Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW8950711_COMPLIANCE_20090123 (2)
STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 q S 01 11 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE 01 COMPLIANCE EVALUATION INSPECTION DOC DATE 2009 of Z 3 YYYYMMDD STATE OF NORTH CAROLINA Department of Environment and Natural Resources WIRO Regional Office FILE ACCESS RECORD �m SECTION �/ SWPP DATUTIME //z� NAME %/�/� L �/� REPRESENTING Z I Z74 Guidelines for Access: The staff of the Regional Office is dedicated to making public records in our custody readily available to the public for review and copying. We also have the responsibility to the public to safeguard these records and to carry out our day-to-day program obligations. Please read carefully the following before signing the form. 1. Due to the large public demand for file access, we request that you call at least a day in advance to schedule an appointment for file review so you can be accommodated. Appointments are scheduled between 9:00 a.m. and 3:00 p.m. Viewing time ends at 4:45 - p.m. Anyone arriving without an appointment may view the files to the extent that time and staff supervision are available. 2. You must specify files you want to review by facility name or incident number, as appropriate. The number of files that you may review at one appointment will be limited to five. 3. You may make copies of a file when the copier is not in use by the staff and if time permits. There is no charge for 25 or less copies.: cost per copy after the initial 25 is 2.5 per copy. Payment is to be made by check, money order, or cash in the administrative offices. 4. Files must be kept in the order you received them. Files may not be taken from the office. No briefcases, large totes, etc. are permitted in the file review area. To remove, alter, deface, mutilate, or destroy material in public files is a misdemeanor for which you can be fined up to $500.00. 5. In accordance with GS 25-3-512, a $25.00 processing fee will be charged and collected for checks on which payment has been refused. 6. The customer must present a photo ID, sign -in, and receive a visitor sticker prior to reviewing files. FACILITY NAME COUNTY 2. 3. 4. 5. llz3/o Z�S' Signat re/Name of Firm or Business Date Time In. Time Out (Please attach business card to form if available) # Copes: Amt. Pd: Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleco 11. Sullins Director Division of Water Quality November 14, 2008 CERTIFIED MAIL #7007 0220 0000 8216 7763 RETURN RECEIPT REQUESTED Mark Maynard Builtmark Corporation, Inc. 1510 South 3rd Street Wilmington, NC 28401 LETTER OF INQUIRY Cardinal Trade Center Stormwater Project No. SW8 950711 New Hanover County Dear Mr. Maynard: You should have received a copy of our Notice of Inspection for the subject project's stormwater controls, conducted on November 6, 2008, to determine compliance with Stormwater Permit Number SW8 950711 issued on December 21, 1995. Please advise if you have not received it and we will resubmit it to your attention. In order to bring this project into compliance so that it can be transferred to the new Owner, The Cardinal Drive Trade Center Condominium Assn., Inc., the required action on your part is to submit a signed and sealed Engineer's Certification. Please inform this Office in writing before November 21, 2008, of the specific actions that will be undertaken and the time frame that will be required to perform and submit this Certification. If you have any questions please contact Steve Pusey of the Division of Water Quality, Stormwater staff, at the Wilmington Regional Office, telephone number (910) 796.Z2-10. Sincerely, /i Steve G.Pusey Environmental Engineer sgp\S:\WQS\STORMWATER\INSPECT\95071 1 -Inquiry.doc Encl. cc: CW-,ilmington--Regional_Officq:-j David Carson, Development Manager, Biltmark Builders, Inc. Stephen Sulkey, Property Mgr., The Cardinal Drive Trade Center Condominium Assn., Inc. No` ca olina Steve Pusey A turvlly North Carolina Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Phone (910) 796-7215 Customer Service Wilmington Regional Office Internet: www.ncwateraualitv.orR Fax (910)350-2004 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer— 50% Recycled110% Post Consumer Paper 6o5uf 7`(0'7 ZS� Z37y r O F F gy�e C � G NPostage $ , ya CO Certified Fee •� t7 O p O Retum Peceipt Fee (Endosemenr Required) �.aQ C:3 Restricted Delivery Fee (Endorsement Regnl�etl) C3 frU U Total Postage 8 Fees ,$ 3� C3 O of o C3 orPO'Apr. of Po Box No. N Wc- -v _... 