Full-Cost Water Pricing
Background
Historically, many utilities have based their water rates on the operation and
maintenance costs of water treatment only and have not been able or willing to include
the cost of the replacement of the water treatment, storage and distribution systems.
Those replacements will come in future years. While this method has resulted in lower
water rates for the system’s customers, historically, water rates have not acknowledged
the full-cost of providing water service. Water systems, like all other man-made
systems, have a useful life expectancy. Water system management must incorporate
the cost of upgrading, maintaining and replacing this infrastructure into their water
pricing.
Full-cost pricing is when the water system (“utility”) charges customers for the actual
cost of water service, including explicit recognition of the level of reinvestment needed
on an on-going basis to refurbish, replace or upgrade existing assets. This will
guarantee the utility the revenue needed to cover at a minimum the costs of operation,
treatment, storage, distribution and for past and future investments. Full-cost pricing is a
pricing structure for drinking water and wastewater service, which fully recovers the cost
of providing that service. Full-cost pricing should be implemented in an economically
efficient, environmentally sound and socially acceptable manner. Full-cost pricing
should also promote efficient water use by customers.
Water systems must base their rates on the true costs of providing water in order to
have the resources available for proper system maintenance and to pay for current
capacity as well as future upgrades and replacements. Availability of state and federal
funds to assist with this work are limited, therefore utilities must be prepared to fund
these upgrades and replacements using their own resources. The sooner a system’s
water rates are based on full-cost pricing, the sooner the needed upgrades and
replacements can be completed. With proper planning, the work can be completed prior
to any major system failures. This planning should not only prevent system failure, but
also prevents sudden, major rate increases in the future that would be needed to repair
the failing systems.
Full-cost pricing:
Is essential for sustainability and economic efficiency; accurate pricing
encourages efficient production and use.
Ensures rates are sufficient and that there is a stable source of funds and
reserves.
Ensures a water system’s financial health, enabling the utility to provide safe
water now and in the future.
Provides better information to customers on the total costs of water service,
and the true value of the product they are purchasing.
Helps customers recognize the value of the service and be more aware of
January 15, 2013 96
their water use.
According to North Carolina’s 2008 Drought Bill (Session Law 2008-143), Section 9-
G.S.143-355.4(b)(1), water rate structures should be adequate to pay the cost of
maintaining, repairing and operating the system. That includes reserves for payment of
principal and interest on indebtedness incurred for maintenance or improvement of the
water system during periods of normal use and periods of reduced water use due to
water conservation measures. In addition, water rates should be sufficient to pay for
future capital costs, whether up-front or through debt service of future loans.
Once the full-cost (the true cost of providing water) has been established, the next step
must be to determine how this cost will be distributed to the system’s customers. Often
the cost of water has not been established at a level that encourages the efficient use of
available water. In fact, in some cases the use of decreasing block rates have actually
resulted in less incentives for water conservation.
Applicability
This BMP is intended for all water systems wishing to recover the full-cost of supplying
water to their customers and to send price signals to customers that will encourage
water conservation. A water system may have already accomplished this BMP if it
currently has a price structure that recovers the true cost of supplying water.
Description
Full-cost pricing is the use of rate structures to provide for the financial security of a
water system. Using this BMP, water systems should consider establishing rates based
on the revenue requirements of the system based on specific considation of the level of
investment needed to maintain, refurbish, replace and upgrade the existing assets to
preserve the long-term capacity and efficiency of those assets or the cost of adding the
next unit of capacity to the system. An established cost of service methodology should
be followed whenever rates are developed or proposed for change.
This BMP addresses pricing structures for retail customers. For water systems
supplying water and sewer services, the principles contained in this BMP can be applied
to the pricing of both services. Water systems that supply water, but not sewer service
should make good faith efforts to work with sewer agencies so that sewer services are
not provided using a pricing structure that conflicts with the objectives of the water
pricing structure.
For full cost pricing structures to be effective, customers must be educated on the
reasons for the system’s rate structure. An explanation of the rate structure should be
included with each customer’s water bill.
