Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Appendix-CD-2F1 - LIP_Base
Appendix – CD-2F1 LIP_Base LIP Input Sheet Duke Enery Catawba-Wateree CHEOPS Model Input sheet for LIP criterion to be modeled in the Catawba Wateree CHEOPS Model Data updated:08/15/2005 09/15/2005 09/27/2005 Intended Scenario:Base Condition, by-plant changes to Minimum Elevations Days of Month to Recalculate LIP Conditions:1 -- Modified By:Brian Krolak Ey Miles Reservoir Critial Elevations (should be at or below the Minimum Elevation entered in the scenario being run.) Reservoir Name 1 2 3 4 5 6 7 8 9 10 11 Critical Reservoir Elevation (ft, relative datum)61.0 89.4 94.0 74.9 90.0 94.3 92.6 95.0 87.2 80.3 88.5 Critical Flows (flows from dams per LIP documentation) Reservoir Name 1 2 3 4 5 6 7 8 9 10 11 Critical Flow (cfs) Jan 231.0 -231.0 80.0 --916.0 -550.0 -1257.0 Critical Flow (cfs) Feb 289.0 -289.0 80.0 --926.0 -900.0 -1494.0 Critical Flow (cfs) Mar 244.0 -244.0 80.0 --845.0 -845.0 -1320.0 Critical Flow (cfs) Apr 192.0 -192.0 80.0 --800.0 -728.0 -982.0 Critical Flow (cfs) May 139.0 -139.0 80.0 --800.0 -510.0 -800.0 Critical Flow (cfs) Jun 145.0 -145.0 80.0 --800.0 -550.0 -800.0 Critical Flow (cfs) Jul 123.0 -123.0 80.0 --800.0 -452.0 -800.0 Critical Flow (cfs) Aug 137.0 -137.0 80.0 --800.0 -452.0 -800.0 Critical Flow (cfs) Sep 125.0 -125.0 80.0 --800.0 -399.0 -800.0 Critical Flow (cfs) Oct 134.0 -134.0 80.0 --800.0 -434.0 -800.0 Critical Flow (cfs) Nov 128.0 -128.0 80.0 --800.0 -514.0 -800.0Critical Flow (cfs) Dec 140.0 -140.0 80.0 --800.0 -550.0 -800.0 BOM Storage/Target Storage ratio Ratio less than or equal to Ratio greater than 6 Month USGS Gage hydrology sum less than or equal to Stage 0 90%85% Stage 1 90%75%78% Stage 2 75%54%65% Stage 3 54%26%55%Stage 4 26%0%40% Changed Wateree and Wylie Critical flows to a low of 800 cfs based on request from Duke on 9/13/05. Modified BOM storage target ratios for stages 2 to 4 9/14/05 based on deeper dips into Lake James and Lake Norman in Stage 1 File: LIP_Base.xls, Tab: Data Page 1 of 2 Printed: 06/21/2006, 2:31 PM LIP Input Sheet Duke Enery Catawba-Wateree CHEOPS Model Actions to be performed Licensee Actions Licensee Delay in implementing Actions (days) NLPF Reduction (%) Reduction to difference between NLPF and Critical Flow Bypass Reduction (%) Reduction to difference between Bypass and Critical Flow Recreation Flows Reduction (%) Plant 1 Normal Minimum Pond Elevation Reduction (ft, absolute) Plant 2 Normal Minimum Pond Elevation Reduction (ft, absolute) Plant 3 Normal Minimum Pond Elevation Reduction (ft, absolute) Plant 4 Normal Minimum Pond Elevation Reduction (ft, absolute) Plant 5 Normal Minimum Pond Elevation Reduction (ft, absolute) Plant 6 Normal Minimum Pond Elevation Reduction (ft, absolute) Plant 7 Normal Minimum Pond Elevation Reduction (ft, absolute) Plant 8 Normal Minimum Pond Elevation Reduction (ft, absolute) Plant 9 Normal Minimum Pond Elevation Reduction (ft, absolute) Plant 10 Normal Minimum Pond Elevation Reduction (ft, absolute) Plant 11 Normal Minimum Pond Elevation Reduction (ft, absolute) Stage 0 4 0%0%0%0 0 0 0 0 0 0 0 0 0 0 Stage 1 4 60%60%60%5 1 1 1 2 1 1 1 1 1 1 Stage 2 4 95%95%100%20 2 2 2 4 2 2 2 2 2 2 Stage 3 4 100%100%100%29 3 3 3 5 3 3 3 3 3 3 Stage 4 4 100%100%100%critical critical critical critical critical critical critical critical critical critical critical Consumptive Withdrawal Reduction (%) Owners of public and large water supply intakes Owner Delay in implementing Actions (days)Plant 1 Plant 2 Plant 3 Plant 4 Plant 5 Plant 6 Plant 7 Plant 8 Plant 9 Plant 10 Plant 11 Stage 0 4 0% Stage 1 4 0.6%3.0%3.0%3.0%1.9%3.0%0.6%3.0%3.0%3.0%0.9% Stage 2 4 1.3%7.0%7.0%7.0%4.5%6.9%1.4%7.0%7.0%7.0%2.0% Stage 3 4 2.8%15.0%15.0%15.0%9.6%14.8%3.0%15.0%15.0%15.0%4.3%Stage 4 4 4.6%25.0%25.0%25.0%16.1%24.7%4.9%25.0%25.0%25.0%7.2% LIP Recovery Days delayed after storage and hydrology condition recovery for groundwater wells to indicate groundwater levels have recovered From Stage 4 to Stage 3 From Stage 3 to Stage 2 From Stage 2 to Stage 1 From Stage 1 to Stage 0 Stage 0 to Normal Groundwater Monitor 0 0 0 0 0 File: LIP_Base.xls, Tab: Data Page 2 of 2 Printed: 06/21/2006, 2:31 PM