HomeMy WebLinkAboutSW8980311_HISTORICAL FILE_20220406 (2)STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW8 Q 6 03 11
DOC TYPE
❑ CURRENT PERMIT
❑ APPROVED PLANS
HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE
2022
YYYYMMDD
Burd, Tina J
From: Burd, Tina 1
Sent: Wednesday, April 6, 2022 2:48 PM
To: maintenance@landfall.org
Subject: SW8 980311 - The Mews Townhomes
The Wilmington Regional Office of the Division of Energy, Mineral and Land Resources (Stormwater Section) accepted
the Stormwater Permit Renewal Application and $505.00 fee for the subject project on April 5, 2022. The project has
been assigned to Ashley Smith and you will be notified if additional information is needed.
Best Regards,
Tina Burd
Administrative Associate II
Wilmington Regional Office
Division of Environmental Assistance & Customer Service
Phone 910-796-7215
NCDEQ
Wilmington Regional Office
127 Cardinal Drive Ext.
Wilmington, NC 28405
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Website: http //deo nc gov/about/divisions/energy-mineral-land-resourcesZstormwater
Based on the current guidance to minimize the spread of COVID-tq, the Department of Environmental Quality has adjusted
operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered
shifts. To accommodate these staffing changes, all DEQoffice locations are limiting public access to appointments only. Please
check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We
appreciate your patience as we continue to serve the public during this challenging time.
Nan -Transfer Application Completeness Review Checklist
Project Name: He Tvleu):S �br..1n�/-Q(pfvlES
Project County/Location: )"JI ll'A /L A rJ DFA L.L.
Permit Action: New New Permit # 2 :
Not located in the ETl of the following delegated
and functioninz programs:
Date Delivered to WIRO: 415
BIMS Received/Accepted Date:----�f��Y
ff---S LOZZ
Date Given to Admin: a a
BIMS Acknowledged Date':p�a--
NHC: Carolina Beach / Kure Beach / Wilmington / Wrightsville Beach
Bruns: Leland / Navassa (?) / Oak Island
Cart: Emerald Isle Onsl: Jacksonville Pend: Surf City
Major Mod / Minor Mod Renewal Existing Permit N:
Applicant & Permittee are the same?3 Expiration Date°:
Permit Type: (nH �;?D / LD Overall / HD &LD Combo
General Permit / Offsite / Exempt + Redevelopment
Development Type: Commer ' Residential Other
Subdivided?: < SubdivisioV or Single Lot
Rule(s): 1 12017 Coastal 1 12008 Coastal [,--11995 Coastal
3 2 2oz2,
MOffsite to SWB:
Ells Offsite Lot approved in Master Permit?s
uPhase II uUniversal u1988 Coastal
Permittee Type & Documents Needed:
Property Owner(s) EDPurchaser MLessee [:]HOA ElDeveloper
QViable? Viable? Viable? QViable? QViable?
MiLease E30ection Minutes
Paperwork
pplication 1��' —7
Fee: I �y 505 (within 6mo) Check#(s): / � / E]No Fee
Supplement' (1 new form or for older forms: 1 original per SCM)
FT&M2
Soils Report (Infil or PP)
Calculations (signed/sealed)
Deed Restrictions, if subdivided
Project Narrative
FIUSGS Map (or on file?) Subject to SA?: Y / N Subject to ORW7: Y / N
Plans (2 Sets)
NOTES:
'Enter BIMS Acknowledged Date on this Sheet
'For New Projects -Enter New Permit # on Supplements & Deed Restriction Templates.
3If permlttee is different, STOP. Needs to be transferred first.
°If w/in 6 months and they are requesting a mod, STOP. Needs a renewal first.
slf Lot not approved in master permit, STOP. Master permit needs mod.
