HomeMy WebLinkAboutSW8950711_CURRENT PERMIT_20220726 (2)STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW8 qS 07 11
DOC TYPE
CURRENT PERMIT
❑ APPROVED PLANS
❑ HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE
2022 07 26
YYYYMMDD
ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
BRIAN WRENN
Director
July 26'", 2022
NORTH CAROLINA
Environmental Quality
7'he Cardinal Drive'rrade Center Condominium Association, Inc.
Attn: Sarah Whisnant, President
114 North 6' Street
Wilmington, NC 28401
Subject: Permit Renewal
Post -Construction Stormwater Management Permit No. SW8 950711
Cardinal Trade Center
New Hanover County
Dear Ms. Whisnant:
Effective August 1, 2013 the Post -Construction Stormwater Management Program has been transferred from the
Division of Water Quality ("DWQ") to the Division of Energy, Mineral and Land Resources ("DEMLR"). All
previous references to DWQ will remain in older permits issued prior to August 1, 2013 until they are modified.
Please note that this permit will now reference DEMLR as the Division responsible for enforcement of the permit.
On August 5, 2009, the Governor signed Session Law 2009-406. 'this law impacted any development approval
issued by the former Division of Water Quality under Article 21 of Chapter 143 of the General Statutes, which
was current and valid at any point between January I, 2008, and December 31, 2010. The law extended the
effective period of any permit that was set to expire during this time frame to three (3) years from its current
expiration date. On August 2, 2010, the Governor signed Session Law 2010-177, which granted an extra year for
a total of four (4) years extension.
'rhe Division of Energy, Mineral and Land Resources received a complete 8-year Permit Renewal Application for
the subject permit on July 25'', 2022. The Division is hereby notifying you that permit SW8 950711 has been
renewed, updated, and re -issued on July 26'", 2022, as attached. As requested, a copy of the current operation and
maintenance agreement is also enclosed. Please be aware that the renewal and re -issuance of this stormwater
permit does not imply that the site is currently in compliance.
This permit shall be effective until February 18'", 2031, which includes all available extensions, and does not
supersede any other agency permit that maybe required. The project shall be subject to the conditions and
limitations as specified therein. This permit does not impose new or increased stormwater control requirements; it
clarifies the rules and requirements of this program to provide you with a better understanding of your obligations
under this permit. Failure to comply with these requirements will result in future compliance problems. Please
note that this permit is not transferable except after notice to and approval by the Division.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request
an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The
written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the
OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding
the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center,
Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOA-H.com. Unless
such demands are made this permit shall be final and binding.
D � ��� North Carolina Department of Environmental Quality I Division of Energy, Mineral and land Resources
Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington, North Carolina 28405
�v� / 910.796.7215
State Stormwater Permit No. SWg 950711
Page 2 of 2
This project will be kept on file at the Wilmington Regional Office. If you have any questions concerning this
permit, please contact Dylan McPeake in the Wilmington Regional Office, at (910) 796-7215 or
dylan.mcpeake@ncdenr.gov.
Sincerely,
Cx� "u(
59;Brian Wrenn, Director
Division of Energy, Mineral and Land Resources
Enclosures: Attachment C — Permitting History
Renewal Application Documents
Copy of the current operation and maintenance agreement
DES/DM: \\\Stormwater\Permits & Projects\1995\950711 I IM2022 07 permit 950711
cc: Wilmington Regional Office Stormwater File
D � ��, North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
'�/J{lt Wilmington Regional office 1 127 Cardinal Drive Extension I Wilmington, North Carolina 28405
ot�`.e.r�' . ` .0 wm.� /'� 910.796,7215
Post -Construction Stormwater Management
Permit No. SW8 950711
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL AND LAND RESOURCES
POST -CONSTRUCTION STORMWATER MANAGEMENT PERMIT
HIGH DENSITY COMMERCIAL DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North
Carolina as amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
The Cardinal Drive Trade Center Condominium Association, Inc.
