Loading...
HomeMy WebLinkAboutSW8950711_CURRENT PERMIT_20220726 (2)STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 qS 07 11 DOC TYPE CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2022 07 26 YYYYMMDD ROY COOPER Governor ELIZABETH S. BISER Secretary BRIAN WRENN Director July 26'", 2022 NORTH CAROLINA Environmental Quality 7'he Cardinal Drive'rrade Center Condominium Association, Inc. Attn: Sarah Whisnant, President 114 North 6' Street Wilmington, NC 28401 Subject: Permit Renewal Post -Construction Stormwater Management Permit No. SW8 950711 Cardinal Trade Center New Hanover County Dear Ms. Whisnant: Effective August 1, 2013 the Post -Construction Stormwater Management Program has been transferred from the Division of Water Quality ("DWQ") to the Division of Energy, Mineral and Land Resources ("DEMLR"). All previous references to DWQ will remain in older permits issued prior to August 1, 2013 until they are modified. Please note that this permit will now reference DEMLR as the Division responsible for enforcement of the permit. On August 5, 2009, the Governor signed Session Law 2009-406. 'this law impacted any development approval issued by the former Division of Water Quality under Article 21 of Chapter 143 of the General Statutes, which was current and valid at any point between January I, 2008, and December 31, 2010. The law extended the effective period of any permit that was set to expire during this time frame to three (3) years from its current expiration date. On August 2, 2010, the Governor signed Session Law 2010-177, which granted an extra year for a total of four (4) years extension. 'rhe Division of Energy, Mineral and Land Resources received a complete 8-year Permit Renewal Application for the subject permit on July 25'', 2022. The Division is hereby notifying you that permit SW8 950711 has been renewed, updated, and re -issued on July 26'", 2022, as attached. As requested, a copy of the current operation and maintenance agreement is also enclosed. Please be aware that the renewal and re -issuance of this stormwater permit does not imply that the site is currently in compliance. This permit shall be effective until February 18'", 2031, which includes all available extensions, and does not supersede any other agency permit that maybe required. The project shall be subject to the conditions and limitations as specified therein. This permit does not impose new or increased stormwater control requirements; it clarifies the rules and requirements of this program to provide you with a better understanding of your obligations under this permit. Failure to comply with these requirements will result in future compliance problems. Please note that this permit is not transferable except after notice to and approval by the Division. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOA-H.com. Unless such demands are made this permit shall be final and binding. D � ��� North Carolina Department of Environmental Quality I Division of Energy, Mineral and land Resources Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington, North Carolina 28405 �v� / 910.796.7215 State Stormwater Permit No. SWg 950711 Page 2 of 2 This project will be kept on file at the Wilmington Regional Office. If you have any questions concerning this permit, please contact Dylan McPeake in the Wilmington Regional Office, at (910) 796-7215 or dylan.mcpeake@ncdenr.gov. Sincerely, Cx� "u( 59;Brian Wrenn, Director Division of Energy, Mineral and Land Resources Enclosures: Attachment C — Permitting History Renewal Application Documents Copy of the current operation and maintenance agreement DES/DM: \\\Stormwater\Permits & Projects\1995\950711 I IM2022 07 permit 950711 cc: Wilmington Regional Office Stormwater File D � ��, North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources '�/J{lt Wilmington Regional office 1 127 Cardinal Drive Extension I Wilmington, North Carolina 28405 ot�`.e.r�' . ` .0 wm.� /'� 910.796,7215 Post -Construction Stormwater Management Permit No. SW8 950711 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES POST -CONSTRUCTION STORMWATER MANAGEMENT PERMIT HIGH DENSITY COMMERCIAL DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO The Cardinal Drive Trade Center Condominium Association, Inc. The Cardinal Drive Trade Center 118-128 Cardinal Drive, Wilmington, New Hanover County FOR THE construction, operation, and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC 2H .1000, effective September 1, 1995 (hereafter referred to as the "stormwater rules'), and as outlined in the application, approved stormwater management plans, supplement, calculations, operation and maintenance agreement, recorded documents, specifications, and other supporting data (the "approved plans and specifications") as attached and/or on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or "DEMLR"). The project shall be constructed, operated and maintained in accordance with these approved plans and specifications. The approved plans and specifications are incorporated by reference and are enforceable part of this permit. This permit shall be effective from the date of issuance until February 18'", 2031 and shall be subject to the following specified conditions and limitations. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or rescission; however, these actions do not stay any condition. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al. I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 on page 2 of this permit. The stormwater control has been designed to handle the runoff from 89,962 square feet of impervious area. The tract will be limited to the amount of built -upon area indicated on page 2 of this permit, and per approved plans. Page 1 of 5 Post -Construction Stormwater Management Permit No. SW8 950711 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area(s) of this project must be directed into the permitted stormwater control system. 6. The following design criteria have been provided in the wet detention pond and must be maintained at design condition: a. Drainage Area, acres: 2.49 Onsite, ft2: 108.630 Offsite, ft2: 0 b. Total Impervious Surfaces, ft2: 89.962 C. Design Storm, inches: 1" d. Pond Design Depth, feet: 7 e. TSS removal efficiency: 90% f. Permanent Pool Elevation, FMSL: 38.8 g. Permanent Pool Surface Area, ft2: 3,850 h. Permitted Storage Volume, ft': 7,509 at temporary pool elev. i. Temporary Storage Elevation, FMSL: 40.43 j. Controlling Orifice: 1.25"0 pipe k. Permitted Forebay Volume, ft': NA I. Fountain Horsepower, HP NA M. Receiving Stream/River Basin: Bradley Creek / Cape Fear n. Stream Index Number: 18-87-24-4-(1) o. Classification of Water Body: "SC; HQW° It. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at the design condition. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: 4. a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. Records of maintenance activities must be kept and made available upon request to authorized personnel of DEMLR. The records will indicate the date, activity, name of person performing the work and what actions were taken. Page 2 of 5 Post -Construction Stormwater Management Permit No. SW8 950711 5. Access to the stormwater facilities for inspection and maintenance shall be maintained via appropriate recorded easements at all times. 6. The facilities shall be constructed, operated and maintained in accordance with the provisions of this permit, the approved plans and specifications, and the supporting documents attached to this permit and on file with the Division. 7. Decorative spray fountains will be allowed in the stormwater treatment system if calculations are provided documenting the permeant pool volume is greater than 30,000 cubic feet. 8. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 10. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 11. No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below. For changes to the project or SCM that impact the certifications, a new or updated certification(s), as applicable, will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification. a. Any modification to the approved plans and specifications, regardless of size including the SCM(s), BUA, details, etc. b. Redesign or addition to the approved amount of BUA or to the drainage area. C. Further development, subdivision, acquisition, lease or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications. d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved SCM(s), the stormwater collection system and/or vegetative conveyance shown on the approved plan. e. The construction of any allocated future BUA. f. The construction of any permeable pavement, #57 stone area, public trails, or landscaping material to be considered a permeable surface that were not included in the approved plans and specifications. g. Other modifications as determined by the Director. Page 3 of 5 Post -Construction Stormwater Management Permit No. SW8 950711 III. GENERAL CONDITIONS CORRECTIVE ACTIONS REQUIRED. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions. This includes actions required by this Division and the stormwater rules such as the construction of additional or replacement on -site stormwater systems. These additional or replacement measures shall receive a permit from the Division prior to construction. 2. PERMIT RENEWAL. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee as outlined in Title 15A NCAC 02H.1045(3). 3. CHANGES TO THE PROJECT NAME, PERMITTEE NAME OR CONTACT INFORMATION. The permittee shall submit a completed Permit Information Update Application Form to the Division within 30 days to making any one of these changes. 