HomeMy WebLinkAbout20150180 Ver 1_More Info Received_20150413Homewood, Sue
From: Rich Glover <rglover @jamestownengineering.com>
Sent: Monday, April 13, 2015 11:10 AM
To: Homewood, Sue; terry.kuneff @highpointnc.gov
Cc: Kevin Martin
Subject: Re: High Point Univ.
Attachments: Sht lA Master Watershed approved 03.31.2015.pdf, Sht 2 Watershed approved
04.08.2015.pdf
Sue,
Attached is a copy of the approved site specific watershed plan showing the buffer impacts as well as the most current
version of the master watershed control plan for campus. How many hard copies do you need? If you have any
questions or need any additional information, please let me know.
Thanks,
Rich
Thomas R. (Rich) Glover, Jr., PE
Jamestown Engineering Group, Inc.
PO Box 365
117 E. Main St.
Jamestown, NC 27282
(336) 886 -5523 (o)
(336) 886 -5478 (f)
ralover (d)iamestownenaineerina.com
www.iamestownenaineerina.com
- - - -- Original Message - - - --
From: Homewood, Sue
To: terrv.kuneffd)hiahpointnc.aov
Cc: Kevin Martin ; Rich Glover
Sent: Tuesday, April 07, 2015 8:41 AM
Subject: RE: High Point Univ.
Hi Terry,
I received a copy of the letter that you issued on March 27 regarding the buffer impact for this project. Unfortunately I
can't match up what you issued with the plans that I have unless I have either a total buffer impact amount to match
with my stream impact, or an attached drawing to verify that it matches the drawings that I have. Do you have an
electronic copy of the plans you approved that you can email to me? I only need pages that show the buffer impact
that you approved, I don't need to see stormwater design etc. We've had many cases of projects coming to us for
approval and then during local approval impacts might change /driveways get re- aligned etc, so I like to be sure what I
approve matches up.
Thanks,
Sue
Sue Homewood
NC DENR Winston -Salem Regional Office
Division of Water Resources — Water Quality Programs
LO
C)
cv
L0
L0
v
cv
/
f
1" = 60°
STREAM BUFFER SECTION DETAIL
SEE HIGH POINT DEVELOPMENT ORDINANCE
AS AMENDED JUNE 1, 2000
FOR PRACTICES AND ACTIVITIES NOT ALLOWED
IN ZONES 1 AND 2
ZONE 1 - UND SIRBED AREA OF VEGETATION
EXTENDING A MINIMUM OF 30 FEET FROM TOP
OF BANK (SEC. 9- 7- 6(d)). ZONE 2 -
UNDISTURBED AREA OF VEGETATION BEGINNING
AT THE OUTER EDGE OF ZONE 1 AND EXTENDING
LANDWARD A MINIMUM OF 20 FEET. EXCEPTIONS
MUST BE APPROVED BY THE WATERSHED REVIEW
COMMITTEE (WRC) PER SEC. 9- 7- 6(d)(3)b.
AREA NO. 3
EAST OF #"
(REVISION #11)
L11flTS OF STUDY
N
AREA NO. 3
AREA EAST OF NORTH +
IN
4
�1
u
LVA
Area to a W, Q Device Areas Outside the Drainage Area of a Water Quality Device
Total Area I Ex. ISA Cum, Isa ISA 2 Cum.
Outside prior to priorto Net Effect Increase/ Change
Title Site Additions Cum. Total Site Added I Total Devices 1993 1993 1 area I Decrease I ISA I ISA Bank Bank ISA%
E1
3.1% 1
Road Extensions 1 0.001 201141 0.001 40361 160.781 APO 46.51( 114.27 j 1.86 j_ 29.06 L 6.21 5.4%1
Temp. Road Tie-in I
(Panther) o.00 201.14 0.00 40.36 160.78 0100 46.51 114.27 o.22 29.28 5,99 5.2%
Montlieu Ave.
Renovations & Parking 0.00 20144 0.00 40,36 160.78 1 0.00 46.51 114.27 3.05 L 32.37 //l �M21�90 2,5%1
1. Includes revised drainage area of -0,21 ac. In Rev. No. 4.
2, See Individual Master Watershed Plan Revisions or Site Specific Watershed Plans
3. 9.90 cc. (ex. ISA prior to 1993 treated in WQ Ponds) - (32.53 ac. - 25.37 oc.) = 2.74 cc.