The Cardinal Drive Trade Center
118-128 Cardinal Drive, Wilmington, New Hanover County
FOR THE
construction, operation, and maintenance of a wet detention pond in compliance with the
provisions of 15A NCAC 2H .1000, effective September 1, 1995 (hereafter referred to as the
"stormwater rules'), and as outlined in the application, approved stormwater management
plans, supplement, calculations, operation and maintenance agreement, recorded documents,
specifications, and other supporting data (the "approved plans and specifications") as attached
and/or on file with and approved by the Division of Energy, Mineral and Land Resources (the
"Division" or "DEMLR"). The project shall be constructed, operated and maintained in
accordance with these approved plans and specifications. The approved plans and
specifications are incorporated by reference and are enforceable part of this permit.
This permit shall be effective from the date of issuance until February 18'", 2031 and shall be
subject to the following specified conditions and limitations. The permit issued shall continue in
force and effect until the permittee files a request with the Division for a permit modification,
transfer, renewal, or rescission; however, these actions do not stay any condition. The issuance
of this permit does not prohibit the Director from reopening and modifying the permit, revoking
and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and
regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al.
I. DESIGN STANDARDS
This permit is effective only with respect to the nature and volume of stormwater
described in the application and other supporting data.
This stormwater system has been approved for the management of stormwater runoff as
described in Section 1.6 on page 2 of this permit. The stormwater control has been
designed to handle the runoff from 89,962 square feet of impervious area.
The tract will be limited to the amount of built -upon area indicated on page 2 of this
permit, and per approved plans.
Page 1 of 5
Post -Construction Stormwater Management
Permit No. SW8 950711
4. All stormwater collection and treatment systems must be located in either dedicated
common areas or recorded easements. The final plats for the project will be recorded
showing all such required easements, in accordance with the approved plans.
5. The runoff from all built -upon area within the permitted drainage area(s) of this project
must be directed into the permitted stormwater control system.
6. The following design criteria have been provided in the wet detention pond and must be
maintained at design condition:
a. Drainage Area, acres:
2.49
Onsite, ft2:
108.630
Offsite, ft2:
0
b. Total Impervious Surfaces, ft2:
89.962
C. Design Storm, inches:
1"
d. Pond Design Depth, feet:
7
e. TSS removal efficiency:
90%
f. Permanent Pool Elevation, FMSL:
38.8
g. Permanent Pool Surface Area, ft2:
3,850
h. Permitted Storage Volume, ft':
7,509 at temporary pool elev.
i. Temporary Storage Elevation, FMSL:
40.43
j. Controlling Orifice:
1.25"0 pipe
k. Permitted Forebay Volume, ft':
NA
I. Fountain Horsepower, HP
NA
M. Receiving Stream/River Basin:
Bradley Creek / Cape Fear
n. Stream Index Number:
18-87-24-4-(1)
o. Classification of Water Body:
"SC; HQW°
It. SCHEDULE OF COMPLIANCE
1. The stormwater management system shall be constructed in its entirety, vegetated and
operational for its intended use prior to the construction of any built -upon surface.
2. During construction, erosion shall be kept to a minimum and any eroded areas of the
system will be repaired immediately.
3. The permittee shall at all times provide the operation and maintenance necessary to
assure the permitted stormwater system functions at the design condition. The approved
Operation and Maintenance Plan must be followed in its entirety and maintenance must
occur at the scheduled intervals including, but not limited to:
4.
a. Semiannual scheduled inspections (every 6 months).
b. Sediment removal.
C. Mowing and re -vegetation of slopes and the vegetated filter.
d. Immediate repair of eroded areas.
e. Maintenance of all slopes in accordance with approved plans and specifications
f. Debris removal and unclogging of outlet structure, orifice device, flow spreader,
catch basins and piping.
g. Access to the outlet structure must be available at all times.
Records of maintenance activities must be kept and made available upon request to
authorized personnel of DEMLR. The records will indicate the date, activity, name of
person performing the work and what actions were taken.