EMAILED ENGINEER DATE:
REVIEWER NAME:
Comments:
GMQ\\\Reference Libra ry\Procedures\Checklists\Co m pleteness Review Checklist 20210908
STATE OF NORTH CAROLINA
DEPARTMENT OF THE SECRETARY OF S'
STATEMENT OF CHANGE OF REGISTERED
OFFICE AND/OR REGISTERED AGENT
SOSID: 0494757
Date Filed: 5/21/2021 3.16:00 PM
Elaine F. Marshall
North Carolina Secretary of State
C2021 133 00525
Pursuant to §55D-31 of the General Statutes of North Carolina, the undersigned entity submits the following for the purpose of
changing its registered office and/or registered agent in the State of North Carolina.
The name of the entity is:
INFORMATION CURRENTLY ON FILE
THE MEWS AT LANDFALL OWNERS' ASSOCIATION
The street address and county of the entity's registered office currently on file is:
NumberandStreet•. 1749 Drysdale.Drive
City: Wilmington
State: NC Zip Code:
county: New Hanover
The mailing address If differentfrom the street address of the registered office currently on file is:
Number and Street:
City:
State: NC Zip Code:
The name of the current registered agent is:
Sandra L. Slocum
NEW INFORMATION
1. The street address and county of the new registered office of the entity is:
(complete this item only ifthe address of the registered office is being changed)
Number and Street:
County:
City: State: NC Zip Code: County:
2. The mailing address T iiTerent from the street address of the new registered office is:
(complete this item only if the address of the registered office is being changed)
Number and Street:
City:
State: NC Zip Code:
County:
L'm �
3. The name of the new registered agent and the new agent's consent to appointment appears below:
(complete this item only ifthe name ofthe registered agent is .' c tged)
R... Roxanne Powell Jxl/
Type or Print Name of New Agent •Signature & Titer
4. The address of the entity's registered office and the address of the business office of its registered agent, as changed,
will be identical.
5. This statement will be effective upon filing, unless a date and/or time is specified:
This is the . 15 day of Y►1 201—. The Mews at Landfall Owners' Association
Enti
Signature
Notes: F Ung tee Is S5.0a. This document must be filed with the Secretary of State. Type or Print Name and Title
• Instead of signing here, the new registered agent may sign a separate written consent to the appointment, which must be attached to this statement.
BUSINESS REGISTRATION DIVISION P. 0. BOX 29622 RALEIGH, NC 27626-0622
Revised July 2017 Form BE-06
Energy. Mineral &
Land Resources
ENVIRONMENTAL QUALITY
November 28, 2017
Mr. Walter Wulf, Owner
1810 Mews Drive
Wilntington,NC 28405
Subject: State Stormwater Management Permit No. SW8 170905
Wulf Itesidence (Located on Lot S of SIV8 980311)
Itigh Density Project — Individual Lot Permeable Pavement
New Ilanover County
Dear Mr. Wulf:
ROY COOPER
Governor
MICHAEL S. REGAN
Secretor)
TRACY DAVIS
Director
The Wilmington Regional Office received a complete, State Stormwater Management Permit Application
for the subject project on November.16, 2017. Staff review of the plans and specifications has
determined that the project, as proposed, will comply with the Stormwater Regulations set forth in'fule
15A NCAC 2H.1000 effective January 1, 2017. We are forwarding permit No. SW8 170905 dated
November 28, 2017, for the construction, operation and maintenance of the stormwater control measures
(SCMs), built -upon areas, as well as the stormwater collection system and/or vegetated conveyance
system associated with the subject project.
']'his permit shall be effective from the date of issuance until November 28, 2025 and shall be subject to
the conditions and limitations as specified therein, and does not supersede any other agency permit that
may be required. Please pay special attention to the permit conditions regarding the operation and
maintenance of the SCMs, stormwater collection system, and/or vegetated conveyances; the limitation of
built -upon area; modification of the project, the procedures for changing ownership of and/or transferring
the permit; and the need to renew the permit. please also pay attention to the permit conditions that
requires the recordation of deed restrictions and protective covenants, easements; and the maintenance
agreement, which must all be provided along with certification upon completion of the project. Failure to
comply with these requirements will result in future compliance problems.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to
request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings
(OAI-I). The written petition must conform to Chapter 150B of the North Carolina General Statutes and
must be Filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH
with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process
at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their
website at www.NCOA! Lcom. Unless such demands are made this permit shall be final and binding.
