Loading...
HomeMy WebLinkAboutNCC230793_Site Plan or Location Map_20230323Genes 0 PROJECT REVISIONS is of C:h 2500 Crownpoint Executive Drive Charlotte, NC 28227 10070 CONSTRUCTION DOCUMENTS 010— >: 0C1004 E°° ("C:) Date of Submittal V3 Proj*ect #: 01024.00 2 r� 1:: 0:� � 0 C/S ; cy') PROJECT TEAM Civil Engineering & Landscape Architecture V 3 Southeast 2923 S. Tryon Street, Suite 320 Charlotte, NC 28203 phone: 704-940-2883 www.v3co.com Surveying CAROLINA SURVEYORS, INC. Carolina Surveyors, Inc 307 Dover St Pineville, NC 28134 phone: 704.889.7601 SHEET INDEX Owner Architect Foard Construction 626 Pecan Avenue Charlotte, NC 28204 phone:704.372.3574 Priest Architecture 3329 Commonwealth Ave Charlotte, NC 28205 phone: 704.379.1810 Sheet Number Sheet Title Revision # Date CO-100 CD-101 COVER SHEET 1 2 1 2 1 1 1 1 1 1 2 1 2 02.03.23 01.05.23 DEMOLITION PLAN CE-101 EROSION CONTROL PLAN - STAGE 1 02.22.23 CE-102 CS-101 EROSION CONTROL PLAN - STAGE 11 DIMENSION CONTROL PLAN VEHICLE ACCESS PLAN 02.03.23 02.22.23 02.03.23 CS-102 CG-101 GRADING & DRAINAGE PLAN 02.03.23 CG-102 DRAINAGE AREA PLAN PRE DEVELOPMENT PLAN POST DEVELOPMENT PLAN SCM DETAIL - UNDERGROUND SAND FILTER INTERSECTION SITE DISTANCE CROWNPOINT EXECUTIVE DR. DRIVEWAY INTERSECTION SITE DISTANCE CROWNPOINT EXECUTIVE DR. DRIVEWAY 02.03.23 01.05.23 02.03.23 CG-103 CG-104 CG-201 02.03.23 01.05.23 01.05.23 CT-101 CT-102 CU-101 WATER DISTRIBUTION & SANITARY SEWER PLAN 02.03.23 LP-101 CX-101 CX-102 LANDSCAPE PLAN 02.22.23 02.03.23 01.05.23 SITE DETAILS SITE DETAILS CX-103 SITE DETAILS 02.22.23 CX-104 SITE DETAILS 01.05.23 I CDOT NOTES: 1. NON-STANDARD ITEMS (IE: PAVERS, IRRIGATION SYSTEMS, ETC.) IN THE RIGHT-OF-WAY REQUIRE A RIGHT-OF-WAY ENCROACHMENT AGREEMENT WITH THE CHARLOTTE DEPARTMENT OF TRANSPORTATION/NORTH CAROLINA DEPARTMENT OF TRANSPORTATION BEFORE INSTALLATION. FOR CIT OF CHARLOTTE MAINTAINED STREETS, CONTACT ENCROACH MENTAGREEMENT@CHARLOTTENC.GOV. 2. DEVELOPER SHALL BE RESPONSIBLE FOR THE INSTALLATION AND MAINTENANCE OF TEMPORARY TRAFFIC CONTROL DEVICES DURING ALL PHASE OF CONSTRUCTION IN ACCORDANCE WITH THE LATEST EDITIONS OF THE CDOT WORK AREA TRAFFIC CONTROL HANDBOOK (WATCH), THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD), AND THE NCDOT ROADWAY STANDARD DRAWINGS. 3. ANY WORK WITHIN THE CITY'S ROW OR CITY MAINTAINED INFRASTRUCTURE MUST BE APPROVED BY CDOT AND WILL REQUIRE A ROW USE PERMIT OR ROW LEASE DEPENDING UPON THE PROPOSED SCOPE AND DURATION OF CLOSURE. THESE APPROVALS ARE IN ADDITION TO SITE PLAN APPROVALS AND SHOULD BE COORDINATED WITH CDOT PRIOR TO CONSTRUCTION. CONTRACTOR SHALL CONTACT ROWUSEPERMIT@CHARLOTTENC.GOV AT LEAST 5 BUSINESS DAYS PRIOR TO BEGINNING WORK FOR IMPACTS LESS THAN 30 DAYS. CONTRACTOR SHALL CONTACT LEAS