Page 2 of 5
Post -Construction Stormwater Management
Permit No. SW8 950711
5. Access to the stormwater facilities for inspection and maintenance shall be maintained
via appropriate recorded easements at all times.
6. The facilities shall be constructed, operated and maintained in accordance with the
provisions of this permit, the approved plans and specifications, and the supporting
documents attached to this permit and on file with the Division.
7. Decorative spray fountains will be allowed in the stormwater treatment system if
calculations are provided documenting the permeant pool volume is greater than 30,000
cubic feet.
8. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and
prior to operation of this permitted facility, a certification must be received from an
appropriate designer for the system installed certifying that the permitted facility has
been installed in accordance with this permit, the approved plans and specifications, and
other supporting documentation. Any deviations from the approved plans and
specifications must be noted on the Certification. A modification may be required for
those deviations.
If the stormwater system was used as an Erosion Control device, it must be restored to
design condition prior to operation as a stormwater treatment device, and prior to
occupancy of the facility.
10. The Director may notify the permittee when the permitted site does not meet one or
more of the minimum requirements of the permit. Within the time frame specified in the
notice, the permittee shall submit a written time schedule to the Director for modifying
the site to meet minimum requirements. The permittee shall provide copies of revised
plans and certification in writing to the Director that the changes have been made.
11. No person or entity, including the permittee, shall alter any component shown in the
approved plans and specifications. Prior to the construction of any modification to the
approved plans, the permittee shall submit to the Director, and shall have received
approval for modified plans, specifications, and calculations including, but not limited to,
those listed below. For changes to the project or SCM that impact the certifications, a
new or updated certification(s), as applicable, will be required and a copy must be
submitted to the appropriate DEQ regional office upon completion of the modification.
a. Any modification to the approved plans and specifications, regardless of size
including the SCM(s), BUA, details, etc.
b. Redesign or addition to the approved amount of BUA or to the drainage area.
C. Further development, subdivision, acquisition, lease or sale of any, all or part of the
project and/or property area as reported in the approved plans and specifications.
d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any
component of the approved SCM(s), the stormwater collection system and/or
vegetative conveyance shown on the approved plan.
e. The construction of any allocated future BUA.
f. The construction of any permeable pavement, #57 stone area, public trails, or
landscaping material to be considered a permeable surface that were not included
in the approved plans and specifications.
g. Other modifications as determined by the Director.
Page 3 of 5
Post -Construction Stormwater Management
Permit No. SW8 950711
III. GENERAL CONDITIONS
CORRECTIVE ACTIONS REQUIRED. If the facilities fail to perform satisfactorily, the
permittee shall take immediate corrective actions. This includes actions required by this
Division and the stormwater rules such as the construction of additional or replacement
on -site stormwater systems. These additional or replacement measures shall receive a
permit from the Division prior to construction.
2. PERMIT RENEWAL. A permit renewal request must be submitted at least 180 days
prior to the expiration date of this permit. The renewal request must include the
appropriate application, documentation and the processing fee as outlined in Title 15A
NCAC 02H.1045(3).
3. CHANGES TO THE PROJECT NAME, PERMITTEE NAME OR CONTACT
INFORMATION. The permittee shall submit a completed Permit Information Update
Application Form to the Division within 30 days to making any one of these changes.
4. TRANSFER. This permit is not transferable to any person or entity except after notice to
and approval by the Director. Neither the sale of the project and/or property, in whole or
in part, nor the conveyance of common area to a third party constitutes an approved
transfer of the permit.
a. TRANSFER REQUEST. The transfer request must include the appropriate
application, documentation and the processing fee as outlined in 15A NCAC
02H.1045(2). This request must be submitted within 90 days of the permit holder
meeting one or more of the following:
i. A natural person who is deceased;
ii. A partnership, limited liability corporation, corporation, or any other business
association that has been dissolved;
iii. A person or entity who has been lawfully and finally divested of title to the
property on which the permitted activity is occurring or will occur through
foreclosure, bankruptcy, or other legal proceeding.
