Loading...
HomeMy WebLinkAboutWQCS00021_NOV-2023-DV-0138_Resp Rvc_20230322March, 20, 2023 Scott Vinson, Regional Supervisor Water Quality Regional Operations Section Raleigh Regional Office Division of Water Resources, NCDEQ RE: Notice of Violation Tracking Number: NOV-2023-DV-0138 Sanitary Sewer Overflows- February 2023 Collection System Permit No. WQCS00021 Wilson Collection System Wilson County Mr. Vinson, NC Dept orEnvironmental Quality • NORTH CAROIINA MAR 22 2023 Raleigh Regional Office Incident # 202300288-On Monday, February 13, at approximately 1 PM, the Water Infrastructure division became aware of a sanitary sewer overflow at manhole #4238 on the Bloomery outfall. The previous weekend, heavy rains in the area and west of our county caused the banks of Contentnea Creek to overflow. As a result, the outfall line flooded, and caused inflow and infiltration on the sewer line. At approximately 2 PM on Tuesday, February 14, the waters of the creek receded and the SSO stopped. In May of 2022, Phase 1 of the Upper Bloomery Swamp Outfall replacement was completed. The 18-inch sewer main was upgraded to 24 inch, with an approximate cost of $800,000. Phase 2 is now underway, (which includes the area where this SSO occurred), with an estimated cost of $3,583,752.90. Construction for this phase should be completed in 1 year. An estimated 63,000 gallons was spilled and did reach surface waters. I can be reached at (252) 296-3404 with further questions. Sincerely, L. Aaron Bailey Division and Maintenance Superintendent Cc: Grant W. Goings — City Manager W. T. Bass IV, PE— Public Works Director Noah Parsons— Water Infrastructure Division Manager