Staeof North Carolina I Envimnmcntal Quality I Energy, Mineral and Land Resources
Wilmington Regionaloffice 1127 Cardinal Drive Extension I Wilminglon,NC 23905
910 796 7215
State Stormwater Permit No. SW8 170905
Page 2 of 2
If you have any questions, or need additional information concerning this matter, please contact Kelly
Johnson in the Wilmington Regional Office, at (910) 796-7215.
Sincerely,
f Tracy Davis, Y.E., Director
Division of Energy, Dlineial and Land Resources
Enclosures: Attachment A — Designer's Certification Forni
GDS/kpj: \\\Stormwater\Permits & Projects\2017\1 70905 HD\2017 11 permit 170905
cc: Howard Resnick, PE, CSD Engineering,
Inspector, New Hanover Countv Building Inspections
NCDO'I' District Engineer
New Plarimer County Engineering
Wilmington Regional Office Stormwater File, SWS 170905
Wilmington Regional Office Stormwater File, SW8 980311
State of North Carolina I Environmental Quality I Energy. taineial and Land Resources
Wilininglon Regional Office 1 12 7 Cardial Drive Cxto ision 114ilmingtnn, NC 28,105
910 796 7215
Slate Stormwater Management
Permit No. SW8 170905
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL AND LAND RESOURCES
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North
Carolina as amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
Walter Wulf
Wulf Residence (Located on Lot 5 of SW8 980311)
1810 Mew Drive, Wilmington, New Hanover County
FOR THE
construction, operation and maintenance of permeable pavement ("stormwater control measures" or
'SCMs") in compliance with the provisions of Title 15A NCAC 2H .1000 effective January 1, 2017 (the
"stormwater rules") and the approved stormwater management plans, application, supplement(s),
specifications, and other supporting data (the "approved plans and specifications") as attached and/or
on file with and approved by the Division of Energy. Mineral and Land Resources (the "Division" or
"DEMLR") and considered an enforceable part of this permit.
This permit shall be effective from the date of issuance until November 28, 2025 and shall be subject
to the following specified conditions and limitations:
I. DESIGN STANDARDS
1. This permit is effective only with respect to the management and volume of stormwater
described in the approved plans and specifications. The maximum amount of built -upon area
(BUA) allowed for the entire project is 4,600 square feet.
2. The drainage area(s) for the on -site stormwater system(s) will be limited to the amount(s) of
built -upon area indicated in this permit and the approved plans and specifications. The runoff
from all built -upon area within the permitted drainage area(s) of this project must be directed into
the permitted stormwater control measure(s). The built -upon area for the future development is
limited to 181 square feet.
3. A 50-foot wide vegetative setback must be provided and maintained adjacent to all surface
waters, measured horizontally from the normal pool elevation of impounded structures, from the
top of bank of each side of streams or rivers, and from the mean high waterline of tidal waters,
perpendicular to the shoreline in accordance with the stormwater rules and the approved plans
and specifications.
4. The stormwater control measure(s) is(are) permitted based on the design criteria presented in
the sealed, signed and dated supplement(s) and as shown in the approved plans and
specifications. These stormwater control measure(s) must be provided and maintained at the
design condition. The approved supplement(s) is(are) incorporated by reference into this permit.
5. This project does not propose any stormwater outlet discharge points and therefore will not have
the opportunity to cause erosion during the 10-year storm event.
Page 1 of 4
State Stormwater Management
Permit No SW8 170905
6. Except for the incidental, unavoidable runoff from the stable vegetated areas shown on the
plans, runoff from adjacent pervious areas shall be prevented from reaching the permeable
pavement.