iv. A person or entity who has sold the property, in whole or in part, on which the
permitted activity is occurring or will occur;
V. The assignment of declarant rights to another individual or entity,
vi. The sale or conveyance of the common areas to a Homeowner's or Property
Owner's Association, subject to the requirements of NCGS 143-214.7(c2);
b. TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site
inspection will be conducted by Division personnel to ensure the permit conditions
have been met and that the project and the on -site stormwater system complies
with the permit conditions. Records of maintenance activities performed to date
may be requested. Projects not in compliance with the permit will not be
transferred until all permit and/or general statute conditions are met.
5. COMPLIANCE. The permittee is responsible for compliance with the terms and
conditions of this permit until the Division approves the transfer request.
APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved
plans, application, supplement, operation and maintenance agreement, all
applicable recorded documents, and specifications shall be maintained on file by
the permittee at all times.
Page 4 of 5
Post -Construction Stormwater Management
Permit No. SW8 950711
b. DIVISION ACCESS. The permittee grants Division Staff permission to enter the
property during normal business hours to inspect all components of the permitted
project.
C. ENFORCEMENT. Any individual or entity found to be in noncompliance with the
provisions of a stormwater management permit or the requirements of the
stormwater rules is subject to enforcement procedures as set forth in NCGS 143
Article 21.
d. ANNUAL CERTIFICATION. The permittee shall electronically submit to the
Division an annual certification completed by either the permittee or their designee
confirming the projects conformance with permit conditions
e. OBTAINING COMPLIANCE. The Director may notify the permittee when the
permitted site does not meet one or more of the minimum requirements of the
permit. Within the time frame specified in the notice, the permittee shall submit a
written time schedule to the Director for modifying the site to meet minimum
requirements. The permittee shall provide copies of modified plans and certification
in writing to the Director that the changes have been made.
OTHER PERMITS. The issuance of this permit does not preclude the permittee
from complying with and obtaining any other permits or approvals that are required
for this development to take place, as required by any statutes, rules, regulations,
or ordinances, which may be imposed by any other Local, State or Federal
government agency having jurisdiction. Any activities undertaken at this site that
cause a water quality violation or undertaken prior to receipt of the necessary
permits or approvals to do so are considered violations of NCGS 143-215.1, and
subject to enforcement procedures pursuant to NCGS 143-215.6.
Permit renewed and reissued this the 261" day of July, 2022.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
-7:, Brian vvrenn, Director
Division of Energy, Mineral and Land Resources
By Authority of the Environmental Management Commission
Page 5 of 5
Attachment C - Permitting History
The Cardinal Drive Trade Center
Permit No. SW8 950711
Approval
Date
Permit
Action
BIMS
Version
Description of the Changes
8/10/1995
Original
Approval
10
12/21/1995
Modification
1.1
I. Added 874 square feet of Impervious area
2. 2,196 square feet of green area entering pond removed
3. 44 square feet extra required surface area
4. 24 cubic feet extra required storage volume
2/18/2009
Renewal
2.0
Expires 2/18/2023 (Orginally 2/18/2019 before extensions)
7/26/2022
Renewal
3.0
Expires 2/18/2031
r
POND MAINTENANCE REQUIREMENTS
Project Name: G•/,ARO/n/AL rf,*DE CENTER Project No. 5CO0 g5011I
Responsible Party:
AfhW
1 *flyoV#O _
CGWSI. CA
Phone No. %4 9
Address: "00
Ne
28Yo3
I. Monthly, or after every runoff producing rainfall event, whichever comes first:
A. Inspect the trash rack; remove accumulated debris, repair/replace if it is not functioning.
B. Inspect and clear the orifice of any obstructions. If a pump is used as the drawdown
mechanism, pump operation will be checked. A log of test nuns of the pump will be kept
on site and made available to DEM personnel upon request.
