DISTURBED OR DESTROYED SHALL BE RESET BY A PROFESSIONAL LAND SURVEYOR REGISTERED IN THE STATE OF NC AT THE CONTRACTOR'S EXPENSE. CONTRACTOR TO PROTECT OR REPLACE NCDOT RIGHT -OF -WAY MARKERS OR MONUMENTS PER NCDOT 806.01. 15. CONTACT CMUD PROJECT MANAGER IMMEDIATELY REGARDING ANY CONFLICTS THAT ARISE DURING CONSTRUCTION OF WORK SHOWN ON THE DRAWINGS. 16. FOR ALL TIE -IN PIPING OR CROSSINGS, CONTRACTOR SHALL VERIFY ALL EXISTING PIPELINE ELEVATIONS, LOCATIONS, DIAMETERS, AND MATERIALS PRIOR TO SHOP DRAWING SUBMITTALS, NOTIFYING THE ENGINEER OF ANY CONFLICTS. 17. ALL DRIVEWAYS, DRAIN PIPES, HEADWALLS, AND OTHER PHYSICAL FEATURES SHALL BE RESTORED TO EQUAL OR BETTER THAN EXISTING CONDITION, IN BOTH NEW AND EXISTING RIGHTS -OF -WAY AND WITHIN ANY TEMPORARY EASEMENT AREAS. ANY STRUCTURES OR DRIVEWAYS DISTURBED OUTSIDE THE RIGHT -OF -WAY OR EASEMENT SHALL ALSO BE FULLY RESTORED AT NO COST TO THE PROPERTY OWNER, 18. PROTECT ALL DRAIN CULVERTS DURING CONSTRUCTION. MAINTAIN PROTECTION UNTIL DISTURBED AREAS ARE STABILIZED WITH GROUND COVER SUFFICIENT TO RESTRAIN EROSION. 19. PROVIDE TEMPORARY DITCH LINING FOR DISTURBED DITCH LINES OR OTHER AREAS OF CONCENTRATED FLOW WHERE SLOPE IS GREATER THAN 2 %. 20, CONTRACTOR TO EXCAVATE AND DETERMINE ELEVATION OF ALL KNOWN CONFLICTS AT LEAST 1000 FEET AHEAD OF PIPE OR CASING INSTALLATION. 21. CLASS B CONCRETE MIX DESIGN SHALL HAVE A MINIMUM 28 -DAY COMPRESSIVE STRENGTH OF 3600 psi. 22. CONTRACTOR TO PROVIDE BYPASS PUMPING AS NEEDED. COORDINATE FLOW WITH CMUD. 23, ELEVATIONS AND GRADES SHOWN WITHIN THESE CONTRACT DRAWINGS ARE CRITICAL TO THIS SEWER INSTALLATION. CONTRACTOR'S REGISTERED LAND SURVEYOR SHALL VERIFY LINES AND GRADES THROUGHOUT THE INSTALLATION PROCESS. 24. FRPM PIPE TO BE HANDLED WITH CARE WHEN UNLOADING, STORING, AND INSTALLING. USE OF CABLES OR CHAINS IS PROHIBITED. CLEAN PIPE ENDS AND APPLY LUBRICANT PRIOR TO INSTALLING. BED FRPM PIPE MINIMUM 5- INCHES BELOW BOTTOM TO MINIMUM 6- INCHES ABOVE TOP OF PIPE FOR ENTIRE TRENCH WIDTH. EACH PIPE JOINT TO BE TESTED IN ACCORDANCE WITH CONTRACT SPECIFICATIONS. ALL FRPM PIPE SHALL BE MANDREL TESTED FOR DEFLECTION NOT LESS THAN 30 -DAYS FOLLOWING COMPLETION AND ACCEPTANCE OF BACKFILL. COMPLETED INSTALLATION TO HAVE ZERO LEAKAGE. 25. PULL TESTING SHALL BE REQUIRED FOR MANHOLE COATINGS AND SHALL BE PERFORMED BY A THIRD PARTY TESTING FIRM PAID BY CMUD. CONTRACTOR SHALL BE RESPONSIBLE FOR RECOATING ALL PULL TEST LOCATIONS. 26. PRE - DRILL, MAXIMUM 25 -FOOT INTERVALS, AHEAD OF LAYING PIPE TO DETERMINE ROCK ELEVATION. 27. SUBMIT SCHEDULE OF VALUES FOR PAY ITEM 2 AS DESCRIBED IN CONTRACT SPECIFICATIONS. 28. EXCESS EXCAVATED MATERIAL FROM PIPE OVERBURDEN SHALL BE REMOVED FROM THE SITE AND DISPOSED OF AT AN APPROVED AND PROPERLY PERMITTED OFFSITE LOCATION. CONTRACTOR SHALL PROVIDE TO ENGINEER EROSION AND SEDIMENT CONTROL DRAWINGS APPROVED BY NCDENR LAND QUALITY SECTION FOR ALL OFFSITE DISPOSAL AREAS USED ON THE PROJECT PRIOR TO DISPOSING OF ANY MATERIALS OFFSITE. 29. REPLACE ALL EXISTING FENCES IMMEDIATELY AFTER CONSTRUCTION HAS CLEARED THE FENCE LINE. TEMPORARY FENCES THAT PROVIDE EQUAL SECURITY SHALL BE ERECTED UNTIL THE EXISTING FENCE CAN BE RESET. 30, THIS PROJECT REQUIRES WORK TO BE PERFORMED WITHIN THE NCDOT RIGHT -OF -WAY. WORK SHALL BE PERFORMED AS OUTLINED IN THE ENCROACHMENTS ISSUED BY NCDOT. NOTIFY THE NCDOT DISTRICT ENGINEER TWENTY -FOUR (24) HOURS PRIOR TO COMMENCING ANY CONSTRUCTION WITHIN THE DEPARTMENT'S RIGHT -OF -WAY. ALL MATERIALS USED IN NCDOT RIGHT -OF -WAY TO BE APPROVED BY NCDOT. 31. LIMITS OF DISTURBANCE FOR THIS PROJECT IS APPROXIMATELY 2.3 ACRES. 32. DELAYED AVAILABILITY ON LINEBERGER PROPERTY. SEEDING SCHEDULE APPLICATION RATES IN POUNDS /ACRE M MAX MAXIMUM MB MAILBOX MECH MECHANICAL MIN MINIMUM MISC MISCELLANEOUS MJ MECHANICAL JOINT MON MONUMENT COMMENTS N N NORTH NCDENR NORTH CAROLINA DEPARTMENT OF UNDERGROUND CABLE TV ENVIRONMENTAL AND NATURAL USE CHANNEL OR DITCH LINING RESOURCES NCDOT NORTH CAROLINA DEPARTMENT 150 OF TRANSPORTATION NO OR # NUMBER N -S NORFOLK- SOUTHERN NTS NOT TO SCALE 20140701 9:43A H: \32070- 000 \Drawings \Taggart Creek \GEN \X2 - HOPE -Adwg By: JGREENE Last Saved By. lgreene XREFs= H: \32070 -D00 \Drawings \Taggart Creek \MISC \HOPE- VI_GS_TB GENERAL AND EROSION CONTROL NOTES: 1. CONTACT CH ARLOTTE- MECKLENBURG UTILITY DEPARTMENT PROJECT MANAGER (JULIE MCLELLAND) AND INSPECTOR BY PHONE OR IN PERSON A MINIMUM OF 40 BUSINESS HOURS PRIOR TO BEGINNING LAND DISTURBING ACTIVITY. JULIE MCLELLAND CAN BE REACHED AT 704 - 634 -8562. 2. ALL WORK SHALL COMPLY WITH CONTRACT DOCUMENTS AND THE SPECIAL PROVISIONS AS DESCRIBED IN THE PROJECT MANUAL. CONTRACT DOCUMENTS SUPERCEDE CMUD STANDARDS. 3. CONTACT THE LOCAL PUBLIC UTILITIES LOCATING SERVICE TO LOCATE UTILITIES IN THE AREA BEFORE ANY EXCAVATION. ALL EXISTING UTILITIES MAY NOT SHOWN ON THE DRAWINGS. CONTRACTOR IS RESPONSIBLE FOR LOCATING AND PROTECTING EXISTING UTILITIES, WHETHER SHOWN OR NOT, AND REPAIRING ALL DAMAGE TO UTILITIES AT HIS OWN EXPENSE. CONTACT NC ONE CALL AT 811 OR 800 - 632 -4949. 4. THE TOPOGRAPHIC MAPS WERE PREPARED FROM AN AERIAL SURVEY - CONTOUR INTERVAL OF 1 FOOT. GRID SYSTEM AND COORDINATES ARE NC STATE PLANE COORDINATE SYSTEM (1983 DATUM). 5. DISTURBANCE SHALL BE LIMITED TO THE TEMPORARY AND PERMANENT CMUD RIGHT -OF -WAY, AREAS FOR WHICH ENCROACHMENT AGREEMENTS HAVE BEEN OBTAINED, AND STAGING AREAS PROCURED BY THE CONTRACTOR. CONTRACTOR SHALL REMOVE ALL TREES WITHIN THE LIMITS OF THE PERMANENT CMUD RIGHT -OF -WAY, EXCEPT WHERE TREE PROTECTION IS SHOWN ON THE DRAWINGS, 6. LIMITS OF CONSTRUCTION (LOC) TO BE EDGE OF TEMPORARY CONSTRUCTION EASEMENT (TCE), EDGE OF PAVEMENT (EOP) OR SILT FENCE LINE (OPEN AREAS) AS INDICATED ON INDIVIDUAL DRAWINGS. 7. CONTRACTOR IS RESPONSIBLE FOR PROCURING ALL MOBILIZATION, STORAGE, AND STAGING AREAS AS WELL AS ACCESS TO THE CONSTRUCTION SITES WITHIN THE TEMPORARY AND PERMANENT CMUD RIGHT -OF -WAY NOT ALREADY ACQUIRED. EROSION CONTROL DEVICES SHALL BE INSTALLED AND MAINTAINED AT ALL WORK SITES, STAGING AREAS AND OFF SITE SPOILS AREAS. CONTRACTOR SHALL FOLLOW ALL LOCAL REGULATIONS REGARDING THE WORK, INCLUDING KEEPING MUD AND DIRT OFF OF PUBLIC ROADS AND PRIVATE ENTRANCES, AND REHABILITATING STAGING, STORAGE OR STOCKPILING AREAS TO EQUAL OR BETTER THAN EXISTING CONDITION. CONTRACTOR SHALL TAKE ALL REASONABLE MEASURES TO PREVENT TRACKING MUD /SOIL ONTO ADJACENT ROADWAYS. ANY MUD /SOIL TRACKED ON ROADWAYS SHALL BE CLEANED DAILY. FOLLOWING COMPLETION OF CONSTRUCTION, RESTORE ALL CONSTRUCTION SITE ACCESS AREAS TO A CONDITION EQUAL TO OR BETTER THAN ORIGINAL. 8. EROSION AND SEDIMENTATION CONTROL FACILITIES SHALL BE INSTALLED PRIOR TO CLEARING OR AS SOON AS PRACTICAL THEREAFTER BEFORE PERFORMING EXCAVATION IN ANY AREA, MAINTAINED DURING WORK, AND REMOVED WHEN WORK IS COMPLETED. TEMPORARY AND PERMANENT STABILIZATION SHALL BE PERFORMED AS SPECIFIED IN SECTION 02276. CONTRACT DOCUMENTS SUPERCEDE CMUD DESIGN STANDARDS. 9. SOIL EXPLORATION WORK WAS PERFORMED BY S &ME. SOILS EXPLORATION WORK IS SOLELY TO ASSIST BIDDERS IN ASSESSING THE NATURE AND EXTENT OF TESTING PROCEDURES REQUIRED TO MAKE THEIR OWN DETERMINATION OF ACTUAL SUBSURFACE CONDITIONS THAT WILL BE ENCOUNTERED DURING THE COURSE OF THE WORK. NO REPRESENTATION IS MADE OR WILL BE GIVEN BY THE ENGINEER CONCERNING ACTUAL CONDITIONS THAT WILL BE ENCOUNTERED. ALL BIDDERS ARE DIRECTED PRIOR TO BIDDING TO CONDUCT ALL INVESTIGATIONS AND TESTING THEY DEEM NECESSARY TO ARRIVE AT THEIR OWN CONCLUSIONS REGARDING SUCH CONDITIONS. SOIL BORING PROFILE ELEVATIONS ARE APPROXIMATE. 10. ALL AREAS WITH OPEN EXCAVATIONS, OPEN VAULTS OR MANHOLES, OR EQUIPMENT SHALL BE FENCED WITH TEMPORARY SAFETY FENCING AT LEAST 4 FEET HIGH AT END OF EACH WORK DAY. 11. WHEN DEWATERING TRENCHES, TURBID WATER SHALL BE PUMPED THROUGH A FILTER BAG. 12. ADDITIONAL SILT FENCE AND SILT FENCE STONE OUTLETS MAY BE REQUIRED BASED ON FIELD CONDITIONS AS DIRECTED BY ENGINEER. 13. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY WASTEWATER SPILLS THAT OCCUR DURING CONSTRUCTION AND ASSOCIATED FINES FROM STATE REGULATORY AGENCIES. 14. ANY LAND CORNER, PROPERTY MONUMENTATION, OR BENCHMARK WITHIN THE LIMITS OF CONSTRUCTION SHALL BE PROTECTED. IF A CORNER MONUMENT IS IN DANGER OF BEING DESTROYED, THE CONTRACTOR SHALL NOTIFY THE OWNER IMMEDIATELY. ANY CORNER MONUMENT DISTURBED OR DESTROYED SHALL BE RESET BY A PROFESSIONAL LAND SURVEYOR REGISTERED IN THE STATE OF NC AT THE CONTRACTOR'S EXPENSE. CONTRACTOR TO PROTECT OR REPLACE NCDOT RIGHT -OF -WAY MARKERS OR MONUMENTS PER NCDOT 806.01. 15. CONTACT CMUD PROJECT MANAGER IMMEDIATELY REGARDING ANY CONFLICTS THAT ARISE DURING CONSTRUCTION OF WORK SHOWN ON THE DRAWINGS. 16. FOR ALL TIE -IN PIPING OR CROSSINGS, CONTRACTOR SHALL VERIFY ALL EXISTING PIPELINE ELEVATIONS, LOCATIONS, DIAMETERS, AND MATERIALS PRIOR TO SHOP DRAWING SUBMITTALS, NOTIFYING THE ENGINEER OF ANY CONFLICTS. 17. ALL DRIVEWAYS, DRAIN PIPES, HEADWALLS, AND OTHER PHYSICAL FEATURES SHALL BE RESTORED TO EQUAL OR BETTER THAN EXISTING CONDITION, IN BOTH NEW AND EXISTING RIGHTS -OF -WAY AND WITHIN ANY TEMPORARY EASEMENT AREAS. ANY STRUCTURES OR DRIVEWAYS DISTURBED OUTSIDE THE RIGHT -OF -WAY OR EASEMENT SHALL ALSO BE FULLY RESTORED AT NO COST TO THE PROPERTY OWNER, 18. PROTECT ALL DRAIN CULVERTS DURING CONSTRUCTION. MAINTAIN PROTECTION UNTIL DISTURBED AREAS ARE STABILIZED WITH GROUND COVER SUFFICIENT TO RESTRAIN EROSION. 19. PROVIDE TEMPORARY DITCH LINING FOR DISTURBED DITCH LINES OR OTHER AREAS OF CONCENTRATED FLOW WHERE SLOPE IS GREATER THAN 2 %. 20, CONTRACTOR TO EXCAVATE AND DETERMINE ELEVATION OF ALL KNOWN CONFLICTS AT LEAST 1000 FEET AHEAD OF PIPE OR CASING INSTALLATION. 21. CLASS B CONCRETE MIX DESIGN SHALL HAVE A MINIMUM 28 -DAY COMPRESSIVE STRENGTH OF 3600 psi. 22. CONTRACTOR TO PROVIDE BYPASS PUMPING AS NEEDED. COORDINATE FLOW WITH CMUD. 23, ELEVATIONS AND GRADES SHOWN WITHIN THESE CONTRACT DRAWINGS ARE CRITICAL TO THIS SEWER INSTALLATION. CONTRACTOR'S REGISTERED LAND SURVEYOR SHALL VERIFY LINES AND GRADES THROUGHOUT THE INSTALLATION PROCESS. 24. FRPM PIPE TO BE HANDLED WITH CARE WHEN UNLOADING, STORING, AND INSTALLING. USE OF CABLES OR CHAINS IS PROHIBITED. CLEAN PIPE ENDS AND APPLY LUBRICANT PRIOR TO INSTALLING. BED FRPM PIPE MINIMUM 5- INCHES BELOW BOTTOM TO MINIMUM 6- INCHES ABOVE TOP OF PIPE FOR ENTIRE TRENCH WIDTH. EACH PIPE JOINT TO BE TESTED IN ACCORDANCE WITH CONTRACT SPECIFICATIONS. ALL FRPM PIPE SHALL BE MANDREL TESTED FOR DEFLECTION NOT LESS THAN 30 -DAYS FOLLOWING COMPLETION AND ACCEPTANCE OF BACKFILL. COMPLETED INSTALLATION TO HAVE ZERO LEAKAGE. 