Loading...
HomeMy WebLinkAbout20230416 Ver 1_Riparian Buffer Authorization Request_20230321Original Submittal 3/21/2023 A. Owner/Applicant Information General Information Q .......................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... Primary Contact Email: * elizabeth.glenn@duke-energy.com Please list the contact person's email for questions or payment on this project if needed. Who is submitting the application?* 0 Owner O Applicant other than Owner O Agent Is there an agent working on this application but Yes not submitting it? No 1. Property Owner Information: ............................................................................................................. 1a. Name on Recorded Deed:* 1b. Responsible Party: 1c. Mailing Address:* 1 d. Telephone:* 980-373-0530 Duke Energy Carolinas, LLC (for Corporations) Street Address 526 S Church St Address Line 2 ECI-05A City Charlotte Postal / Zip Code 28202-1802 B. Project Information and Prior Project History 1. Project Information State / Province / Region NC Country us 1e. Email Address:* elizabeth.glenn@duke- energy.com 1a. Name of Project:* Allen Steam Station South Starter Landfill Basin (Subdivision, facility, or establishment name) 1b. Is this a publicly -funded transportation project?* Yes No 1d. Subdivision Name: NA 1e. Nearest Municipality: Belmont 1f. Property Size: acres 1 g. County (or Counties) where the project is located:* Gaston 1h. Property ID# Date of Purchase Tax PIN or Parcel id 1i. Deed Information Type of Book Book# Page# I Deed 268 587 O DI 1 j. Attach a copy of the recorded map that indicates when the lot was last platted. Click the upload button or drag and drop files here to attach document AIIenDeed.pdf 1.15MB PDF only 1 k. How would you like to provide the Latitude and Longitude information? Address Lookup n Manually Address Lookup Street Address 253 Plant Allen Road Address Line 2 City State / Province / Region Belmont NC Postal / Zip Code Country 28012 us Longitude* -81.0149481999999 Latitude* 35.1839027 9 11. Is the project located in any of North Carolina's twenty coastal counties?* Yes No 2. Surface Waters .................................................................................................................................................................................................................................................................................................................................. 2a. Name of the nearest body of water to proposed project: * Catawba / Lake Wylie 2b. Water Quality Classification of nearest receiving water: WS-IV B 2c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 1,403 (linear feet only) 3. Project Description: 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Allen Station is located in Gaston County NC on the west side of Lake Wylie (formed from impoundment of Catawba River). Mixed developed space, pastureland, and forested land cover types (evergreen, deciduous, mixed, herbaceous) constitutes the largest land cover within the project limits, while mixed forest is the largest land cover within a one -mile radius. 3b. Attach an 8 % x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the site. Click the upload button or drag and drop files here to attach document SSLF ESC Buffer Permit Package Topo.pdf 1.15MB PDF only 3c. Attach an 8 % x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map depicting the project site. Click the upload button or drag and drop files here to attach document SSLF ESC Buffer Permit Package - Soil Map.pdf 1022.22KB PDF only 4. Proposed Activity Provide a detailed description of the proposed activity including its purpose and include the type of equipment to be used: Installation of a sediment basin and outfall to control stormwater runoff from the lined CCR landfill. This basin will support both construction and completed landfill activities. All runoff will be non -contact stormwater. Long -reach excavators will be used to install the basin. Attach a site plan as applicable to the project: Click the upload button or drag and drop files here to attach document SSLF E&SC Buffer Permit Package - 2023-03-17.pdf 6.77MB PDF only 5. Jurisdictional Determinations 5a. Have jurisdictional wetlands or stream determinations by the Corps or State been requested or obtained for this property/project (including all prior phases) in the past?