C. Inspect the pond side slopes and grassed inlet swales; remove trash, and repair eroded
areas before the next rainfall event.
D. If the pond is operated 'with a vegetated filter, the filter will be checked for sediment
accumulation, trash accumulation, erosion and proper operation of the flow spreader
mechanism. Repairs/cleaning will be done as necessary.
II. Quarterly:
A. Inspect the collection system (ie. catch basins, piping, grassed swales) for proper
functioning. Accumulated trash will be cleared from basin grates, basin bottoms, and
piping will be checked for obstructions and cleared as required.
B. Pond inlet pipes will be checked for undercutting, riprap or other energy dissipation
structures will be replaced, and broken pipes will be repaired.
III. Semi-annually:
A. Accumulated sediment from the bottom of the outlet structure will be removed.
B. The pond depth will be checked at various points. If depth is reduced to 75% of original
design depth or 3 feet whichever is greater, sediment will be removed to at least the
original design depth.
C. Grassed swales, including the vegetated filter if applicable, will be reseeded twice a year
as necessary. ` fit � 110 ATE
J U L 2 4 1995
D E M
pROJ I 950-? I I
'
l:'
`{ I
It
�.
• 1
��!
��: �
POND MAINTENANCE REQUIREMENTS
PAGE 2
IV. General:
A. Mowing of the side slopes will be accomplished according to the season. Maximum grass
height will be 6".
B. Cattails are encouraged along the pond perimeter, however they will be removed when they
cover more than 1/2 the surface area of the pond.
C. The orifice/pump is designed to draw down the pond in 2-5 days. If drawdown is not
accomplished in that time, the system will be checked for clogging. The source of the
clogging will be found and eliminated.
D. All components of the detention pond system will be kept in good working order. Repair
or replacement components will meet the original design specifications as per the approved
stormwater plan.
V. Special Requirements:
I, Vy (Aku nMiNvtc hereby acknowledge that I am the financially
responsible party for maintenance of this detention pond. I will perform the maintenance as outlined
above, as part of the Certification of Compliance with Stormwarer Regulations received for this project.
Signature: �-z QQMe, C), Date: A U ki ICI
1, N\scheme_ T-,.y�os j ,a Notary Public for the State of NcCA'A r)a)url0.
Countyof Neal knWcwet— do hereby certify that
personally appeared before me this 2() day of J U\,,l , 19 q'i , and acknowledge the
due execution of the foregoing instrument. Witness my hand and official seal,
SEAL
My commission expires lO -qq
DA/arl: S:\WQS\STORMWAT\FORMS\O&M-POND. FOR
DEMLR USE ONLY
Date Recqived
Fee Paid
Permit Number
I
SD °=
SW O l(
NC DEQ Division of Energy, Mineral and Land Resources
STATE STORMWATER:
PERMIT RENEWAL APPLICATION FORM
In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permit 180 days
prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781)
Section 80. (c). This application form is for permit renewals only.
A. PROJECT INFORMATION
1. State Stormwater Permit Number: SV✓g' 9 J-0 7 y /
2. Project name: L 7/z/30 E G E�Y E1Z
3. Project street address: // P To / z ^- -1t 0/N/z,4 ��l 6 rA C@pSS r-ye S71�49PY F2n/n, )1000
City: 1,V/1A..1/✓679N County: NEt� /,AN�1/c ZIP :2gP.,f OAF'rce,
4. What, if any, changes have been made to the project as permitted?
If the project has changed from the original approved plans, please complete SWU-101 for a Major
Modification or Minor Modification Application form available at: https://deg.nc.gov/abouUdivisions/energv-
mi n era I-land-resources/energy-mi n e ra I-land-ru I es/sto rmwate r-program/post-construction.