4. 2.62 cc. - 1,65 cc. (to pond) =1.17 ac.
5. 2,42 cc. (Removed *excel.) + 0.97 cc. (to remain 0 Excel) + 0.32 ac. (lot ABC not to pond) = 3,71 cc.
6. 2.04 ac, (ex. to be removed) + .28 cc (ex. to remain) - 0.61 cc. (to ex. Isa device) = 1.51 ac.
(TABU 2)
IMPERVIOUS SURFACE AREA SUMMARY
(EXCLUDING BMP IMPACTS)
Cumulative Net Effective Cummulative
Total Central Existing ISA Existing ISA Prior Area (Excluding ISA Increase ISA Change Since
Revision Area Annexed Cam usArea Prior to 1993 to 1993 "93 ) Since 1993 1993 ° lSA
Acres (Acres Aaes Acres) Aces Acres Aaes) (%
Original 0.00 112.10 35.27 3527 7613 9.84 9.84 12.8%
Revision #1 0.00 112.10 0.00 35.27 76.83 054 1038 7 13.5%
Revision #2 0.00 112.10 0.00 35.27 76.83 -0A6 9.9 129%
Revision #3 0.00 112.10 0100 35.27 7613 1,10 11.0 14.3%
Revision #4 10,43 12253 282 38.09 84.44 2.10.: 13 1 15.5%
Revision #5 0100 12253 0,00 38.09 84.44 018 11.29 15.7%
Revision #6 0.0 12253 0.00 38.09 84.44 299 6.28 19.3%
Revision #7 7.48 130.01 243 40.52 89.49 2,41 18.70 20.9%
Revision #8 & 9 0.00 130,01 0100 4052 89A9 dI.11 18.58 20.8%
Revision #10 20.90 150.91 5.41 45,93 104.98 411 22.79 213%
Centennial Square lI 13.51 164.42 2.31 4814 116,18 2.15 2434 21.5%
Area No, I (West of centennial) 50 169.51 1.11 49,35 120,16 - 1.11 23.83 10%
Area No. 3 (East of North College) 1.62 171.13 045 49,80 121.33 -0,45 23.38 19.3%
Area No. 2 (West of 6Y College Dr.) 4.38 17551 0.59 5039 125.12 0.00 23.38 18,7%
Area No, 4 south Montlieu 21.96 197,47 8.36 58.75 13832 -8.36 15.02 10.8%
Montlieu Area not previously annexed 3.67 201,14 1.81 60.56 14058 0,00 15.02 10.7%
arris venue ar ing oa ensions 0,00 201.14 0;00 60.56 140:58 1.86 16.88 120%
remp, Road Ton (Panther) uo 201,14 0.00 60.56 140.58 0.22 17.10 122%
MontlieuAve. Renovations& Parking On 201.14 0.00 6056 140,58 31 20 9 14.4%
CALL:
1. 5.11 cc ( roposed) -3.01 ac. (removed) = 2.10 ac. Isa increased
2. 3.13 ac. {pproposed) - 0.14 ac. (removed) _2.98 ac. isa Increase
3. 14.24 ac. (proposed) - 10.04 cc. (removed) = 4.20 cc. iso Increase
4. 4.19 ao, (proposed) - 2.04 cc, (removed) = 2.15 ac. Isa Increase
5. 2.04 cc. ex. Isa removed
6. 4.44 ac. Iso removed
TABU S
WATER QUALITY CONTROL DEVICE SUMMARY
Curr ISA All
Revision Device Name Total DA Ex. ISA. July 1993 Net Eff. Area Device Max. ISA CHANGE Tr ted Future ISA
CHANGE SINCE 1993
}
.:
f
HIGH POINT UNIVERSITY ACCEPT THIS SUBMISSION AS MY PLAN OF DEVELOPMENT AND ACRE
INSTALL ALL REOU ED IMP OVEMENTS AND COMPLY WITH THE CONDITIONS OF APPROVAL.