* Yes No 5b. Who did the determination on the jurisdictional areas? Who did the determination? List name if known Date Attach Corps David Brown (Name if known) 11/10/2015 pdf only *** Please include the date of the determination and upload a copy of the determination. Comments: 6. Project History 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? Yes No 6b. List any permits/approvals that have been requested or obtained for this project in the past. ... ...... ...... ..... ...... ....... .......... ..... ...... ....... ... ...... Application Date Date Issued Permit Type L6/11/2021 6/14/202111 SAW-2021-00679 6c. Please explain and detail according to "help file" instructions. The permanent stream impacts of 233 linear feet (0.03acres) and permanent wetland impacts of 0.17 acres to facilitate the removal and safe disposal of coal combustion residuals materials and the closure of the ash basin at Allen Steam Station. 7. Future Project Plans 7a. Is this project a phased project?* Yes No C. Proposed Impacts Inventory Buffer Impacts Project is in which protected Basin?* Neuse River Basin (15A NCAC 02B.0233) Catawba River Basin (15A NCAC 02B.0243) Randleman Lake Watershed (15A NCAC 02B.0250) Tar -Pamlico River Basin (15A NCAC 02B.0259) Jordan Lake Watershed (15A NCAC 02B.0267) Goose Creek Watershed (15A NCAC 02B.0606 & 15A NCAC 02B.0607) Individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. -][Site# - Reason Stream Name Buffer Impact* IF Impact Type Zone 1 Zone 2 SCM Installation Catawba River Permanent (P) Allowable w/ 14,306.00 0.00 Map label (e.g. Road Crossing 1) Perm or Temp mitigation Square Feet Square Feet SCM Catawba River Permanent (P) Allowable 0.00 7,825.00 Map label (e.g. Road Crossing 1) Perm or Temp Square Feet Square Feet Total Zone 1 Impacts: 14,306.00 Total Zone 2 Impacts: 7,825.00 Total Buffer Impacts: 22,131.00 Comments: D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project. Sizing of the outfall structure to meet design criteria, but disturb minimal areas in the buffer zone. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Limit earth moving equipment in the buffer zone by employing long reach equipment and hand digging/ placement of material where appropriate and safe for workers. 2. Buffer Mitigation 2a. The table below identifies the square footage of impact to each zone of the riparian buffer and the required mitigation. Zone 1 - Catawba Only Total Impact Multiplier Required Mitigation 14,306.00 2 28,612.00 Square Feet Square Feet I Zone 2 Total Impact Multiplier Required Mitigation 0.00 1.50 0.00 Square Feet Square Feet 2b. What is the mitigation plan proposed for this 0 Payment to private mitigation bank project? * ❑ Payment to Division of Mitigation (DMS) Permittee responsible mitigation 2e. Attach statement of availability from mitigation provider.* Click the upload button or drag and drop files here to attach document Allen Steam Station South - SOA 3-9-23 (003).pdf 173.76KB PDF only 2g. Comments: E. Diffuse Flow Plan 1a. What type of SCM are you providing?* p Level Spreader Vegetated Conveyance (lower SHWT) Wetland Swale (higher SHWT) Proposed project will not create concentrated stormwater flow through the buffer LJ Other SCM that removed minimum of 30% nitrogen 1 c. Diffuse Flow Documentation Click the upload button or drag and drop files here to attach document O&M Agreement SIGNED.pdf 430.55KB PDF only F. Supplementary Information Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes No Violations 2a. Is the site in violation of DWR Wetland Rules (15A NCAC 02H .0500), Isolated Wetland Rules (15A NCAC 02H .1300), DWR Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 02B .0200)? Yes No 2b. Is this an after -the -fact buffer authorization application? U Yes * No G. Additional Information U .......................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... Please upload any additional information you would like the Division to consider during application review. Additional Attachments: Click the upload button or drag and drop files here to attach document PDF only Additional Comments: H. Sign and Submit .......................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... By digitally signing below, I certify that: o I have given true, accurate, and complete information on this form; o I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act") o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the application form." Print Name:* Mehdi Maibodi Signature Submission Date: 03/21/2023 (Auto populated field) Initial Review Is this accepted into the review process?* Is this project a public transportation project?* ID#* Version: Select Reviewer: Select Reviewing Office* Has payment been received?* Yes No Yes No 20230416 Sue Homewood:Sue.Homewood@ncdenr.gov Central Office - (919) 707-9000 No Payment Needed Fee Received Need Fee - send electronic notification