7. It is recommended that during the installation of the permeable pavement, care is taken to avoid
compaction of the underlying subgrade soils. To confirm compaction has not occurred, it is
recommended that a direct measurement of the soil's infiltration rate be conducted after
excavation and before the aggregate is placed. If the infiltration rate has diminished, it is
recommended to scarify, rip, or trench the subgrade to restore the infiltration rate.
8. After installation, the permeable pavement shall be protected from sediment deposition until the
site is completed and stabilized
9. Concentrations of oils, grease, heavy metals, and toxic chemicals shall not be stored or handled
where they may enter the permeable pavement.
It. SCHEDULE OF COMPLIANCE
1. The project and SCM shall be constructed, operated and maintained in accordance with the
conditions of this permit and the approved plans and specifications.
2. The on -site stormwater system shall be entirely constructed, and operational prior to the
construction of any development within the drainage area, per the approved plans and
specifications.
3. During construction, erosion shall be kept to a minimum and any eroded areas of the on -site
stormwater system will be repaired immediately. If the stormwater system is used as an Erosion
Control device, it must be restored to design condition prior to operation as a stormwater
treatment device, and prior to occupancy of the facility.
4 All stormwater control measures, stormwater collection systems vegetated conveyance systems,
and/or maintenance accesses must be located in public rights -of -way, dedicated common areas
that extend to the nearest public right-of-way, and/or permanent recorded easements that
extend to the nearest public right-of-way for the purpose of inspection, operation, maintenance,
and repair.
5. The permittee shall provide and perform the operation and maintenance necessary, as listed in
the signed Operation and Maintenance Agreement, to assure that all components of the
permitted on -site stormwater system functions at the approved design condition. The approved
Operation and Maintenance Agreement is incorporated by reference into this permit and must
be followed in its entirety and maintenance must occur at the scheduled intervals.
6. The operation and maintenance agreement must be recorded with the Office of the Register of
Deeds.
7. Records of maintenance activities must be kept and made available upon request to authorized
personnel of the Division. The records will indicate the date, activity, name of person performing
the work and what actions were taken.
8. The final plats for the project must be recorded with the Office of the Register of Deeds. The
recorded plat must reference the Operation and Maintenance Agreement and must also show all
public rights -of -way, dedicated common areas, and/or permanent drainage easements, in
accordance with the approved plans.
9. The permittee is responsible for verifying that the proposed built -upon area for the entire project
does not exceed the maximum allowed by this permit.
Page 2 of 4
State Stormwater Management
Permit No. SW8 170905
�0. Upon completion of the project, the permittee shall determine whether or not the project is in
compliance with the permitted plans and take the necessary following actions:
a. If the permittee determines that the project is in compliance with the permitted plans, then
within 45 days of completion, the permittee shall submit to the Division one hard copy and
one electronic copy of the following:
i. The completed and signed Designer's Certification provided in Attachment A
noting any deviations from the approved plans and specifications. Deviations
may require approval from the Division;
ii. A copy of the recorded maintenance agreement;
iii. Unless already provided, a copy of the recorded deed restrictions and protective
covenants; and
iv. A copy of the recorded plat delineating the public rights -of -way, dedicated
common areas and/or permanent recorded easements, when applicable.
b. If the permittee determines that the project is not in compliance with the permitted plans,
the permittee shall submit an application to modify the permit within 30 days of completion
of the project or provide a. plan of action, with a timeline, to bring the site into compliance.
