HomeMy WebLinkAboutNCC230763_Site Plan or Location Map_20230322TOWN OF FUQUAY-VARINA STANI
EROSION CONTROL PLAN FOR SIB
` I14
48 49 50 I 57 . 58 59
46 �, � j` 47 i i 60 " o 00
15
45 ICI 51 74 61 16 1
62 ,\
44 yy 52 l 73 17
I �'� 5..i I
I I 43 i I� 111,E
42
41
0
LL1
a�
X
U
4
U
w
LIJ
Q
W
LL
LL
J
N
W
H
LJ
E1J
O
F_
H
z
0
z
0
O
w
0
z
z
a
a
z
0
0
m
iD
z
0
LLA
0
n
Z
0
N Cn3
W CV
O �
J N
O ti
N
Wo
W
N a
63
NA
64 "" 19 jdo�
65
66
20
21
r 27
1
30 29 28 22 I
26 f %
24 \�
j 25 ,\''
x. 1,
VICINITY MAP
FOREST BLUFF ESTATE
PROJECT NAME: FOREST BLUFF ESTATES
TOWN OF FUQUAY-VARINA PROJECT NO.:
DATE OF PERMIT ISSUANCE: _
DATE OF PERMIT EXPIRATION: - - -
_J
DRAWING INDEX
)ARD ED
S TMENT AIND
z
o
X
N
w
N_
=
U)
rn
z
cry
w
Y 0 S O
rY
NGLE FAMIL L T
WI.—
J
Q
U
U)
r-�
O
=
�
�
U)
Cj
O
T
_C?
N
N
C)
N
W
�
Q
CO
(Q
�
O
N
O
Z
w
J
LL.
EC-00 COVER SHEET
EC-01 EROSION CONTROL PLAN
EC-02 EROSION CONTROL DETAILS 1
EC-03 EROSION CONTROL DETAILS 1►
Civil Engineering:
The Curry Engineering Group, PLLC
NC License # P-0799
PO Box 2018
205 S. Fuquay Ave
Fuquay-Varina, NC 27526
919.552.0849 (o)
919.880.9857 (m)
Contact: Don Curry, PE
email: don@curryeng.com
Survevor:
TYPICAL CONSTRUCTION SEQUENCE FOR SINGLE
FAMILY LOTS SEDIMENT AND EROSION CONTROL
1. SCHEDULE A PRE -CONSTRUCTION CONFERENCE WITH THE TOWN OF FUQUAY-VARINA. OBTAIN A LAND DISTURBING PERMIT.
2. INSTALL MEASURES AS SHOWN ON THE APPROVED PLAN. CLEAR ONLY AS NECESSARY TO INSTALL THESE DEVICES. SEED TEMPORARY DIVERS)ONS,
BERMS AND BASINS IMMEDfATELY AFTER CONSTRUCTION.
3. CALL ENGINEERING CONSTRUCTION INSPECTOR FOR A COMPLIANCE INSPECTION.
4. MAINTAIN DEVICES AS NEEDED FOR ALL PHASES OF PROJECT. REMOVE EROSION CONTROL DEVICES WITH ENGINEERING CONSTRUCTION
INSPECTOR APPROVAL ONLY,
5. MAINTAIN RAIN GAUGE AND SELF -INSPECTION RECORDS PER NPDES REQUIREMENTS.
6. STABILiZE SITE AS AREAS ARE BROUGHT UP TO FINISH GRADE WITH VEGETATION, PAVING, DITCH LININGS, ETC. SEED AND MULCH DENUDED AREAS
PER GROUND STABILIZATION TIME FRAMES ON APPROVED PLAN.
7. WHEN CONSTRUCTION IS COMPLETED, AND ALL AREAS ARE STABILIZED, CALL ENGINEERING CONSTRUCTION INSPECTOR FOR INSPECTION,
8. IF SITE IS APPROVED, REMOVE TEMPORARY DIVERSIONS, SILT FENCE, SEDIMENT BASINS, ETC., AND SEED OUT OR STABILIZE ANY RESULTING BARE
AREAS. ALL REMAINING PERMANENT EROSION CONTROL DEVICES, SUCH AS VELOCITY DISSIPATORS, SHOULD NOW BE INSTALLED.
9. WHEN VEGETATION HAS BECOME PERMANENTLY ESTABLISHED, CALL FOR A FINAL SITE INSPECTION BY THE ENGINEERING CONSTRUCTION
INSPECTOR.
0-111,
/+4
FUQUAY V/-1PINA
ENGINEERING DEPTAPPROVA[L� �7
signature Swwwr l E)ate 10� � Z L
Mauldin -Watkins Surveying, PA
P.O. BOX 444/1301 W. Broad Street
Fuquay-Varina, NC 27526
919.552.9326
Contact: Wayne Mauldin, PLS
Projects shall be constructed according to the Standard Specifications and
Details in effect at the time the project receives Town approval for
construction. The Contractor must have a complete set of stamped plans
and specifications on the jobsite any time work is being performed. Stamp
shall be affixed to plans below:
v
0
0
4
0
C
0
UJ
w
UJ
LJLft
afti
ca
U)
LW
0
Lift
N
N 3 :
� N
C
�U
z
?. M
N C
r 'C
rT (11
LL
A
L j
f3 Cr
O M
N W_
fn a]
0
O N
N N
rn_rn_
H LL
UJ
LU
Z
U)
ac
0
SEAL
C.7
z
LU
SAL9r' z
36823 ca
":q✓fNG I W
VA
lllil; � EC=00