Loading...
HomeMy WebLinkAboutSW8970724_CURRENT PERMIT_20220614 (2)STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 DOC TYPE [� CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE Zo 2 2 01,01 YYYYMMDD ROY COOPER Oovenmr EIJZABEfH S. BISER NORTH CAROLINA Envircnmmiar QuaRry June 14'", 2022 Seeco Properties, LLC Attu David N. Skipper, Manager 6622 Windingwood Lane Wilmington, NC 28411 Subject: Permit Renewal Post -Construction Stormwater Management Permit No. SW8 970724 Seeco Property New Hanover County Dear Mr. Skipper: Effective August 1, 2013 the Post -Construction Stormwater Management Program has been transferred from the Division of Water Quality ("DWQ") to the Division of Energy, Mineral and Land Resources ("DEMUR"): All previous references to DWQ will remain in older permits issued prior to August 1, 2013 until they are modified. Please note that this permit will now reference DEMLR as the Division responsible for enforcement of the permit. On August 5, 2009, the Governor signed Session Law 2009-406. This law impacted any development approval issued by the former Division of Water Quality under Article 21 of Chapter 143 of the General Statutes, which was current and valid at any point between January 1, 2008, and December 31, 2010. The law extended the effective period of any permit that was set to expire during this time frame to three (3) years from its current expiration date. On August 2, 2010, the Governor signed Session Law 2010-177, which granted an extra year for a total of four (4) years extension. The Division of Energy, Mineral and Land Resources received a complete 8-year Permit Renewal Application for the subject permit on June 13th, 2022. The Division is hereby notifying you that permit SW8 970724 has been renewed, updated, and re -issued on June 141, 2022, as attached As requested, a copy of the current operation and maintenance agreement is also enclosed. Please be aware that the renewal and re -issuance of this stormwater permit does not imply that the site is currently in compliance. This permit shall be effective until June 2od, 2030, which includes all available extensions, and does not supersede any other agency permit that may be required. The project shall be subject to the conditions and limitations as specified therein. This permit does not impose new or increased stormwater control requirements; it clarifies the rules and requirements of this program to provide you with a better understanding of your obligations under this permit Failure to comply with these requirements will result in future compliance problems. Please note that this permit is not transferable except after notice to and approval by the Division. If any parts, requirements, or limitations contained in this permit are unacceptable, you Have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. D f North Carolina Department of Environmental QiaRty I Dtvtsion of Energy. Mineral and Land Resources WIIMngton Regional Office 1 127 Cardinal Drive Extension I Wilmington, North Carolina 28405 +�� / 910.796.7215 State Stormwater Permit No. SWS 970724 Page 2 of 2 This project will be kept on file at the Wilmington Regional Office. If you have any questions concerning this permit, please contact Dylan McPeake in the Wilmington Regional Office at (910) 796-7215 or dylan.mcpeake@ncdenr.gov. Sincerely, � % c- M- Brian Wrenn, Director Division of Energy, Mineral and Land Resources Enclosures: Attachmem C — Permitting History Renewal Application Documents Copy of the current operation and maintenance agreement DES/DM: \\\Stormwater\Permits & Pmject5\1997\970724 HD\2022 06 permit 970724 cc: Wilmington Regional Office Stormwater File lD North Carolina Department of Environmental Quality I Division of Energy. Mineral and Land Resources f/ — EQ Wilmington Regional Office 1127 Cardinal Drive Extension I Wilmington, North Carolina 28405 910.796.7215 Post -Construction Stormwater Management Permit No. SW8 970724 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES POST -CONSTRUCTION STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Seeco Properties, L.L.C. Seeco Property 6701 Amsterdam Way, New Hanover County FOR THE construction, operation and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and as outlined in the application, approved stormwater management plans, supplement, calculations, operation and maintenance agreement, recorded documents, specifications, and other supporting data (the "approved plans and specifications") as attached and/or on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or "DEMLR"). The project shall be constructed, operated and maintained in accordance with these approved plans and specifications. The approved plans and specifications are incorporated by reference and are enforceable part of this permit This permit shall be effective from the date of issuance until June 2ntl, 2030 and shall be subject to the following specified conditions and limitations. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or rescission; however, these actions do not stay any condition. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al. I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 on page 3 of this permit. The stormwater control has been designed to handle the runoff from 24,352 square feet of impervious area from the east pond and 25,129 square feet of impervious area from the west pond 3. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. Page 1 of 5 Post -Construction Stormwater Management Permit No. SW8 970724 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. 