INERJDEVELOPER DATE
r "..i
IS
i
UDD.E
TTEE L
01ECTOR OF PLANNING AND DEVELOPMENT
45
Cu
s
i�
a>
U-
r-1
-< C
CU
c_) <
< +
O >
>
CHANGE SINCE 1993
}
.:
f
HIGH POINT UNIVERSITY ACCEPT THIS SUBMISSION AS MY PLAN OF DEVELOPMENT AND ACRE
INSTALL ALL REOU ED IMP OVEMENTS AND COMPLY WITH THE CONDITIONS OF APPROVAL.
INERJDEVELOPER DATE
r "..i
IS
i
UDD.E
TTEE L
01ECTOR OF PLANNING AND DEVELOPMENT
45
Cu
s
i�
a>
U-
r-1
-< C
CU
c_) <
< +
O >
>
tri
HIGH POINT
UNIVERSITY
�A
VICINITY MAP
NOT TO SCALE
Nb — wo Ab� .40
90 000 000 000 000
No
to 44 001w
oo!"060,D
000
�00
4tw 00 000 'Iwo "now NOON
4* ft 00 00 00 000 ..y wow
woo Won www won noml MOM Mooft 000 0
SM"M
M,W M
MM MM, WOM
LIMITS OF FLOODWAY 0000 LIMITS OF FLOODWAY ANQ�-`-,
SPECIAL FL0N.D pAZA-06
H
000 AREAS -0. FCATED
A(9,016546 TO FIRM MAP
'
--PANEL NO. 37107801 0()
41' 19-
000 DATED JUNE 1-E --(SEE
llf�3:n 00
FtWb ''LAIN 0000
0000 ts
*00*
0000 —,D1fiiEOPMENT PERMIT
rr•aw DATE APRIL 1, 2015 FROM ......................
..................
amw "go* ..........
CITY OF HIGH POINT)
M=M www mam =am 000*
(PUBILB 4P
LIMITS OF BUFFER &P CTs-.---,-
-A- FARRIS
-Y- -OF--HDGH
APPROVED- Yf-THEnCTT tijo�T ::��
�Fjb I wf rE 401/404 PERMITS FOR
40
DETAILS OF IMPACTED AREAS ALL HOUSES AN
ym no
DRIVEWAYS TQ-tE ......
REMOVED
0�fTyp.)
A#
DEMOLITION NOTES i If I
1. ALL CONSTRUCTION MATERIALS AND DEBRIS SHALL BECOME
THE PROPERTY OF THE GENERAL CONTRACTOR FOR
OFF—SITE DISPOSAL.
2. THE SEQUENCE • ALL DEMOLITION ACTIVITIES SHALL BE
APPROVED BY THE OWNERS REPRESENTATIVE SEVEN DAYS
PRIOR • ANY RELATED CONSTRUCTION ACTIVITIES.
3. DEMOLITION WORK INDICATED • THIS PLAN REFLECTS
MAJOR ITEMS TO BE REMOVED OR MODIFIED, AND IS NOT
0
INTENDED TO BE ALL INCLUSIVE. THE CONTRACTOR IS RESPONSIBLE
FOR INSPECTING THE SITE FOR ADDITIONAL MISCELLANEOUS
DEMOLITION MICH MAY BE REQUIRED TO COMPLETE THE WORK.
THIS INCIDENTAL DEMOLITION IS CONSIDERED TO BE INCLUDED
UNDER THE WORK OF THE CONTRACT AND SHALL
PERFORMED AT NO ADDITIONAL COST TO THE OWN BE ER. N .
4. LOCATIONS OF EXISTING UTILITIES ARE APPROXIMATE.
THE CONTRACTOR SHALL VERIFIY LOCATIONS OF ALL UTILITIES
PRIOR TO COMMENCEMENT OF ANY DEMOLITION OR CONSTRUCTION
ACTIVITIES.
I
ri
L0
CL
•
•
•
ME i
EX�EVADWAY TO BE
REMO By &NTRACTCiA
"Ira'
-X.
...........
r4FA
77:
7.: ...
............
'7.
Jf
20'
ZONE 2 30' ZONE 1. 01
- 20' j BUFFE bu R ZONE 1 ZONE
(TYPT UFFER
ryp.) (UFFER
• TYP.)
