Loading...
HomeMy WebLinkAboutAppendix-B_Water_Balance_Tables Appendix B Water Balance Tables CONCORD & KANNAPOLIS I.B.T. EIS Non-IBT Withdrawals & Discharges Kannapolis Withdrawal Source Source Basin 50 yr. Safe Yield Receiving Basin Coddle Creek Reservoir Rocky River 2.00* Rocky River *Note: Contracted Limit During Droughts Kannapolis Lake Rocky River 8.50*Rocky River *Note: Includes Second Creek IBT Safe Yield 10.50 Concord Coddle Creek Reservoir Rocky River 14.20* Rocky River *Note: Kannapolis 2 MGD subtracted out Lake Concord Reservoir Rocky River 1.20 Rocky River Lake Fisher Reservoir Rocky River 5.15 Rocky River 20.55 Proposed IBT Notes:IBT is used to supplement 50 Yr. SY(Available Supply) so that ADD is 80% of increased Avail. Supply in 2010, 2020, and 2035 Year Avail. Supply ADD New Avail Suppy IBT % Treated Concord 2010 20.55 16.61 20.76 0.21 Total ADDF 17.2 0.88 2020 20.55 21.91 27.39 6.84 Total ADD 19.6 2035 20.55 29.07 36.34 15.79 % Treated Total ADDF 17.2 0.88 Year Avail. Supply ADD New Avail Suppy IBT Total MDD 19.6 Kananpolis 2010 10.50 10.83 13.54 3.04 2020 10.50 12.94 16.18 5.68 2035 10.50 15.26 19.08 8.58 ASSUMPTIONS: 1.)The WSACC Master Plan indicated for 2000 that ADD WW flows were 88% of ADD water Demand ( or 12% of water demand is consumptive use. 2.)This same percentage is used back to 1992 and forward to 2030 to project expected Consumptive Use Water Balance Table - Average Daily Values Consumptive Loss Wastewater Discharge Year Water System Withdrawal Source Source Basin Withdrawal (MGD) Receiving Basin Source Basin (MGD) Receiving Basin (MGD) Source Basin (MGD) Receiving Basin (MGD) Total Return to Source Basin (MGD) Total Interbasin Transfer (MGD) (A) (B)(C)(D) (E) (F) (G) (H)=(D)+(F) (I)=(C)-(H) 1992 Kannapolis IBTs by Source Basin S.Yadkin River Note: Second Creek pumps to Kannapolis Lake Second Creek S.Yadkin River 5.35 Rocky River 0.00 0.64 0.00 4.71 0.00 5.35 1992 Concord IBTs by Source Basin No IBTs in 1992 1997 Kannapolis IBTs by Source Basin S.Yadkin River Note: Second Creek pumps to Kannapolis Lake Second Creek S.Yadkin River 4.49 Rocky River 0.00 0.54 0.00 3.95 0.00 4.49 1997 Concord IBTs by Source Basin No IBTs in 1997 2002 Kannapolis IBTs by Source Basin S.Yadkin River Second Creek S.Yadkin River 5.50 Rocky River 0.00 0.66 0.00 4.84 5.50 5.50 2002 Concord IBTs by Source Basin Catawba River New in 2002 Charlotte Mecklenburg Utilities Catawba River 1.48 Rocky River 0.00 0.18 0.00 1.30 0.00 1.48 2010 Kannapolis IBTs by Source Basin S.Yadkin River Second Creek S.Yadkin River 5.50 Rocky River 0.00 0.66 0.00 4.84 0.00 5.50 Yadkin River Purchases from Salisbury Salisbury Yadkin River 0.30 Rocky River 0.00 0.04 0.00 0.26 0.00 0.30 Catawba River Proposed IBT Lake Norman Catawba River 3.04 Rocky River 0.00 0.36 0.00 2.68 0.00 3.04 2010 Concord IBTs by Source Basin