6. The following design criteria have been provided in the wet detention pond and must be maintained at design condition: Water Body Receiving Stormwater Runoff: Smith Creek Classification of Water Body: If Class SA, chloride sampling results: Pond Depth: Permanent Pool Elevation: Total Impervious Surfaces Allowed: Offsite Area entering Pond: Required Surface Area: Provided Surface Area: Required Storage Volume: Provided Storage Volume: Temporary Storage Elevation: Controlling Orifice: II. SCHEDULE OF COMPLIANCE "C Sw" N/A EAST 5 feet 38.5 FMSL 24,352 ft2 WEST 5 feet 39.7 FMSL 25,129 ft2 none, per Engineer 1,735 ft2 1,759 ft2 1,775 ft2 2,004 ft' 2,774 W 39.8 FMSL 1,725 ft2 2,139 ft' 3,206 ft' 41.2 FMLS '/" D hole drilled in a 4" D PVC pipe 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all time provide the operation and maintenance necessary to assure the permitted stormwater system functions at the design condition. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. c. Mowing and re -vegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. Page 2 of 5 Post -Construction Stormwater Management Permit No. SW8 970724 f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping/ g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DEMLR. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. The facilities shall be constructed, operated and maintained in accordance with the provisions of this permit, the approved plans and specifications, and the supporting documents attached to this permit and on file with the Division. 6. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, the permittee shall cause a certification from an appropriate designer for the system installed to be submitted, certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 7. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 8. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 9. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 10. No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below. For changes to the project or SCM that impact the certifications, a new or updated certification(s), as applicable, will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification. a. Any modification to the approved plans and specifications, regardless of size including the SCM(s), BUA, details, etc. b. Redesign or addition to the approved amount of BUA or to the drainage area. c. Further development, subdivision, acquisition, lease or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications. d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved SCM(s), the stormwater collection system and/or vegetative conveyance shown on the approved plan. e. The construction of any allocated future BUA. f. The construction of any permeable pavement, #57 stone area, public trails, or landscaping material to be considered a permeable surface that were not included in the approved plans and specifications. g. Other modifications as determined by the Director. Page 3 of 5 Post -Construction Stormwater Management Permit No. SW8 970724 III. GENERAL CONDITIONS 1. CORRECTIVE ACTIONS REQUIRED. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions. This includes actions required by this Division and the stormwater rules such as the construction of additional or replacement on -site stormwater systems. These additional or replacement measures shall receive a permit from the Division prior to construction. 2. PERMIT RENEWAL. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee as outlined in Title 15A NCAC 02H.1045(3). 3. CHANGES TO THE PROJECT NAME, PERMITTEE NAME OR CONTACT INFORMATION. The permittee shall submit a completed Permit Information Update Application Form to the Division within 30 days to making any one of these changes. 4. TRANSFER. This permit is not transferable to any person or entity except after notice to and approval by the Director. Neither the sale of the project and/or property, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit. a. TRANSFER REQUEST. The transfer request must include the appropriate application, documentation and the processing fee as outlined in 15A NCAC 02H.1045(2). This request must be submitted within 90 days of the permit holder meeting one or more of the following: i. A natural person who is deceased; ii. A partnership, limited liability corporation, corporation, or any other business association that has been dissolved; iii. A person or entity who has been lawfully and finally divested of title to the property on which the permitted activity is occurring or will occur through foreclosure, bankruptcy, or other legal proceeding. iv. A person or entity who has sold the property, in whole or in part, on which the permitted activity is occurring or will occur; V. The assignment of declarant rights to another individual or entity; vi. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of NCGS 143-214.7(c2); b. TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on -site stormwater system complies with the permit conditions. Records of maintenance activities performed to date may be requested. Projects not in compliance with the permit will not be transferred until all permit and/or general statute conditions are met. 5. COMPLIANCE. The permittee is responsible for compliance with the terms and conditions of this permit until the Division approves the transfer request. a. APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved plans, application, supplement, operation and maintenance agreement, all applicable recorded documents, and specifications shall be maintained on file by the permittee at all times. b. DIVISION ACCESS. The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted project. c. ENFORCEMENT. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. d. ANNUAL CERTIFICATION. The permittee shall electronically submit to the Division an annual certification completed by either the permittee or their designee confirming the projects conformance with permit conditions Page 4 of 5 Post -Construction Stormwater Management Permit No. SW8 970724 e. OBTAINING COMPLIANCE. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of modified plans and certification in writing to the Director that the changes have been made. f. OTHER PERMITS. The issuance of this permit does not preclude the permittee from complying with and obtaining any other permits or approvals that are required for this development to take place, as required by any statutes, rules, regulations, or ordinances, which may be imposed by any other Local, State or Federal government agency having jurisdiction. Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS 143-215.6. Permit renewed, updated and reissued this the 14t" day of June, 2022. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION F Brian vvrenn, Director Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Page 5 of 5 Attachment C - Permitting History Permit No. SW8 970724 Approval Date Permit Action BIMS Version Description of the Changes 9/12/1997 Original Approval 1.0 6/2/2008 Renewal 2.0 Expires 6/2/2018 6/14/2022 Renewal 3.0 Expires 6/2/2030 DEMLR USE ONLY Date Received Fee Paid Permit Number NC DEQ Division of Energy, Mineral and Land Resources RECEIVED STATE STORMWATER: JUN 13 2022 PERMIT RENEWAL APPLICATION FORM NCDE-O WILMINGTON RO In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permit 180 days prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781) Section 60.(c). This application form is for permit renewals only. A. PROJECT INFORMATION SVV8 970724 1. State Stormwater Permit Number: 2. Project name: Seeco Properties, LLC 3. Project street address: 6701 Amsterdam Way City: Wilmington,N.C. County: New Hanover 4. What, if any, changes have been made to the project as permitted? none ZIP : df If the project has changed from the original approved plans, please complete SWU-101 fora Major Modification or Minor Modification Application form available at: https://deg.nc.gov/abouUdivisions/energy- m ineral-land-resources/energy-m inera I-land-rules/stormwater-program/post-construction. B. PERMITTEE INFORMATION If changes to the permittee or project name have been made, please complete either the Permit Update form or the Permit Transferform available at: https://deg.nc.gov/abouUdivisions/energy-mineral-land- resources/energy-mineral-land-rules/stormwater-program/post-construction. State Stormwater Permits do not automatically transfer with the sale of the property. 1. Current Permit Holder's Company Name/Organization: SeeCO Properties LLC 2. Signing Official's Name: David N. Skipper 3. Signing Official's Title: manager 4. Mailing Address: 6622 Windingwood Lane City: Wilmington State: N.C. ZIP : 26411 5. Street Address: Same City: State: ZIP 6. Phone: (910 6661373 Email ladatrutanoec.rrcom ECEIVE jUN 13 2022 BV---- Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018 f C. SUBMITTAL REQUIREMENTS Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HQW/ORW). Only applications packages that include all required items listed below will be accepted and reviewed. ach item below to indicate that the required information is provided in the application package: 1. A permit application processing fee of $505.00 payable to NCDEQ. 2. One original signed hard copy and one electronic copy of this completed form. The signing official named on this application to represent the current permittee must meet one of the following: a. Corporation — a principle executive officer of at least the level of vice-president; b. Limited Liability Company (LLC) — a manager or company official as those terms are defined in G.S. 57D "North Carolina Limited Liability Company Act;" c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee; d. Partnership or limited partnership — the general partner; e. Sole proprietor; or f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the signature of another entity. 3. One hard copy and one electronic copy of recorded documents required by the original permit that have not yet been received by DEMLR, including: deed restrictions, protective covenants, condominium/planned community declaration and easements. If the project has been built, include documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If the project has not been built, include a signed agreement that the final recorded deed restrictions and protective covenants will be submitted at a later date. 4. 0&M Agreements, Please select one: ❑ I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to keep this on file with the permit; or ® 1 do not have a copy of the current recorded O&M Agreement for all SCMs and am requesting a copy be sent to me. I agree to keep this on file with the permit. 5. Designer Certifications, Please select one: A copy of the certification(s) confirming that the project was built in accordance with the approved plans have been previously provided to the Division; or ❑ A copy of the certification(s) confirming that the project was built in accordance with the approved plans are enclosed; or ❑ The project has not yet been built. 