LIMITS OF BUFFER IMPACTS
APPROVED BY THE CITY OF HIGH
POINT (SEE 401/404 PERMITS FOR
• DETAILS OF IMPACTED AREAS)
ALL HOUSES AND—
DRIVEWAYS TO BE
REMOVED BY OTHERS
(TYP.)
Mffl-m
Im
IENT ALONG
AND REMOVE
PASE MATERII
.4
-SLAND
(TYPO
LIMITS OF PROPOSED PAVEMEN
...........
LIMITS OF EXISTING PAVEMENT
........... ...........
AND OTHER ISA TO BE REMOVE
..........
L
WE HIGH POINT UNIVERSITY , ACCEPT THIS SUBMISSION AS OUR PLAN OF DEVELOPMENT AND ACRE
TO INSTALL ALL REQUIRE 9 IMPR VEMENTS AND COMPLY WITH THE CONDITIONS OF APP7VAL.
OWNER/DEVELOPER DATE
-- 11
..... ....... .... .
L EX PAVEMENT
To- Rwm,-(Typ.
.. .. ..... .............
............
..........
0t
- =77.1
P-3
j
-0
1" = 60'
R—EAM BUFFER SECTION D04IL
SEE HIGH POINT DEVELOPMENT ORDINANCE
AS AMENDED JUNE 1, 2000
FOR PRACTICES AND ACTIVITIES NOT ALLOWED
IN ZONES I AND 2
ZONE I — UNDISTURBED AREA OF VEGETATION
EXTENDING A MINIMUM OF 30 FEET FROM TOP
OF BANK (SEC. 9-7-6(d)). ZONE 2 —
UNDISTURBEO AREA OF VEGETATION BEGINNING
AT THE OUTER EDGE OF ZONE 1 AND EXTENDING
LANDWARD A MINIMUM OF 20 FEET, EXCEPTIONS
MUST BE APPROVED BY THE WATERSHED REVIEW
COMMITTEE (WRC) PER SEC. 9-7-6(d)(3)b.
0
40' 30' 20' 10' 0 4V 80,
SCALE: 1"=40'
This Watershed Devel meet Plan (Dev. is approved
r
by a LVtershed R,6vie'w Committee.
YY-3
Director !of Planning and Development
Date
IT-11M i I
CITY OF HIGH POINT
GUILFORD COUNTY — NORTH CAROLINA
WATERSHED: CITY 1AKE GSA
DISTURBED AREA=6.2 AC±
1182
3085
ISA
TO BE REMOVED
1302
3262
.EXISTING
(PRIOR TO
JULY 1, 1993)
1577
1. PRIOR TO
JULY 1, 1993
1938
1368
EAST FARRIS
DRIVE
1120
976
ADDRESS
BUILDINGS
DRIVES AND WALKWAYS
TOTAL S.F.
902
1933
N/A
1933
904
1809
471
2280
906
2484
1435
3919
8132
u(
R/
h
LIMITS OF PROPOSED PAVEMEN
...........
LIMITS OF EXISTING PAVEMENT
........... ...........
AND OTHER ISA TO BE REMOVE
..........
L
WE HIGH POINT UNIVERSITY , ACCEPT THIS SUBMISSION AS OUR PLAN OF DEVELOPMENT AND ACRE
TO INSTALL ALL REQUIRE 9 IMPR VEMENTS AND COMPLY WITH THE CONDITIONS OF APP7VAL.
OWNER/DEVELOPER DATE
-- 11
..... ....... .... .
L EX PAVEMENT
To- Rwm,-(Typ.
.. .. ..... .............
............
..........
0t
- =77.1
P-3
j
-0
1" = 60'
R—EAM BUFFER SECTION D04IL
SEE HIGH POINT DEVELOPMENT ORDINANCE
AS AMENDED JUNE 1, 2000
FOR PRACTICES AND ACTIVITIES NOT ALLOWED
IN ZONES I AND 2
ZONE I — UNDISTURBED AREA OF VEGETATION
EXTENDING A MINIMUM OF 30 FEET FROM TOP
OF BANK (SEC. 9-7-6(d)). ZONE 2 —
UNDISTURBEO AREA OF VEGETATION BEGINNING
AT THE OUTER EDGE OF ZONE 1 AND EXTENDING
LANDWARD A MINIMUM OF 20 FEET, EXCEPTIONS
MUST BE APPROVED BY THE WATERSHED REVIEW
COMMITTEE (WRC) PER SEC. 9-7-6(d)(3)b.