January 15, 2013 97
Determining Full-Cost Pricing
Full-cost pricing for water utilities is based on the cost of maintaining, repairing and
operating the system. This pricing includes reserves for payment of principal and
interest on indebtedness for the maintenance or improvements, and future capital
expenses such as expected debt service. Essentially, full-cost pricing is an effective
way to achieve long-term sustainability, and if done correctly, can address equity
concerns, provide increased financial flexibility and stability, can be more cost effective
over the long term, and can provide better cost justification for tiered rate structures.
There are many ways to account for your system’s costs. You should pick one that
works well with your current accounting system and that supports the rates you plan to
use. Any approach must fully account for all costs related to the provision of water. To
estimate these costs, review records of the last year’s expenditures and account for
changes to operating costs and capital projects expected to be completed during the
next five years to twenty years. All utilities should create a capital improvement plan that
estimates future capital costs in each year for the next five years to twenty years, and
incorporate it into full-cost pricing. A ten to twenty year capital planning horizon is good,
but financial planning should take into account, but be limited to a five year forecast.
Beyond five years, any rate or financial forecast is typically unreliable, at best.
Cost components are calculated annually, and can be categorized into three different
areas: personnel costs, non-personnel costs, and capital reserves (debt service set-
aside and reserves for future capital costs).
Personnel Costs:
Salaries and wages for administrative and operations and maintenance
personnel.
Labor costs for services required in the operations of the system including:
o Treatment
o Monitoring
o Maintenance
o Testing
o Meter reading and billing operations
o Customer Service
o Legal and Accounting
o Engineering, if applicable
o Management
o Benefits for personnel including:
Medical Insurance
Retirement
Vacation
Bonuses
January 15, 2013 98
Non-personnel Costs:
Cost for office operations including:
o Space rentals
o Mortgages
o Office supplies
o Computer and lab equipment
o Contracts
o Cost for utilities including:
Electricity
Natural Gas
Communications
Water purchased from other systems
When estimating future utility costs and revenues, you will likely need to forecast the
total annual water use. Examine your billing data to determine the total annual sales as
well as your records for water withdrawals each year to predict future demand.
Other direct costs to operate the system including:
o Chemicals
o Leased equipment
o Routine maintenance and repair costs at facility sites, and for equipment
and vehicles
o Insurance costs covering buildings, vehicles, and personnel.
o Costs for professional services such as accounting, legal and engineering
if not done in-house
o Permitting costs
o Costs for career development and certification renewals for personnel.
o Costs for residuals disposal
o Costs for security and surveillance
Indirect costs to operate the system including:
o Transfers to the City or County for financial, personnel or other services
provided
Capital Reserves and Debt Service Payments:
Sufficient revenue must be allocated to make principal and interest payments on current
and future indebtedness, and for capital expenses that will be paid in cash. Debt service
excludes mortgages, but covers investments for capital projects needed to maintain the
safe operation of your system. The timing of investing in system assets is an integral
component to determining sufficient reserves, and should be addressed in your Capital
Improvement Plan. Projects for which capital reserves and debt service set-asides
should be allocated can include:
January 15, 2013 99
Rehabilitation and replacement of existing assets, including pipes, pumps,
control systems, tanks, etc.
Expansions and upgrades of the treatment and distribution systems.
Interconnections to other systems.
Source water development and protection.
Any other interest owed by the system.
Managing system assets should be addressed in your Asset Management Plan. Asset
management can be a lengthy process. It involves following five steps that will help you
determine how much money should be placed in a reserve fund each year. Asset
management is a part of your Capital Improvement Plan. The five steps are to:
Develop an inventory of all of your assets by listing them and collecting
information on the condition, age, service history and useful life of each one.
Prioritize your assets to help you decide how best to allocate your limited
resources. Priority should be based on the asset's importance (“criticality”) to the
operation of your system and the protection of public health. Other factors to
consider include how soon you will have to replace the asset and whether other
pieces of equipment can perform the same function (redundancy).
Determine the costs of asset rehabilitation and replacement, which should
include an analysis of both capital cost and life cycle cost.