Catawba River Purchases from CMU…Accounted/Switched to Proposed IBT Below Charlotte Mecklenburg Utilities Catawba River 0.00 Rocky River Proposed IBT Lake Norman Catawba River 0.00 Rocky River 0.00 0.00 0.00 0.00 0.00 0.00 Yadkin River Purchases from Albemarle City of Albmarle Yadkin River 0.21 Rocky River 0.00 0.03 0.00 0.18 0.00 0.21 2020 Kannapolis IBTs by Source Basin S.Yadkin River Second Creek S.Yadkin River 5.50 Rocky River 0.00 0.66 0.00 4.84 0.00 5.50 Yadkin River Purchases from Salisbury Salisbury Yadkin River 0.30 Rocky River 0.00 0.04 0.00 0.26 0.00 0.30 Catawba River Proposed IBT Lake Norman Catawba River 5.68 Rocky River 0.00 0.68 0.00 5.00 0.00 5.68 2020 Concord IBTs by Source Basin Yadkin River Purchases from Albemarle City of Albmarle Yadkin River 3.12 Rocky River 0.00 0.37 0.00 2.75 0.00 3.12 Catawba River Proposed IBT Lake Norman Catawba River 3.42 Rocky River 0.00 0.41 0.00 3.01 0.00 3.42 2035 Kannapolis IBTs by Source Basin S.Yadkin River Second Creek Yadkin River 5.50 Rocky River 0.00 0.66 0.00 4.84 0.00 5.50 Yadkin River Purchases from Salisbury Salisbury Yadkin River 0.30 Rocky River 0.00 0.04 0.00 0.26 0.00 0.30 Catawba River Proposed IBT Lake Norman Catawba River 8.58 Rocky River 0.00 1.03 0.00 7.55 0.00 8.58 2035 Concord IBTs by Source Basin Yadkin River Purchases from Albemarle City of Albmarle Yadkin River 6.25 Rocky River 0.00 0.75 0.00 5.50 0.00 6.25 Catawba River Proposed IBT Lake Norman Catawba River 9.54 Rocky River 0.00 1.14 0.00 8.40 0.00 9.54 CONCORD & KANNAPOLIS I.B.T. EIS Non-IBT Withdrawals & Discharges Kannapolis Withdrawal Source Source Basin 50 yr. Safe Yield Receiving Basin Coddle Creek Reservoir Rocky River 2.00* Rocky River *Note: Contracted Limit During Droughts Kannapolis Lake Rocky River 8.50*Rocky River *Note: Includes Second Creek IBT Safe Yield 10.50 Concord Coddle Creek Reservoir Rocky River 14.20* Rocky River *Note: Kannapolis 2 MGD subtracted out Lake Concord Reservoir Rocky River 1.20 Rocky River Lake Fisher Reservoir Rocky River 5.15 Rocky River 20.55 Proposed IBT Notes:IBT is used to supplement 50 Yr. SY(Available Supply) so that ADD is 80% of increased Avail. Supply in 2010, 2020, and 2035 Year Avail. Supply ADD New Avail Suppy IBT IBT(MDD) Concord 2010 20.55 16.61 20.76 0.21 0.34 2020 20.55 21.91 27.39 6.84 10.94 2035 20.55 29.07 36.34 15.79 25.26 Year Avail. Supply ADD New Avail Suppy IBT IBT(MDD) Kananpolis 2010 10.50 10.83 13.54 3.04 4.86 2020 10.50 12.94 16.18 5.68 9.08 2035 10.50 15.26 19.08 8.58 13.72 ASSUMPTIONS: 1.)The WSACC Master Plan indicated for 2000 that ADD WW flows were 88% of ADD water Demand or 12% of water demand is consumptive use. 2.)This same percentage is used back to 1992 and forward to 2030 to project expected Consumptive Use Water Balance Table - Maximum Daily Values Consumptive Loss Wastewater Discharge Year Water