Loading...
HomeMy WebLinkAboutSW8980707_HISTORICAL FILE_20130218 (2)STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 9$ 07 07 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS MHISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2013 02 18 YYYYMMDD North Carolina Pat McCrory Governor February 18, 2013 M MCA NR Department of Environment and Division of Water Quality Charles Wakild, P. E. Mr. Tom Goldsmith, President Sandpiper Bay Property Owners' Association, Inc. 7403 Balmore Dr. SW Sunset Beach, NC 28468 Director Subject: Approved Plan Revision Sandpiper Bay Golf Plantation Phase I Stormwater Permit No. SW8 980707 Brunswick County Dear Mr. Goldsmith: Natural Resources John E. Skvarla, III Secretary On February 18, 2013, the Wilmington Regional Office received a request to revise the approved plans for Stormwater Management Permit Number SW8 980707. The revisions include adding a retaining wall near, but outside the outer permitted edge of a stormwater pond. It has been determined that a formal permit modification is not required for the proposed changes. The plans approved on this date do not show any interference with any easement around the permitted pond. We are forwarding you an approved copy of the revised plans for your files. Please add the attached plans to the previously approved plan set. Please be aware that all terms and conditions of the permit issued most recently on September 10, 2012, remain in full force and effect. Please also understand that the approval of this revision to the approved plans for the subject State Stormwater Permit is done on a case -by -case basis. Any other changes to this project must be approved through this Office prior to construction. The issuance of this plan revision does not preclude the permittee from complying with all other applicable statutes, rules, regulations or ordinances which may have jurisdiction over the proposed activity, and obtaining a permit or approval prior to construction. If you have any questions concerning this matter, please do not hesitate to call Georgette Scott or me at (910) 796- 7215. Sincerely, Ily Jo son En mental Engineer GDSlkpj: S:1WQS1StormwaterlPennits & Projects119981980707 HD12013 02 permit_pr 980707 cc: Jay Houston, PE Inspector, Brunswick County Building Inspections Wilmington Regional Office 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One Phone: 919807-63001 FAX: 919807-64921 DENR Assistance: 1877 623-6748 N4orthCarclfina Internet:w .ncwateroualiN.ora Natuyra & Date Received Fee Pai (express on Permit Number State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT PLAN REVISION APPLICATION FORM This form may be photocopied for use as an original 1. GENERAL INFORMATION 1. Stormwater Management Permit Number: SW8 980707 2. Project Name: 3. Permit Holder's name (specify the name of the corporation, individual, etc.): i...• t. ..• •. .•. $Ti 4. Print Owner/Signing Official's name and title (person legally responsible for permit): Tom Goldsmith President 5. Mailing Address for person listed in item 2 above: 7403 Balmore Drive SW City:Sunset Beach State:NC Zip:28468 Phone: (910 1 575-3446 Fax: (910 ) 575-3446 Emaii:tgold,;m@atmc.net II. PLAN REVISION INFORMATION 1. Summarize the plan revision proposed (attach additional pages if needed): :GENE JAN 18 2013 Construction of a slope stability/landscape bulkhead adjacent to but outside of the regulatory limits of a permitted stormwater Pond 111. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the DWQ Office that issued the permit. 1. Please indicate that you have provided the following required information by initialing in the space provided next to each item. Initials • Original 6 I copy of the Plan Revision Application Form _ • Two (2) copies of revised plans (must be revisions of original approved plan sheet(s)) If applying for Expressreview ew (only available in 20 coastal counties)• • Application fee of $500.00 (made payable to NCDENR) VI. APPLICANT'S CERTIFICATION 1, (print or type name of person listed in General Information, item 3) Tom Goldsmith certify that I have authorized these plan revisions and that the information included on this plan revision application is, to the %best of my knowledge, correct and complete. Sienature: / r//r�/i1�^ Date: Plan Rnaicinn Fnrm Rnv IIh.I J00In Pa t of 9 Sandpit)er Bay PrU) )erty Owners Association January 27, 2013 Ms. Kelly Johnson Environmental Engineer NCDENR N.C. Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Re: Storm Water Permit 980707 Dear Ms. Johnson: Enclosed is a copy of the Sandpiper Bay Property Owners Association Board of Directors' minutes for our Organizational Meeting with the appointment of officers. Sincerely, ruditli Ballweg, Secretary Sandpiper Bay POA Board of Directors cc: Sandpiper Bay POA BOD, Tom Goldsmith ECE�VF— FEB 18 2013 Organizational Meeting of December 12, 2012 Attendees: Judith Ballweg, Ray Cooksey, Mary Cross, Tom Goldsmith, Donald Moore In accordance with the Sandpiper Bay Property Owners Association Bylaws, Article III, Section 9, an Organizational Meeting was held on December 12, 2012 for the purpose of appointing Officers for the Board of Directors for the period of December, 2012 to December, 2013. The following positions were selected and approved unanimously by the Board of Directors: President: Tom Goldsmith Vice -President Ray Cooksey Secretary Judith Ballweg Treasurer Donald Moore Director At Large Mary Cross Submitted by: Judith Ballweg Secretary rFOEB EIV E 1 B 2013 BY:_-_---- HOUSTON and ASSOCIATES, P.A. C-0636 Consulting Engineers SI IALLO'17E, NORTH CAROLINA 28459 117 Pine Street Post Office Box 627 jayhouston@atmc.net Ms. Kelly Johnson, Environmental Engineer Division of Water Quality NCDENR 127 Cardinal Drive Extension Wilmington, North Carolina 28405 Telephone (910) 754-6324 Facsimile (910) 754-2121 Cellular: (910) 200-0200 Thursday, January 31, 2013 ECEIVE FEB 01 2013 BY:___ Subject: Sandpiper Bay Golf Plantation PUD - Phase I Stormwater Plan Minor Revision for Approval - SW8 980707 Proposed Slope Stability/Landscape Bulkhead Response to Request for Additional. Information, Jan 25, 2013 Dear Ms. Johnson: Attached are two (2) copies of the revised plan which addresses Item 2 in your review letter dated January 25, 2013 requesting additional information. Item 1 requested documentation for the signatory authority of Mr. Tom Goldsmith as president of the Sandpiper Bay HOA and will be provided under separate cover from the Sandpiper POA. The original stormwater plan elevations for the adjacent stormwater pond have been added to the Plan View and Section View and the pond has been labeled consistent with the original plan submitted by others. The top of the existing approximately 3:1 vegetated slope is labeled as "Top of Existing Bank" on the plan. There is no drainage easement, inside the lot lines, of which we are aware. The homeowner maintains the vegetation down to the waterline and will continue to do so. A note has been amplified in the Section . View to direct grading toward the stormwater pond and Note 5 addresses the direction of stormwater from impervious surfaces to be directed into the stormwater pond. We trust that your comments have been adequately addressed and we appreciate your prompt attention to this matter. Should you have any comments or require any additional information, please call me at once. RECp FEB 01 2013 Enclosures Sincerely, Houston, P.E. ►n and Associates, P.A. pc: Mr. Lance Harding, 514 Sandpiper Bay Drive, w/attachment Mr. Tom Goldsmith, President, Sandpiper Bay POA, w/attachment Mr. Tim Tilma, Sandpiper Bay GC (North Star Development), w/attachment Mr. Randy Walters, Sunset Beach Building Inspector, w/attachment File; 12-1094 (Harding - Sandpiper Bay SW Permit Minor Revision) NC®ENR North Carolina Department of Environment and Natural Resources Division of Water Quality Pat McCrory Charles Wakild, P. E. Governor Director January 25, 2013 Mr. Tom Goldsmith, President Sandpiper Bay Property Owners' Association, Inc. 7403 Balmore Dr. SW Sunset Beach, NC 28468 Subject: Request for Additional Information Stormwater Project No. SW8 980707 Sandpiper Bay Golf Plantation Phase I Brunswick County Dear Mr. Goldsmith: John E. Skvarla, III Secretary The Wilmington Regional Office received and accepted a plan revision for a State Stormwater Management Permit Application for Sandpiper Bay Golf Plantation Phase I on January 18, 2013. A preliminary in-depth review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. Signature Authority: It appears that a new HOA President has been elected. Please submit meeting notes of the meeting showing that Mr. Goldsmith has been elected so that we can update our records. 