25. PULL TESTING SHALL BE REQUIRED FOR MANHOLE COATINGS AND SHALL BE PERFORMED BY A THIRD PARTY TESTING FIRM PAID BY CMUD. CONTRACTOR SHALL BE RESPONSIBLE FOR RECOATING ALL PULL TEST LOCATIONS. 26. PRE - DRILL, MAXIMUM 25 -FOOT INTERVALS, AHEAD OF LAYING PIPE TO DETERMINE ROCK ELEVATION. 27. SUBMIT SCHEDULE OF VALUES FOR PAY ITEM 2 AS DESCRIBED IN CONTRACT SPECIFICATIONS. 28. EXCESS EXCAVATED MATERIAL FROM PIPE OVERBURDEN SHALL BE REMOVED FROM THE SITE AND DISPOSED OF AT AN APPROVED AND PROPERLY PERMITTED OFFSITE LOCATION. CONTRACTOR SHALL PROVIDE TO ENGINEER EROSION AND SEDIMENT CONTROL DRAWINGS APPROVED BY NCDENR LAND QUALITY SECTION FOR ALL OFFSITE DISPOSAL AREAS USED ON THE PROJECT PRIOR TO DISPOSING OF ANY MATERIALS OFFSITE. 29. REPLACE ALL EXISTING FENCES IMMEDIATELY AFTER CONSTRUCTION HAS CLEARED THE FENCE LINE. TEMPORARY FENCES THAT PROVIDE EQUAL SECURITY SHALL BE ERECTED UNTIL THE EXISTING FENCE CAN BE RESET. 30, THIS PROJECT REQUIRES WORK TO BE PERFORMED WITHIN THE NCDOT RIGHT -OF -WAY. WORK SHALL BE PERFORMED AS OUTLINED IN THE ENCROACHMENTS ISSUED BY NCDOT. NOTIFY THE NCDOT DISTRICT ENGINEER TWENTY -FOUR (24) HOURS PRIOR TO COMMENCING ANY CONSTRUCTION WITHIN THE DEPARTMENT'S RIGHT -OF -WAY. ALL MATERIALS USED IN NCDOT RIGHT -OF -WAY TO BE APPROVED BY NCDOT. 31. LIMITS OF DISTURBANCE FOR THIS PROJECT IS APPROXIMATELY 2.3 ACRES. 32. DELAYED AVAILABILITY ON LINEBERGER PROPERTY. SEEDING SCHEDULE APPLICATION RATES IN POUNDS /ACRE SEED ** PLANTING PROPOSED � FORCEMAIN & GRAVITY SEWER STRAW o PROPOSED SAN SWR MANHOLE MIXTURE SEASON LIME* SEED FERTILIZER* MULCH TOPDRESSING* COMMENTS UNDERGROUND TELEPHONE UGT OVERHEAD TELEPHONE OHT UNDERGROUND CABLE TV 500 OF USE CHANNEL OR DITCH LINING P APRIL 15 -JUNE 15 2000 150 500 4000 10 -10 -10 (WHERE SPECIFIED) TO COVER BOTTOM �< TOWER LINE EXISTING GAS MAIN EXIST ?" GAS GAS VALVE 60 OF NITROGEN OF DITCHES, 9GTW EXISTING WATER OR SEWER R/W EXIST R/W PROPOSED WATER OR SEWER R/W -- PROPOSED TCE /LOC 500 OF USE CHANNEL OR DITCH LINING PF AUG 15 -OCT 15 2000 150 500 4000 10 -10 -10 (WHERE SPECIFIED) TO COVER BOTTOM MARSH - CREEK OR BRANCH -- -�- TOP OF BANK /SLOPE 60 OF NITROGEN OF DITCHES. TOE OF BANK /SLOPE .TOE. RIP - RAP WOODSLINEw� 500 OF USE CHANNEL OR DITCH LINING PW FEB 15 -MARCH 21 2000 150 500 4000 10 -10 -10 (WHERE SPECIFIED) TO COVER BOTTOM FENCE ( LABEL TYPE ) STREET SIGN ( LABEL TYPE) y STORM DRAIN /CATCH BASIN 60 OF NITROGEN OF DITCHES. TW JAN 1 -MAY 1 N/A 170 750 -100D 4000 N/A OVER SEED WITH TYPE P SEED MIXTURE ROLLED EROSION CONTROL MATTING STD. 6.17 - TREE PROTECTION BARRIER FENCE SEDIMENT LOG INLET PROTECTION DURING NEXT PLANTING SEASON TS MAY 1- AUGUST 15 N/A 35 750 -1000 4000 N/A OVER SEED WITH TYPE P SEED MIXTURE DURING NEXT PLANTING SEASON TF AUGUST 16 -DEC 30 N/A 120J 750 -1000 4000 N/A OVER SEED WITH TYPE P SEED MIXTURE DURING NEXT PLANTING SEASON * APPLICATION RATES AND /OR CHEMICAL ANALYSIS SHALL BE CONFIRMED OR ESTABLISHED BY SOIL TEST. ** SEED MIXTURES TO BE USED ON THE PROJECT SHALL BE AS FOLLOWS: P - PERMANENT SEEDING (TO EXTEND SPRING SEEDING DATES) 150# /ACRE COMMON HULLED BERMUDA GRASS PF - PERMANENT FALL SEEDING 150# /ACRE KENTUCKY 31 TALL FESCUE (ALTA TALL FESCUE) PW - PERMANENT WNTER SEEDING 150 # /ACRE KENTUCKY 31 TALL FESCUE (ALTA TALL FESCUE) TW - TEMPORARY WNTER SEEDING 120# /ACRE RYE (GRAIN) 50# /ACRE KOREAN LESPEDEZA TS - TEMPORARY SUMMER SEEDING 35# /ACRE BROWN TOP MILLET OR SUDAN GRASS PER ROLL, AS MANUFACTURED BY AMXCO, AMERICAN EXCELSIOR COMPANY, OR EQUAL. TF - TEMPORARY FALL SEEDING 120# /ACRE RYE (GRAIN) * ** APPLY ASPHALT AT A RATE OF 0.10 GAL, /YD' (10 GAL /1,000 FT� TD TACK STRAW MULCH, CONSTRUCTION SEQUENCE SUBMIT A SCHEDULE OF PROPOSED CONSTRUCTION OPERATIONS TO ENGINEER FOR REVIEW PRIOR TO COMMENCING WITH CONSTRUCTION. THE SCHEDULE SHALL INDICATE THE SEQUENCE OF WORK, TIME OF STARTING AND COMPLETING EACH PART, DATES FOR ANY CONNECTIONS TO BE MADE TO EXISTING PIPING, STRUCTURES, OR FACILITIES. GENERAL CONSTRUCTION SEQUENCE SHALL BE AS FOLLOWS: 1. INSTALL EROSION CONTROL DEVICES. 2. CLEAR AND GRUB LIMITS OF CONSTRUCTION. 3. INSTALL THE PROPOSED 42 -INCH DIAMETER SEWER LINE WITH RELATED BRANCH LINES AS INDICATED ON THE CONTRACT DRAWINGS. PIPE AND MANHOLE TESTING TO BE PERFORMED CONCURRENT WITH THE INSTALLATION OF THE WORK, PER SPEC XXXX. FINAL CONNECTIONS TO EXISTING PIPING SHALL NOT BE MADE TO PREVENT SEWAGE FROM FLOWING INTO THE NEWLY INSTALLED PIPE. 4. TV THE NEW INSTALLATION. 5. INSTALL INTERIOR MIC COATING IN MANHOLES 6, COMPLETE PROJECT IN ACCORDANCE WITH CONTRACT DOCUMENTS. 7. THIS PIPE WILL NOT BE ACTIVATED AS PART OF THIS PROJECT. 3 107/141 JOG LEGEND PROPOSED AIR RELEASE VAULT EXISTING � SAN. SWR. PROPOSED � FORCEMAIN & GRAVITY SEWER EXISTING SAN SWR. MANHOLE o PROPOSED SAN SWR MANHOLE 0 EXISTING WATER MAIN EXIST WL EXISTING WATER VALVE D 11 EXISTING FIRE HYDRANT WATER METER UNDERGROUND TELEPHONE UGT OVERHEAD TELEPHONE OHT UNDERGROUND CABLE TV UGTV OVERHEAD CABLE TV DHTV UNDERGROUND FIBER OPTIC FOC UNDERGROUND ELECTRIC UGE OVERHEAD ELECTRIC ❑HE UTILITY POLE /GUY WIRE �< TOWER LINE EXISTING GAS MAIN EXIST ?" GAS GAS VALVE •GV GAS TEST WELL 9GTW EXISTING WATER OR SEWER R/W EXIST R/W PROPOSED WATER OR SEWER R/W -- PROPOSED TCE /LOC P LLI -e- ROAD /STREET R/W Riw PROPERTY LINE -fl- EDGE OF PAVEMENT GROUND PROFILE EXISTING IRON PIN MARSH - CREEK OR BRANCH -- -�- TOP OF BANK /SLOPE ... ' . TOE OF BANK /SLOPE .TOE. RIP - RAP WOODSLINEw� TREE BUILDING L IIIIIIRAILROAD I I I I I I GUARD RAIL T T T BRIDGE FENCE ( LABEL TYPE ) STREET SIGN ( LABEL TYPE) y STORM DRAIN /CATCH BASIN SEDIMENT FENCE (SILT FENCE) STD. 6.62 1 o CHECK DAM STD. 6.83 - ®� TEMPORARY STREAM CROSSING STD. E.C. 1 STONE FILLED BURLAP BAGS STD. E.C. 2 O STONE AND CONCRETE RIP -RAP STD. E.C. 3 - ROLLED EROSION CONTROL MATTING STD. 6.17 - TREE PROTECTION BARRIER FENCE SEDIMENT LOG INLET PROTECTION RECORD DRAWING THIS DRAWING HAS BEEN MODIFIED TO REFLECT FIELD CHANGES REPORTED BY THE CONTRACTOR OR ANOTHER PARTY, BUT NOT VERIFIED BY THE CERTIFYING ENGINEER Know wh�t'� below. C II befor you chi . THIS DOCUMENT ORIGINALLY ISSUED FOR CONSTRUCTION AND SEALED BY JAMES N. STRUVE, SEAL NUMBER 18179. C� Z Q D O U w ry Iffi 9FA 101-+-00 1 02 +00 GUARDR N\\ \PP 3H0 PP o EXIST 12" WATER MAIN / — ,� o Illllll�f rrl :c _ \ EIP o VACUUM EXCAVATION (LQC),� 12" WATER MAIN _- \\\ \ \ \\ ti DEPTH Ti TOP OF PIPE 1+00 •-� _ _- -- °=`;�. + PID o =t BORE #1 \ EIP � — ^ e e�,,� e TCE (L OC) XX \ \ \ \ \\ \ \ \\ \ EIP \ BROc / \ o SS SSA i I \ \\ \ 640 \ b 104-+-00 1 05 +00 PROFILE HORZ: 1 " =40' VERT: 1 " =4' 106 +00 BILLY GRAHAM PARKWAY (US H W Y 52 1) 107 +00 108 +00 1094-00 EDP — C/A J 1 1 0 +00 T r -I /V,' / / JV4LV / I p - — I DB 3192, PG 237 DB 3180, PG 207 DB 320, PG 213 PLAN PROPOSED RETAINING DB 27267, PG 502 WALL (BY OTHERS) DB 54, PG 111 I"=40' 3 107/141 JOG I RECORD DRAWINGS 20140701 9:44A H: \32070 -000 \Drawing9\Taggart Creek \CON TR ACT\Gravity Sewer OPTION 2 \PP 4— HOPE —VII By. JGREENE Last Saved By jgreene XREFs= .. \..\ BASE\ SP —XP,H: \32070 -000 \Drawings \Taggart Creek\ BASE\ 32070- 000- 8 ASE— HOPEVI,H: \320 70-000 \Drawing s\Taggart Creek \MI SC\H OPE— VI _GS_TB, H: \32070-000\Dra win gs\Ta ggart Creek \BASE \Survey \HOPE VI \HOPE VI,H: \32070 -000 \Drawings \Taggart Creek\ BASE \ExistProperty,H: \32070 -000 \Drawings \Taggart Creek \BASE \Exi stProperty— G IS NOTES: 1. CONTRACTOR SHALL MAINTAIN EXISTING CONCRETE SOUND BARRIER WALL ALONG BILLY GRAHAM PARKWAY AND RESTORE TO PRE – EXISTING CONDITION AT NO ADDITIONAL COST TO OWNER. 2. PROPOSED MULTI – FAMILY DEVELOPMENT WITHIN CITY OF CHARLOTTE HOUSING AUTHORITY PROPERTY (SHOWN ON THESE PLANS) IS REFERRED TO AS THE HOPE VI DEVELOPMENT. THE HOPE VI DEVELOPMENT IS CURRENTLY UNDER CONSTRUCTION. CONTRACTOR SHALL COORDINATE CONSTRUCTION OF SANITARY SEWER LINE AS SHOWN IN THESE CONTRACT DOCUMENTS WITH DEVELOPER AND CONTRACTOR OF THE HOPE VI DEVELOPMENT. 3. PLUG PIPE AFTER INSTALLATION WITH MASONRY WALL. 4. PRE –BLAST ROCK TO ELEVATION 605 AT A WIDTH OF 8' FROM STA 102 +00 TO BEGINNING OF PIPE INSTALLATION (STA 103 +00). 5. INSTALL SILT FENCE AND STABILIZED OUTLET FOR SILT FENCE WHERE PANELS HAVE BEEN REMOVED FROM EXISTING CONCRETE SOUND BARRIER WALL. 6. WATER LEVEL AND AUGER REFUSAL ELEVATIONS PER BORING RESULTS ARE PROVIDED BY S &ME REPORT ENTITLED "RESULTS OF GEOTECHNICAL SERVICES, PROPOSED CMU TAGGART CREEK GRAVITY SEWER OUTFALL, HOPE VI DEVELOPMENT" DATED OCTOBER 10, 2012. APPENDIX TO CONTRACT PROJECT MANUAL. RECORD DRAWING THIS DRAWING HAS BEEN MODIFIED TO REFLECT FIELD CHANGES REPORTED BY THE CONTRACTOR OR ANOTHER PARTY, BUT NOT VERIFIED BY THE CERTIFYING ENGINEER i] Knowwhat's below. a�� for you di . THIS DOCUMENT ORIGINALLY ISSUED FOR CONSTRUCTION AND SEALED BY JAMES N. STRUVE, SEAL NUMBER 18179. 0 Z_ Q 0 U w ry TA 10 +9.4 TA 166+ 4. 9 10 +9.5 +TA= '� AHLE 19MAHLE 6 3 .5 111m=632.1 GRADE I Al _,—EXISTING 630 I 630 EXIST 12" WATERMAIN WA TER LEVEL (SEE NOTE #6) 6" STORM DRAIN 6201 A UGER REFUSAL (SEE NOTE 6) 6 0 BEGIN PROJECT AT STA 103 +00, SEE NO TE 3 Ti BORE #1 I PRE —BLAST ROCK 254.46 LF 42" FRPM SN72 0.13: (SEE NOTE 4) 267.94 LF 42" RFPM SN72 ®0.06: 610 275.36 LF ® 42" FRPM SN72 0.13: 610 — INV 609.32 __ — — " " FL O r= 0 .21 — 4 " 42" SANITARY SEWER FUTURE PROPOSED WORK 600 LL I I I 6 0 101-+-00 1 02 +00 GUARDR N\\ \PP 3H0 PP o EXIST 12" WATER MAIN / — ,� o Illllll�f rrl :c _ \ EIP o VACUUM EXCAVATION (LQC),� 12" WATER MAIN _- \\\ \ \ \\ ti DEPTH Ti TOP OF PIPE 1+00 •-� _ _- -- °=`;�. + PID o =t BORE #1 \ EIP � — ^ e e�,,� e TCE (L OC) XX \ \ \ \ \\ \ \ \\ \ EIP \ BROc / \ o SS SSA i I \ \\ \ 640 \ b 104-+-00 1 05 +00 PROFILE HORZ: 1 " =40' VERT: 1 " =4' 106 +00 BILLY GRAHAM PARKWAY (US H W Y 52 1) 107 +00 108 +00 1094-00 EDP — C/A J 1 1 0 +00 T r -I /V,' / / JV4LV / I p - — I DB 3192, PG 237 DB 3180, PG 207 DB 320, PG 213 PLAN PROPOSED RETAINING DB 27267, PG 502 WALL (BY OTHERS) DB 54, PG 111 I"=40' 3 107/141 JOG I RECORD DRAWINGS 20140701 9:44A H: \32070 -000 \Drawing9\Taggart Creek \CON TR ACT\Gravity Sewer OPTION 2 \PP 4— HOPE —VII By. JGREENE Last Saved By jgreene XREFs= .. \..