11. No person or entity, including the permittee, shall alter any component shown in the approved
plans and specifications.. Prior to the construction of any modification to the approved plans, the
permittee shall submit to the Director, and shall have received approval for modified plans,
specifications, and calculations including, but not limited to, those listed below:
a. Any modification to the approved plans and specifications, regardless of size including the
stormwater control measures, built -upon area, details, etc.
b. Redesign or addition to the approved amount of built -upon area or to the drainage area.
c. Further development, subdivision, acquisition, lease or sale of any, all or part of the project
area as reported in the approved plans and specifications.
d. Altering, modifying, removing, relocating, redirecting, regrading or resizing of any
component of the approved stormwater control measure, stormwater collection system
and/or vegetative conveyance system shown on the approved plan.
e. The construction of any allocated future BUA.
f. The construction of any permeable pavement for BUA credit that was not included in the
approved plans and specifications.
g. The construction of any #57 stone area, public trails, or landscaping material to be
considered a permeable surface that were not included in the approved plans and
specifications.
h. Other modifications as determined by the Director.
12. The Director may notify the permittee when the permitted site does not meet one or more of the
minimum requirements of the permit. Within the time frame specified in the notice, the permittee
shall submit a written time schedule to the Director for modifying the site to meet minimum
requirements. The permittee shall provide copies of modified plans and certification in writing to
the Director that the changes have been made.
13. Prior to transfer of the permit, a file review and site inspection will be conducted by Division
personnel to ensure the permit conditions have been met and that the project and the on -site
stormwater system complies with the permit conditions. Any items not in compliance must be
repaired, replaced restored, or resolved prior to the transfer. Records of maintenance activities
performed to date may be requested.
III. GENERAL CONDITIONS
1. Any individual or entity found to be in noncompliance with the provisions of a stormwater
management permit or the requirements of the stormwater rules is subject to enforcement
procedures as set forth in NCGS 143 Article 21.
2. The issuance of this permit does not preclude the permittee from complying with and obtaining
any other permits or approvals that are required for this development to take place, as required
by any statutes, rules, regulations, or ordinances, which may be imposed by any other Local,
State or Federal government agency having jurisdiction. Any activities undertaken at this site
that cause a water quality violation or undertaken prior to receipt of the necessary permits or
approvals to do so are considered violations of NCGS 143-215.1, and subject to enforcement
procedures pursuant to NCGS 143-215.&
Page 3 of 4
Stale Stormwater Management
Permit No SW8 170905
If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions.
This includes actions required by this Division and the stormwater rules such as the construction
of additional or replacement on -site stormwater systems. These additional or replacement
measures shall receive a permit from the Division prior to construction.
4. This permit is not transferable to any person or entity except after notice to and approval by the
Director. The permittee shall submit a completed and signed State Stormwater Request Form
for Permit Transfer or Permit Information Update, accompanied by the supporting
documentation as listed on the form, to the Division at least 60 days prior to any one or more of
the following events:
a. Any ownership change including:
i. The sale or conveyance of the project area in whole or in part, except in the case of
an individual lot sale that is made subject to the recorded deed restrictions and
protective covenants,
ii. Dissolution of the partnership or corporate entity, subject to NCGS 57D-2-01(e) and
NCGS 57D-6-07.
b. Bankruptcy:
c Foreclosure, subject to the requirements of Session Law 2013-121,
d. A name change of the current permittee;
e. A name change of the project,
f. A mailing address change of the permittee;
5. The permittee is responsible for compliance with all terms and conditions of this permit until the
Division approves the transfer request. Neither the sale of the project, in whole or in part, nor
the conveyance of common area to a third party constitutes an approved transfer of the permit.
6. The permittee grants Division Staff permission to enter the property during normal business
hours to inspect all components of the permitted project.
7. The permit issued shall continue in force and effect until the permittee files a request with the
Division for a permit modification, transfer, renewal, or rescission, however, these actions do not
stay any permit conditions.
8. Approved plans, application documents, supplements, calculations, operation and maintenance
agreement, and specifications for this project are incorporated by reference and are enforceable
parts of the permit. A copy of this permit, application, supplements, operation and maintenance
agreement, and approved plans and specifications shall be maintained on file by the permittee.
9. Unless specified elsewhere, permanent seeding requirements for the on -site stormwater system
must follow the guidelines established in the North Carolina Erosion and Sediment Control
Planning and Design Manual.
