Loading...
HomeMy WebLinkAboutNCC230722_Site Plan or Location Map_202303214 1 VICINITY MAP SCALE: NOT TO SCALE NAME: OYSTER CREEK LANDING OWNERIDEVELOPER: HAMPSTEAD STATION. LLC 2324 PANSY STREET HUNTSVILLE, AL 35801 PHONE: (919) 6063100 EMAIL: LDD12486@GMAIL.COM PREPARED BY: MCKIM & CREED, INC 243 N. FRONT STREET WILMINGTON, NC 28401 PHONE: 910.343.1048 PROJECT MANAGER: RICHARD COLLIER, PE RCO LLI ER@MC KIM C R EED. C OM s5loPROJECT ENGINEER: TRAE LIVICK, PE a •• 7 =` 2ii Oai TLIVICK@MCKIMCREED.COM LANDSCAPE ARCHITECT: AMANDA MACLEOD, PLA !�+. AMACLEOD@MCKIMCREED.COM ^•, M�Nv .•F`` SURVEYOR: MATT ROBERTS, LS M ROB ERTS@MC KIMC RE ED. C OM PENDER COUNTY CERTIFICATIONS Certification of Submission A copy of this plat has born submitted. Approval is subject to Review; this does not constitute an approval. Pender County Utilities: Date Pender County Environmental Health: Date: Pender County Addressing Coordinator: Date: Fender County Fire Marshal- Date: Certification of Preliminary Plat Approval Preliminary Plat Approved by Pender County for a Period of two (2) years subject to the Pender County Unified Developou m Ordinanrn requirement and conditions of approval. Planning Staff: Date NOTES: 1. DETAILED LIGHTING PLAN WILL BE DESIGNED BY DUKE AND SUBMITTED PRIOR TO TRC APPROVAL. 2. A PORTION OF THE SITE'S PROPOSED BUILT UPON AREA (BUA) IS ACCOUNTED FOR BY PERMIT # SW8 070226. PERMIT MODIFICATION WILL BE SUBMITTED TO NCDEQ FOR REVIEW AND APPROVAL PRIOR TO TRC APPROVAL. THE REMAINING SITE AREA WILL ALSO BE SUBMITTED TO NCDEQ FOR REVIEW AND APPROVAL PRIOR TO TRC APPROVAL. 3. ESTIMATED GROSS TRIPS GENERATED: 2,184 DAILY TRIPS; 310 TRIPS AM PEAK; 463 TRIPS PM PEAK (ITE LU CODES: 710, 822, & 932) 3 1 PROJECT INFORMATION OYSTER CREEK LANDING MDP PERMIT DRAWINGS US HIGHWAY 17, HAMPSTEAD, PENDER COUNTY, NORTH CAROLINA 12/12/2022 PROJECT LIMITS II Y � t Pj to r 4-1 2 I LOCATION MAP 7 I US HIGHWAY 17 N SCALE: NTS Know whafs below. Call before you dig. NUMBER TITLE C1.0 COVER C1.1 GENERAL NOTES C2.0 EXISTING CONDITIONS C2.1 DEMOLITION PLAN C3.0 SITE PLAN - OVERALL C4.0 EROSION CONTROL PLAN - STAGE 1 C5.0 EROSION CONTROL PLAN - STAGE 2 C7.0 GRADING AND DRAINAGE PLAN - OVERALL C8.0 UTILITY PLAN - OVERALL C10.0 LANDSCAPE PLAN - OVERALL C11.0 SITE DETAILS C11.1 SITE DETAILS C12.0 EROSION CONTROL DETAILS C12.1 EROSION CONTROL DETAILS C12.2 EROSION CONTROL DETAILS C13.0 GRADING AND DRAINAGE DETAILS C13.1 GRADING AND DRAINAGE DETAILS C13.2 GRADING AND DRAINAGE DETAILS C14.0 UTILITY DETAILS C14.1 UTILITY DETAILS C17.0 LANDSCAPE DETAILS