\ BASE\ SP —XP,H: \32070 -000 \Drawings \Taggart Creek\ BASE\ 32070- 000- 8 ASE— HOPEVI,H: \320 70-000 \Drawing s\Taggart Creek \MI SC\H OPE— VI _GS_TB, H: \32070-000\Dra win gs\Ta ggart Creek \BASE \Survey \HOPE VI \HOPE VI,H: \32070 -000 \Drawings \Taggart Creek\ BASE \ExistProperty,H: \32070 -000 \Drawings \Taggart Creek \BASE \Exi stProperty— G IS NOTES: 1. CONTRACTOR SHALL MAINTAIN EXISTING CONCRETE SOUND BARRIER WALL ALONG BILLY GRAHAM PARKWAY AND RESTORE TO PRE – EXISTING CONDITION AT NO ADDITIONAL COST TO OWNER. 2. PROPOSED MULTI – FAMILY DEVELOPMENT WITHIN CITY OF CHARLOTTE HOUSING AUTHORITY PROPERTY (SHOWN ON THESE PLANS) IS REFERRED TO AS THE HOPE VI DEVELOPMENT. THE HOPE VI DEVELOPMENT IS CURRENTLY UNDER CONSTRUCTION. CONTRACTOR SHALL COORDINATE CONSTRUCTION OF SANITARY SEWER LINE AS SHOWN IN THESE CONTRACT DOCUMENTS WITH DEVELOPER AND CONTRACTOR OF THE HOPE VI DEVELOPMENT. 3. PLUG PIPE AFTER INSTALLATION WITH MASONRY WALL. 4. PRE –BLAST ROCK TO ELEVATION 605 AT A WIDTH OF 8' FROM STA 102 +00 TO BEGINNING OF PIPE INSTALLATION (STA 103 +00). 5. INSTALL SILT FENCE AND STABILIZED OUTLET FOR SILT FENCE WHERE PANELS HAVE BEEN REMOVED FROM EXISTING CONCRETE SOUND BARRIER WALL. 6. WATER LEVEL AND AUGER REFUSAL ELEVATIONS PER BORING RESULTS ARE PROVIDED BY S &ME REPORT ENTITLED "RESULTS OF GEOTECHNICAL SERVICES, PROPOSED CMU TAGGART CREEK GRAVITY SEWER OUTFALL, HOPE VI DEVELOPMENT" DATED OCTOBER 10, 2012. APPENDIX TO CONTRACT PROJECT MANUAL. RECORD DRAWING THIS DRAWING HAS BEEN MODIFIED TO REFLECT FIELD CHANGES REPORTED BY THE CONTRACTOR OR ANOTHER PARTY, BUT NOT VERIFIED BY THE CERTIFYING ENGINEER i] Knowwhat's below. a�� for you di . THIS DOCUMENT ORIGINALLY ISSUED FOR CONSTRUCTION AND SEALED BY JAMES N. STRUVE, SEAL NUMBER 18179. 0 Z_ Q 0 U w ry l 11 1 1 +00 EX SSMH RIM 638.75 INV IN 617.01 NW INV IN 615.20 N INV IN 616.70 NE INV OUT 615.08 ■■■■■■■■■■ ■ ■ ■ ■I ■ ■ ■ ■ ■■ ■■■■■■■■■■ 0000 ■ ■ ■00■ ■■■■■■■■■■ ■� ■ ■ ■ ■ ■ ■ ■■ ■ ■ ■ ■ ■ ■ ■ ■ ■11 ■■■■■■■■■■ ■■■■■■■■■■ ■■■ 0000 ■ ■ ■I ■■■■■■■■■■ ■ ■ ■ ■� ■ ■ ■ ■ ■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■�1��7 ■ ■ ■ ■ ■■ ■ ■ ■ ■ ■ ■ ■ ■ ■11 ■■■■■■■■■■ 0000■ ■0 - �■ ■■■ 0000 ■ ■ ■I ■■■■■■■■■■ ■ ■ ■I!1� ■ ■ ■ ■ ■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■ ■�� ■ ■ ■ ■ ■■ � ■ ■ ■ ■ ■ ■ ■ ■�1 ■■■■■■■■■■ ■ ■ ■ ■ ■ ■L���■ ■■■ 0000 ■ ■ ■I ■■■■■■■■■■ ■ ■ ■1� ■ ■ ■ ■ ■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■I�� ■ ■ ■ ■ ■■ �� ■ ■ ■ ■ ■ ■ ■�� : EMBANKMENT OR .. : - A = DETAIL : ' , ; " � ■ ■ ■ ■ ■ ■ ■��■i� ■■■ 0000 ■ ■ ■I ■■■■■■■■■■ ■ ■ ■1�� ■ ■ ■ ■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■�i�� ■ ■ ■ ■ ■■ \� ■ ■ ■ ■ ■ ■E�� ■ ■ ■ ■ ■E� = -�■ ■■■ 0000 ■ ■ ■I ■■■■■■■■■■ ■ ■■ ■ ■ ■ ■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■ ■I ■ ■ ■ ■ ■ ■ ■■ `L ii■ ■ ■ ■ ■ ■0 ■ ■ ■ ■M ' �I ■■■ 0000 ■ ■ ■I ems■■■■■■ ■■ ■■■ ■��■ ■ ■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ r. ■i■■■■■■■■ ■� ■■■■ ■ ■ ■�� EI ■ ■■ ■ ■��� ■■■ 0000■ : ■1 ■■■■■■■■■■ ■ ■■�r� ■ ■ ■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■ ■i■■■■■■■■ ■ ■ ■■■ ■ ■ ■ ■�1 ■ 0000■ ■■■ ■■■ PRE-BLAST ROCK ■1 ■■■■■■■■■■ ■ ■ ■ ■I ■ ■ ■ ■ ■■ ■■■■■■■■■■ 0000 ■ ■ ■r ■■ !■' '' ©0000■■■ ■ ■',I t■■■■■■■ ■ ■ ■ ■ ■ ■ ■_ ■_ ■111 0000_■■ \� ■ ■ ■■ ■■■ ■■■ 01 100YR FLOOD ■�. ■ ■ ■ ■ ■ ■ ■■ ■ ■ ■■1 ■ ■ ■ ■ ■■ ■■■■■■■■■■ 0000 ■■ \■ ■■ ■ ■ ■■ ■■ ■ ■ \r ■ 11 ■ 0000■ ■11 ■ ■ ■ ■ ■■ ■III ■I 0000■ \0_000 ■ ■ ■■I 0000■■ ■■■■■■■■■■ ■ ■ ■ ■II ■ ■ ■`!.it ■ ■ ■ ■ ■ ■■ ■1 III ■ 0000■ II 1 ■ ■ ■ ■ ■■ ■III \I■■ 0000 ■ ■ ■1 ■■■ ■■■ 000_0_ ■_ ■__ ■I ■ ■ ■ ■ ■ ■� ■ ■■ ■ ■ ■i�■ ■ ■ ■ ■■ ■■■■■■■■■■ ■■0II■■■■■■ ■■■■■■■■■■ ■1 III 0000 ■ ■■ ■III 1 ■ ■ ■ ■ ■■ ■III ■ ■ ■ ■ ■ ■ ■ ■�■■ ■ ■ ■� ■ ■__ ■_ ■�I ■■■ ■■■ ■���� ■�I ■■■■■■■■■■ ■r��.l 0000■■ ■■■■■■■■■■ ■ ■ ■� ■ ■ ■ ■ ■■ ■■■■■■■■■■ ■1 III 0000 ■ ■■ ■III 1■■■■■■■ 1 I ■ ■ ■ ■ ■ ■ ■ ■!�1 �����■ 11 ��� �� ■_ 0_0_0_0_ ■_ ■ ■I ■■■■■■■■■■ ■■■lii 0!000■ ■■■■■■■■■■ ■ ■II 0000■!■ ■ ■ ■ ■E ■ ■ ■ ■■ ■1 III 0000 ■ ■■ ■III 1■■■■■■■ II I A ■ ■ ■ ■ ■ ■ ■��■ 0000 ■ ■1 I I ■■■ ■■■ ■ ■��� ■01 ■■■■■■■■■■ ■■ ■III 0000■\ iir\ \0000■■ ■■■■■■■■■■ ■■■■■■■■■i ■1 III 0000 ■ ■■ ■III 1■■■■■■■ 1 I ■ ■ ■ ■ ■ ■ ■ ■ \`■ 0000 ■ ■1 I I ■■■ ■■■ 0000 ■ ■ ■I e� ■ ■ ■■ ■ ■ ■■ ■■■i 11 0000■■ ■■ ■■:.� ■ ■■■ 0000 AUGER I I I I I - I I ■■■■■■■■ ■� �i ■■■■■■■■ ■ 11 ■■■■■■■■ 11 i ■■■■■■■■■►■ Uri■ ■ ■n■ 1 r ■e �r■ ■ ■ ■ ■1 ■■■■■■■■■■ ■■■i r1 0000■■ ■■■■■■■■■■ 0000 ■■■■■■■■ ■� n ■■■■■■■■ ■ 11 ■■■■■■■■ 11 i ■■■■■■■■■■ ■■■■i■■ rr ■iii ■�■ 0000 ■ ■ ■1 ■■■■■■■■■■ ■ ■ ■I Y 0000■■ ■� 0000 0000 0000 ■■■■■■■■■■ WA TER LEVEL, _ ■ ■ ■■ ■ ■■■■■■■■■ \ \0000■■ ■1 �I 0000 ■ ■■ ■III 1 ■ ■ ■ ■ ■■ ■III ■■■■■■■■■■ ■ ■ ■ ■� ■1 II III■ ■■■ 0000 ■ ■ ■I ■■■■■■■■■■ ■■■■■■■■■■ ■ ■ ■ ■ ■I ■I n Y 0000■■ 0000■■ ■ ■■■■■■■■■ ■■ ■■■■m ■ice , : • _ ■■ ■1 �I 0000 ■■ ■■III 1 ■ ■ ■ ■■ ■■III ■■■■■■■■■■ ■1 II III■ ■■■ ■■■ ■I , - - , . , : . • OM NI III ■■■■■■■■ ■ 11 ■■■■■■■■ 11 I ■■■■■■■■■■ ■■■■■■■ II 111■ ■■ ■■■■■■■■■■ ■ ■ ■I n 0000■■ ■�■ ■■■■■■■■■ ■■■■■■■■■■ ■1111 §0000000111 1 I ■■■■■■■■■■ 0000■ ■111111■ ■■ ■ ■ ■ ■�L�I�JI■ ■11 AAl�I!�ll [I 0000■■ �S ■ 1-0000000000111111 ■■■■ ■■ 1111 ■ ■ ■ ■■ ■■III ■■■■■■■■■■ 0000■ ■111111■ ■■ ■_■ ■r t ■0 ■_ ■0 ■_111 ■_■_■__■_■_■_■■_■_■_ 0_0__00_■_■_■__:.. ■_1111: • - ■ , ■■ 1111■■■■■■■ I I MENU■■■■■■_ ■■■■NU■ — -- 11 . HT ■■ - - -- —ate II _0_00__0■_■_ ������ �������� ■■ � ■ ■ ■ ■ ■ ■■ _._■_■_■■_■_■_■__■■_ ■■■■■■■■■■ ■111 �uu■ -9- ,., , .: ■ ■ I I ■■ .. 0, , ■ II � ■E■ 0000■ 0000 ■111111■ ■■■ . . :: ■I _�� ������� ��I_� ■ ■II 0000■■■ ■■ ■111 0000■■ ■■■■■■■■ , , : 0000000000000111 ■■ ■ 1111■ ■III �� ■■ , 8, 0000 ■111111■ ■ ■� ■1 ,; e■■■■■■■■■ ■■■i 0000 : • - 0000■■ ■■ ■■■■■■■■ :..: �i ■■ 0111 ■■ ■ 11 loom ■■ ON 11 ■■■ ■r�■ ■■■■ ■e ■1 ■ ■ ■ ■E■ ■E ■ ■ ' I�III ■ ■ ■■ ■■ ■ ■� ■■1 �� ■ ■ ■ ■ ■ ■ ■ ■■� ■■ � ■■■■■■■■■■ ■ ■ ■ ■ ■ ■ ■ ■■ ■�����__�� 0000 �����■■��•� ■ ■■ �•■ ■L! n ��____ 11 _0_00_0_ ■■■ ■■■ 0000 ■ ■ ■1 _:11:= = = =___ i __��_����� ■■■■ili■ r1 ■ ■ ■ ■■ii ■ ■ ■ ■ ■�■ > ■ ■ ■ ■ ■ ■■ L':1 ■ ■�0:� ■� ■� © ■ ■■ ■ ■ ■ ■ ■� ■�iE�� �,� ■ ■ ■ ■ ■ ■ ■I ■■■■■■■■■■ ■ ■ ■■10��� -- 0■ - - - 0000■■■ ■■■■■■■■■\ \■■■ 00■■ 42 IWTARY SEWER ■ ■IC�Q • X000■ ■ ■■ . -0 ■ ■11 ■0 ■ ■■ ■ ■ ■ ■II ■■ f i1f y1�I■0 ■ ■ ■ ■ ■I ■■■■■■■■■■ ■ ■ ■■1 ■ - ■■ 0000■■■ ■■■■■■■■■■ `■ ■■11��1� ■ ■■ ■ ■ ■■ ■ ■ ■■ ■■■■■■■■■■ 0000■ ■e - - . - ■ ■ ■1 SEE CMUD , STANDARD "CONCRETE COLLAR" - ■■■■■■■■ = • - ■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■ ■■■■■■■■■■ ■■■■■■■■■■ ■ 0000■ ■■■ 0000 ■ ■ ■I ■■ ■■ ■■ ■■MEW WII■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■ 0000■ ■ - - . - . ■■I ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■ ■■ ■ ■ ■■ ■■■ ■ ■ ■■ ■ ■ ■ ■■■ ■ ■ ■ ■ ■ ■■ ■■■ FUTURE WORK ■ ■I ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■�����i ■ ■I 11 1 1 +00 EX SSMH RIM 638.75 INV IN 617.01 NW INV IN 615.20 N INV IN 616.70 NE INV OUT 615.08 (EOP) (E0-p-)_ - i 1 1 2 +00 EX 10" SS PARKWAY g,LLY GRARAM AM 52 1) (u5 N 6 j_ lA NH, O / 620 = SEE CONNECTION NO. 1 ��7-- SEE SHEET 6 1 n BORE #2 i 615 L 9 1 1 3 +00 1 1 4 +00 1 1 5 +00 BORE #10TH 16-+-00 11 7 +00 PROFILE HORZ: I"=40' VERT: 1"=4' NCDOT CONTROLLED ACCESS, STATE PROJECT NO. 82722904 SHEET 31 1 18 +00 1 19 +01019 +00 1194-73 ivc.uv i fT/ ry NCDOT RR/W ANTI -SEEP COLLAR, SEE CMUD STANDARD DETAIL "CONCRETE COLLAR" TYP 00+/EX 10" SS W/ 25' -J PERMANENT EASEMENT 630 1 � (LOc) o \ ` HOUSING AUTHORITY \ INV O 620.39 / - �V, \ ° CITY OF CHARLOTTE INV OUT 620.37 �0 \ QC END PROJECT AT C$ I �� n , -625 STA 1 19408.97, $ I PIN# 11504201 SEE NOTE 3 ° DB 3192, PG 237 \ _ ,o � _ l ( ✓ n \ / E STREET DB 3180, PG 207 SSMH \ \ �� QC) s ° O KSVAL DB 320, PG 213 RIM 634.83 1 BR Q DB 27267, PG 502 INV IN 621.05 % 1 DB 54, PG III INV OUT 621.03 EX SSMH RIM 631.72 INV 621.57 SEE CONNECT /ON NO. 2 SEE SHEET 6 PROPOSED STORM DRAIN (BY OTHERS) 20140701 9:46A H:\32070-000 Drawin s Ta art Creek CONTRACT Gravit Sewer OPTION 2 PP 5— HOPE —Vl.dw B : JGREENE Last Saved B . ' reene XREFs= .. .. BASE SP —XP 32070 -000 Drawin s Ta art Creek BASE 32070 -000— BASE— HOPEVI H: 32070 -000 Drawin s Ta art Creek MISC HOPE —VI GS TB H: 32070 -000 Drawin s Ta art Creek BASE Surve HOPE VI HOPE VI H: 32070 -000 Drawin s Ta art Creek BASE ExistPro ert H: 32070 -000 Drawin s Ta art Creek BASE Surve Barr Davis 07 -19 -2012 ACAD 2007 —Ta ert Creek Storm and Sanitary Sewer H: 32070 -000 Drawin s Ta art Creek BASE ExistPro ert GIS � � 9 � 99 � � Y � 9 Y Y 19 � � � .H � � 9 � 99 � � � � � 9 � 99 � � — — � � � 9 � 99 � � Y� � . � � 9 � 99 � � P Y. � � 9 � 99 � � Y� Y � 99 Y � � 9 � 99 � � P Y- NOTES: 1. CONTRACTOR SHALL MAINTAIN EXISTING CONCRETE SOUND BARRIER WALL ALONG BILLY GRAHAM PARKWAY AND RESTORE TO PRE - EXISTING CONDITION AT NO ADDITIONAL COST TO OWNER. 2. PROPOSED MULTI - FAMILY DEVELOPMENT WITHIN CITY OF CHARLOTTE HOUSING AUTHORITY PROPERTY (SHOWN ON THESE PLANS) IS REFERRED TO AS THE HOPE VI DEVELOPMENT. THE HOPE VI DEVELOPMENT IS CURRENTLY UNDER CONSTRUCTION. CONTRACTOR SHALL COORDINATE CONSTRUCTION OF SANITARY SEWER LINE AS SHOWN IN THESE CONTRACT DOCUMENTS WITH DEVELOPER AND CONTRACTOR OF THE HOPE VI DEVELOPMENT. 3. PLUG PIPE AFTER INSTALLATION WITH MASONRY WALL. 4. PRE -BLAST ROCK TO ELEVATION 605 AT A WIDTH OF 8' FROM END OF PIPE INSTALLATION (STA 119 +08.97) TO STA 120 +00.00. 5. REMOVE AND REPLACE EXISTING FENCE WITHIN LIMITS OF CONSTRUCTION, SEE DETAIL 0244400. 6. WATER LEVEL AND AUGER REFUSAL ELEVATIONS PER BORING RESULTS ARE PROVIDED BY S&ME REPORT ENTITLED "RESULTS OF GEOTECHNICAL SERVICES, PROPOSED CMU TAGGART CREEK GRAVITY SEWER OUTFALL, HOPE VI DEVELOPMENT" DATED OCTOBER 10, 2012. APPENDIX TO CONTRACT PROJECT MANUAL. 7. NOTE DELAY START ON LINEBERGER PARCEL, DATE T13D. 12 LUTHER LINEBERGER ET AL. PIN# 11507501 DB 658, PG 126 (SEE NO TE 7) SSMH RIM 624.51 INV IN 618.78 N INV IN 618.96 SE INV OUT 618.72 RECORD DRAWING THIS DRAWING HAS BEEN MODIFIED TO REFLECT FIELD CHANGES REPORTED BY THE CONTRACTOR OR ANOTHER PARTY, BUT NOT VERIFIED BY THE CERTIFYING ENGINEER 'r1 Kn w wh t'� below. befer you III . THIS DOCUMENT ORIGINALLY ISSUED FOR CONSTRUCTION AND SEALED BY JAMES N. STRUVE, SEAL NUMBER 18179. 0 Z_ 0 O U w F4n Lr full 0 +00 SSMH RIM 638.75 INV IN 617.01 NW/ INV IN 615.20 N INV IN 616.70 NE INV OUT 615.08 / 55 ter. PROFILE HORZ: I"=40' VERT: I"=4' 59.80 LF DI PIPE P401 CORE DRILL EX /STING MANHOLE AND CONNECT NEW DI PIPE. POUR CLASS B CONCRETE COLLAR AROUND CONNECTION. 