INGAGREEMENT@CHARLOTTENC.GOV AS SOON AS POSSIBLE FOR IMPACTS GREATER THAN 30 DAYS. EVERY EFFORT SHALL BE MADE TO CONSTRUCT IMPROVEMENTS WITH MINIMAL IMPACT TO ALL USERS OF THE PUBLIC ROW. 4. THE DEVELOPER SHALL CONTACT THE IMPLEMENTATION SECTION MANAGER, TONY TAGLIAFERRI, OF THE CHARLOTTE DEPARTMENT OF TRANSPORTATION (CDOT) OR THEIR DESIGNEE AT 704-336-4119 TO IDENTIFY ANY CONFLICTS WITH TRAFFIC SIGNALIZATION EQUIPMENT. 60- 90 DAY WILL BE REQUIRED TO COORDINATE RELOCATION. DEVELOPER SHALL BE RESPONSIBLE FOR ALL RELATED RELOCATION COST AND/OR ANY REPAIR COST CAUSED BY THE CONTRACTOR/DEVELOPER. 5. PEDESTRIAN -SCALE LIGHTING AND/OR STREET LIGHTING SHALL NOT BE INSTALLED WITHIN THE RIGHT-OF-WAY WITHOUT REVIEW AND APPROVAL CDOT. DEVELOPER TO CONTACT CANDACE INGE (704-336-3932 OR CANDACE.INGE@CHARLOTTENC.GOV) FOR LOCAL STREET LIGHTING CRITERIA WITH RESIDENTIAL SUBDIVISION PROJECTS AND TO CONTACT BRUCE HORLDT (704-589-5836 OR BRUCE.HORLDT@CHARLOTTENC.GOV) FOR ALL OTHER PROJECTS LIGHTING REQUIREMENTS. COORDINATE WITH DUKE ENERGY AND CDOT AS NECESSARY TO DETERMINE LIGHTING LEVELS, LIGHTING LAYOUT AND REQUIREMENTS FOR INSTALLATION. 6. PRIVATE DEVELOPMENT UTILITY RELOCATION COORDINATION - FOR UTILITY COORDINATION RELATED TO BOTH EXISTING UTILITY RELOCATION NEEDS AND PROPOSED NEW UTILITY INSTALLATIONS, PLEASE CONTACT UTILTITYWORKPERMIT@CHARLOTTENC.GOV. 7. A JOINT USE MANHOLE (MEET -ME MANHOLE) IS TO BE PROVIDED BY THE DEVELOPER TO ACCOMMODATE ALL UTILITY TELECOM SERVICE PROVIDERS. THE JOINT USE MANHOLE SHALL BE LOCATED ON PRIVATE PROPERTY OUTSIDE OF THE CITY RIGHT-OF-WAY. ,Projects\01024 Genesis of Charlotte\Plans\Produdion DWGs\01024-CO-100_COVER SHEET.dwg, 2/22/2023 4:50:52 PM, denial soder, V3 Southeast REGULATORY APPROVALS SITE OVERVIEW MAP I I I I I I I I � I = O I � a >Ok I _j MOM U m Z:) W rz po Z N w n W I p z I I I I I I I I I PROJECT CERTIFICATION CHECKLIST TREE SAVE PLAT UNDISTURBED OPEN SPACE PLAT STORM DRAINAGE CERTIFICATION BUA AS -BUILT SCM AS -BUILT STORM SYSTEM AS -BUILT INSTALLATION OF PIPE ANTISEEP COLLARS WITNESSED SANITARY SEWER CERTIFICATION PRIVATE AS-BUILTS PUBLIC AS-BUILTS AIR PRESSURE TEST MANDREL TEST VACUUM TEST WATER DISTRIBUTION CERTIFICATION HYDROSTATIC TEST ALLOWABLE LEAKAGE TEST TOTAL COLIFORM RESIDUAL CHLORINE TEST PRIVATE AS-BUILTS PUBLIC AS-BUILTS NOTIFY CIVIL ENGINEER 48 HOURS IN ADVANCE OF ANY REQUIRED TESTING OR WITNESSED INSTALLATION. CONTRACTOR IS REQUIRED TO PERFORM A PRE -TEST ON ALL WATER AND SEWER LINES AT LEAST CROWNPOINT EXECUTIVE DR ■ El VICINITY MAP IAA v Cram,, 8 X m D Cn m co 0 I I I I I } 4tr$nsnn P� V .1% 'e- ":�� SITE LOCATION iL F7tlC NAMW V fAflt= r I ranfreldOr . <7 "' a (��L N.T.S. N N.T.S. oICIVI� /,, O •F•ssiOti'• �'�. SEAL 047011 •'FHGINEE�••• \ G• y \ ON