HomeMy WebLinkAbout090148_Routine Inspection_20230213Division of Water Resources
Facility Number'' '��,'' 0 Division of Soil and Water Conservation
0 Other Agency
type of Visit: 0"Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance
Season for Visit: _0--Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access
Date of Visit: '� Arrival Time: `�z Departure Time: L y `� ��?7 County:��.;_.
Farm Name: Owner Email:
f
Owner Name: Phone:
Mailing Address:
Physical Address:
Facility Contact:'Title:
Phone:
Region: F
Onsite Re resentative:�` Lire rator:
p g t _
Certified Operator: : ` 4�-f ,_ �wr Certification Number:
Back-up Operator: Certification Number:
Location of Farm: Latitude: Longitude:
Swine
Design Current Design Current
Capacity Pop. Wet Poultry Capacity Pop.
Layer
Non -Layer
Wean to Finish
Wean to Feeder
Feeder to Finish
Farrow to Wean
Farrow to Feeder
Farrow to Finish
Gilts
Boars
Other
Design Current
Dry Poultry Capacity Pop.
Layers
Non -Layers
Pullets
Turkeys
Turkey Pouets
Other
Discharj4es and Stream Impacts
1. Is any discharge observed from any part of the operation?
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
b. Did the discharge reach waters of the State'? (If yes, notify DWR)
c. Wliat is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
2. Is there evidence of a past discharge from any part of the operation'?
3. Were there any observable adverse impacts or potential adverse impacts to the waters
of the State other than from a discharge?
Design Current
Cattle Capacity Pop.
Dairy Cow
Dairy Calf
Dairy Heifer
Dry Cow
Non -Dairy
Beef Stocl<er
Beef Feeder
Beef Brood Cow
[� Yes -E—I'No ❑ NA ❑ NE
❑ Yes ❑ No ❑ NA ❑ NE
❑ Yes ❑ No ❑ NA ❑ NE
❑ Yes ❑ No ❑ NA ❑ NE
❑ Yes P,"T,No ❑ NA ❑ NE
❑ Yes r.No ❑ NA ❑ NE
Page 1 of 3 511212020 Continued
Facility Number: -141Y Date of Inspection: l
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate?
❑ Yes No
❑ NA
❑ NE
a. If yes, is waste level into the structural freeboard?
❑ Yes ❑j No
❑ NA
❑ NE
Structure 1 Structure 2 Structure 3 Structure 4
Structure 5 Structure 6
Identifier:
Spillway?:
Designed Freeboard (in):
Observed Freeboard (in):
5. Are there any immediate threats to the integrity of any of the structures observed?
❑ Yes .�No
❑ NA
❑ NE
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a
❑ Yes eNo
❑ NA
❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health
or environmental threat,
notify DWR
7. Do any of the structures need maintenance or improvement?
❑ Yes �No
❑ NA
❑ NE
8. Do any of the structures lack adequate markers as required by the permit?
❑ Yes EfNo
❑ NA
❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require
❑ Yes &No
❑ NA
❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need
❑ Yes �No
❑ NA
❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below.
❑ Yes .E�No
❑ NA
❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s):
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP?
❑ Yes &No
❑ NA
❑ NE
15. Does the receiving crop and/or land application site need improvement?
❑ Yes No
❑ NA
❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable
❑ Yes No
❑ NA
❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application?
❑ Yes No
❑ NA
❑ NE
18. Is there a lack of properly operating waste application equipment?
❑ Yes No
❑ NA
❑ NE
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
❑ Yes �No
❑ NA
❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
❑ Yes ZNo
❑ NA
❑ NE
the appropriate box.
❑ WUP [:]Checklists [:]Design [:]Maps [:]Lease Agreements
❑ Other:
21. Does record keeping need improvement? If yes, check the appropriate box below.
❑ Yes �No
❑ NA
❑ NE
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis
❑ Waste Transfers
❑ Weather Code
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey
22. Did the facility fail to install and maintain a rain gauge?
❑ Yes E� No
❑ NA
❑ NE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment?
