From: Gerald Pottern <gpottern @rjgacarolina.com>
Sent: Monday, April 13, 2015 11:01 AM
To: Bailey, David E SAW
Cc: Alsmeyer, Eric C SAW; Homewood, Sue; Ellis, John; Bryant, Shari L.;
twarren @cityofroxboro.com; Stimpson, Paul
Subject: Re: [EXTERNAL] Roxboro Water Intake, Dan River, Caswell +Person counties;
SAW - 2014 -02236 (UNCLASSIFIED)
Attachments: PCN Form Roxboro.DanIntake- 3.pdf, PCN Figures 11A- B.Apr2015 revised.Roxbo-
Yancey.pdf
Dave -- Attached are the latest PCN revsions with section C2 on page 6 revised to include crossings W2 and W3, and the
revised Figures 11A and 1113 with wetlands W2 and W3 re- inserted. We're waiting for SHPO and FWS letters.
Gerald
- - - -- Original Message - - - --
From: "Bailey, David E SAW" < David.E.Bailey2 @usace.army.mil>
To: "Gerald Pottern" <gpottern @rjgacarolina.com>
Cc: " Alsmeyer, Eric C SAW" < Eric .C.Alsmeyer @usace.army.mil >; "Homewood, Sue"
<sue.homewood @ncdenr.gov >; "Ellis, John" <john_ellis @fws.gov >; "Bryant, Shari L." <shari.bryant @ncwildlife.org >;
< twarren @cityofroxboro.com >; " Stimpson, Paul" <PStimpson @LaBellaPC.com >; "Gledhill - earley, Renee"
<renee.gledhill - earley @ncdcr.gov>
Sent: Monday, April 13, 2015 8:59 AM
Subject: RE: [EXTERNAL] Roxboro Water Intake, Dan River, Caswell +Person counties; SAW- 2014 -02236 (UNCLASSIFIED)
Classification: UNCLASSIFIED
Caveats: NONE
Thanks Gerald. I appreciate you sending the revised information including detailed descriptions. As you allude to I will
need SHPO and FWS confirmation correspondence before I can verify the use of NWP 12. In the mean time, I do have a
correction to make for the JD which may affect a portion of the PCN:
In my notes I did not record having removed wetlands W2 and W3 from Jurisdiction. They are certainly swales between
farm fields, but based on my notes and recollection they are Jurisdictional due to meeting the 3 wetland criteria and
(based on best available information) connecting
(eventually) to a TNW. Please make these corrections on your PCN figures.
If this correction changes anything with respect to the PCN please make those changes and email them to me.
Thanks again, and please let me know if you have any questions.
-Dave Bailey
David E. Bailey, PWS
Regulatory Project Manager
US Army Corps of Engineers
CE- SAW -RG -R
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
El Yes [D No ❑Unknown
Corps or State been requested or obtained for this property /
® Yes ❑ No ❑ Unknown
project (including all prior phases) in the past?
6. Future Project Plans
4b. If the Corps made the jurisdictional determination, what type
® preliminary ❑ Final David Bailey, 11 Feb 2015
of determination was made?
pumping facilities and raw water line to Yanceyville will be constructed at least 5 to 10 years laters, based on current
4c. If yes, who delineated the jurisdictional areas?
Agency /Consultant Company:
Name (if known): Gerald Pottern (consultant)
Other: Robert J. Goldstein & Assoc (RJG &A)
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
5. Project History
5a. Have permits or certifications been requested or obtained for
El Yes [D No ❑Unknown
this project (including all prior phases) in the past?
2. Wetland Impacts
5b. If yes, explain in detail according to "help file" instructions. NA.
6. Future Project Plans
6a. Is this a phased project?
® Yes ❑ No
6b. If yes, explain. The intake channel, pump station building pad, and access road is scheduled to be built in 2015. The
pumping facilities and raw water line to Yanceyville will be constructed at least 5 to 10 years laters, based on current
population growth and water demand projections. The applicant is aware that the permit authorization will likely expire
before Phase 2 construction begins, and may need to be re- permitted at that time.
C. Proposed Impacts Inventory
1. Impacts Summary
1a. Which sections were completed below for your project (check all that apply):
® Wetlands ® Streams - tributaries ❑ Buffers ® Open Waters ❑ Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a.
2b.
2c.
2d.
2e.
2f.
Wetland impact #
Type of Jurisdiction
Permanent (P) or
Type of impact
Type of wetland
Forested
(Corps, DWQ non -404)
Area of impact
Temporary T
& Figure #
if known
& Lat -Long coord
acres
W 1 ®P ❑ T
excavate intake
floodplain
® Yes
® Corps 36.5332
YG = 0.084
channel, Fig 6.
depression
E] No
E] DWQ 79.2198
W2 ❑ P ® T
roadside pipeline
linear wetland
❑ Yes
® Corps 36.4942
ditch = 0.008
crossing, Fig 11A.
(ditched seep)
® No
❑ DWQ 79.2417
W3 ❑ P ® T
roadside pipeline
linear wetland
❑ Yes
® Corps 36.4695
ditch = 0.003
crossing, Fig 11B.
(ditched seep)
® No
❑ DWQ 79.2607
W 5 [-I P ®T
off -road pipeline
alluvial wetland
E] Yes
® Corps 36.3924
YE = 0.021
crossing, Fig 11D.
® No
❑ DWQ 79.3472
W6 ❑ P ®T
off -road pipeline
alluvial wetland
El Yes
® Corps 36.3938
YF = 0.014
crossing, Fig 11D.
® No
❑ DWQ 79.3421
2g. Total wetland impacts (worst -case, extending 10 ft beyond road ROW and 30 ft wide off -road
0.130 acre
construction corridors) = 0.084 acre permanent impact; 0.046 acre temp impact.
2h. Comments:
Wetland YD, along NC -62 @ Lat 36.4197 (identified as W4 in the 2006 EA and in the Nov 2014 PCN) will be avoided.
Page 6 of 14
PCN Form - Version 1.3, Dec 2008
Figure 11R. USGS National Map, Yancgville raw water line, Intake site Sta 0 +00 to Sta,198 +00. Figure 11 B. USGS National Map, Yancgville raw water line, Sta 198 +00 to Sta, 412 +00.
Milton and Leasburg USGS topographic quadrangles. Leasburg and Yancey llle USGS topographic quadrangles.