0
40' 30' 20' 10' 0 4V 80,
SCALE: 1"=40'
This Watershed Devel meet Plan (Dev. is approved
r
by a LVtershed R,6vie'w Committee.
YY-3
Director !of Planning and Development
Date
IT-11M i I
CITY OF HIGH POINT
GUILFORD COUNTY — NORTH CAROLINA
FIFTH COURT
ADDRESS BUILDINGS DRIVES AND WALKWAYS
11•�
1003
WATERSHED: CITY 1AKE GSA
DISTURBED AREA=6.2 AC±
1182
3085
ISA
TO BE REMOVED
1302
3262
.EXISTING
(PRIOR TO
JULY 1, 1993)
1577
1. PRIOR TO
JULY 1, 1993
1938
1368
EAST FARRIS
DRIVE
1120
976
ADDRESS
BUILDINGS
DRIVES AND WALKWAYS
TOTAL S.F.
902
1933
N/A
1933
904
1809
471
2280
906
2484
1435
3919
8132
FIFTH COURT
ADDRESS BUILDINGS DRIVES AND WALKWAYS
11•�
1003
1903
1182
3085
1005
1960
1302
3262
1007
1182
1577
2759
1009
1938
1368
3306
1011
1120
976
2096
OLD FIFTH COURT
OLD FIFTH STREET
OLD WILLOUBAR TERRACE & DRIVEWAY
2. AFTER JULY, 1993
EXISTING PARKING LOT
191
TOTAL S.F.
6715
98,934
23,355
98,934
6910
774
136,688 S.F.
ISA SUMMARY
ISA REMOVED: 8.!
PROPOSED ISA: 3.14 ACRES
NET ISA INCREASE: 1.86 ACRES*
iM161140
* THIS SITE WILL BE INCLUDED IN THE UNIVERSITY'S MASTER WATERSHED
PLAN NUMBER 11 WHICH HAS ALLOCATIONS FOR ISA.
w P?
Q\N -,
%
09#00$4111"o
Homewood, Sue
From: Rich Glover < rglover @jamestownengineering.com>
Sent: Wednesday, April 15, 2015 2:06 PM
To: Homewood, Sue
Subject: Re: High Point Univ.
Sue,
The Master Watershed Plan is the approved Stormwater Management Plan. Sorry for the different language. The City
has determined that no additional treatment is necessary for these improvements due to measures that have been put
into place in other parts of campus that offset this new built -upon area.
The new impervious surface is being discharged into existing storm piping networks. The flow area to these pipes have
been reduced during previous projects to allow for the increase in impervious surface during with this project. There will
not be any new pipe penetrations into the buffers.
If you have any other questions, please feel free to contact me.
Thanks,
Rich
Thomas R. (Rich) Glover, Jr., PE
Jamestown Engineering Group, Inc.
PO Box 365
117 E. Main St.
Jamestown, NC 27282
(336) 886 -5523 (o)
(336) 886 -5478 (f)
rglover .iamestownengineering.com
www.mamestownengineering.com
- - - -- Original Message - - - --
From: Homewood, Sue
To: Rich Glover
Sent: Wednesday, April 15, 2015 12:55 PM
Subject: FW: High Point Univ.
As a follow up, can you tell me where the stormwater from the new impervious surfaces are going? despite the overall
watershed plan /ISA calculations etc, even if treatment is not required, diffuse flow must still be met for any new
stormwater and I can't verify that from what you sent. Thanks.
Sue Homewood
NC DENR Winston -Salem Regional Office
Division of Water Resources — Water Quality Programs
450 W. Hanes Mill Rd, Suite 300 (Please note my new contact information)
Winston Salem NC 27105
Voice: (336) 776 -9693
Cell: (336) 813 -1863
E -mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be
disclosed to third parties.