❑ Yes '[?�No
❑ NA
❑ NE
Page 2 of 3
511212020 Continued
Facility Number: - Date of Inspection:,-
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ZfNo
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes �o
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes [-�No
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ,,ErNo
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
pen -nit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below.
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP?
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative?
34. Does the facility require a follow-up visit by the same agency?
Reviewer/Inspector Signature:
Page 3 of 3
❑ NA ❑ NE
❑ NA ❑ NE
❑ NA ❑ NE
❑ NA ❑ NE
❑ Yes �''No ❑ NA ❑ NE
❑ Yes EfrNo ❑ NA ❑ NE
❑ Yes E No ❑ NA ❑ NE
❑ Yes -E3 No ❑ NA ❑ NE
❑ Yes ,2 No ❑ NA ❑ NE
❑ Yes E�:[No ❑ NA ❑ NE
❑ Yes .:[D-No ❑ NA ❑ NE
Date: � Z � Ld-2
511212020
FACILITY#: FARM NAME: LAGOON LEVEL
PERMIT c9�
DUE EVERY 5 YEARS
- EXPERIATION DATE ! v� NUMBER OF ANIMALS
- CURRENT NUMBER OF ANIMAL
- OIC CARD YES OR NO
WASTE UTILIZATION PLAN (WUP) (#20)
SOIL TYPES
CROP TYPES_ Go-r�r► C�
- ODOR CONTROL CHECK LIS OR NO
- Irrigation Plan Maps ES R
WASTE REPORT (#21)
-GOOD FOR 60 DAYS BEFORE OR AFTER
DATE NITROGEN LEVEL
DATE NITROGEN LEVEL
DATE NITROGEN LEVEL
SOIL REPORT
- EVERY 3 YEARS: DATE
- P-1 (NO MORE THEN 400)
- PH (Note if 4 or less)
— Cu/ZN (NO MORE THEN 8000) CU ZN
(IF PEANUTS NO MORE THEN 300)
Not over PAN CROP TYPES
FLOW RATES
Not over PAN CROP TYPES
FLOW RATES
Not over PAN
FLOW RATES
Not over PAN
FLOW RATES
IRR2 (#21)
NITROGEN (N)
NITROGEN (N)
CROP TYPES
NITROGEN (N)
CROP TYPES
NITROGEN (N)
CALBRIATION (#24)
EACH REEL SHOULD BE CALIBRATED EVERY OTHER YEAR
DATE OF CALIBRATION
FLOW RATES
RAIN FALL (#21)
-INITIAL AFTER 1" RAIN EVENT
-LOOK FOR ANY LEVEL THAT IS LESS THEN THE DESIGNED FREEBORED POA NEEDED.
SLUDGE (#21 &25)
-DUE EVERY YEAR: DATE
0: �� mow? P: 3 % RATIO OF SLUDGE i
0: P: % RATIO OF SLUDGE
0: P: % RATIO OF SLUDGE
0: P: % RATIO OF SLUDGE
OTHER FORMS (#22 AND 921)
RAIN BREAKER FORM __CROP YEILDS MORTALITY
*If fields are grazed there will be no crop yields
VISUAL CHECK
FOUNDATION OR PIT LEAKS PIPE LEAKS LAGOON SEEPAGE LAGOON BARE
AREAS TREES OR GRASS NEED TO BE REMOVED EROSION DITCHES
WINTER CROP(OVERSEEDED) HARVESTED FIELDS GOOD HEALTHY CORPS CORRECT
CROPS NO PONDING REELS FEED BINS LAGOON GARBAGE
Bermuda grass: Opens March 1 st - Ends September 3011,
Small Grain Over seed: Opens October 1 st - Ends March 31 st
Corn: Opens February 15th - Ends June 30th
Cotton: Opens March 15th - Ends August 1st
Rye: Opens September 1 st - Ends March 31 st
Oats: -Opens September IA'- Ends April 15th
Wheat: Opens September 1 st - Ends April 30th
Soybeans: Opens April 1 st- Ends September 15th
Fescue: Opens August 1st - Ends July 31 st
Sorghum Hay: Opens March 15th - Ends August 31 st