2 — 8'(EXIST) 7 - 8'(EX /ST) .48 - 12'(PROP) .48 - 10'(EXIST) 1 +00 / EX 10" SAN. SEWER TO REMAIN IN SERVICE 42" SANITARY SEWER e i s oo /j 12" SANITARY / ILL SEWER 5,,� 111+3 Z111 �r0 ei // PERMANENT EASEMENT / BORE #3 NCDOT RW '\° i x, PLAN CONNECTION N0. 1 (SEE SHEET 5) 1"=20' e_- _ NCDOT MW 30 PERMANENT EASEMENT C / / EX 8" SS W/ 20' EASEMENT END PROJECT AT STA 119 +08.97, SEE NO TE 3 - 30' TCE S24. 03' 00"'E 40.00'- 00+6[L Fin Fin ■■ ■■■■■■■■■■ ■■ ■■■■■■■■■■ ■■ ■■■■■■■■■■ ■■ ■■■■■■■■■■ ■■■■■■■■■■■■ ■■ NOON■ � � ■■■ ■■ ■■■■■■■■■■ ■■ ■■■■■■■■■■ ■■ ■■■■■■■■■■ ■■■■■■■ NONE ■■■■■■■ ■■■ NEE ■■ NOON ■■ j 1 ■ .. , -, 0.99Y. .� 12 A. ` - " ■■■■■■■ ■■m ■ ■■■ ■■ s '' 1mr1■ ■■ �■■ Off I INmmir ■ffiI oom■ ■■ II ■■■ ■ ■IIII \ \ ■■ ■ ■III 11\ ■ ■IIII ■�� ■■IIII■ ■■IIII■ ■■ I IN 1111111114110011111111111 ■■■ em !l Ii ■■■■■■■ ■m■ ■■ il i ■■■■■■■■■■ ■■■■■■■■■■■■ ■� ■■■■■■■■ ■■ EXISTING GRADE NOON■■■ ■ ... .,. , ■■■ ■■.NOON ON ■■ ■ ■■ ■■ ■■■■■■ ■ ■■ ■■■■■■■■■ ■■ ■■■■■■■■ EVIIIIIIIIIIIIIIII ■■ I i � ■ ■■ ■IIII■■■ ■., 0 +00 SSMH RIM 638.75 INV IN 617.01 NW/ INV IN 615.20 N INV IN 616.70 NE INV OUT 615.08 / 55 ter. PROFILE HORZ: I"=40' VERT: I"=4' 59.80 LF DI PIPE P401 CORE DRILL EX /STING MANHOLE AND CONNECT NEW DI PIPE. POUR CLASS B CONCRETE COLLAR AROUND CONNECTION. 2 — 8'(EXIST) 7 - 8'(EX /ST) .48 - 12'(PROP) .48 - 10'(EXIST) 1 +00 / EX 10" SAN. SEWER TO REMAIN IN SERVICE 42" SANITARY SEWER e i s oo /j 12" SANITARY / ILL SEWER 5,,� 111+3 Z111 �r0 ei // PERMANENT EASEMENT / BORE #3 NCDOT RW '\° i x, PLAN CONNECTION N0. 1 (SEE SHEET 5) 1"=20' e_- _ NCDOT MW 30 PERMANENT EASEMENT C / / EX 8" SS W/ 20' EASEMENT END PROJECT AT STA 119 +08.97, SEE NO TE 3 - 30' TCE S24. 03' 00"'E 40.00'- 00+6[L Fin Fin ■■ ■■■■■■■■■■ ■■ ■■■■■■■■■■ ■■ ■■■■■■■■■■ ■■ ■■■■■■■■■■ ■■■■■■■■■■■■ ■■ ■■■■■■■■■■ ■■ ■■■■■■■■■■ ■■ ■■■■■■■■■■ ■■ ■■■■■■■■■■ ■■■■■■■■■■■■ ■■ EXISTING GRADE NOON■■■ ■■ ■■.NOON ■■ I i � ■ ■■ ■IIII■■■ ■■ II ■■ ■x!!11 ■ ■ ■■ ■■ II I I�11\ PLUG NOON■■ ■ ■III ISHWATER TIGHT 10 01111 ■■ III INS I■1lON ■ II I MINN.' 199 ,1, �.,4M_ ON II :I ■ ■fJ�mmmm� ■■ ►i ►► u■■■■■■■■■ ■■ II loom■■■■■■ ei li ii ■■■■■■■ ■ma ■■ II ■■■■■■■■■■ ■ad■■■■■■■■■ ■■ �. ■■ ■■ �� ■■ - ■ ■■ ■ ■ ■ ■ ■ ■ ■ ■■ ■■■■■■■■■■■■ ■■ ■■■■■■■■■■ 0 +00 1 PROFILE HORZ: I"=40' VERT: 1"=4' 46 o, ,� fw.'W�kvm Ri)qhvol ss SSMH s� RIM 624.51 S29• 4- „ '467E 20.77'/ INV IN 618.78 N ' M INV IN 618.96 SE s SS INV OUT 61 �0 TCE �L0C) x 10„ ss T a CV 0� sSF� ss � � � / //� 620 �� • 42” SANITARY SEWER PLAN CONNECTION NO. 2 (SEE SHEET 5) 1"=20' ITURE WORK Y OTHERS) of IiIIIIIIIIIII11=0101 /+ A /0+00/1 181 .s ' "I MANHOLE lTH TWA TER TI T RING/ AND COV R 10" SANITARY SEWER \ / ss ?, 1-56 / EXIST MANHOLE TO BE REPLACED AS PART OF l FUTURE WORK EX 10" SAN. SEWER TO I REMAIN IN SERVICE 3 I07/14I JOG RECORD DRAWINGS 20140701 9: 48A H: 32070 -000 Drawin s Ta art Creek CONTRACT Gravit Sewer OPTION 2 PP 6— HOPE —VI.dw B . JGREENE Last Saved B . K rissom XREFs= .. BASE SP —XP H: 32070 -000 Drawin s Ta art Creek BASE 32070 -000— BASE— HOPEVI H: 32070 -000 Drawin s Ta art Creek MISC HOPE —Ml GS TB H: 32070 -000 Drawin s Ta art Creek BASE Surve HOPE VI HOPE VI H: 32070 -000 Drawin s Ta art Creek BASE ExistPro ert H: 32070 -000 Drawin s Ta art Creek BASE Surve Barr Davis 07 -19 -2012 ACAD 2007 —Ta ert Creek Storm and Sanitary Sewer H: 32070 -000 Drawin s Ta art Creek BASE ExistPro ert —GIS � � 9 � 99 � � Y � 9 Y Y 9 •� � � � � � 9 � 99 � � � � 9 � 99 � � — — � � 9 � 99 � � Y� � � � 9 � 99 � � P Y> � � 9 � 99 � � Y� Y � 99 Y � � � 9 � 99 � � P Y NOTES: 1. CONTRACTOR SHALL MAINTAIN EXISTING 20' CONCRETE SOUND BARRIER WALL ALONG BILLY GRAHAM PARKWAY AND RESTORE TO PRE - EXISTING CONDITION AT NO ADDITIONAL COST TO OWNER. 2. PROPOSED MULTI - FAMILY DEVELOPMENT WITHIN CITY OF CHARLOTTE HOUSING AUTHORITY PROPERTY (SHOWN ON THESE PLANS) IS REFERRED TO AS THE HOPE VI DEVELOPMENT. THE HOPE A DEVELOPMENT IS CURRENTLY UNDER CONSTRUCTION. CONTRACTOR SHALL COORDINATE CONSTRUCTION OF SANITARY SEWER LINE AS SHOWN IN THESE CONTRACT DOCUMENTS WITH DEVELOPER AND CONTRACTOR OF THE HOPE VI DEVELOPMENT. 3. PLUG PIPE AFTER INSTALLATION WITH MASONRY WALL. RECORD DRAWING THIS DRAWING HAS BEEN MODIFIED TO REFLECT FIELD CHANGES REPORTED BY THE CONTRACTOR OR ANOTHER PARTY, BUT NOT VERIFIED BY THE CERTIFYING ENGINEER Know what' below. a�� fior you di . THIS DOCUMENT ORIGINALLY ISSUED FOR CONSTRUCTION AND SEALED BY JAMES N. STRUVE, SEAL NUMBER 18179. 0 z 0 w O W ry TRENCH EXCAVATION LIMITS INTERNAL DIAMETER OF PIPE W WIDTH OF TRENCH MAX W =MIN 4" -6» 3' —g„ 2' -0„ 8 „12 0„ 3'- ” 3. OVERLAP EDGES OF ADJACENT PARALLEL ROLLS BY 6 IN AND ANCHOR AT 12 -INCH O.D. +2' 14 -16" 4' -2" O.D. +2' 18" 4' -4" VIEW O.D. +2' 20 ",21 4' -8" O.D. +2' 24" 4' -11" O.D. +2' 27" 5-9" O.D. +2' 30" 6' -7" STREAM BANK STABILIZATION O.D. +2' 36 7' -4" O.D. +2' 42" 8' -2" 0227023R O.D. +2' 48" 8' -9" O.D. +2' 54 9' -4" O.D. +2' 60 9' -10" O.D. +2' 72" 11' -0" O.D. +2' 78" 11' -8" O.D. +2' 84" 12' -0" O.D. +2' 90" 12' -6" O.D. +2' 96" 13' -0" O.D. +2' 108" 14' -0" O.D. +2' DEPTH OF CUT S MAXIMUM PAVEMENT REPLACEMENT WIDTH 0 -6' S =W +4' >6 -8' S =W +8' >8 -10' S= W+ 12' >10 -12' S= W+ 16' >12 -14' S= W+ 20' >14 -16' S =W +24' >16 -18' S= W+ 28' >18' S= W+ 32' W = TRENCH WIDTH PIPE. TRENCH SIDE BE IN ACCORDANCE REQUIREMENTS. AT BOTTOM OF SLOPES SHALL WITH OSHA 0222109 TOP OF SLOPE 5 Is �ft FLOW _ PLAN VIEW INSTALL RECM, PER DETAIL 2/7 SLOPE TO MATCH EXISTING i� /�/ "10. 57 STONE OR FLOWABLE ILL FULL TRENCH WIDTH (N( NCASEMENT REQUIRED FOR PACE GREATER THAN 12 ") PROPOSED PIPELINE OVER EXIST PIPE NOTES: 1. RESTORE BANKS TO PRE - CONSTRUCTION TOPOGRAPHY AND TEMPORARILY STABILIZE WITH SEED AS SPECIFIED IN CONTRACT DOCUMENTS. SEED DENUDED AREA FROM ORDINARY HIGH WATER MARK TO TOP OF BANK WITH ERNST SEED MIX #ERNMX -307 OR APPROVED EQUAL. SEED AREA PRIOR TO MATTING. 2. INSTALL MATTING PER DETAIL 2 - RECM DETAIL. INSTALL MATTING PRIOR TO LIVE STAKING. 3, STABILIZATION WITH LIVE STAKES TO BE INSTALLED IN DORMANT SEASON (DECEMBER 15 - MARCH 31). IF CONSTRUCTION IS COMPLETED OUTSIDE OF DORMANT SEASON, SEED AND MAT AREA PER NOTES 1 AND 2 AND RETURN TO SITE DURING DORMANT SEASON TO INSTALL LIVE STAKES. 4. LIVE STAKES SHALL BE NATIVE SPECIES. ACCEPTABLE SPECIES: CORNUS AMOMUM, SALIX SERICEA, AND SAMBUCUS CANADENSIS. 5. SOAK LIVE STAKES FROM TIME OF HARVESTING TO IMMEDIATELY BEFORE INSTALLATION AND RECUT ENDS TO BE BURIED AT 45 DEGREE ANGLES PRIOR TO INSTALLATION. 6. USE 1,h -INCH TO 74 -INCH REBAR FOR PILOT HOLES PRIOR TO DRIVING LIVE STAKES INTO GROUND. DRIVE LIVE STAKE Y4 OF ITS LENGTH INTO THE GROUND. RECUT ANY EXPOSED LIVE STAKE TIPS DAMAGED BY INSTALLATION SO THAT THEY ARE BLUNT. STAKES TO BE '/ -INCH TO 1.5 -INCH IN DIAMETER, 2 -FT TO 3 -FT LONG. 7. CONTRACTOR SHALL PROVIDE THE SERVICES OF A QUALIFIED PROFESSIONAL IN LIVE STAKING TO INSTALL LIVE STAKING. PROPOSED PIPELINE 6" MIN 12" MAX EXIST PIPE PROPO`. PIPELINI 0222118 EXPC 2 -IN STA4 SLOF PROPOSED PIPELINE UNDER EXIST PIPE NOTES: KLY IN LKUSIUN UUN IKUL MA I I INU FOR A DEPTH OF 1 —FT PER MANUFACTURER'S RECOMMENDATIONS N I X 24 -INCH AD STAKES ORDINARY 1. BEGIN AT TOP OF SLOPE AND ANCHOR FIBER MATTING IN A 12 -INCH DEEP INITIAL HIGH WATER — LIVE STAKES ANCHOR TRENCH, BACKFILL TRENCH AND TAMP EARTH FIRMLY. 2. UNROLL FIBER MATTING DOWNSLOPE IN THE DIRECTION OF WATER FLOW, 3. OVERLAP EDGES OF ADJACENT PARALLEL ROLLS BY 6 IN AND ANCHOR AT 12 -INCH CENTERS. 4. WHEN FIBER MAT MUST BE SPLICED, PLACE END OVER END (SHINGLE STYLE) WITH 12 SECTION VIEW IN OVERLAP AND ANCHOR USING TWO STAGGERED ROWS OF STAKES AT 6 IN CENTERS. 5. LAY FIBER MAT LOOSELY AND ANCHOR SUFFICIENTLY TO MAINTAIN DIRECT CONTACT WITH THE SOIL - DO NOT STRETCH. STREAM BANK STABILIZATION 6. FOR SLOPES 2:1 AND STEEPER USE A MINIMUM OF 3 STAKES PER SQUARE YARD AND FOR SLOPES FLATTER THAN 2:1 USE A MINIMUM OF 2 STAKES PER SQUARE 0227023R 7. YARD. ANCHOR, FILL, AND COMPACT END OF FIBER MATTING IN 12 -INCH X 6 -INCH TERMINAL ANCHOR TRENCH (MIRROR IMAGE OF TRENCH AT TOP OF SLOPE). 8. DO NOT INSTALL MAT UNDERNEATH RIFFLE GRADE CONTROL STONE. RECM DETAIL DETAIL z NTS 7 20140701 9: 49A H: \32070 -000 \Drawings \Taggart Creek \STD DETAILS \HOPE— M \D1— H0PE— \A.dwg By. JGREENE Last Saved By. Kgrissom XREF9= H: \32070- 000 \Drawings \Taggart Creek \MISC \HOPE— V1_GS_T9 K1 07/141 JOG rr: ».�r�;jF�ltni4 RECORD DRAWING =D BACKFILL AND BEDDING 15007) THIS DRAWING HAS BEEN MODIFIED TO REFLECT FIELD CHANGES REPORTED BY THE CONTRACTOR OR ANOTHER PARTY, BUT NOT VERIFIED BY THE CERTIFYING ENGINEER Knowwhat'� below. C II b far you i . THIS DOCUMENT ORIGINALLY ISSUED FOR CONSTRUCTION AND SEALED BY JAMES N. STRUVE, SEAL NUMBER 18179. N 0 z Q 0 ID O U Li ry A Lm- i/ NO T£5: fi I. ALL AlAS04Y A/ORTAR SHALL BE•PORRAN& CEAIETVT 9' JMT DUP. OM.) OR D1P r :.3 A11 TD UAVISRUMED sROLrNa 2. CARE MUST BE TAKEN TO FORM A SUOOTH fiff -SUFED TROUGH FROM ENTRANCE PIPES TO EXT T PIPE, AND 4' MIX ON GURKD MANHOLES THE TROUGH MLOSr BE A SVOOTH CRCULAR ARC TANGENT TO 7HE INSIDE WALLS OF 7T•OE POPES AT TWR ENDS. 3 PROTECMC WALL MR OUTSIDE DROP SMALL BE A �3 U NNUM OF 4* UASONRY. 4. 7W-SL6PF OF THE OUTSIDE DROP TROUGH 6WALL '- DE 114` PER FOOT. SL. ALL POPE OPENFNGS TO BE NO GREATER "N J' w LARGER THAN aV. OF POPE ANO AL 170NALLY V1 ` R&4FORCEV MTN A AOVUL i OF a 2 SO W. OF � ° STEEL AT 90 DEM?FFS PIPE TO BE CENTERED IN SIRACYT WALL Or ACH M '' GPEMVz. ADD)nw& RawoRGTNB Nor REavArD BE L"?ED OWN mxw FOR GORED OPEVNCS. 6. RAMSf r AtASDNO?Y 71ES EERY 12 94CHES 7. DROP STRUCTURE WAY BE FORMED AND POURED OF 3600 PR [(ICRETE IN LF£U OF MASONRY 13. FOOTWO FOR DROP MAY BE POURED AS PART OF zc5 THE U4NNH(XE BASE SLAB OR M-D POURED AND MOVES '. '^ Q 77ED TO MANHOLE BASLE .NTH THREE EOUALLY SPACED - :: 16 REBARS DOWELED 9VTO MANHOLE BASE 2' FROM U) TOP OF aA&. CROUT INTO 9' DEEP IYQLES WITH EXPANSION GROUT, ' 9. OU751DE DM)P SHALL NOT ENTER MANNOYE )N CONE � y SECTFL'NV- .4 to MATCH DROP INFLUENT CROM TO CROWN *TH A EFFLUENT PIPE. OT. DROP MAY BE PVC, 01A OR VC -P. 1 } 3-/G ftL19ARS 6 ftocs TAKK m SUPPORT DROP S7RUCTi1 M }r + F °' STONE (F REO OIRED) i/ 11 �. i, .•.�`v �,•f� tit..: ;f CHARLOTTE—MEARTMEN RG VT+ILITY` DEPARTMENT ENGINEERING DIVISION CHARLOTTE, NORTH CAROLINA s T7 A -A ha ro.: NN= STANDARD DETAIL Nt; SEWER PROFILE OUTSIDE DROP July 27, 1995 XV_61 Sewer SpecificalionslDetails (SD) 5/V x2 F/2- EVANUIN ANO" BO,7S CM BOTTdW ORACF 3/$"x4- CXPANSMW AMNM BLM, TS ON ]�P r'rWACArr.. F1 All ;AAAGI,.0 AS RrQV, M .SEAT $QVAM Y *V MAMYa f 11,46'0 HOLES �SRAiXET FARPOGi IM DRELLED AS SHOW FROV F/4'5= PLA; Fff PIPE BRACKET (srE TW *AMER PLATES 7D PLL1W Km F14- PLATE W A nAOV A -A A=qpm To 7w rfw or PREcASr JAANm& M: MET .SPACERS MAY BE REOLMD ON LOMEN BIRACKETS, No T. YENr SHALL of ON EEEK %w AND PDAYT DONNST AV. 2. 