B. PERMITTEE INFORMATION
If changes to the permittee or project name have been made, please complete either the Permit Update form
or the Permit Transfer form available at., https://deg.nc.gov/abouUdivisions/energy-mineral-land-
resources/enerav-mineral-land-rules/stormwater-oroaram/post-construction. State Stormwater Permits do not
1. Current Permit Holder's Company Name/Organization: cA2p//11o2- 7'rV4AE CC:A'fG��
2. Signing Official's Name: •-riLaFHB/V cl I61C-KE 7
3. Signing Official's Title: CoMMUN/ry i/�!�
4. Mailing Address: //�O'- N, 6YN S7-2eC'7
City: Cron/ State: /V C ZIP : y
5. Street Address:
City:
6. Phone: (�)
ZIP :
�-3 Email: 0- COA%
LIZ .
JUL 2 12022
BY.•
Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018
C. SUBMITTAL REQUIREMENTS R �p
Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) r DEMO
Central Of ice (Urbanizing Areas Ph 2, USMP, Non -Coastal HQW/ORW). Only applications pac ges that
t
include all required items listed below will be accepted and reviewed.
Initial each item below to indicate that the required information Is provided in the application package:
Sf 1. A permit application processing fee of $505.00 payable to NCDEQ.
2. One original signed hard copy and one electronic copy of this completed form. The signing official
named on this application to represent the current permittee must meet one of the following:
a. Corporation — a principle executive officer of at least the level of vice-president;
b. Limited Liability Company (LLC) — a manager or company official as those terms are defined
in G.S. 57D "North Carolina Limited Liability Company Act;"
c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee;
d. Partnership or limited partnership — the general partner;
e. Sole proprietor; or
f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the
signature of another entity.
3. One hard copy and one electronic copy of recorded documents required by the original permit that
have not yet been received by DEMLR, including: deed restrictions, protective covenants,
condominium/planned community declaration and easements. If the project has been built, include
documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If
the project has not been built, include a signed agreement that the final recorded deed restrictions
and protective covenants will be submitted at a later date.
SJ 4. O&M Agreements, Please select one:
❑ I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to
keep this on file with the permit; or
® 1 do not have a copy of the current recorded O&M Agreement for all SCMs and am
requesting a copy be sent to me. I agree to keep this on file with the permit.
5. Designer Certifications, Please select one:
❑ A copy of the certification(s) confirming that the project was built in accordance with the
approved plans have been previously provided to the Division; or
❑ A copy of the certification(s) confirming that the project was built in accordance with the
approved plans are enclosed; or
❑ The project has not yet been built.
6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a
signed, sealed, and dated letter from a licensed professional stating that the SCMs have been
inspected, and that they have been built and maintained in accordance with the permit.
7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC):
Provide one hard copy and one electronic copy of documentation from the NC Secretary of State,
or other official documentation, which supports the titles and positions held by the persons listed in
Section C.2 per 15A NCAC 2H. 1043(3)(b).
httos://www.sosnc.aov/online services/search/bv title/ Business Reaistration
YQ,�-qr oCO L✓E hwve niPVFX "oD /�N`/
sti >ti/f fY11C1 /F yoc� oo raLE�r� rE.vo ry
r"1GP..f, / r,--vr-F /�"ceL�O qc.� I...� /�'�VF T�47 Y� ,✓L�/C�'O
f /.✓ zcJo /F' YoV Z ao.�
AlZ Yo you 18(17 r0e�° �� oNGc�A� P�vP2 Size S(�
Stormwater Permit Renewal Application Form Page 2 of 3
May 11, 2018
jt %Y(wjS'6 SC.✓'0 V'r
A cnnYoF ry/f,
D. PERMITTEE'S CERTIFICATION
1, (r. Jae- �Q, the person legally responsible for the permit, cVfy that I have
a copy of the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on siteyMat I am
responsible for the performance of the maintenance procedures, and the site has been and will be maintained
according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs
or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the
project, SCMs, or ownership. All information provided on this permit renewal application is, to the best of my
knowledge, correct and complete.