6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a signed, sealed, and dated letter from a licensed professional stating that the SCMs have been r inspected, and that they have been built and maintained in accordance with the permit. _ 7. (IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC): Provide one hard copy and one electronic copy of documentation from the NC Secretary of State, or other official documentation, which supports the titles and positions held by the persons listed in Section C.2 per 15A NCAC 2H. 1043(3)(b). https://www.sosnc.gov/online services/search/by title/ Business Registration ErElvE JUN 13 2022 BY• Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018 D. PERMITTEE'S CERTIFICATION David N. Skipper , the person legally responsible for the permit, certify that I have a copy of the Permit and 0&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am responsible for the performance of the main ance procedures, and the site has been and will be maintained according to the O&M Agreement and appr v d plans. I agree to notify DEMLR of any problems with the SCMs or built -upon area and to submit the prope f m o odify or trgfer the permit prior to any changes to the project, SCMs, or ownership. All inform o pro ide on this gpl/h renewal application is, to the best of my knowledge, correct and complete. Signature: David N. Skipper 41IM NOTARIZATION:: I, fYc s .zap a Notary Public for the State of N0.4CAA.11"R County of Ne,.J liiAntovcll ,dohereby certify that —4>A.rd N. ckrAetL personally appeared before me %ttj�uug u1J, % •- day of 'T0 u 20 2 L , and acknowledge the due "�Vagmiof orr� going instrument. Witness my hand and official seal, =4 pTAR (�otary Se PUBLICS Mytca�nfm s`s on expir 7/ Zo 2 G SUN � 3 202� Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018 /ƒ e - %2 »��M/�y- JV3 ^� State Stormwater Management Systems OK ` I Permit number SW8 WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin and inlet piping, pretreatment including forebays and the vegetated filter where provided, and outlet pipe where discharging to infiltration basin or other stormwater system. Maintenance activities shall be performed as follows: After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice [or other inlet/outlet pipe where applicable] of any obstructions such that drawdown of the pond occurs as designed. 2. Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. Clear discharge piping of sedimenl or other build-up to ensure the pond empties as designed. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). Do not allow the sediment build-up to exceed the level of discharge pipe to the infiltration basin. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads __ 6leet in the main pond. the sediment shall be removed. When the permanent pool depth reads feet in the forebay [and micro -pool], the sediment shall be removed. [where applicable] BASIN DIAGRAM (fill in the blanks) Permanent Pool Elevation ',s iir/J L Sedimentmoval EI.,,\75% 5 Sediment Removal Elevation 0� 7� 75% Bottom E vation �,� ° ----- ----------- ------- _ R4ttom.Flevation 33 � f 2510/ FOREBAY MAIN POND 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm where applicable. Paec I uf= State Stormwater Management Systems t✓�� I Permit number SWS WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin and inlet piping, pretreatment including forebays and the vegetated filter where provided, and outlet pipe where discharging to infiltration basin or other stormwater system. Maintenance activities shall be performed as follows: After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice [or other inlet/outlet pipe where applicable] of any obstructions such that drawdown of the pond occurs as designed. 2. Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. Clear discharge piping of sediment or other, build-up to ensure the pond empties as designed. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). Do not allow the sediment build-up to exceed the level of discharge pipe to the infiltration basin. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 3, %5 feet in the main pond, the sediment shall be removejd. When the permanent pool depth reads b feet in the forebay [and micro -pool], the sediment shall be removed. [where applicable] W C �j%BASIN DIAGRAM (fill in the blanks) �p �— Permanent Pool Elevation �. ��'irlS Sediment moval El.,3szl 75% ------- Sediment Removal Elevation 5 75% Bottom E vation 327 5% - ` - ' " . FOREBAY MAIN POND 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface These plants shall be encouraged to grow along the vegetated shelf and forebay berm where applicable. Page I of 2 State Stormwater Management Systems Permit number SW8 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. 7. All components of the wet detention basin system shall be maintained in good working order. 8. Remove all trees and heavy woody vegetation from the basins and dike walls (sideslopes). I acknowledge and agree by my signature below that I am responsible for the performance of the eight maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: Title: r M Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the oresirlent I, l✓�� � 41 DYE_, a Notary Public for the State of nDrZnd Cft4 UYl i- County of Y\6-W L41gn606-+e , do hereby certify that �Pt"u � 0 n SILI PPC�L personally appeared before me this I v day of-P 2-00-7, and acknowledge the due execution of the forgoing wet [wetland] detention basin maintenance requirements. Witness my hand and official seal, fy pQ ego i NOTARY `•• 1 ? PUBLIC z °q;,OVER GQ,.,`. EAL2 My commission expires • L-) ' I, File: \wqs\stormwater\pat'sinspect\oandmwet basin.doc lln-c 2 ul•2 Engineers Certification I, / —IC444W., &7/N , as a duly registered Professional Engineer in the State of North Carolina, hereby certify that the two (2) wet detention ponds located at 6701 Amsterdam Way in Wilmington, North Carolina have generally been restored to the original permitted specifications. Signature lov ° Date Registration No. �. yt