1ENr AND BRACKETS S#GLL Of PA1bW7W PER SPEC, .T. AVW PLACING PIPE RACKET AT AWAAWOLE JOWIS GIT STEPS 4. ANaidP SLEEK TNREACM 31U0 AHD NUT SMAU BE SrAMYLESS STM OR 40ALVAMIE0 STEEL S ROTATE SrRAA;h7 WALL CF AMMOL.E TO CREVC -IME. C RARLO TTE —ME CKLENHUR G UTILITY DEPARTMENT ENGINEERING DIVISION CHARLOT'T'E, NORTH CAROLINA -ftyn DETAIL PLM � '~Nm SEWER PRWU mw %WL MANHOLE DENT 1 Ma' 1 Otte I By 1 11M*bn 1 r� n.yro Bf I sr 1 WSW Rr 1 w.�� 1 AMM%.wBY i um.- DI-W W1 27, 1995 XV-66 Sewer Specifications /Details (SID) 20140701 9:49A H: \32070 -Q00 \Drawings \Taggart Creek \STD DETAI1_S \H0PE -M \D3- H0PE- V1.dwg By. JGREENE Last Saved By, Kgrissam XREFs= H:\32070-000\Drawings\Taggart Creek \MISC \HOPE- M_GS_TB ON de &OAft0"r r5'TA DArffi CAST GROW FFAW APO OMIER .7 lBUCrDVwrv- WArETf TlanlT) N 7' �. IscLLG NEFMT OF RISER AND CONE =0170N MAIM s' $Loot 1-,4' TO ,n Wv. Im4'. 61 NODED s7m YSHT PIPE -- - N91W VAACS ft-WS) NEE NOTES & ' d FLAT TOP" Kg7H FRAME QL TEL] TO MANHOLE NOTE t rMR (4) FOOT DMIMTT£R UAWiME SEICRONS TO BE AN ACCOWWWr WWI AARJCAISLE SrANDARD DETAFLI 2 EAWMMPX W 41L "OOMSS FAR SIX FOOT Ol WO? AND L.ARGM MANHOLES SHALL BE I/12 ►f,SHIE OEAAIEntR PER ASTM C47d. I SLAB AND WALL. R1AF WL W FM SIX FOOT DIA/WTO AND LARGER MAMWaES Awr BE mooTim FLW AAPROVAL 7n rr sRTUCTURAL LNACwrY A r Mf OWNS INSrAi1,JM i. OUTux DROPS .!TALL Akre ENTEm FOUR Foor D1.4M£TER RISER 3ECAL' a j, STEPS AND CU MON SARAN+NT WA[! 10 W OWW WOESr SPADMOM OF MrANT, 6 FIVE NCH 0AIAETER FIANMEP AMC PLAOV ENO STEEL WALL PPE SNAIL W CAST Of PLACE (PLUMB) WIN BOLT HOLES X FIANGE SMADr7LM TILE WVTER EII5IES Pft TO OE WA &W PER VENT PM VEORCATXWS 7, F7w #m DVmem sma mvr PvE TO BE Fu1WMBs Ho MrrN COMPATIBLE (CAA TEL) PLANx AND A" wCr;SSARY HARDWAw FQR OOLTSD ATiACri' "T, mw DUILEr rQ Pmr romovim AAR 6 SEE CONSTOifX170 W PLANS FOR LOCATION OF MANS PI2V SLAB: SAME' MANHG'I.ES �WAV F7fOliaRL' FtAr w SLABS 6mm Bar ON FRAUE AND COWR. TOdS DETAIL SHALL W CaV_9 REV A RECOIMk"hM C0mF4AAWV AND PARABLE SHOP ORAN9WS MAY BE SUBIRF" FOR APPROVAL a FVff RAnW LerTM AQ" SMALL AE pLaR= WIN NGN— s9AV91NC CROVT O. FOR d' ALSiCaE OAWMIER MA*ffi = 6' CONES 41A BE V$EO W LIEV OF RAT TOP STABS OR rRANMTOV SECT&WS 70 4' COWS LE WARRXHF cm mp..) July 27, 1995 i July 27, 1995 CHARLOTTE —MECKI BURG UTILITY DEPARTMENT ENGINEERING DIVISION CHARLOTTE, NORTH CAROLINA xa TWO fTP STANDARD DETAIL Sb °"°'NIS SEWER PL" PROFILE PRECAST` !BAND - -• _ 6' AND S' DIAMETER XV -53 Sewer Specifications/Details (SD) -114' �GeaPC�iMER PoLiAWtiE7M£ MASM 112' aww 6D sxn jww&9movr ... NOTE: MG STEP m BE L1RIVEN WT rAPEM MIS IN PRE'C'AST UN&CEE SECOLVK DO Wr I.X AS A G17LWTfQ -iN STEP, 5 -314. SECTM A -A 4. .. Ate' ,yy{ J 4 • 1' # a IDDD La PULL OUT TEST REPORT REOD OOV EAQN STFO? CHARLOTTE —MECIG NBURG UTILITY DEPARTMENT ENGINEERING DIVISION CHARLOTTE, NORTH CAROLINA STANDARD DETAIL SEWER AW "°' PI.ASNC STEP CORED HOLE DRIVEN IN PLACE XV -70 Sewer Specifications /Details (SD) A I - A 1r AW .* r :t !f .:- `tip �l•r'� -.1- B J ri .S fir. .... 0 a' F.+ y i 'r + r' SECTION A -A srcm w 0r FdREG4Sr SECTION 8 —B COLLAR, TEA. -SELVE w OF CCNCIrM aAsL 2' YONARD IRIYUGH NQTEP 1. IKAhN $WAIL ALSO COMPLf Of STANOARA . DETAILS 4 ANO 7 AS APFIMLA&S,, A. CHARLOTTE— MECKLENBURG UTILATY DEPARTMENT ENGINEERING DIV15ION CHARLOTTE, NORTH CAROLINA F STANDARD DETAIL. PLm T SEWER PRECAST MANHOLES INSTALLED OVER fXfSTime PIP July 27, 1995 XV -64 Sewer Specifications /Details (SD) i POURED IN PLACE 1: • L CONO?F FE i i FLOW • a PIPE r? D. 4 (rYF,) 3 No• 4 GARS .3' te' . r -O b' SEE NOTE 1 7'--0' MIN, L L 3" CANC, PLACED ON UNDISTURBED SOIL AS DETLAVINCO BY THE ENGINEER PLfii�i 1rIL p �! VIE W VERTICAL VIEW !VOTES: CHARLOTTE — ME C = NIA UR G T- FORMS NOT REQUIRED BELOW SPRING LINE, 0CNCRC1r UTILITY DEPARTMENT MAY BE PLACED AGAINST SHAPED BANKS IN LIEU ENGINEERING DIVISION OF FORUR CHARLOTTE, NORTH CAROLINA . wi . STANDARD DETAIL - SEWER PRCMZ ZL CONCRETE COLLAR - L L iy July 27, 1995 XV -76 Sewer SpecificationsMetails (SD) 3 I07/14I JOG RECORD DRAWINGS RECORD DRAWING THIS DRAWING HAS BEEN MODIFIED TO REFLECT FIELD CHANGES REPORTED BY THE CONTRACTOR OR ANOTHER PARTY, BUT NOT VERIFIED BY THE CERTIFYING ENGINEER Glom v�d�flff,? M@m W00 T@ma gn THIS DOCUMENT ORIGINALLY ISSUED FOR CONSTRUCTION AND SEALED BY JAMES N. STRUVE, SEAL NUMBER 18179. V) 0 Z_ Q ry 0 0 0 W ry us. FOUNDRY & wo. CORP. EAST JORDAN IRON KVfWS 9A Y, {9 }- 01' ANCHOR 0 wamax�ar� g m HICLES ON A 0 37112" B.C.D. w -r 7W 0 ° 4 w �I �. (6) _ g 1 ANCHOR HOLES ON A [7�Pr t1 DE ¢ N 3r B.C.B. a ` P p SANITARY C] ° d 7 0 VVV 14 J 1'ARIHLSTYLE TEXT TYP_ 1 Z z LLI ELI OM GASHET NEOPRENE ' Z ` 9 N ARY Ste”" RUEOER 60DUROhET13t �sncrwarea • f]O Q 1-L fc SURFACE NECtSSEu D �r d L) d LL NETRATINC3 IN U. PEN I O PK*04c ES 1 112" Ir I Er- LL < 32" 31)1" a J LLjLJ 1 i lZ" 1 _ 28 5d8" 3112" TYPE 3 8112' L13 1112, 618• I.D. 1 11T'OA. 9®" TrPEau1E FLaTwalllErt T cn USFCAMLOCK HEX BOLT MACHINED � o Lu LLI K%CHINED SURFACE SURFACE ¢ I.— 2 '2 Ll C) 1518" �1 112' 1 112'-L ¢ ? ✓U FOUNDRY Yil0EN119rc xy LU D to CAN LOCK Lc)rK Le suRFA CE LOCKLLIG 1NEEOPRE3E Lu ~ 2 7116" 43' = 5111 -11 HEX z Gc. 31$" AN NUT TYPE ant Ss WELD ON am NUT OR d 11116rc 5T_11 TYPE 90435 PEEN END THREADS ON BKXT NYLOKNUT [r7 "FRAM E 33 19" 321 f4" 1 1fZ 1" 33 114" 32 3116" CASGaSKEr NEOPRENE ` RUBBER BODUROMEUR 8 141' GS t490A1CX01 T►IC rwo m 4' p LC m W 3" I 11Id" I vI8" 4112" u e 32114' 29116 3a' 33 1511 f Ju i 4Q 314° 4D 314" B z } a 3!4• f �_ C � WEIGHT - 175 LB. MIN.. 0% MINUS TOLERANCE WEIGHT - 179 LB. MIN., 496 MINUS TOLERANCE sri Cr-#M 35 3116' DDVETAJL NOTES: LOAD RATING - HEAVY DUTY USE WITH TYPE4 OR 5 COVER o MATERIAL -ASTM A48 - CLASS 35 GRAY IRON FRAME SHALL CONFORM TO DIMENSION AND WEIGHT REQUIREMENT& GROOVE COATING- UNDIPPED FRAME SHALL NOT BE OUT OF ROUND. of U.S. FOUNDRY & MFG. CORP. M �o EASTJOIRDAN IRON WORKS y. {RECESSED F1J.13F¢ vh ! " (*CLOSED LU PICKH101 ES J u z m 41yEGKL�,yIg�� ,1tLENEl 7W S f lr z L �I / rAM LOCK 4 r ASSE ABLY 7f18" �� �1 (SEE UFT [7�Pr t1 DE 11 87AA" WA2VING UONCITENTE&I p SANITARY C] ° „W SEWER J 1'ARIHLSTYLE TEXT TYP_ Q 1 D 1 #. 1 Sld• LE1T9bNG 51113' REC:�SED �. � Z z LLI ELI OM GASHET NEOPRENE ' Q6 he ` 9 N ARY Ste”" RUEOER 60DUROhET13t �sncrwarea • f]O Q 1-L fc SURFACE NECtSSEu D �r d L) d LL NETRATINC3 IN U. PEN I L'..a11 PK*04c ES 1 112" 9 JI 32" 31)1" 273M Oslo 1 i lZ" 1 _ 28 5d8" 3112" TYPE 3 8112' L13 1112, 618• I.D. 1 11T'OA. 9®" TrPEau1E FLaTwalllErt Q H USFCAMLOCK HEX BOLT HEXEKXT9S eLU ALL E S. T ALL M S.S. RUBBER WASHER I 1 2> TYPE! Q 0 SURFACE 3412• I � - --^II-- -�-N+'�6" MACHINED Y� ~ 1 W ❑ Z CAN LOCK Lc)rK Le suRFA CE LOCKLLIG 1NEEOPRE3E LU ' LLI _ 2 GASKET 43' = 5111 -11 HEX Gc. 31$" AN NUT TYPE ant Ss WELD ON am NUT OR aLIJ C9 Q 11116rc 5T_11 TYPE 90435 PEEN END THREADS ON BKXT NYLOKNUT S 2 11✓3' CASGaSKEr NEOPRENE ` RUBBER BODUROMEUR 8 141' GS t490A1CX01 T►IC rwo m p LC m W 3" I 11Id" I t ara i. 'rec°x � Jz 3148 0 70 cm wm 114. FEE 5f!• B 3lg'5f8" 3!4• f �_ 511 BI tai H O Cr-#M 35 3116' DDVETAJL = DI SO 93116 g ] 0 GROOVE of MATERIAL -ASTM A48 MATERIAL -ASTM ASW DUCTILE IRON - 165 L.B. MIN. , CBS, MINUS TOLERANCE CLASS 35 GRADE 80 -55-06 WEIGHT- 160 LB. MIN., 0% MINUS TOLERANCE ID DOTES; w LOAD RATING - HEAVY DUTY USE WITH TYPE D OR E FRRAME .01 MATERIAL - DUCTILE OR CAST IRON AS €N DILATED ABOVE COVER SHALL CONFORM TO DIMENSION AND WEIGHT REQUIREMENTS. COATING - UNDIPPED COVER SHALL NOT BE OUT of RouND. 20140701 9:49A H: \32070 -Q00 \Drawings \Taggart Creek \STD DETAILS \H0PE -M \D4- H0PE- V1,dwg By JGREENE Last Saved By. jgreene XREFs= H: \32070 -00Q \Drawings \Taggart Creek \MISC \HOPE- VI_GS_TB 3 107/141 JOG I RECORD DRAWINGS RECORD DRAWING THIS DRAWING HAS BEEN MODIFIED TO REFLECT FIELD CHANGES REPORTED BY THE CONTRACTOR OR ANOTHER PARTY, BUT NOT VERIFIED BY THE CERTIFYING ENGINEER THIS DOCUMENT ORIGINALLY ISSUED FOR CONSTRUCTION AND SEALED BY JAMES N. STRUVE, SEAL NUMBER 18179. (n Z Q ry 0 !Y O V W Of % x I M:ru bNti \ L jap LEGEND TO SOIL CLASSIFICATION AND SYMBOLS WATER LEVELS (Shown in Water Level Column) = Water Level At Termination of Boring = Water Level Taken After 24 Hours s = Loss of Drilling Water HC = Hole Cave CONSISTENCY OF COHESIVE SOILS SOIL TYPES (Shown in Graphic Log) RESISTANCE Fill BLOWS /FOOT Asphalt 4 Soft ■ Topsoil 5 to 8 Partially Weathered Rook 9 to 15 Cored Rock • �� WEU -GRADM GRAVELS, ow GRAVEL -SANG MDL7URES, 31 to 50 LITTLE OR NO FINES e M POORLY - GRADED GRAVELS, GIR GRAVEL - SAND MDCTURE& DRILLING METHOD; 3' /d' H.S.A. LITTLE OR NO FINES 4 4 4 2 5 SILTY GM SAND - RAVELSTURESEL- SAHD - SL.T MDCTl1RES LU {ai CLAYEY GRAVELS. GRAVEL - RAND - CLAY IVINF RES • • • • ..' '• WELL4WADED SANDS, GRAVELLY SANDS, LITTLE OR NO FINES FILL - GRANITE Boulder, very slightly weathered, hard, close fracture spacing, joints Indiscernible AND UJ GRAVELLY .LNTL SP GRAVELLY SPWDS, LITLE OR NO w D y a SM MLTYSMO6, SAND -SILT MKI11RES p SC CLAYEY SA14D3, STAND -CLAY MuCTUR69 RHSANDS. CRYSTALLINE ROCK - gray and white METAMORPHOSED QUARTZ DIORITE with an intrusive metavolcanic seam from 20.7- 22.3', slightly weathered, very hard, close to moderately close fracture spacing with 7 joints at 60' w ROCK ILTYOR SANDS, ROGK FLOUR, SILTY DR ML ¢ w sc 8 H CLAYEY FINE SAND6ORCLAYEY SILTS WI H BLIGHT PLASTICITY w L] INORGANIC CLAYS LOW TO is CL MEDIUMPLJk!rrlCrry, GRAVELLY CLAYS. SANDY MAYS, SILTY 00 96 %36% CLAYS, LEAN CLAYS MATERIAL DESCRIPTION ORGANIC SILTS AND ORGANIC AL CLAYS of Low PLAwncnY i UJ 114ORMMC MICACEOLIS 5 V w MH OR DI ATCU ACEO t1S FINE SAND c STAN DARDPENETRATICNJ TESTDATA OR SILTYSOILS, ELASTIC SILTS t7 CH PLAS MA1G CLAYS of HIGH PLASTICITY, FAT CLAYS ¢ ORGANIC SILTS AND ORGANIC (]H CLAYS OF MEDIUM TO HIGH Refusal at 17.7 feet Boring terminated at 30.8 feet PLASTICITY WATER LEVELS (Shown in Water Level Column) = Water Level At Termination of Boring = Water Level Taken After 24 Hours s = Loss of Drilling Water HC = Hole Cave CONSISTENCY OF COHESIVE SOILS RELATIVE DENSITY Very Loose Loose Medium Dense Dense Very Dense STD. PENETRATION RESISTANCE BLOWSTOOT 0to4 5to10 11 to 30 31 to 50 Over 50 