2. Plans: Please show the permitted elevations of the normal pool and the temporary pool (which appears to be labeled as the "regulatory high pond level" on the plans. Please also show the locations of the top of the 3:1 vegetated slope above the vegetated shelf, and the drainage easement (if there is one in place) in relation to the location of the proposed bulkhead. Please also label the pond number, and also either show the topography on Lot 192 or include a note that Lot 192 will be graded to drain to the pond as permitted. Please remember that a change to one number may have a domino effect on other numbers. Please check all plans, calculations and forms to ensure that the numbers are consistent throughout. Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to February 25, 2013, or the application will be returned as incomplete. The return of a project will necessitate resubmission of all required items, including the application fee. If you need additional time to submit the information, please mail, email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143- 215.6A. 1617 Mail Service Center, Ralegh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One Phone: 919A07-63001 FAX: 919-807-6492 1 DENR Assistance:1-877-623.6748 NorthCarohna Internet www.ncwatemualiN.om 'A a{uyra l Mr. Goldsmith January 25, 2013 Page 2 of 2 Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 796-7215 or email me at kelly.p.johnson@ncdenr.gov. Sincerely, Yelly Joelly Joh on Envi ental Engineer GDSlkpj: S:1WQMStormwatehPennits & Projects11998\980707 HD12013 01 addinfo 980707 cc: Jay Houston, PE Wilmington Regional Office Stormwater File Completeness Review Checklist Project Name: �rot��iPEQ Received Date: 123 Project Location: Accepted Date: I Rule(s) 132008 Coastal 111995 Coastal ElPhase II (WiRO) Universal 1:11988 Coastal Type of Permit: New or Mod or PR Existing Permit q (Mod o R): a�p7l)7 nPE Cert on File? Density: HD or LID %: (% OK?) Type: Commercial or Residential F-1NCG: FlOffsite to SW8 Exempt Stream Class: EISA Map Subdivided?: Subdivision or Single Lot ORW Map Paperwork Emailed Engineer on: F-1Supplement(s) (1 original per BMP) BMP Type(s): MO&M with correct/original signatures (1 original per BMP except LS/VFS and swoles) Application with correct/original signatures ❑Corp or LLC: Sig. Auth. per SoS or letter F-1$505 (within 6mo) Soils Report with SHWT Calculations (signed/sealed) nNo obvious errors msity includes common areas, etc Restrictions, if subdivided: & Notarized Plans r-12 Sets Grading ❑Vicinity Map Legend Note to Reviewer: Details (roads, cul-de-sacs, curbs, sidewalks, BMPs, Buildings, etc) Wetlands: Delineated or No Wetlands Layout (proposed BUA dimensions) �DA Maps Project Boundaries Infiltration Wet Pond Offsite Soils Report Soils Report F-1PE Cert for Master Lot #: SHWT: Deed Rest for Master Lot ft Matches Master Bottom: aSHWT: PP: BUA Permitted (Master): sf Visited: BUA Proposed (Offsite): sf Additional Information: Permitted Proposed: Proposed: Proposed: BUA (sf) DA (sf) PP (el) SHWT (el) Depth (ft) SA (sf) 117 Pine Street Post Office Box 627 jayhouston@atmc.net HOUSTON and ASSOCIATES, P.A. C-0636 Consulting Engineers SHALLOTTE, NORTH CAROLINA 28459 Telephone (910) 754-6324 Facsimile (910) 754-2121 Cellular: (910) 200-0200 Friday, January 18, 2013 Ms. Linda Lewis Division of Water Quality RE , `C� J-AN 18 NCDENR 2013 127 Cardinal Drive Extension Wilmington, North Carolina 28405 Subject:. Sandpiper Bay Golf Plantation PUD - Phase I Stormwater Plan Minor Revision for Approval - SW8 980707 Proposed Slope Stability/Landscape Bulkhead Dear Ms. Lewis: On behalf of North Star Development, the Sandpiper Bay POA, and Mr. Lance Harding, homeowner, we are pleased to submit for your review and approval this request for a minor revision to the existing stormwater permit for the subject project. We have met with all interested parties, including the Town of Sunset Beach, and believe that this submittal meets the requirements of the state and the desires of the interested parties. The proposed slope stability/landscape bulkhead is totally outside of the adjacent regulatory stormwater pond operation elevations, and therefore, does not change any of the permit conditions, calculations or other. pertinent