4. TRANSFER. This permit is not transferable to any person or entity except after notice to and approval by the Director. Neither the sale of the project and/or property, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit. a. TRANSFER REQUEST. The transfer request must include the appropriate application, documentation and the processing fee as outlined in 15A NCAC 02H.1045(2). This request must be submitted within 90 days of the permit holder meeting one or more of the following: i. A natural person who is deceased; ii. A partnership, limited liability corporation, corporation, or any other business association that has been dissolved; iii. A person or entity who has been lawfully and finally divested of title to the property on which the permitted activity is occurring or will occur through foreclosure, bankruptcy, or other legal proceeding. iv. A person or entity who has sold the property, in whole or in part, on which the permitted activity is occurring or will occur; V. The assignment of declarant rights to another individual or entity, vi. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of NCGS 143-214.7(c2); b. TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on -site stormwater system complies with the permit conditions. Records of maintenance activities performed to date may be requested. Projects not in compliance with the permit will not be transferred until all permit and/or general statute conditions are met. 5. COMPLIANCE. The permittee is responsible for compliance with the terms and conditions of this permit until the Division approves the transfer request. APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved plans, application, supplement, operation and maintenance agreement, all applicable recorded documents, and specifications shall be maintained on file by the permittee at all times. Page 4 of 5 Post -Construction Stormwater Management Permit No. SW8 950711 b. DIVISION ACCESS. The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted project. C. ENFORCEMENT. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. d. ANNUAL CERTIFICATION. The permittee shall electronically submit to the Division an annual certification completed by either the permittee or their designee confirming the projects conformance with permit conditions e. OBTAINING COMPLIANCE. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of modified plans and certification in writing to the Director that the changes have been made. OTHER PERMITS. The issuance of this permit does not preclude the permittee from complying with and obtaining any other permits or approvals that are required for this development to take place, as required by any statutes, rules, regulations, or ordinances, which may be imposed by any other Local, State or Federal government agency having jurisdiction. Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS 143-215.6. Permit renewed and reissued this the 261" day of July, 2022. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION -7:, Brian vvrenn, Director Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Page 5 of 5 Attachment C - Permitting History The Cardinal Drive Trade Center Permit No. SW8 950711 Approval Date Permit Action BIMS Version Description of the Changes 8/10/1995 Original Approval 10 12/21/1995 Modification 1.1 I. Added 874 square feet of Impervious area 2. 2,196 square feet of green area entering pond removed 3. 44 square feet extra required surface area 4. 24 cubic feet extra required storage volume 2/18/2009 Renewal 2.0 Expires 2/18/2023 (Orginally 2/18/2019 before extensions) 7/26/2022 Renewal 3.0 Expires 2/18/2031 r POND MAINTENANCE REQUIREMENTS Project Name: G•/,ARO/n/AL rf,*DE CENTER Project No. 5CO0 g5011I Responsible Party: AfhW 1 *flyoV#O _ CGWSI. CA Phone No. %4 9 Address: "00 Ne 28Yo3 I. Monthly, or after every runoff producing rainfall event, whichever comes first: A. Inspect the trash rack; remove accumulated debris, repair/replace if it is not functioning. B. Inspect and clear the orifice of any obstructions. If a pump is used as the drawdown mechanism, pump operation will be checked. A log of test nuns of the pump will be kept on site and made available to DEM personnel upon request. C. Inspect the pond side slopes and grassed inlet swales; remove trash, and repair eroded areas before the next rainfall event. D. If the pond is operated 'with a vegetated filter, the filter will be checked for sediment accumulation, trash accumulation, erosion and proper operation of the flow spreader mechanism. Repairs/cleaning will be done as necessary. II. Quarterly: A. Inspect the collection system (ie. catch basins, piping, grassed swales) for proper functioning. Accumulated trash will be cleared from basin grates, basin bottoms, and piping will be checked for obstructions and