Decide what percentage of these costs you will cover with cash (i.e., money you
set aside in the reserve account), and how much you will cover through debt. In
some cases, it may make more financial sense to borrow money to cover the
initial cost of the project and pay those costs over a longer period of time, even
with interest payments.
Review and revise your plan. Your Asset Management Plan should be used to
help you shape your Capital Improvement Plan. It should evolve as you gain
more information and as your system’s assets and utility’s priorities change.
Following this process will help you determine how much money must be generated
through water rates to fulfill your capital improvement plan.
Determine the costs associated with operating, maintaining, rehabilitating, replacement,
upgrading, expanding and repairing your system. Then, tally those costs to determine
the full-cost pricing of water. These full cost data should be reviewed annually and
adjustments made to future budgets as appropriate.
Determining Revenue Requirements:
After determining your costs, you will need to calculate how much revenue you collect
each year to offset these costs. Revenue sources can include:
Water sales
Fees and service charges
Tap or connection charges
January 15, 2013 100
Interest
Grants
Transfer payments from other funds (this practice is not recommended for any
public enterprise fund)
Private investments
Other sources
Now that you have a better sense of your costs, revenues and reserves, you are ready
to determine how much revenue will be needed from customers each year to cover any
shortfalls. To cover the full cost of doing business (i.e., to meet the goals of full-cost
pricing), the amount of revenue that you receive from your customers should equal your
total annual costs including your annual debt service payments minus any subsidies or
transfer payments you receive.
You will need to calculate your required revenue annually, taking into account your
budget for the upcoming year. In addition, you will need to think beyond your needs for
the next year. Variable costs, changes in subsidies, debt service costs, and other
factors can affect your required revenue from year to year. Estimating costs for the next
several years based on your fixed costs, operating expenses, asset rehabilitation and
repair needs, and existing debt service can help avoid a significant gap between future
revenue and costs. Once you have a better idea of actual costs, you can revise your
estimates accordingly.
Now that you know your costs and the amount of money you need to collect from your
customers to fully cover those costs, you are ready to start thinking about how you are
going to collect this money. One way is through setting appropriate rates for water used
by your customers that will account for your full cost.
Implementation
Full-cost pricing is best introduced over time and in multiple steps. Some of these steps
include:
Evaluating all the costs associated with the utility and incorporating adequate
accounting programs.
Implementing reporting procedures.
Monitoring and documenting usage patterns for various sectors of users.
Educating consumers on the value the utility provides.
Planning for reserves necessary to fund the maintenance and upgrades required.
Planning for the future and forecasting revenue requirements.
Determining the actual cost of service.
Required Customer Revenue = (Total Annual Costs) – (Subsidies) – (Transfer
Payments) – (Other Revenues)
January 15, 2013 101
Implementing an Asset Management Plan.
Evaluating and optimizing all aspects of the system (treatment, operations,
metering, billing, distribution, debt instruments, etc.).
A rate structure that allows the utility to be self-sustaining is a balanced approach to
utility management. Given the constraints discussed above, the structure of cost-based
rates will vary by community. In the long run, full-cost pricing is imperative for every
utility.
Successful adoption of a new rate structure may necessitate developing and
implementing a public involvement process in order to educate the community about the
new rate structure. The new rate structure should adhere to all applicable regulatory
procedures and constraints. If the conservation pricing structure to be implemented is
substantially different from current practices, then a phased-in approach may be
appropriate.
Public involvement in the development and implementation of rates can help assure that
the goals of the full-cost pricing initiatives will be met and accepted by local
constituents. Public meetings, advisory groups and public announcements are among
ways to generate public involvement.
Schedule
Water systems pursuing this BMP should begin implementing it at the earliest possible
date. Although the implementation of full-cost pricing will likely have a significant impact
on a system’s water rates, phasing in this change can avoid more severe impacts on
the system’s customers. Improper planning will result in system failures and the inability
to provide an adequate and safe water supply. When this happens, utilities may be
forced to implement water rates that far exceed those that could have been
implemented earlier with sufficient planning.
The implementation of full-cost pricing will take a major commitment by the system’s
management and its customers. The easy path is to continue to ignore the problem and
leave the pending system failures and resulting major rate increases for others.
