Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Coleen H. Sullins Director
Division of Water Quality
December 4, 2008
Mr. Rodney E. Gaddy, Vice President
Carolina Power & Light Co, d/b/a Progress Energy Carolinas, Inc.
P.O. Box 1551
Raleigh, NC 27602
NOTICE OF INSPECTION
Wilmington South Operating Center-CP & L
Stormwater Project No. SW8 981209
New Hanover County
Dear Mr. Gaddy:
Please find attached a copy of the completed form entitled "Stormwater Compliance Inspection
Report". The report summarizes the findings of a recent inspection of the project's stormwater
controls conducted on December 3, 2008 to determine compliance with Stormwater Permit
Number SW8 981209 issued on September 25, 2008.
Please disregard the previous inspection report, issued on September 11, 2008, because of an
error in recording. The initial cover letter for that inspection was intended to be issued as a
Notice of Inspection. If you have any questions please contact me at the Wilmington Regional
Office, telephone number (910) 796-7318.
Sincerely,
David Cox
Senior Environmental Specialist
GS/dwc: S:\WQS\STORMWAT\INSPECT\981209.dec08
cc: Richard Moore, McKim & Creed
tWilmington_Regional_Office7
David Cox
North Carolina Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Phone (910) 796-7215
Wilmington Regional Office Internet: www.newaterauality.org Fax (910) 350-2004
NorthCarolina
Xtura//y
Customer Service
1-877-623-6748
An Equal Opportunity/Affirmative Action Employer— 50% Recycled110% Post Consumer Paper
Compliance Inspection Report
Permit: SW8981209 Effective: 09/25/08 Expiration: 09/25/18 Owner: Progress Energy Carolinas Inc
Project: Progress Energy Wilmington South
Operations Center
County: New Hanover Raleigh St
Region: Wilmington
Wilmington NC 28412
Contact Person: Caren Anders Title: Vice President of Transmi Phone:
Directions to Project:
Type of Project: State Stormwater- HD- Detention Pond
Drain Areas:
On -Site Representative(s):
Related Permits:
Inspection Date: 12103/2008 Entry Time: 02:30 PM
Primary Inspector: David W Cox
Secondary Inspector(s):
Reason for Inspection: Follow-up
Permit Inspection Type: Slate Stormwater
Facility Status: ■ Compliant 0 Not Compliant
Question Areas:
State Stormwater
(See attachment summary)
Exit Time: 02:45 PM
Phone:910-796-7215
Inspection Type: Compliance Evaluation
Page:1
0
r Permit: SW8981209 Owner - Project: Progress Energy Carolinas Inc
Inspection Date: 12/03/2008 Inspection Type: Compliance Evaluation Reason for Visit: Follow-up
Inspection Summary:
File Review
Yes
No
NA
NE
Is the permit active?
■
❑
❑
❑
Signed copy of the Engineer's certification is in the file?
■
❑
❑
❑
Signed copy of the Operation & Maintenance Agreement is in the file?
■
❑
❑
❑
Copy of the recorded deed restrictions is in the file?
■
❑
❑
❑
Comment:
Built Upon Area
Yes
No
NA
NE
Is the site BUA constructed as per the permit and approval plans?
■
❑
❑
❑
Is the drainage area as per the permit and approved plans?
■
❑
❑
❑
Is the BUA (as permitted) graded such that the runoff drains to the system?
■
❑
❑
❑
Comment:
SW Measures
Yes
No
NA
NE
Are the SW measures constructed as per the approved plans?
❑
❑
❑
❑
Are the inlets located per the approved plans?
❑
❑
❑
❑
Are the outlet structures located per the approved plans?
❑
❑
❑
❑
Comment:
Operation and Maintenance
Yes
No
NA
NE
Are the SW measures being maintained and operated as per the permit requirements?
In
❑
❑
❑
Are the SW BMP inspection and maintenance records complete and available for review or provided to DWO ❑ ❑ ❑ ■
upon request?
Comment:
Page:2
Progress Energy
October 21, 2008
Mr, Edward Beck
Regional Supervisor, Surface Water Protection Section
NCDENR - Division of Water Quality
127 Cardinal Drive Extension
Wilmington, NC 28405
�CEIVED
O C i 2 8 1008
byt
Subject: (1) Response to Notice of Inspection and Non -Compliance, (2) Comments on Permit
Wilmington South Operations Center, New Hanover County
Stormwater Permit No. SW8 981209
Dear Mr. Beck,
This letter is sent in response to the Notice of/nspection and Non -Compliance for the Progress Energy Wilmington South
Operations Center, dated September 25, 2008 and received in our offices on October 16, 2008. The deficiency noted in the
inspection report was the need to remove accumulated sediment from the forebay, as recommended on the Designer's Certification
provided as part of the permit renewal application.
In our permit renewal application, submitted on August 19, 2008, we noted in the cover letter (last paragraph on page 1) that the
reconmiended maintenance was complete and we included the scope of work from the contractor performing the task. This scope
included removal of sediment from the forebay and reseeding the slopes with permanent vegetation. Attached is a photograph of
the forebay taken on August 19, 2008, immediately following completion of the maintenance activity. We were not present for the
agency inspection performed in September 2008 (either on September 11, 2008 or September 25, 2008, as both dates are
referenced in the inspection report). As the facility is gated and controlled -access, it is likely that the inspector was unable to
adequately observe the stormwater control system from outside the gate.
Based on the additional documentation of completion of this maintenance activity provided by this letter, we respectfully request
that the non-compliance notification be rescinded in writing. We are strongly committed to being good stewards of the
environment and non-compliance events are taken very seriously by Progress Energy staff and management.
Progress Energy also offers the following comments on the permit itself, which we believe will require reissuance. First, on page 2
of 7, the permit expiration date is listed as September 25, 2008. We believe the correct expiration date is September 25, 2018.