cleared as required. B. Pond inlet pipes will be checked for undercutting, riprap or other energy dissipation structures will be replaced, and broken pipes will be repaired. III. Semi-annually: A. Accumulated sediment from the bottom of the outlet structure will be removed. B. The pond depth will be checked at various points. If depth is reduced to 75% of original design depth or 3 feet whichever is greater, sediment will be removed to at least the original design depth. C. Grassed swales, including the vegetated filter if applicable, will be reseeded twice a year as necessary. ` fit � 110 ATE J U L 2 4 1995 D E M pROJ I 950-? I I ' l:' `{ I It �. • 1 ��! ��: � POND MAINTENANCE REQUIREMENTS PAGE 2 IV. General: A. Mowing of the side slopes will be accomplished according to the season. Maximum grass height will be 6". B. Cattails are encouraged along the pond perimeter, however they will be removed when they cover more than 1/2 the surface area of the pond. C. The orifice/pump is designed to draw down the pond in 2-5 days. If drawdown is not accomplished in that time, the system will be checked for clogging. The source of the clogging will be found and eliminated. D. All components of the detention pond system will be kept in good working order. Repair or replacement components will meet the original design specifications as per the approved stormwater plan. V. Special Requirements: I, Vy (Aku nMiNvtc hereby acknowledge that I am the financially responsible party for maintenance of this detention pond. I will perform the maintenance as outlined above, as part of the Certification of Compliance with Stormwarer Regulations received for this project. Signature: �-z QQMe, C), Date: A U ki ICI 1, N\scheme_ T-,.y�os j ,a Notary Public for the State of NcCA'A r)a)url0. Countyof Neal knWcwet— do hereby certify that personally appeared before me this 2() day of J U\,,l , 19 q'i , and acknowledge the due execution of the foregoing instrument. Witness my hand and official seal, SEAL My commission expires lO -qq DA/arl: S:\WQS\STORMWAT\FORMS\O&M-POND. FOR DEMLR USE ONLY Date Recqived Fee Paid Permit Number I SD °= SW O l( NC DEQ Division of Energy, Mineral and Land Resources STATE STORMWATER: PERMIT RENEWAL APPLICATION FORM In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permit 180 days prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781) Section 80. (c). This application form is for permit renewals only. A. PROJECT INFORMATION 1. State Stormwater Permit Number: SV✓g' 9 J-0 7 y / 2. Project name: L 7/z/30 E G E�Y E1Z 3. Project street address: // P To / z ^- -1t 0/N/z,4 ��l 6 rA C@pSS r-ye S71�49PY F2n/n, )1000 City: 1,V/1A..1/✓679N County: NEt� /,AN�1/c ZIP :2gP.,f OAF'rce, 4. What, if any, changes have been made to the project as permitted? If the project has changed from the original approved plans, please complete SWU-101 for a Major Modification or Minor Modification Application form available at: https://deg.nc.gov/abouUdivisions/energv- mi n era I-land-resources/energy-mi n e ra I-land-ru I es/sto rmwate r-program/post-construction. B. PERMITTEE INFORMATION If changes to the permittee or project name have been made, please complete either the Permit Update form or the Permit Transfer form available at., https://deg.nc.gov/abouUdivisions/energy-mineral-land- resources/enerav-mineral-land-rules/stormwater-oroaram/post-construction. State Stormwater Permits do not 1. Current Permit Holder's Company Name/Organization: cA2p//11o2- 7'rV4AE CC:A'fG�� 2. Signing Official's Name: •-riLaFHB/V cl I61C-KE 7 3. Signing Official's Title: CoMMUN/ry i/�!� 4. Mailing Address: //�O'- N, 6YN S7-2eC'7 City: Cron/ State: /V C ZIP : y 5. Street Address: City: 6. Phone: (�) ZIP : �-3 Email: 0- COA% LIZ . JUL 2 12022 BY.• Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018 C. SUBMITTAL REQUIREMENTS R �p Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) r DEMO Central Of ice (Urbanizing Areas Ph 2, USMP, Non -Coastal HQW/ORW). Only applications pac ges that t include all required items listed below will be accepted and reviewed. Initial each item below to indicate that the required information Is provided in the application package: Sf 1. A permit application processing fee of $505.00 payable to NCDEQ. 2. One original signed hard copy and one electronic copy of this completed form. The signing official named on this application to represent the current permittee must meet one of the following: a. Corporation — a principle executive officer of at least the level of vice-president; b. Limited Liability Company (LLC) — a manager or company official as those terms are defined in G.S. 57D "North Carolina Limited Liability Company Act;" c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee; d. Partnership or limited partnership — the general partner; e. Sole proprietor; or f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the signature of another entity. 