System Withdrawal Source Source Basin Withdrawal (MGD) Receiving Basin Source Basin (MGD) g Basin (MGD) Source Basin (MGD) Receiving Basin (MGD) Source Basin (MGD) Interbasin Transfer Capacity (A) (B)(C)(D) (E) (F) (G) (H)=(D)+(F) (I)=(C)-(H) 1992 Kannapolis IBTs by Source Basin S.Yadkin River Note: Second Creek pumps to Kannapolis Lake Second Creek S.Yadkin River 5.35 Rocky River 0.00 0.64 0.00 4.71 0.00 5.35 1992 Concord IBTs by Source Basin No IBTs in 1992 1997 Kannapolis IBTs by Source Basin S.Yadkin River Note: Second Creek pumps to Kannapolis Lake Second Creek S.Yadkin River 4.49 Rocky River 0.00 0.54 0.00 3.95 0.00 4.49 1997 Concord IBTs by Source Basin No IBTs in 1997 2002 Kannapolis IBTs by Source Basin S.Yadkin River Second Creek S.Yadkin River 5.50 Rocky River 0.00 0.66 0.00 4.84 5.50 5.50 2002 Concord IBTs by Source Basin Catawba River New in 2002 Charlotte Mecklenburg Utilities Catawba River 1.48 Rocky River 0.00 0.18 0.00 1.30 0.00 1.48 2010 Kannapolis IBTs by Source Basin S.Yadkin River Second Creek S.Yadkin River 5.50 Rocky River 0.00 0.66 0.00 4.84 0.00 5.50 Yadkin River Purchases from Salisbury Salisbury Yadkin River 0.30 Rocky River 0.00 0.04 0.00 0.26 0.00 0.30 Catawba River Proposed IBT Lake Norman Catawba River 4.86 Rocky River 0.00 0.58 0.00 4.28 0.00 4.86 2010 Concord IBTs by Source Basin Catawba River Purchases from CMU…Accounted/Switched to Proposed IBT Below Charlotte Mecklenburg Utilities Catawba River 0.00 Rocky River Proposed IBT Lake Norman Catawba River 0.00 Rocky River 0.00 0.00 0.00 0.00 0.00 0.00 Yadkin River Purchases from Albemarle City of Albmarle Yadkin River 0.34 Rocky River 0.00 0.04 0.00 0.30 0.00 0.34 2020 Kannapolis IBTs by Source Basin S.Yadkin River Second Creek S.Yadkin River 5.50 Rocky River 0.00 0.66 0.00 4.84 0.00 5.50 Yadkin River Purchases from Salisbury Salisbury Yadkin River 0.30 Rocky River 0.00 0.04 0.00 0.26 0.00 0.30 Catawba River Proposed IBT Lake Norman Catawba River 9.08 Rocky River 0.00 1.09 0.00 7.99 0.00 9.08 2020 Concord IBTs by Source Basin Yadkin River Purchases from Albemarle City of Albmarle Yadkin River 5.00 Rocky River 0.00 0.60 0.00 4.40 0.00 5.00 Catawba River Proposed IBT Lake Norman Catawba River 5.94 Rocky River 0.00 0.71 0.00 5.23 0.00 5.94 2035 Kannapolis IBTs by Source Basin S.Yadkin River Second Creek Yadkin River 5.50 Rocky River 0.00 0.66 0.00 4.84 0.00 5.50 Yadkin River Purchases from Salisbury Salisbury Yadkin River 0.30 Rocky River 0.00 0.04 0.00 0.26 0.00 0.30 Catawba River Proposed IBT Lake Norman Catawba River 13.72 Rocky River 0.00 1.65 0.00 12.07 0.00 13.72 2035 Concord IBTs by Source Basin Yadkin River Purchases from Albemarle City of Albmarle Yadkin River 10.00 Rocky River 0.00 1.20 0.00 8.80 0.00 10.00 Catawba River Proposed IBT Lake Norman Catawba River 15.26 Rocky River 0.00 1.83 0.00 13.43 0.00 15.26