10. The issuance of this permit does not prohibit the Director from reopening and modifying the
permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the
laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al
11. A permit renewal request must be submitted at least 180 days prior to the expiration date of this
permit. The renewal request must include the appropriate application, documentation and the
processing fee as outlined in Title 15A NCAC 02H.1045(3).
Permit issued this the 2811 day of November 2017.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
A,,, -Tracy Davis, P.E., Director
Division of Energy, Mineral and Land Resources
By Authority of the Environmental Management Commission
Permit Number SW8 170905
Page 4 of 4
Slate Stormwater Management
Permit No. SW8 170905
Attachment A
Wulf Residence
Stormwater Permit No. SW8 170905
New Hanover County
Designer's Certification
I, , as a duly registered in the State of
North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of
the project,
for (Project Owner) hereby state that, to the best of my
abilities, due care and diligence was used in the observation of the project construction such that the
construction was observed to be built within substantial compliance and intent of the approved plans
and specifications.
The checklist of items on page 2 of this form is a part of this Certification.
Noted deviations from approved plans and specifications:
Signature
Registration Number
Date
SEAL
cc: NCDEQ-DEMLR Regional Office
Inspector, New Hanover County Building Inspections
Page 1 of 2
State Slormwater Management
Permit No. SVV8 170905
General Certification Requirements:
1. The drainage area to the system contains approximately the permitted acreage.
2. The drainage area to the system contains no more than the permitted amount of built -
upon area.
3. All the built -upon area associated with the project is graded such that the runoff drains
to the system.
4. All roof drains are located such that the runoff is directed into the system.
5. All slopes are grassed with permanent vegetation.
6. Vegetated slopes are no steeper than 3 1,
7. The inlets are located per the approved plans and do not cause short-circuiting of the
system.
8. The permitted amounts of surface area and/or volume have been provided.
9. All required design depths are provided.
10. All required parts of the system are provided.
11. The required dimensions of the system are provided, per the approved plan.
12. All components of the stormwater control measure are located in either recorded
common areas, or recorded easements.
Permeable Pavement Certification Requirements:
1. The soil subgrade slope under the permeable pavement has the appropriate slope.
2. The base material under the permeable pavement areas is a washed aggregate.
3. The permeable pavement surface has demonstrated a minimum infiltration rate of 50
inches per hour using a head less than or equal to four (4) inches.
4. Except for the incidental, unavoidable runoff from the stable vegetated areas shown on
the approved plans, runoff from adjacent pervious areas has been prevented from
reaching the permeable pavement.
5. A capped observation was installed at the low point in each permeable pavement
system or terraced area as shown on the approved plans.
6. Edge restraints have been installed around the perimeter of the permeable interlocking
concrete pavers and/or concrete grid pavers.
7. The soil subgrade was graded when dry and when there is no precipitation.
8. After installation, the permeable pavement was protected from sediment deposition
until the site was completed and stabilized. An in -situ infiltration permeability test has
been conducted to confirm.
Page 2 of 2
Casmer, Jo
From: Mark Johnson <mark@maMohnsoncustomhomes.com>
Sent: Thursday, September 29, 2016 7:01 AM
To: Casmer, Jo
Subject: Re: 1810 Mews Drive
Thx Jo, we think we found an error on our community restrictive covenant's document. 1 was able to get the
Stormwater permit from Landfall and as I suspected, the words were swapped. We will be in touch when we have
questions. Thank you, Mark
Mark Johnson
910.409.z421
www.MarkjohnsonCustomHomes.com
> On Sep 28, 2w6, at z:4r PM, Casmer, Jo <jo.casmer@ncdenr.gov> wrote:
> I'm happy to schedule a file review for you so you can take a look at it all. If you want to give me an idea of
day/time that works for you, I will check the schedule and confirm back.