elements. Included within the submittal package is the minor revision application and two (2) copies of the proposed bulkhead plan. It is our understanding that there Is no application fee. The Town of Sunset Beach Building Inspections Department is requiring your approval prior to the issuance of a building permit for the proposed structure. We appreciate your attention comments or require any additional contact our office at your convenience. EGOVE JAN 18 2013 tt BV:_ Enclosures to this matter. Should you have any information, please do not hesitate to Sincerely, Houston, P.E. rn and Associates, P.A. pc: Mr. Lance Harding, 514 Sandpiper Bay Drive, w/attachment Mr. Tom Goldsmith, President, Sandpiper Bay POA, w/attachment Mr. 'rim Tilma, Sandpiper Bay GC (North Star Development), w/attachment Mr. Randy Walters, Sunset Beach Building Inspector, w/attachment File; 12-1094 (Harding - Sandpiper Bay SW Permit Minor Revision) NC®ENR North Carolina Department of Environment and Natural Resources o Division of Water Quality Beverly Eaves Perdue Charles Wakild, P. E. Governor Director September 10, 2012 Sandpiper Bay Property Owner's Association, Inc C/o Mike Spinelli, President or Current President 7422 Balmore Ct. Sunset Beach, NC 28468 Subject: Permit I Correction Sandpiper Bay Golf Plantation Stormwater Permit No. SW8 980707 Brunswick County Dear Mr. Spinelli: Dee Freeman Secretary Page 6 of your permit stated a specific BUA per lot. This has been corrected to reflect the revision made on February 23, 2012. Please replace page 6 of your state stormwater permit issued on July 23, 2012 with the corrected pages attached. If you have any questions concerning the requirements of the permit, please do not hesitate to call David Cox at (910) 796-7215. Sincerely, For Charles Wakild, P.E., Director Division of Water Quality CW/GDS/ dwc: S:\WQS\Stormwater\Permits & Projects\2000\980707offsite\2012 09 permit 980707 cc Amy Wang Brunswick County Building Inspections Wilmington Regional Office Stormwater File Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 Phone: 910-796-72151 FAX: 910-350-20041 DENR Assistance: 1-877-623-6748 Internet: vvvnavaterqualily.org An Rural nnonr imlm 1 Arnrmafma Art nn rmnii One NorthCarolina Natimallyr State Stormwater Management Systems Permit No. SW8 980707 12. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 13. Prior to the sale of any lot, deed restrictions must be recorded which limit the built -upon area per lot to the amount as shown on the Project Data Sheet, per Section I, Part 2. The recorded statements must follow the form: a. "Each lot in the subdivision is approved for 100% amount of impervious or as recorded in the restrictive covenants amended by Sandpiper Bay Property Owners' Association Inc. Which is inclusive of that portion of the right-of-way between the lot line and the edge of pavement, structures, pavement, walkways of brick, stone, or slate, but not including open wood decking." b. "The covenants pertaining to stormwater regulations may not be changed or deleted without concurrence of the State." C. "Alteration of the drainage as shown on the approved plan may not take place without the concurrence of the State." d. "All runoff on the lot must drain into the permitted system. This may be accomplished through providing roof drain gutters which drain to the street, grading the lot to drain toward the street; or grading perimeter swales and directing them into the pond or street. Lots that naturally drain into the system are not required to provide these measures." 14. A copy of the recorded deed restrictions must be submitted to the Division within 30 days of the date of recording the plat. The recorded copy most be signed by the Permittee, dated, stamped with the deed book number and page, and bear the stamp/signature of the Register of Deeds. 15. The permittee shall at all times keep the collection system within the project clear, and must provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes at a minimum of 3:1 in accordance with approved plans and specifications. f. Debris removal and unclogging of drainage structures. g. Access to the overflow structure and valve must be available at all times. 15. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 16. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data.