SAMPLER TYRES (Shown in Samples Column) Shelby Tune ® Split Spoon. I Rock Core E] No Recovery TERMS Standard - The Number of Blows cf 144 lb. Hammer Failing Penetration 30 in. Required to Drive 1,4 in. I.D. Split Spoon Resistance Sampler 1 Foot. As Specified in ASTM D 15813. REC - Total Length of Rock Reomnad in the Core Barrel Divided by the Total Length of the Core Run Times 100%. RQD - Total Length of Sound Rock Segments Recovered that are Longer Than or Equal to 4" (mechanical breaks excluded) Divided by the Total Length of the Care Run Times 1 OD%. *S ME ENGINEERING ' TESTING ENVIRONMENTAL SERVICES PROJECT: CMU Taggart Creek - Hope VI Development STD. PENETRATION Charlotte, North Carolina RESISTANCE CONSISTENCY BLOWS /FOOT Very Soft 0 to 2 Soft 3 to 4 Firm 5 to 8 Stiff 9 to 15 Very SO 16 to 30 Hard 31 to 50 Very Hard over 50 RELATIVE [DENSITY OF COHESIONLESS SOILS RELATIVE DENSITY Very Loose Loose Medium Dense Dense Very Dense STD. PENETRATION RESISTANCE BLOWSTOOT 0to4 5to10 11 to 30 31 to 50 Over 50 SAMPLER TYRES (Shown in Samples Column) Shelby Tune ® Split Spoon. I Rock Core E] No Recovery TERMS Standard - The Number of Blows cf 144 lb. Hammer Failing Penetration 30 in. Required to Drive 1,4 in. I.D. Split Spoon Resistance Sampler 1 Foot. As Specified in ASTM D 15813. REC - Total Length of Rock Reomnad in the Core Barrel Divided by the Total Length of the Core Run Times 100%. RQD - Total Length of Sound Rock Segments Recovered that are Longer Than or Equal to 4" (mechanical breaks excluded) Divided by the Total Length of the Care Run Times 1 OD%. *S ME ENGINEERING ' TESTING ENVIRONMENTAL SERVICES PROJECT: CMU Taggart Creek - Hope VI Development SAMPLING METHOD: Rock Core,SpIlWoon Charlotte, North Carolina BORING LOG 8 -04 S &ME Project No. 1351 -12 -113 _ .. 2 C - a O MATERIAL DESCRIPTION NOTES. DATE DRILLED: 8117112 ELEVATION: 622.0ft BLOW C4UN ;CORE DATA ca - r N DRILL RIG: CME 550 BORING DEPTH: 13.0 ft DRILLER: J. Little WATER LEVEL: 24 -hour NM HAMMER TYPE: Automatic LOGGED BY: N. Page SAMPLING METHOD: Split s oon NORTHING: EASTING: DRILLING METHOD; 3' /d' H.S.A. 3 4 7 2 2 4 4 4 2 5 = 7 LU FILL: SANDY CLAY (CL) - firm, tan red brawn FILL: SANDY CLAY (CL) - stiff, tan red brown, moist FILL: SANDY CLAY (CL) - soft, tan red brown, moist t w BLCWCOUN FILL - GRANITE Boulder, very slightly weathered, hard, close fracture spacing, joints Indiscernible 2 w- UJ 71. w D y a ALLUVIUM: SANDY CLAY (CL) - firm, brown, trace wood fragments, and rootlets, saturated HC 9- 1 CORE DATA CRYSTALLINE ROCK - gray and white METAMORPHOSED QUARTZ DIORITE with an intrusive metavolcanic seam from 20.7- 22.3', slightly weathered, very hard, close to moderately close fracture spacing with 7 joints at 60' w 87 %58% ¢ w sc 8 H = a w L] z R REMARKS MATERIAL DESCRIPTION 00 96 %36% o MATERIAL DESCRIPTION w i UJ STANDARD PENETI3A[T10N TEST DATA 5 V w EL c STAN DARDPENETRATICNJ TESTDATA 7 t7 Z ¢ LU w Refusal at 17.7 feet Boring terminated at 30.8 feet co f6lrn wj ¢ ° (bIo vs.Yt} Z 3 5 rn Topsoil/ Rootmat (3 inches) 16 20 30 6080 10 20 30 6080 brown red gray Topsoil/ Rootmat (2 inches) Topsoil/ Rootmat (2.5 inches) FILL: SANDY CLAY (CL) - stiff, brown, 2 FILL: SANDY CLAY (CL) - soft to firm, brown 6 0 10 gs_ 1 4 56.1 2 2 2 14 4 micaceous, moist red orange FILL: CLAYEY SAND (SC) - loose to very loose, brown red orange, fine to medium, moist SS-2 2 3 5 6 8 SS -2 2 3 4 + 7 5 5 gray, moist 517JD 617.0 2 3 3 6 FILL: CLAYEY SAND (SC) - very loose to ALLUVIUM: SANDY CLAY (CL) - soft, brown 3 3 7: 6 2 FILL: SANDY CLAY (CL) - soft, brown gray, 4 7 10 loose, brawn, fine to medium, moist gray 2 5S -3 t 2 2 2 2 moist 615.0 55 4 1 2 1 3 3 6 14 ALLUVIUM: SILTY SAM] (SM) -very loose, 512.0 HC SS -4 SS -4 5 14 0 WOFI 1 U 612A trace fine gravel, moist 612.0 ALLUVIUM: SANDY CLAY (CL) - very soft, gray, moist SS -5 0 56.5 8 RC 1 Refusal at 13 feet 15 12 15 610.0 CRYSTALLINE ROCK - dark gray SS-5 00 80 1 Boring terminated at 13 feet METAVOLCANIC, very slightly weathered, 15 607.0 1. THIS LOG IS ONLYA PORTION OFA REPORT PREPARED FOR THE NAMED PROJECTAND MUST ONLY BE USED TOGETHER WITHTH4TREPORT, 2. ACCRr T ASAP 5RON TEST DATA IN GENERAL OdACEWHD-1W 3. STR A' ITA' CATrONANDGROUN bWATERDEPr14S ARE Nor EXACT. 4. WATER LEVEL ISATTIMEOFFLORALYONANOWILLVARY. Page 7 of 7 n C e LL `x C c F 5. h i" L i= C LL 1. PROJECT: CMU Taggart Creek - Hope VI Development Charlotte, North Carolina BORING LOG $ -01 S &ME Project No. 1351 -12 -113 DATE DRILLED: 8122112 ELEVATION: 635.0 ft NOTES: DRILL RIG: CME550 BORING DEPTH. 30.8ft DRILLER: J_ Little WATER LEVEL: NM HAMMER TYPE: ,automatic LOGGED BY: N. Page SAMPLING METHOD: Rock Core,SpIlWoon NORTHING: EASTING: DRILLING METHOD, 3' /4' H.S.A. _ .. 2 C - a O MATERIAL DESCRIPTION w a ti- - r- w z �. J W UJ Lr M_ Q 'n uy BLOW C4UN ;CORE DATA ca - r N RENMI4iiKS STANDARD PENETRATION TESTDATA (blrnvsfl} 10 20 30 6080 w z 5 14 15 24 25 30 BORING DEPTH: 13.5 R descriptions Topsoil/ Rootmat (3 inches) SAMPLING METHOD: Split spoon 630.0 525 A 620.0 515,0 510.0 605Q SS -1 SS-2 SS -3 SS -4 55.5 RC -1 RC-2 RC -3 5 3 d 1 2 3 4 7 2 2 4 4 4 2 5 = 7 7 $ ii 4 7 FILL: SANDY CLAY (CL) - firm, tan red brawn FILL: SANDY CLAY (CL) - stiff, tan red brown, moist FILL: SANDY CLAY (CL) - soft, tan red brown, moist 1 BLi7WCOUNT / CURE DATA FILL - GRANITE Boulder, very slightly weathered, hard, close fracture spacing, joints Indiscernible 2 w- UJ 71. w D y a ALLUVIUM: SANDY CLAY (CL) - firm, brown, trace wood fragments, and rootlets, saturated HC w ~ CRYSTALLINE ROCK - gray and white METAMORPHOSED QUARTZ DIORITE with an intrusive metavolcanic seam from 20.7- 22.3', slightly weathered, very hard, close to moderately close fracture spacing with 7 joints at 60' w 87 %58% ¢ w sc 8 H REMARKS � c °� a MATERIAL DESCRIPTION 00 96 %36% 70% ] 8% CRYSTALLINE ROCK - brown / t METAVOLCANIC, very severely weathered, / l very soft _- CRYSTALLINE ROCK - dark gray METAVOLCANIC. with anintrusive metamorphosed quartz diorite seam from 25,7- 27,5', slightly weathered, hard, close to moderately close fracture spacing with 7 joints at 60', 5 at 45', and t at 1 b° w w EL c STAN DARDPENETRATICNJ TESTDATA 7 t7 Z ¢ LU w Refusal at 17.7 feet Boring terminated at 30.8 feet 1. THIS LOG IS ONLYA PORTION OFA REPORT PREPARED FOR TIME NAMED PROJECT AND MUST ONLY BE US ED TOGETHER WITH THAT REPORT, 2 BORIING ACMEPL ASAP NETR4B. TTON TEST DATA IN GENERAL 3, S TRA TTFICA TION AND GROUNDWATER DEPTHS ARE NOT EXACT. 4. WATER LEVEL IS A r TTME OF EXPLORATIONAND MLL VARY. Page 1 of ? PROJECT: CMU Taggart Creek -Hope VI Development SAMPLING METHOD: Rock Core Charlotte, North Carolina BORING LOG B -05 S &ME Project No. 1351 -12 -113 U 0 o MATERIAL DESCRIPTION NOTES: Hole became crooked and a 5 ft offset DATE DRILLED: 8123/12 ELEVATION: 622.0 ft was made. Refer to boring 13- 05Afor rock core DRILL RIG: CME 550 BORING DEPTH: 16.5 ft DRILL RIG: CME 550 BORING DEPTH: 13.5 R descriptions LOGGED BY: N. Page SAMPLING METHOD: Split spoon DRILLER: J. Lithe WATER LEVEL: Not Encountered DRILLING METHOD; 3' /T H.S.A. HAMMER TYPE: Automatic LOGGED BY: N. Page SAMPLING METHOD: Rock Core Split s oon NORTHING: EASTING: DRILLING METHOD: 3' /d' H.S.A. BLi7WCOUNT / CURE DATA FILL - GRANITE Boulder, very slightly weathered, hard, close fracture spacing, joints Indiscernible 2 w- UJ [D w D y a BLOW COUNT t GORE DATA M= w ~ - w ¢ w sc 8 H REMARKS � c °� a MATERIAL DESCRIPTION == ] 8% w w EL c STAN DARDPENETRATICNJ TESTDATA 7 t7 Z ¢ LU w FILL: SANDY CLAY (CL) - stiff to very stiff, co f6lrn wj Z ° 10 20 30 6080 SS -1 3 5 rn Topsoil/ Rootmat (3 inches) 16 20 30 6080 Refusal at 2 feet Boring terminated at 30.3 feet brown red gray Topsoil/ Rootmat (2 inches) FILL: SANDY CLAY (CL) - stiff to firm, brown FILL: SANDY CLAY (CL) - stiff, brown, 2 4 6 0 10 gs_ 1 4 6 8 16 14 micaceous, moist 617.0- FILL: CLAYEY SAND (SC) - loose to very loose, brown red orange, fine to medium, moist SS-2 2 3 5 6 8 SS -2 4 6 6 12 5 gray, moist 617.0 2 3 3 6 5S -3 ALLUVIUM: SANDY CLAY (CL) - soft, brown 3 3 7: 6 2 FILL: SANDY CLAY (CL) - soft, brown gray, 4 7 10 SS -4 gray 2 2 SS -3 1 2 2 moist 615.0 55 4 1 2 2 4 14 ALLUVIUM: SILTY SAM] (SM) -very loose, 512.0 HC brown, trace rootlets, fine to coarse SS -4 Q 0 0 WOFI 1 U , trace fine gravel, moist 612.0 ALLUVIUM: SANDY CLAY (CL) - very soft, gray, moist SS -5 0 56.5 8 RC 1 3 15 12 15 610.0 CRYSTALLINE ROCK - dark gray SS-5 00 80 1 METAVOLCANIC, very slightly weathered, 15 607.0 hard, close fracture spacing with 2 joints at 60° No ALLUVIUM: SILTY CLAY (CH) -stiff, brown PARTIALLY WEATHERED ROCK: CLAYEY gray white, moist GRAVEL (GC) - gray orange, fine 2 55 -6 5 and 1at10' Refusal at 16.5 feet 20 Boring terminated at 16,5 feet SS -6 502.0 Refusal at 11.5 feet 9 20 Refusal at 20 feet 6115.0 Boring terminated at 13.5 feet Boling terminated at 20 feet 1. TNS LOG IS ONLYA PORTTONOFA REPORTPREPARED FOR THE NAMED PROJEC TAND MUST ONLY BE USED TOGETHER WITH FHA TREPORT. 2, BORING�IA AM LING AND7P I 58&4 TION TEST DATA IN GENERAL 3, STRA77 RCAr10N AND GROUNDWA TER DEPrNSAne Nor EXACT. 4. WA TER LEVEL ISAr77MECFFEXPLORArfONAND WILL VARY. i Page 7 of 7 n 'C e LL LL C L i c L `c V n PROJECT: CMU Taggart Creek -Hope VI Development SAMPLING METHOD: Rock Core Charlotte, North Carolina BORING LOG g -OZ S&ME Project No. 113511-12-113 U 0 o MATERIAL DESCRIPTION NOTES' DATEDRILLED: 8117/12 ELEVATION: 622.0 ft BLOWCOUN 1 CORE DATA v ° °�, DRILL RIG: CME 550 BORING DEPTH: 16.5 ft DRILLER: J. Little WATER LEVEL: 13 feet on 8118/2012 HAMMER TYPE: Automatic LOGGED BY: N. Page SAMPLING METHOD: Split spoon NORTHING: EASTING: DRILLING METHOD; 3' /T H.S.A. 0 a v w FILL - see boring log B -05 for soil description w a e Q- BLi7WCOUNT / CURE DATA FILL - GRANITE Boulder, very slightly weathered, hard, close fracture spacing, joints Indiscernible 2 w- r= [D w ® M= w L~ z U REMARKS w a D MATERIAL DESCRIPTION J w w CL c °� STANDARD PENETRATION TEST DATA 7 96 %94% 0011 8% O Topsoil/ Rootmat (2 inches) w 7 {blorvsYt} Z FILL: SANDY CLAY (CL) - stiff to very stiff, 7• rn ° 10 20 30 6080 SS -1 3 5 5 Topsoil/ Rootmat (3 inches) 70 Refusal at 2 feet Boring terminated at 30.3 feet brown red gray FILL: SANDY CLAY (CL) - stiff to firm, brown S5 -1 2 4 6 0 10 6 8 S red gray, moist 16 5 617.0- FILL: CLAYEY SAND (SC) - loose to very loose, brown red orange, fine to medium, moist SS-2 2 3 5 6 8 5 02 617.0 gray, moist SS -3 2 3 3 6 5S -3 3 3 3 7: 6 2 FILL: SANDY CLAY (CL) - soft, brown gray, 4 7 10 SS -4 1 2 2 612.0 RM, 10 moist 615.0 55 4 1 2 2 4 14 512.0 HC ALLUVIUM: SANDY CLAY (CL) - very soft, ALLUVIUM: SANDY CLAY (CL) - stiff, gray, brown gray white, moist trace fine gravel, moist ALLUVIUM: SANDY CLAY (CL) - very soft, gray, moist SS -5 0 56.5 8 9 3 15 12 15 610.0 SS-5 0 1 1 15 607.0 No ALLUVIUM: SILTY CLAY (CH) -stiff, brown PARTIALLY WEATHERED ROCK: CLAYEY gray white, moist GRAVEL (GC) - gray orange, fine 2 55 -6 5 Refusal at 16.5 feet 20 Boring terminated at 16,5 feet SS -6 502.0 9 20 1. THIS LOG IS ONLYA POR TION OFA REPORT PREPARED FOR THE NAMED PROJEGTAND MUST ONLYBE USED TOGETHER WITH TH4 TREPORT. 