> -----Original Message----
• From: Mark Johnson [mailto:mark@markjohnsoncustomhomes.comJ
> Sent: Wednesday, September 28, 2016 2:07 PM
> To: Casmer, Jo <jo.casmer@ncdenr.gov>
> Subject: 18io Mews Drive
> Hi Jo, 1 hope you are well. I am doing a remodel for a client that wants to add a swimming pool to their
backyard. In the restrictive covenants, which I have taken a picture of and pasted below, it mentions open wood
decking (which is pervious) with a number of other impervious items which seems odd.
> I am trying to figure out if....
> >) the Stormwater permit for this community specifically outlined open wood decking as not allowed within
the 4600sf coverage for Pervious reasons? If that were the case, I'm guessing it would be an error.
> OR
> z) if the community was simply trying to limit the amount of coverage no matter what the material is.
> Can 1 come see the stormwater permit or do you know this information by chance?
> It just doesn't make sense for the community to get involved in what a homeowner wants to put on their
ground if it's not an architectural beautification or Pervious reason.
> Thank you in advance, Mark
G',1':uCj 1; ! :f �( l{, ;7 Lr I!,t „f'i L'"I S•': la,(4 to -f:hI J%! -.AIrGIASYhG'
I: 1 l , I !l.qY ll: 'I (.1.: :, '_11'•-;' H'bll. . :1'lr; Ir I� lL; it tr^. !(' �.., '.; .. :.
r
e l •(_' L. .x. •.I; ,It •_ 't' 1. r�l'.. .; ). r �r � : - h o:! t
,i
'1.'. -, .. ..•!i I). !«.:. ,. ,.. Il'! ,'I '.t �.(.� :,. .. _ ILIA., .. .� . i !r.
I'• Ij1' r(!It11:1, ". (SJ '!J1 (" !i'li: C'T.i iti f!II iF '}S.e (.n 'III/. .. ;(:L)F.1f Oiii„!/•:7 r tf'.?'!..
A" 1;
L. '(_LI G.0 1'•IEL:. \f hCJ I•'!^-�U4UI' :..• :r �r.t.. I f.!' .. l i'.; lllJ,r_;
LOrq
�':. c j'I it Y .... f Lfi'•.��'1' .
I.' I ,. y !�' lr.�n„I;; ., �c:,(r . ,.ycN`..•1•."l:nli.�•t...n'4�n.,!'u.'• cn,: •
_., i)Illil Crl, IJ Fc'Jevn .' ---
(1'li.\;I t1::� � .l,.Lp" 11 •" : td;' l i'tI(: n:=Y:j: till, ZCIJ (,<�f;�S nlJlj G)Ujit llt U4Cj!'
' il' ..Sr r•. II,... ..r: H <
t I,. ( ,l, .) �, i:` !',j' i 'i�o:Gi' ,!'.I', !i It :r::•'17.II1.: 11'4U/.�
,,.. rg,),'I.j1!1zl„J�tr:';u)ujy:aur;<';,•:ui
r.J'16j: jD�Ji17, dl
:.rU i.zaa lt)•" t �1Ifs /.a.;' p.��.11
!( ' ,•i! (.1 .. J' _ .r '� :l. �')i'. F' i� .'.I rl.. -. •i 'll t. I lit!
j I:' Ifl le . j.IJ}I�j' q q rl:?UIJ� 4;i ,'.L:'l lh, fli'll (.S;,ffi;;fll ,rl cr. �l}I 4I. t'... '•4.( :jr t ,t,, ,tl.' (u 1. ^JAG 1 :.'I[,
?G dt ll'•. }'-fJ'ri'i(7CI r•• J~I C.
V,::`LI''CAPI;:JUCJ.'I.NLF'T�ILWUI;<I! 196( IUCN1! W1PJ.^^.,
�'. _._Y"Ya—JGif al.1Y'pY.::.��:' -�'a:a �'i. L-. :'i.e -:3 . ;:'�['�. �. ^.: h•.•_. rrr'� Y..-1n��.�'�:d.-�r.� 1.
v•