Signature: Date: 1q-L2, Z
NOT IZATION:
a Notary Public for the State of
County of , do hereby certify
that personally appeared before me
this the day of —S 20�G, and acknowledge the due
execution of the forgoing instrument. Witness myhand and official seal,
NICOLE C. MASCO
Seal) Notary Public
wv Hanover Co., North Carolina
My Commiss'on
Notary Signature:
My commission expires
Ottdaz
JUL 11 2022
Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018
I
J_.
1 '-
1 —
��
'T j ,� g
e. _ i P
r 3 �' �
u
S V'
�l
a ±
Cardinal Drive Trade Center, Inc.
As acting president of cardinal trade center COA
board, I authorize and allow Stephen J. Sulkey
To sign any documents and contracts on the behalf
of the cardinal trade center board to the division of
energy, mineral, and land resource
rj
CEIVF
UL 2 5 2022
BY:
Permit No# 54 I J07 I/
N-ET DI-,TCNTON BASIN ONERA'IION AND MAINTG.NANCE AGREEMENT
Maintenance activities shall be performed as follot+s:
I . Aftcr every significant runoff producing rainfall event and at least monthly:
a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation,
vegetated cover, and general condition.
b. Check and clear the orifice of any obstructions such ilia drawdown of the temporary pool occurs within
2 to 5 days as designed.
2. Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative
cover to maintain a maximum height of six inches, and remove trash as needed.
3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain
proper functioning.
4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to
73% of the original design depth (see diagram below). Removed sediment shall be disposed of in an.
appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e.
stockpiling near a wet detention basin or suealn, etc.).
The measuring device used to determine the sediment elevation shall be such that it will give an accurate
depth reading and not readily penetrateinto accumulated sediments.
When the permanent pool depth reads feet in the main pond, the sediment shall be removed.
\4'hen the permanent pool depth reads
FOREt3AY
feet in the forebay, the sediment shall be removed.
BASIN DIAGRAM
/fill in the blcnls)
Permanent Pool 1'Icvanon
Sediment Removal Devanon
Ilouum Dmition
MAIN POND
FEB 0 4 2009
--r- --.-
5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These
plants shall be encouraged to grow along the vegetated shelf and forebay bean.
6. Il'the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through
the emergency drain shall be minimized 10 the maximum extent practical.
7. All components of the wel detention basin system shall he maintained in rood working order.
8. Remove all trees and heavy woody vegetation from the basins and dike walls.
I acknowledge and agree by my signature below that I am responsible for the performance of the seven
maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any
changes to the system or responsible party.
Prins name: ---POYUI(,Lb__W`
Title: BOARD PW(Mrr
Address: 3 53v «e5 LMP R06D SE SU�t ulA IdC Z�dyZZ
Phone: ql0-1S3-3f4'�
Signature: ( �n
Date: Z O �
Note, the legally responsible pam should nor be a hoincowners association unless more Oran 50%n1'the lots have been sold and a
resident ol'Ohc suhdivisiun has been named the pieside.nt.
1, t C r �t ,A a Notary public for the State of AJ6AT- } Ci9iCol IA14
County of Ltj 04NDj)-P K do hereby certify, that C)4 t4L0 �\f- 14O
personally appeared before me this day of S�t1u4ye 2Cy) and acknowledge the due
execution of the forgoing wet detention basin maintenance requirements. Witness arty hand and official seal;
Sc;al
4C 3.
naycommission expires , lot, ),D/a
Project Name: C-4R1)1A)14L TRAPt e15A17E;R ,All y
Stormwater Permit No.: 5 W 8 9507// cis
Designer's Certification
1, Vmo; R • NMEYcdT, .7R PE , as a duly
Registered Professional Engineer in the State of North Carolina, having been authorized to observe
(periodically/weekly/full time) d
the construction of the project, CARPI N%F✓ 794PE CEV TEJA
forCARD[NAL A5S4oCtATE$ L•L.0. (Project Owner)
hereby state that to the best of my abilities, due care and diligence was used in the observation of the
project construction such that the construction was observed to be built within substantial compliance and
intent of the approved plans a d spec, tcations.