2. BORING i4 NCE Lf 7 H NO PP EV sas4T70M TES TDA TA IN GENERAL 3. STRAThRCA 77ONAND GROUNDWATER DEPTHS ARENOTEXACT. 4. WA TER LEVEL IS A r TIME OF SXPLORArIONAND WILL VARY. Page 7 of 7 PROJECT: CMU Taggart Creek - Hope VI Development Charlotte, 'North Carolina BORING LOG B -05A S &ME Project No. 1351 -12 -113 DATE DRILLED: 8123112 ELEVATION: 622.0ft N01 L'_ Refer to Loring E-15 for sail descriptions DRILL RIG: CME 550 BORING DEPTH: 30.38 DRILLER: J. Little WATER LEVEL: 7.5feet on 8124/2012 HAMMER TYPE: Automatic LOGGED BY: N. Page SAMPLING METHOD: Rock Core NORTHING: EASTINC- DRILLING METHOD: 3' /d' H.S.A. U 0 o MATERIAL DESCRIPTION W w} w r- w Q u 9- a i UJ ¢ ` BLOWCOUN 1 CORE DATA v ° °�, REMARKS srAND,aROPENa<rRAnoNTl= 5rDATA IiDIilVVtSlt} 10 20 30 6080 w 7 z 5 14 5 20 25 30 W z Topsoil/ Rootmat (2 inches) - FIG 617A 512.0 6071D 602JD 597.0 592Ti RC 1 RC -2 RC -3 RC -4 RC -5 _ 0 a v C FILL - see boring log B -05 for soil description ;CORE tD REMARKS FILL - GRANITE Boulder, very slightly weathered, hard, close fracture spacing, joints Indiscernible 2 w- 39% 0% w ® FILL - see boring log B -05 for soil description E STAN DARDPENETRATION TsSTDATA REMW3KS ALLUVIUM -see boring log B -05 for soil description a - J w CRYSTALLINE ROCK - dark gray METAVOLCANIC, slightly weathered, hard, _very close fracture spacing, joints indiscemible _J CRYSTALLINE ROCK - dark gray METAVOLCANIC, fresh to very slightly weathered, hard, moderately close to close fracture spacing, with 4joints at 60° and 6 at 30° tv w 84 %51% Z i 96 %94% 0011 8% O Topsoil/ Rootmat (2 inches) w w {blorvsYt} Z FILL: SANDY CLAY (CL) - stiff to very stiff, 1000192% N 16 20 30 6480 SS -1 3 5 5 0 70 Refusal at 2 feet Boring terminated at 30.3 feet 1. THIS LOG IS ONLYA PORTION OFA REPORT PREPARED FOR THE NAMED PROJECT AND MUST ONL Y SE USED TOGETHER WITH THA T REPOR T 2. BORING A L As E '4 7TON TEST DATA IN GENERAL g 3. SYRA11MCATIONANDGROVNDWA TER D L= PTHS ARE Nor EXAGr 4. WATER LEVEL TSAr TIME OF'EXPLORATIONAND IMLL VARY. ;% 1► Page 9 of I PROJECT: CMU Taggart Creek -Hope VI Development Charlotte, North Carolina BORING LOG $ -03 S&ME Project No. 1351 -12 -113 NOTES' DATEDRILLED: 8/17/12 ELEVATION: 622.0ft DRILL RIG: CME 550 BORING DEPTH: 20.0111 DRILLER: J. UNIe WATER LEVEL: 24 -hour NM HAMMER TYPE: Automatic LOGGED BY: N. Page SAMPLING METHOD: Splitspoon NORTHING: EASTING: DRILLING METHOD: 3' /d' H.S.A. DRILL RIG: CME 550 BORING DEPTH: 21.5 ft DRILLER: J. Lltlfe W z �- w D w>_ BLOW COUNT DATA NORTHING: EASTING: _ 0 a v C � w `; ;CORE tD REMARKS w 2 w- = MATERIAL DESCRIPTION w ® w. CL X E STAN DARDPENETRATION TsSTDATA REMW3KS w a MATERIAL DESCRIPTION J w Q tv w IL7I{Y4V9Y Z i 10 20 30 6080 O Topsoil/ Rootmat (2 inches) w w {blorvsYt} Z FILL: SANDY CLAY (CL) - stiff to very stiff, va N 16 20 30 6480 SS -1 3 5 5 0 70 brown red gray FILL: SANDY CLAY (CL) - firm, red brown SS-1 2 2 d 6 SS -2 6 8 S Ii 16 5 617.0- FILL: CLAYEY SAND (SC) - loose to very loose, brown red orange, fine to medium, moist 5S -2 2 FILL: SANDY CLAY (CL) - firm, brown red 3 6 6 5 620.0 gray, moist SS -3 2 3 3 6 5S -3 3 3 d 7: 554 2 3 4 7 10 SS -4 1 2 2 612.0 4 10 615.0 Q HC ALLUVIUM: SANDY CLAY (CL) - very soft, ALLUVIUM: SANDY CLAY (CL) - stiff, gray, brown gray white, moist trace fine gravel, moist SS -5 0 56.5 8 9 3 15 12 15 610.0 607.0 No ALLUVIUM: SILTY CLAY (CH) -stiff, brown PARTIALLY WEATHERED ROCK: CLAYEY gray white, moist GRAVEL (GC) - gray orange, fine 2 55 -6 5 20 SS -6 502.0 9 20 Refusal at 20 feet 6115.0 Boling terminated at 20 feet Refusal at 21.5 feet 1. THIS LOG IS ONLYA POR77ONOFA REPORT PREPARED FOR THE NAMED PROJECT AND MUST ONLY BE USED TOGETHER WITH THAT REPORT. 2 BORING A ASAP E SaTR 77ON TEST DA TA IN GENERAL 3, STRA17FICATTONANDGROUNDWA TER DEPTHS ARE NOT EXACT. 4. WATER LEVEL M A r TIME OF EXPLORAWONAND WILL VARY. Page 7 of 9 PROJECT: CMU Taggart Creek -Hope VI Development Charlotte, North Carolina BORING LOG B -06 S&ME Project No. 1351 -12 -113 NOTES: DATEDRILLED: 8117112 ELEVATION: 625.0 ft DRILL RIG: CME 550 BORING DEPTH: 21.5 ft DRILLER: J. Lltlfe WATER LEVEL: 13 feet on 811/312012 HAMMER TYPEe Automatic LOGGED BY: N. Page SAMPLING METHOD: Split soon NORTHING: EASTING: DRILLING METHOD: 3' /4' H.S.A. v W - w 'BLOW D C a COUNT XORE DATA = = w C] z ca REMW3KS w a MATERIAL DESCRIPTION w `� STANDARDPENE=� AONTESTDATA i O w w {blorvsYt} Z va N 16 20 30 6480 Topsoil/ Rootmat (3 inches) FILL: SANDY CLAY (CL) - firm, red brown SS-1 2 2 d 6 6 FILL: CLAYEY SAND (SC) - loose to very loose, brown red orange, fine to medium, moist 5S -2 2 3 3 6 6 5 620.0 5S -3 3 3 d 7: 7 SS -4 1 2 2 4 10 615.0 ALLUVIUM: SANDY CLAY (CL) - very soft, brown gray white, moist SS -5 0 0 1 1 15 610.0 ALLUVIUM: SILTY CLAY (CH) -stiff, brown gray white, moist 2 4 5 SS -6 9 20 6115.0 Refusal at 21.5 feet Boring terminated at 21.5 feet 1. THOS LOG IS ONLYA PORTION OFA REPORTPREPARED FOR THE NAMED PROJEC TAND MUST ONLY BE USED TOGETHER WITH THA TREPORT. 2 BORING `]A A W LI G AMDT7 4 a fT RA TION TEST DATA IN GENERAL 3. S TPA 77RCAnONA Aft) GR OUNDWA TER DEPThSARE Nor EXAcr d. WATER LEVEL IS A TIME OF EMORA 770M A ND WILL VARY: i Page 7 of 7 V) 0 Z a B, A, y c I L' r -s y x C Y e L' G LL 5 PROJECT: CMU Taggart Creek - Hope VI Development Charlotte, North Carolina BORING LOG $ -08 Charlotte, North Carolina BORING LOG B -07 S&ME Project No. 1351 -12 -113 DRILLER: J_ Little WATER LEVEL: 5 feet on 8/22/2012 HAMMER TYPE: Automatic LOGGED BY: N. Page SAMPLING METHOD: Rock Core,SpIlWoon NOTES' DATE DRILLED: 8122!12 ELEVATION: 627.0 ft _ .. DRILL RIG: CME 550 BORING DEPTH: 15.0 ft DRILLER: J. Little WATER LEVEL: 10 feet on 8/2312012 HAMMER TYPE: Automatic LOGGED BY: N. Page SAMPLING METHOD: SpIlitspDon NORTHING: EASTING: DRILLING METHOD: 31I" H.S.A. REMARKS STAN DARDPENETRATION TESTDATA lblo Yrf j 10 26 30 6480 Topsoil/ Rootmat (3 inches) 5 1O� 15 20 25 30 LIJ - UJ w w `; -- w BLON COUNT 623.0- 51$0 613.0 61 .0 603.0 598.0 SS_1 33 -2 SS -3 SS -4 SS.S RC-1 RC-2 Rc a 2 2 2 5 9 U 3 5 4 B 11 = 6 7 Q Z y DATA REMARKS W _- o MATERIAL DESCRIPTION 5 5 w �COFtE U REMARKS 5 V a MATERIAL DESCRIPTION 3 4 7: a STANDARD PENETRATIONTESroATA a a - FILL: SANDY CLAY (CL) - soft, red brown, trace fine gravel Topsoil/ Rootmat (3 inches) w w - CL _ STANDARD PENETRATION TEST DATA ? = 4 10 ?J J w (A 1 to ep it7I0MY4gt} Z 0 16 3 Topsoil/ Rootmat (2 inches) s ua a7 N ° 10 20 30 6680 Topsoil ! Rootmat (1 inch) Topsoil/ Rootmat (2.5 inches) RESIDUUM: CLAYEY SILT (MH) -firm, red PARTIALLY WEATHERED ROCK: SILTY SS_1 2 3 FILL: SANDY CLAY (CL) -firm to stiff, tan B 2 SS -1 3 SS -1 3 4 3 7 7 612- .0 55 5 RESIDUUM: CLAYEY SILT (MH) - stiff, red brown, trace rootlets, moist to wet W. orange, manganese staining 5S -2 4 5 7 12 5 5 5 9 4 S3 -2 3 METAVOLCANIC with an intrusive 4 3 S3 -2 5 SS -3 2 14 5 9 622.1] 95 %82% = orange white red, fine to medium 20- SANDY SILT (ML) - firm, red brown, moist 2 607A 2 5S -3 3 3 5 2 s 3 7 6 to- 22.5- 22.8', hard, moderately dose to close $17.0 SS -4 3 FILL: SILTY CLAY (CH) - stiff, red dark brown, 7 fracture spacing with 1 joint at 45° and 5 at 30° 13 trace rootlets, organic odor, moist 1 SS -4 2 5 5 10 14 RC -2 617.0 78% HC 25 602.0 PARTIALLY WEATHERED ROCK: SILTY 2 FTC SAND (SM) - tan brown, trace rock fragments, fine to coarse gray, fine to medium 15 CRYSTALLINE ROCK - gray and white SfY. METAMORPHOSED QUARTZ DIORITE, RESIDUUM: SANDY CLAY (CL) -vary stiff, . SS 5or.2 33 -5 4 5 6 brown, trace rock fragments, moist mD 15 = &12.0 spacing with 3 joints at 60 °, others indiscern ible Boring terminated at 14.2 feet 85 -5 5 9 16 13 _ 15 2O 612.0 RG' 6% Refusal at 15 feet CRYSTALLINE ROCK - dark gray trace rock fragments, fine to coarse METAVOLCANIC, slightly to very slightly Boring terminated at 15 feet 30 weathered, hard, close to moderately close SS 6 28 19 37 NOTES" 1, THIS LOG IS ONLYA PORTIONOFA REPORT PREPARED FOR THE NAMED PROJECT AND MUST ONL Y SE USED TOGETHER WITH TH4 T REPORT 2 BORING 4NMPL A IDTAPENETR�. TION TEST DATA IN GENERAL 3, STRATTFICA77ONANDGROUNDWA TER DEPTHS ARE Nor EXACT 4. WATER LEVEL IS A 7 TIME 0€ EKPLORATIONAND WILL VARY. Page 9 of 9 M"Ily� PROJECT: CMU Taggart Creek - Hope VI Development Charlotte, North Carolina BORING LOG $ -08 Charlotte, North Carolina BORING LOG 6 -11 S &ME Project No. 1351 -12 -113 DRILLER: J_ Little WATER LEVEL: 5 feet on 8/22/2012 HAMMER TYPE: Automatic LOGGED BY: N. Page SAMPLING METHOD: Rock Core,SpIlWoon NOTES` DATE DRILLED: 8117112 ELEVATION: 627.0ft _ .. DRILL RIG: CME 550 BORING DEPTH: 21.0 R DRILLER: J. Little WATER LEVEL: 11.8 feet on 812112012 HAMMER TYPE: Automatic LOGGED BY: N. Page SAMPLING METHOD: Split s oon NORTHING: EASTING: DRILLING METHOD: 3' /d' H.S.A. REMARKS STAN DARDPENETRATION TESTDATA lblo Yrf j 10 26 30 6480 Topsoil/ Rootmat (3 inches) 5 1O� 15 20 25 30 LIJ - UJ w w `; t ui 9- BLCWCOUN 1 CORE DATA 623.0- 51$0 613.0 61 .0 603.0 598.0 SS_1 33 -2 SS -3 SS -4 SS.S RC-1 RC-2 Rc a 2 2 2 5 9 U 3 5 4 B 11 = 6 7 6 7 8 15 22 w (] z REMARKS w Z) 2 o MATERIAL DESCRIPTION 5 5 CL CRYSTALLINE ROCK - dark gray METAVOLCANIC, very slightly weathered, very hard, close fracture spacing with 8 joints at 45° and 3 at 30° STANDARD PENErRAnaN TEST DATA 5 V SS-2 3 3 4 7: 7 STANDARD PENETRATIONTESroATA 7 80 %50% 924% e FILL: SANDY CLAY (CL) - soft, red brown, trace fine gravel Topsoil/ Rootmat (3 inches) ¢ 3 (bIo YsYt} Z = 4 10 ?J 6170 SS-4 2 10 20 30 6080 Z 0 16 3 Topsoil/ Rootmat (2 inches) s `•'1 u�] 16 20 36 6680 Topsoil ! Rootmat (1 inch) FILL: SILTY CLAY (CH) - firm, red brown RESIDUUM: CLAYEY SILT (MH) -firm, red PARTIALLY WEATHERED ROCK: SILTY SS_1 2 3 5 B 2 SS -1 3 5 8 15 LA)1% coarse 612- .0 55 5 RESIDUUM: CLAYEY SILT (MH) - stiff, red 21 W. orange, manganese staining 5S -2 4 5 7 12 5 6224 manganese staining S3 -2 3 METAVOLCANIC with an intrusive 4 3 7 5 SS -3 2 4 5 9 RC -1 95 %82% = orange white red, fine to medium 20- SANDY SILT (ML) - firm, red brown, moist 2 607A 2 staining 10 SS -4 2 3 3 7 6 to- 22.5- 22.8', hard, moderately dose to close $17.0 SS -4 3 6 7 fracture spacing with 1 joint at 45° and 5 at 30° 13 10-- 1 HC RC -2 SILTY SAND (SM) - medium dense, black 78% HC 25 602.0 PARTIALLY WEATHERED ROCK: SILTY 2 4 SAND (SM) - tan brown, trace rock fragments, fine to coarse gray, fine to medium 15 CRYSTALLINE ROCK - gray and white SfY. METAMORPHOSED QUARTZ DIORITE, . SS 5or.2 33 -5 4 5 6 1 = mD 15 = &12.0 spacing with 3 joints at 60 °, others indiscern ible Boring terminated at 14.2 feet SS -6 10 SILTY SAND (SM) - very dense, gray black, 13 _ 25 2O RG' 6% CRYSTALLINE ROCK - dark gray trace rock fragments, fine to coarse METAVOLCANIC, slightly to very slightly 30 weathered, hard, close to moderately close SS 6 28 19 37 % 20 607.0 SS -7 26 50F. Refusal at 16.7 feet .4 25 Refusal at 21 feet Boring terminated at 21 feet Boring terminated at 30.5 feet NOTES_ 1, THIS LOG IS ONLYA PORTION OFA REPORT PREPARED FOR THE NAMED PROJECT AND MUST ONLY BE USED TOGETHER WITH TH4 T REPORT, 2. ACCRr AND N D-5RON TEST DATA IN GENERAL OdACEWH 1W 3. STRA r7RCA TION ANb GROVNDWA DER DEPTHS ARE Nor EXACT. 