3. One hard copy and one electronic copy of recorded documents required by the original permit that have not yet been received by DEMLR, including: deed restrictions, protective covenants, condominium/planned community declaration and easements. If the project has been built, include documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If the project has not been built, include a signed agreement that the final recorded deed restrictions and protective covenants will be submitted at a later date. SJ 4. O&M Agreements, Please select one: ❑ I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to keep this on file with the permit; or ® 1 do not have a copy of the current recorded O&M Agreement for all SCMs and am requesting a copy be sent to me. I agree to keep this on file with the permit. 5. Designer Certifications, Please select one: ❑ A copy of the certification(s) confirming that the project was built in accordance with the approved plans have been previously provided to the Division; or ❑ A copy of the certification(s) confirming that the project was built in accordance with the approved plans are enclosed; or ❑ The project has not yet been built. 6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a signed, sealed, and dated letter from a licensed professional stating that the SCMs have been inspected, and that they have been built and maintained in accordance with the permit. 7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC): Provide one hard copy and one electronic copy of documentation from the NC Secretary of State, or other official documentation, which supports the titles and positions held by the persons listed in Section C.2 per 15A NCAC 2H. 1043(3)(b). httos://www.sosnc.aov/online services/search/bv title/ Business Reaistration YQ,�-qr oCO L✓E hwve niPVFX "oD /�N`/ sti >ti/f fY11C1 /F yoc� oo raLE�r� rE.vo ry r"1GP..f, / r,--vr-F /�"ceL�O qc.� I...� /�'�VF T�47 Y� ,✓L�/C�'O f /.✓ zcJo /F' YoV Z ao.� AlZ Yo you 18(17 r0e�° �� oNGc�A� P�vP2 Size S(� Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018 jt %Y(wjS'6 SC.✓'0 V'r A cnnYoF ry/f, D. PERMITTEE'S CERTIFICATION 1, (r. Jae- �Q, the person legally responsible for the permit, cVfy that I have a copy of the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on siteyMat I am responsible for the performance of the maintenance procedures, and the site has been and will be maintained according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the project, SCMs, or ownership. All information provided on this permit renewal application is, to the best of my knowledge, correct and complete. Signature: Date: 1q-L2, Z NOT IZATION: a Notary Public for the State of County of , do hereby certify that personally appeared before me this the day of —S 20�G, and acknowledge the due execution of the forgoing instrument. Witness myhand and official seal, NICOLE C. MASCO Seal) Notary Public wv Hanover Co., North Carolina My Commiss'on Notary Signature: My commission expires Ottdaz JUL 11 2022 Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018 I J_. 1 '- 1 — �� 'T j ,� g e. _ i P r 3 �' � u S V' �l a ± Cardinal Drive Trade Center, Inc. As acting president of cardinal trade center COA board, I authorize and allow Stephen J. Sulkey To sign any documents and contracts on the behalf of the cardinal trade center board to the division of energy, mineral, and land resource rj CEIVF UL 2 5 2022 BY: Permit No# 54 I J07 I/ N-ET DI-,TCNTON BASIN ONERA'IION AND MAINTG.NANCE AGREEMENT Maintenance activities shall be performed as follot+s: I . Aftcr every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such ilia drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 73% of the original design depth (see diagram below). Removed sediment shall be disposed of in an. appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or suealn, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrateinto accumulated sediments. When the permanent pool depth reads feet in the main pond, the sediment shall be removed. \4'hen the permanent pool depth reads FOREt3AY feet in the forebay, the sediment shall be removed. BASIN DIAGRAM /fill in the blcnls) Permanent Pool 1'Icvanon Sediment Removal Devanon Ilouum Dmition MAIN POND FEB 0 4 2009 --r- --.- 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay bean. 6. Il'the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized 10 the maximum extent practical. 7. All components of the wel detention basin system shall he maintained in rood working order. 