Rp 1�
Signature 1 '`' .` .FESgI*'. i
Registration Number
Date lZ �U�aB ��n •�009524Q
Certification Requirements: `
Cy' II: the drainage area to the system contains approximately the permitter) fifth
�d�X� 2.The drainage area to the system contains no more than the permitted amount of built -upon area.
*3.AII the built -upon area associated with the project is graded such that the runoff drains to the
y�4.All roof drains are located such that the runoff is directed into the system.
//////ry-J______//��-��-/5.The outlet/bypass structure elevations are per the approved plan.
t//(� 6: the outlet structure is located per the approved plans. dt�
��,y'y--�,����� FED 0 4 2009
lam"/: fmsh rack is provided on the outlet/bypass structure.
// BY:
.All slopes are grassed with permanent vegetation.
Yt�p 9.Vegetated slopes are no steeper than 3:1.
I one inlets are located per the approved plans and do not cause short-circuiting of the system.
XI.The permitted amounts of surface area and/or volume have been provided.
drawdown devices are correctly sized per the approved plans.
required design depths are provided.
required parts of the system are provided, such as a vegetated shelf, and a forebay.
5.The required system dimensions are provided per the approved plans.
J.
r
J
i
��
•"
-.
i
=
S
f
i
',
�:/
E31P!ES
STATE OF NORTII CAHOLl NA '"
COUNTY OF NEW HANOVER
.. fek rc DEEDS
IIANOVER CO. NC
DECLARATION OF CONDOMINIUM '95 NOU 29 P!7 2 59
FOR
THE CARDINAL DRIVE TRADE CENTER
ARTICLE 1
SUBMISSION; DEFINITIONS
Section 1.1. Submission of Property. Cardinal Drive
Associates, L.L.C., a limited liability company formed pursuant to
S57C-2-20 of the General Statutes of North Carolina, with an
address of 1633 Pembroke Jones Drive, Wilmington, North Carolina
28405 ("Declarant"), the owner in fee simple of the real estate
described in Exhibit "A", located within the County of New Hanover,
and State of North Carolina, hereby submits such real estate,
including all improvements, to be constructed thereon, together
with all easements, rights and appurtenances thereunto belonging to
the provisions of Chapter 47C of the General Statutes of North
Carolina, known as the North Carolina Condominium Act ("Condominium
Act"), and hereby creates with respect to said real estate a
condominium to be known as "THE CARDINAL DRIVE TRADE CENTER".
Section l
Documents, the followiDng wordson
and phrases shallhaveethee following
meanings:
a. "Allocated Interests" means the undivided interest In the
Common Elements and Common Expense liability, and votes In the
Association, allocated to Units in the Condominium. The Allocated
Interests are described in Article 7 of this Declaration and shown
on Exhibit "B".
b. "Association" means "The Cardinal Drive Trade Center
Condominium Association, Inc.", a non-profit corporation organized
under Chapter 55A of the General Statutes of North Carolina. It is
the Association of Unit Owners pursuant to Section 47C-3-101 of the
Condominium Act.
C. "Bylaws" means the Bylaws of the Association, as they may
be amended from time to time.
d. "Common Elements" means all portions of the Condominium
other than the Units.
e. "Common Expenses" means the expenses or financial
liabilities for the operation of the Condominium. These
include:
(1) expenses of administration, maintenance, repair
OW 09 or replacement of the Common Elements;
(if) expenses declared to be Common Expenses by
the Condominium Documents or by the Condominium
Act;
(iii) expenses agreed upon as Common Expenses by
the Association; and
such
reasonable
establishedby the Association, whetheres as may b
held in
trust or by the Association, for repair,
replacement or addition to the Common Elements or
any other real. or personal property acquired or
held by the Association.
f. "Condominium" means the real property described In Exhibit
3y8'L69