4. WATER LEVEL 1SA'rI7M9OF9XPLORArICNAND WILL VARY. ! Page 7 of 7 c L C tx rr n L LL c C LL 0 PROJECT: CMU Taggart Creek -Hope VI Development Charlotte, North Carolina BORING LOG $ -08 S &ME Project No. 1351 -12 -113 DATE DRILLED: 8121112 ELEVATION: 627.0ft NOTES` DRILL RIG: CME550 BORING DEPTH: 34.5ft DRILLER: J_ Little WATER LEVEL: 5 feet on 8/22/2012 HAMMER TYPE: Automatic LOGGED BY: N. Page SAMPLING METHOD: Rock Core,SpIlWoon NORTHING: EASTING: DRILLING METHOD; 3' /4' H.S.A. _ .. C) - a MATERIAL DESCRIPTION LU w - UJ r- w fl �. > Lr M_ to uy BLCWCOtJN ;CORE DATA ca r N REMARKS STANDARD PENETRATION TEST DATA it1104Y91t} 10 20 30 6086 w Z w D y a w IL rn BLOW COUNT t CORE DATA 8 --_ � C REMARKS STAN DARDPENETRATION TESTDATA lblo Yrf j 10 26 30 6480 Topsoil/ Rootmat (3 inches) 5 1O� 15 20 25 30 O - UJ w w `; Topsoil/ Rootmat (3 inches) 7' 1 ITC 623.0- 51$0 613.0 61 .0 603.0 598.0 SS_1 33 -2 SS -3 SS -4 SS.S RC-1 RC-2 Rc a 2 2 2 5 9 FILL: SANDY CLAY (CL) - firm, black brown 3 5 4 B 11 = 6 7 6 7 8 15 22 FILL: SILTY SAND (SM) - loose, gray tan, trace fine gravel, rcaceous, fine to coarse FILL: SANDY CLAY (CL) - firm, red black brown, trace fine gravel SS -1 2 2 3 5 5 5 ut L5 ~ CRYSTALLINE ROCK - dark gray METAVOLCANIC, very slightly weathered, very hard, close fracture spacing with 8 joints at 45° and 3 at 30° REMARKS 91 %76% 622.0 SS-2 3 3 4 7: 7 STANDARD PENETRATIONTESroATA 7 80 %50% 924% e FILL: SANDY CLAY (CL) - soft, red brown, trace fine gravel Topsoil/ Rootmat (3 inches) SS 3 3 1 3 = 4 10 ?J 6170 SS-4 2 4 Z 0 16 3 RESIDUUM: CLAYEY SAND (SC) - loose, red orange brown, little fine gravel, fine to coarse s `•'1 u�] 16 20 36 6680 Topsoil ! Rootmat (1 inch) RESIDUUM: CLAYEY SILT (MH) -firm, red PARTIALLY WEATHERED ROCK: SILTY SAND (SM) - gray, with rock fragments, fine to SS -2 2 SS -1 3 5 8 15 LA)1% coarse 612- .0 55 5 4 21 W. 6L3 �� SANDY SILT (ML) - firm, red orange - CRYSTALLINE ROCK - dark gray manganese staining S3 -2 3 METAVOLCANIC with an intrusive 4 3 7 5 622.0 metamorphosed quartz d iorite seam from RC -1 95 %82% = orange white red, fine to medium 20- 20.5- 22.0', slight to moderately severe weathering with severe weathering from 2 607A 2 staining 10 = = SS -3 4 = 7 3 a 7 13 22.5- 22.8', hard, moderately dose to close SS -4 3 6 7 fracture spacing with 1 joint at 45° and 5 at 30° 13 10-- 617,0 HC RC -2 001 78% 25 602.0 PARTIALLY WEATHERED ROCK: SILTY 2 4 SAND (SM) - tan brown, trace rock fragments, fine to coarse 15 CRYSTALLINE ROCK - gray and white SfY. METAMORPHOSED QUARTZ DIORITE, SS 5or.2 No Recovery slightly weathered, very hard, close fracture Refusal at 142 feet = - spacing with 3 joints at 60 °, others indiscern ible Boring terminated at 14.2 feet SS -6 10 13 13 _ 25 2O RG' 6% CRYSTALLINE ROCK - dark gray METAVOLCANIC, slightly to very slightly 30 weathered, hard, close to moderately close PARTIALLY WEATHERED ROCK: SILTY 597.0 SAND (SM) - gray brown, fine fracture spacing with 4 joints at 60° SS -7 26 50F. Refusal at 16.7 feet .4 25 601.0 Boring terminated at 30.5 feet SS $ 24 NOTES" 1. THIS LOG IS ONLYA PORTION OFA REPORT PREPARED FOR TIME NAMED PROJEG T AND MUST ONLY BE USED TOGETHER WITH THAT REPORT, 2 BORI01�fia AMEPL � ps �ENETRAB. 7TON TEST DATA IN GENERAL 3, S TRA TTFICA 77ON AND GROUNDWATER DEPTHS ARE NOT EXACT. 4. WATER LEVEL ISATTrMEOFE YPLORATIONAND WILL VARY. ! Page 1 of ? PROJECT: CMU Taggart Creek -Hope VI Development Charlotte, North Carolina S &ME Project No. 1351 -12 -113 BORING LOG g -12 DATE DRILLED: 8121/12 ELEVATION: 628.0 ft NOTES: DRILL RIG: CME 550 BORING DEPTH: 30.5 R DRILLER: J. Little WATER LEVEL: 5.7 feet on 8/22/2012 HAMMER TYPE: Automatic LOGGED BY: N. Page SAMPLING METHOD: Rock Core Split s oon NORTHING: EASTING: DRILLING METHOD: 3' /4' H.S.A. WATER LEVEL: Not Encountered v a MATERIAL DESCRIPTION UJ U 3u ¢ Lu J w w D y a w IL rn BLOW COUNT t CORE DATA 8 --_ � C REMARKS STAN DARDPENETRATION TESTDATA lblo Yrf j 10 26 30 6480 w ] Z 5 1O� 15 20 25 30 O - UJ w w `; Topsoil/ Rootmat (3 inches) 7' 1 ITC 623.0- 51$0 613.0 61 .0 603.0 598.0 SS_1 33 -2 SS -3 SS -4 SS.S RC-1 RC-2 Rc a 2 2 2 5 9 3 2 4 7 11 3 5 4 B 11 = 6 7 6 7 8 15 22 FILL: SILTY SAND (SM) - loose, gray tan, trace fine gravel, rcaceous, fine to coarse FILL: SANDY CLAY (CL) - firm, red black brown, trace fine gravel = B = LU = FILL: SILTY SAND (SM) -loose, orange black red, with clay pockets, micaceous, fine to coarse RESIDUUM: SANDY SILT (ML) - stiff, brown tan orange, manganese staining SILTY SAND (SM) - medium dense, black gray, trace rock fragments, f €ne to coarse - = ut L5 ~ CRYSTALLINE ROCK - dark gray METAVOLCANIC, very slightly weathered, very hard, close fracture spacing with 8 joints at 45° and 3 at 30° REMARKS 91 %76% a a MATERIAL DESCRIPTION w CL E _ °� - STANDARD PENETRATIONTESroATA 7 80 %50% 924% e 50% Topsoil/ Rootmat (3 inches) CRYSTALLINE ROCK - gray METAMORPHOSED QUARTZ DIORITE, completely to moderately weathered, soft to moderately hard, very close fracture spacing with indiscernible joints = ?J W �. CRYSTALLINE ROCK - gray and white METAMORPHOSED QUARTZ DIORITE, very slightly weathered, very hard, moderately close fracture spacing with 2 joints at 45 degDfracture iW4YY5ntL} Z 2 3 3 CRYSTALLINE ROCK - greenish gray METAMORPHOSED QUARTZ DIORIT moderately weathered, hard, very clos spacing with indiscernible joints s NOTES° heitisai at 11jjb..q'i te{{ett{} f{ ��,}} 1. THIS LOG IS &4W8HON Ur.A� REI MNNARED FOR THE NAMED PROJECTAND MUST ONLY BE USED TOGETHER WITH FHA TREPORT 2, BORINGL4ltifCE LING AND7 % TR TRW TEST DATA IN GENERAL. 3, S TPA TIRCA" 0NANOGA ,0UNDWAT&?DEPrk6ARENorEXACi. 4. WATER LEVEL IS A r TIME OFEXPLORATIONAND WILL VARY. i Page 9 of 1 r e LL C PROJECT: CMU Taggart Creek -Hope VI Development Charlotte, North Carolina BORING LOG B -10 Charlotte, North Carolina BORING LOG B -09 S&ME Project No. 1351-12-113 DRILL RIG: CME 550 BORING DEPTH: 39.Oft DRILLER: J. UNIL, WATER LEVEL: 13.4 feet on 512112012 HAMMER TYPE: Automatic LOGGED BY: N. Page NOTES: DATEDRILLED: 8117/12 ELEVATION: 627.0 ft DRILLING METHOD; 3' /d' H.S.A. DRILL RIG: CME 550 BORING DEPTH: 142 ft DRILLER: J. Little WATER LEVEL: Not Encountered HAMMER TYPE: Automatic LOGGED BY: N. Page SAMPLING METHOD: Split s oon NORTHING: EASTING: DRILLING METHOD: 3' /T H.S.A. U_ a O - UJ w w `; w BLOIrVCOl1NT '2 0, [� w w .� Z C a _ - > ,CORE DATA LU = CD J w = ut L5 ~ z REMARKS a a MATERIAL DESCRIPTION w CL E _ °� - STANDARD PENETRATIONTESroATA 7 Topsoil/ Rootmat (3 inches) = ?J W �. w ° xa 7 iW4YY5ntL} Z 2 3 3 7 s `•'1 u�] 16 20 36 6680 Topsoil ! Rootmat (1 inch) RESIDUUM: CLAYEY SILT (MH) -firm, red FILL: CLAYEY SAND (SC) - medium dense, SS -2 2 SS -1 3 5 8 3 13 brown, fine to medium 621.0 RESIDUUM: CLAYEY SILT (MH) - firm, red, SANDY SILT (ML) - firm, red orange - manganese staining S3 -2 3 3 4 3 7 5 622.0 SANDY SILT (ML) -stiff, red tan, manganese orange white red, fine to medium SS -4 2 2 2 staining 10 SS -3 4 6 7 3 a 7 13 SS -4 3 6 7 3 13 10-- 617,0 HC PARTIALLY WEATHERED ROCK: SILTY 2 4 SAND (SM) - tan brown, trace rock fragments, fine to coarse 15 26 SfY. 611.0 SS 5or.2 No Recovery Refusal at 142 feet = Boring terminated at 14.2 feet SS -6 10 13 13 _ 25 2O NOTES" 1. THIS LOG IS ONLYA POR TION OFA REPORT PREPARED FOR THE NAMED PROJEC T AND MUST ONL Y BE USED TOGETHER WITH TIIA T REPORT. Z BORING ACEL ASDPP NETR TION TESTDAFA IN GENERAL 3, STRATTFICA 77ONAND GROUNDWATER DEPTHS ARENOTEXACT. 4. WATER LEVEL IS AT 179E OF ExPLORA TIONAAFD WILL VARY. Page 7 of 1 C L! PROJECT: CMU Taggart Creek -Hope VI Development Charlotte, North Carolina BORING LOG B -10 S &ME Project No. 1351 - 12413 NOTES' DATEDRILLED: 8/17/12 ELEVATION: 625.0 ft DRILL RIG: CME 550 BORING DEPTH: 39.Oft DRILLER: J. UNIL, WATER LEVEL: 13.4 feet on 512112012 HAMMER TYPE: Automatic LOGGED BY: N. Page SAMPLING METHOD: Split s oon NORTHING: EASTING: DRILLING METHOD; 3' /d' H.S.A. W z �- ul C 0. BLOW COUNT CORE DATA _ U_ a O - UJ w w `; to REIUTARK S '2 0, MATERIAL DESCRIPTION w w .� CL x E STANDARD PE TIesT DATA �-D' J w Q `�' ui INETRATION ibJ -Y-T* Z r ° cN 10 20 3D 6680 Topsoil/ Rootmat (3 inches) = FILL: SANDY CLAY (CL) - firm, brown red SS_ 1 2 3 3 6 s RESIDUUM: CLAYEY SILT (MH) -firm, red orange SS -2 2 3 3 6 5 5 621.0 SANDY SILT (ML) - firm, red orange - SS -3 2 2 3 5 SILTY SAND (SM) - very loose to loose, orange white red, fine to medium SS -4 2 2 2 4 10 616D HC 555 2 4 5 15 T, 611.0 No Recovery = SS -6 10 13 13 _ 25 2O 506.0 PARTIALLY WEATHERED ROCK: SILTY SAND (SM) - gray brown, fine SS -7 26 50F. .4 25 601.0 SS $ 24 24 5WA 501.4 30 596 0 Refusal at 30 feet Boring terminated at 30 feet NOTES: 1. THIS LOG IS ONLYA POR77ONOFA REPORT PREPA RED FOR THE NAMED PROJECT AND MUST ONLY BE USED TOGETHER WITH THA T REPORT. 2 BORING A Vf iF! MD P S 58T8. 77ON TEST DA TA IN GENERAL 3, STRA17FICATIONANDGROUAIDWA TER DEPTHS ARE NOT EXACT. 4. WATER LEVEL IS A T TIME OF EXPLORAWONAND WILL VARY. ! Page 7 of 9 V) 0 Z a •