Second, there are two instances where the runoff from impervious area is listed as 159,459 ft2 instead of the correct area of
159,232 RZ. These are on pages 2 and 3 of the permit. Additionally, we are planning to schedule a meeting with Mr. Cox of your
office to obtain clarification on the required inspection frequency.
If you have additional questions regarding this information or our request to rescind the non-compliance notification, please do not
hesitate to contact me at 919-546-3112 or krislin.beck@pgnmail.com.
JjSSiinncerely,�n Q ,'
1Vvao — l"•1�--
Kristin M. Beck
Supervisor, Corporate Services Department EHS Compliance
Progress Energy Service Company, LLC
P B. Box 1551
Raleigh, NC 27602
cc: Ms. Robbie Blue
Mr. Buzz Bryson
Mr. Don Cooke
Ms. Jeanie Cooke
Mr. Don Ennis
Mr. Robin Hilburn
Wilmington South Facility Files
Cape Jear Landscaping) LLC
P.0 Box 190
Wrightsville Beach, NC 28480-0190
Name / Address
Progress Energy
c/o Don Cooke
1451 Military Cutoff Road
Wilmington, NC 28403
Estimate
Date
Estimate H
8/15/2008
326
'Perms
Project
Due on receipt
Storm Water Management ...
Description
Qty
Cost
Total
I) Remove and dispose of two feet of accumulated sediment from
5,250.00
- 5,250.00
the upper basin (approximately two hundred cubic yards)
2) Seed and straw sides of retention pond
1) Add larger size rip rap to overflow between upper and lower
1,150.00
1,150.00
basins
1) Remove the sediment from the area in front of the outlet for the
575.00
575.00
storm drains in the front parking lot ( approximately 12 cubic
yards)
Thank you for doing business with Cape Fear Landscaping
Don Hickey & Bobby Stewart
Total $6,975.00
Phone H Fax H
(910)395-1787 (910)395-1787
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Coleco H. Sullins Director
Division of Water Quality
September 25, 2008
Mr. Rodney E. Gaddy, Vice President
Carolina Power & Light Co. d/b/a Progress Energy Carolinas, Inc
P.O. Box 1551
Wilmington, NC 28412
NOTICE OF INSPECTION AND NON-COMPLIANCE
Wilmington South Operating Center-CP& L
Stormwater Project No. SW8 981209
New Hanover County
Dear Mr. Gaddy:
Please find attached a copy of the completed form entitled "Stormwater Compliance Inspection
Report". The report summarizes the findings of a recent inspection of the project's stormwater
controls conducted on Septmber 11, 2008 to determine compliance with Stormwater Permit
Number SW8 981209 issued on February 23, 1999.
A summary of the findings and comments are noted under Section 4 of the report. Please
inform this Office in writing before October 25, 2008, of the specific actions that will be
undertaken and the time frame required to correct the deficiencies. Failure to provide the
requested information, when required, may initiate enforcement action. If you have any
questions please contact me at the Wilmington Regional Office, telephone number (910) 796-
7215.
Sincer
David Cox ell
Senior Environmental Specialist
ENB/dwc: S:\WQS\STORMWAT\INSPECT\981209.sep08
cc: Roger a Moore
Wilmington Regional Office
David Cox
NorthCarolina
JVatura//ff
North Carolina Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Phone (910) 796-7215 Customer Service
Wilmington Regional Office Internet: www.ncwateruualitv.ory Fax (910)350-2004 1-977-623-6748
An Equal OpportunitylAffirmative Action Employer— 50% Recycled110% Post Consumer Paper
Wilmington South Operating Center-CP&L
September 25, 2008
Stormwater Permit No. SW8 981209
STORMWATER COMPLIANCE INSPECTION REPORT
1. Project Name: Progress Energy
Project Number: 981209 Control Measure: Wet Pond
Water Body: Banards Creek Classification: C SW
Directions to site, address: 404 Raleigh Rd
2. Inspection Date: September 25, 2008
Weather Conditions: Sunny
3. Compliance Issues:
Y N
®❑ The drainage area (including offsite) and built -upon area to the permitted
system are per the approved plan. No unpermitted offsite drainage enters
the system.
®❑ All the built -upon area associated with the project is graded such that the
runoff drains to the system.
®❑ For ponds/infiltration, the outlet/bypass structure relative elevations are
per the approved plan. (Must be verified via as -built survey if in question).
4. Required Actions: (Explain each deficiency and what needs to be done to bring
the system back into compliance)
1. Please remove the sediment out of the forebay that was listed as a
deviation listed on the Designers Certificate.
Inspector: David Cox
Water Quality/Wilmington Regional Office/(910) 796-7215
ENB/dwc: S:\WQS\STORMWAT\INSPECT\981209.sep08
Page 2 of 4
Cape rear Landscaping, LLC
P.0 Box 190
Wrightsville Beach, NC 28480-0190
Name / Address
Progress Energy
c/o Don Cooke
1451 Mili(aryCutoff Road
Wilmington, NC 28403
Estimate
Date
Estimate N
8/15/2008
326
Terms
Project
Due on receipt
Storm Water Management ...
Description
CRY
Cost
Total
1) Remove and dispose of Iwo feet of accumulated sediment from
5,250.00
5,250.00
the upper basin (approximately two hundred cubic yards)
2) Seed and straw sides of retention pond
1) Add larger size rip rap to overflow between upper and lower
1,150.00
1,150.00
basins
1) Remove the sediment from the area in front of the outlet for the
575.00
575.00
storm drains in the front parking lot ( approximately 12 cubic
yards)
Thank you for doing business with Cape Fear Landscaping
Don Hickey & Bobby Stewart
Total $6,975.00