The key to full-cost pricing is to explain the need for the proposed rate structure and the
consequences of inaction. The educational process starts with the system’s
management and staff and then quickly moves on to the system’s customers.
Scope
To accomplish this BMP, the water system must determine the full cost for the operation
of the system and set water rates at a level to help meet these current and future needs.
Management must also maintain these funds for their intended purposes and not divert
them for other needs.
January 15, 2013 102
Documentation
To track this BMP, the water system should maintain the following documentation:
A copy of its legally adopted rate ordinance or rate tariff that follows the
guidelines of this BMP.
Billing and customer records that include annual revenues by customer class and
revenue derived from commodity charges and fixed charges by customer class
for the reporting period.
A copy of the education materials on full-cost pricing sent to customers for each
calendar year this BMP is in effect.
An account of all system costs.
An Asset Management Plan, last updated within the past two or three years.
A Capital Improvement Plan, last updated within the past two or three years.
A water system bill meeting the parameters and schedule in the Schedule
Section.
Other Considerations
While Full-Cost Water Pricing is a valuable tool to help ensure that the utility will have
adequate water available for all its customers, the utility must also ensure the rates are
adequate to cover the day-to-day operation of the water system and the system’s long-
term system repairs or replacement.
The June 2012 Journal of the AWWA, contained an article by H. Edwin Overcast titled
“Is it time for water utilities to rethink pricing?” In the article, Overcast discussed how
utilities face declining per capita consumption as a result of conservation measures,
unpredictable weather patterns, and implementation of increasing-block rate structures.
Faced with generally declining use per customer, water utilities are confronted with the
unfortunate fact that revenues may not be sufficient to cover the costs of operation,
maintenance and debt service needed to keep the system of reservoirs, treatment
plants, pumps, pipes, valves, fire hydrants and meters running.
One solution Overcast discusses is recovering fixed capital cost associated with local
infrastructure (distribution system-related fixed cost) through fixed monthly charges and
recovering traditional volumetric-related costs through volumetric charges. This option,
called straight fixed-variable rate design has been adopted by other types of utility
providers. Shifting customer costs from volumetric charges to fixed charges would likely
need to be phased in over several years in order to mitigate the impact of such changes
on the bills of the smaller-volume users.
For comments or questions regarding the full-cost pricing BMP, please contact the
water efficiency specialist of the Water Supply Planning Branch at 919-707-9021.
January 15, 2013 103
References
Principles of Water Rates, Fees, and Charges (M1 Manual), AWWA, 2000.
Residential End Uses of Water, AWWA Research Foundation, 1999
http://www.allianceforwaterefficiency.org/residential-end-uses-of-water-study-
1999.aspx.
Setting Small Drinking Water Systems Rates for a Sustainable Future, EPA
Office of Water, January 2006.
http://www.epa.gov/ogwdw/smallsystems/pdfs/guide_smallsystems_final_ratesett
ing_guide.pdf.
Water Price Elasticities for Single-Family Homes in Texas, Texas Water
Development Board, August 1999.
http://www.twdb.state.tx.us/rwpg/rpgm_rpts/96483189.pdf
Designing, Evaluating, and Implementing Conservation Rate Structures,
California Urban Water Conservation Council, July 1997.
Effectiveness of Residential Water Price and Nonprice Programs, AWWARF,
1998.
http://www.waterrf.org/ProjectsReports/ExecutiveSummaryLibrary/90747_737A_
profile.pdf
Is it time for water utilities to rethink pricing?, Journal AWWA, June 2012
SWIC-Recommended Guidance for North Carolina Utilities Attempting to Support
Water Conservation in the Long‐Term through Rate Structure Design and Billing
Practices,
http://www.ncwater.org/Water_Supply_Planning/Water_Conservation/SWIC_11-
22-10.pdf, November 2010.
Town of Cary Elasticity Analysis, prepared by Keith Bishton and Dave Green-
ftp://199.72.17.76/Engineering/IntWatResMP/Appendices/Appendix_C_Price%20
Elasticity%20TM_05042007.pdf.