Loading...
HomeMy WebLinkAboutNC0025071_2022_PAR Review_20230315 (3)Regional Pretreatment Annual Report (PAR) Review Is the PAR on time? Yes ® No ❑ Does it have two copies? Yes ® No ❑ Did they send any other submissions with it? Yes ❑ No Included? Adequate? Narrative ® Yes ❑ No ❑ NA ® Yes ❑ No ❑ NA PPS Form Yes ❑ No ® Yes ❑ No SNCR Yes ❑ No ® Yes ❑ No IDSF Yes ❑ No ® Yes ❑ No Allocation Table 0 Yes ❑ No ® Yes ❑ No For modified programs, evaluate shaded items only. A Narrative is req'd for a modified program ONLY if there are SIUs in SNC Compliance Schedule ❑ Yes ❑ No ®NA ❑ Yes ❑ No ® NA Public Notice ❑ Yes ❑ No ® NA ❑ Yes ❑ No ® NA Program Information ® Yes ❑ No ® Yes ❑ No Historical SNC ❑ Yes ® No ❑ NA ❑ Yes ❑ No ® NA D E Regional Office: Winston Salem POTW: Mebane Bridge - City of Eden NPDES Permit # NC 0025071 Report Period: 1/1/22 to 12/31/22 ® Full ❑ Modified* POTW noted Corrections? ® Yes ❑ No ❑ Yes ❑ No ® NA If Wo ; check recommendation below: 1. Have at least 90% of SIU permits been issued with 180 days ® ❑ ❑ ❑ ❑ ❑ ❑ ❑ of expiration? (See Allocation Table) Yes No Not Req'd NOD NOV QNCR NCP CPA ® ❑ ❑ ❑ ❑ ❑ ❑ ❑ 2. Were at least 80% of SIUs inspected? (See PPS Form) Yes No Not Req'd NOD NOV QNCR NCP CPA 3. Has effective enforcement been taken against industries in ❑ ❑ ® ❑ ❑ ❑ ❑ ❑ SNC, including those causing pass -through or interference? Yes No NA NOD NOV QNCR NCP CPA (See Narrartive and SNCR Form) ❑ ❑ ® ❑ ❑ ❑ ❑ ❑ 4. Does public notice cover all SIUs in SNC? Yes No NA NOD NOV QNCR NCP CPA Note: Exceptions should be explained in the comment section below: -Allocation Tables were not originally sent when PAR was submitted. Alerted Mr. Powell and he emailed the AT's right away. Forwarded AT's to Keyes McGee and Octavio Henriquez on 3/20/2023. Reviewed by: %4zcl.�GVQi�y Date: 3/15/2023