8. Remove all trees and heavy woody vegetation from the basins and dike walls. I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Prins name: ---POYUI(,Lb__W` Title: BOARD PW(Mrr Address: 3 53v «e5 LMP R06D SE SU�t ulA IdC Z�dyZZ Phone: ql0-1S3-3f4'� Signature: ( �n Date: Z O � Note, the legally responsible pam should nor be a hoincowners association unless more Oran 50%n1'the lots have been sold and a resident ol'Ohc suhdivisiun has been named the pieside.nt. 1, t C r �t ,A a Notary public for the State of AJ6AT- } Ci9iCol IA14 County of Ltj 04NDj)-P K do hereby certify, that C)4 t4L0 �\f- 14O personally appeared before me this day of S�t1u4ye 2Cy) and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness arty hand and official seal; Sc;al 4C 3. naycommission expires , lot, ),D/a Project Name: C-4R1)1A)14L TRAPt e15A17E;R ,All y Stormwater Permit No.: 5 W 8 9507// cis Designer's Certification 1, Vmo; R • NMEYcdT, .7R PE , as a duly Registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) d the construction of the project, CARPI N%F✓ 794PE CEV TEJA forCARD[NAL A5S4oCtATE$ L•L.0. (Project Owner) hereby state that to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans a d spec, tcations. Rp 1� Signature 1 '`' .` .FESgI*'. i Registration Number Date lZ �U�aB ��n •�009524Q Certification Requirements: ` Cy' II: the drainage area to the system contains approximately the permitter) fifth �d�X� 2.The drainage area to the system contains no more than the permitted amount of built -upon area. *3.AII the built -upon area associated with the project is graded such that the runoff drains to the y�4.All roof drains are located such that the runoff is directed into the system. //////ry-J______//��-��-/5.The outlet/bypass structure elevations are per the approved plan. t//(� 6: the outlet structure is located per the approved plans. dt� ��,y'y--�,����� FED 0 4 2009 lam"/: fmsh rack is provided on the outlet/bypass structure. // BY: .All slopes are grassed with permanent vegetation. Yt�p 9.Vegetated slopes are no steeper than 3:1. I one inlets are located per the approved plans and do not cause short-circuiting of the system. XI.The permitted amounts of surface area and/or volume have been provided. drawdown devices are correctly sized per the approved plans. required design depths are provided. required parts of the system are provided, such as a vegetated shelf, and a forebay. 5.The required system dimensions are provided per the approved plans. J. r J i �� •" -. i = S f i ', �:/ E31P!ES STATE OF NORTII CAHOLl NA '" COUNTY OF NEW HANOVER .. fek rc DEEDS IIANOVER CO. NC DECLARATION OF CONDOMINIUM '95 NOU 29 P!7 2 59 FOR THE CARDINAL DRIVE TRADE CENTER ARTICLE 1 SUBMISSION; DEFINITIONS Section 1.1. Submission of Property. Cardinal Drive Associates, L.L.C., a limited liability company formed pursuant to S57C-2-20 of the General Statutes of North Carolina, with an address of 1633 Pembroke Jones Drive, Wilmington, North Carolina 28405 ("Declarant"), the owner in fee simple of the real estate described in Exhibit "A", located within the County of New Hanover, and State of North Carolina, hereby submits such real estate, including all improvements, to be constructed thereon, together with all easements, rights and appurtenances thereunto belonging to the provisions of Chapter 47C of the General Statutes of North Carolina, known as the North Carolina Condominium Act ("Condominium Act"), and hereby creates with respect to said real estate a condominium to be known as "THE CARDINAL DRIVE TRADE CENTER". Section l Documents, the followiDng wordson and phrases shallhaveethee following meanings: a. "Allocated Interests" means the undivided interest In the Common Elements and Common Expense liability, and votes In the Association, allocated to Units in the Condominium. The Allocated Interests are described in Article 7 of this Declaration and shown on Exhibit "B". b. "Association" means "The Cardinal Drive Trade Center Condominium Association, Inc.", a non-profit corporation organized under Chapter 55A of the General Statutes of North Carolina. It is the Association of Unit Owners pursuant to Section 47C-3-101 of the Condominium Act. C. "Bylaws" means the Bylaws of the Association, as they may be amended from time to time. d. "Common Elements" means all portions of the Condominium other than the Units. e. "Common Expenses" means the expenses or financial liabilities for the operation of the Condominium. These include: (1) expenses of administration, maintenance, repair OW 09 or replacement of the Common Elements; (if) expenses declared to be Common Expenses by the Condominium Documents or by the Condominium Act; (iii) expenses agreed upon as Common Expenses by the Association; and such reasonable establishedby the Association, whetheres as may b held in trust or by the Association, for repair, replacement or addition to the Common Elements or any other real. or personal property acquired or held by the Association. f. "Condominium" means the real property described In Exhibit 3y8'L69