0 a, - -Postmark Here t(P � e<y[{{� 0I 11/20/2008 12:15 9102512380 BILTMARKCONSTRUCTION PAGE 01 Biltmark Construction, Inc. _Tos Steve Pusey From: David Carew Pour 910-350-2004 Pagens 2 (induding cover sheet) Phom Dates 11/202008 Rr. Cardinal Trade Pond CC: ❑ urgent ❑ For R,erlow ❑ Pease Comment ❑ pease Reply ❑ pion" Ress"le • CommerMas Mr. Pussy, Please find the attached letter In response to your request. Let me know If you have any questions concerning the matter. Thank you - David Carson 910-251-2374 / S Z D 200 9 Jr'sr 15 e'a'l , re<_,d , P. O. BOX 1229 WILMINGTON, NC 28402 PHONE 910.251.5030 FAX 9io.251.9188 11/20/200B 12:15 9102512380 BILTMARKCONSTRUCTION PAGE 02 November 20, 2008 Steve d. Pusey Environmental Engineer Division of Water Quality 1.27 Cardinal Drive Extension Wilmington, NC 28405 Dear Mr. Pusey, Thank you for your recent correspondence concerning an inspection of the Cardinal Drive Trade Center Condonunium Association, Inc.'s stormwater pond (Stormwatcr Project No. SW8 950711). This letter is to update you of our planned specific actions and general time frame to address the items mentioned in the inspection. I have spoken with the Association Manager, Mr. Sulkey, and we have reached a geru rall agreement on an action plan to satisfy the requests from DWQ and to transfer the permit, to the Association once those items are completed. We anticipate being able to complete the transfer within the next 60 days, if not sooner. Please let me know if you have any questions at (910) 251-2374. Sincerely, David Carson On behalf of Mark Maynard Cc: Stephen I Sulkey, Association Manager, Cardinal Drive Trade Condo. Assoc., Inc 151 O-A S. Thlry Street P.O. Box 1229 r Wilmington, NC 2OA02 Tole 010-251.5030 - Fox 9110.251.23e0 Llcanpp 0111890 wnrF;q 0 ww� —1 rev .� Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources November 7, 2008 Mr. Stephen J. Sulkey, Property Manager The Cardinal Drive Trade Center Condominium Association, Inc. 3530 Lewis Loop Road SE Bolivia, NC 28422 NOTICE OF INSPECTION Cardinal Trade Center Stormwater Project No. SW8 950711 New Hanover County Dear Mr. Sulkey: Coleco 11. Sullins Director Division of Water Quality Please find attached a copy of the completed form entitled "Stormwater Inspection Report". The report summarizes the findings of a recent inspection of the project's stormwater controls conducted on November 6, 2008 to determine compliance with Stormwater Permit Number SW8 950711 issued on December 21. 1995. The required actions that are necessary to correct any deficiencies are noted under the Inspection Summary, Comment section of the report. Please inform this Office in writing before November 21, 2008, of the specific actions that will be undertaken and the time frame that will be required to correct the deficiencies. If you have any questions please contact Steve Pusey of the Division of Water Quality, Stormwater staff, at the Wilmington Regional Office, telephone number (910) 796-7210. Sincerely, Steve G.Pusey Environmental Engineer sgp\S:\WQS\STORMWATER\INSPECT\950711.nov08 Encl. cc: Wilmington Regional Office David Carson, Development Manager, Biltmark Builders, Inc. Mark Maynard, Cardinal Associates, LLC Steve Pusey Inspection Summary: North Carolina Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Phone (910) 796-7215 Wilmington Regional Office Interact: www.ncwaterouality ore Fax (910) 350-2004 NOo� Carolina Naturally Customer Service 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer — 50% Recycledll 0% Post Consumer Paper f Permit: SW8950711 County: New Hanover Region: Wilmington Contact Person: Directions to Project: Compliance Inspection Report Effective:08/10/95 Expiration: Title: Type of Project: State Stormwater - HD - Detention Pond Drain Areas: On -Site Representative(s): Related Permits: Inspection Date: 11106/2008 Entry Time: 03:00 PM Primary Inspector: Steven G Pusey Secondary Inspector(s): Reason for Inspection: Routine Permit Inspection Type: State Stormwater Facility Status: ■ Compliant ❑ Not Compliant Question Areas: 0 State Stormwater (See attachment summary) Owner: Unknown Wiro Project: Cardinal Trade Center Cardinal Drive Ext Wilmington NC 28405 Phone: Exit Time: 04:00 PM Phone: Inspection Type: Compliance Evaluation Page:1 Permit: SW8950711 Owner • Project: Unknown Wiro Inspection Date: 11/06/2008 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: File Review Yes No NA NE Is the permit active? ■ ❑ ❑ ❑ Signed copy of the Engineer's certification is in the file? ❑ ■ ❑ ❑ Signed copy of the Operation & Maintenance Agreement is in the file? ❑ ■ ❑ ❑ Copy of the recorded deed restrictions is in the file? ❑ ■ ❑ ❑. Comment: 1. A signed copy of the Engineer's certification has never been submitted. This document must be submitted in order to renew the permit. 2. The O&M Agreement was signed by a Mr. Walter Winter on July 20, 1995. The responsible party listed on the form for pond maintenance was Mark Maynard Construction Co. Since this has changed, an signed Permit / Ownership Change form must be submitted. 3. A copy of recorded deed restrictions is not in the file. Please locate and submit. Built Upon Area Yes No NA NE Is the site BUA constructed as per the permit and approval plans? ■ ❑ ❑ ❑ Is the drainage area as per the permit and approved plans? ■ ❑ ❑ ❑ Is the BUA (as permitted) graded such that the runoff drains to the system? ■ ❑ ❑ ❑ Comment: SW Measures Yes No NA NE Are the SW measures constructed as per the approved plans? ■ ❑ ❑ ❑ Are the inlets located per the approved plans? ■ ❑ ❑ ❑ Are the outlet structures located per the approved plans? ■ ❑ ❑ ❑ Comment Operation and Maintenance Yes No NA NE Are the SW measures being maintained and operated as per the permit requirements? ■ ❑ ❑ ❑ Are the SW BMP inspection and maintenance records complete and available for review or provided to DWO ❑ ❑ ❑ ■ upon request? Comment: Page:2 STORMWATER COMPLIANCE INSPECTION REPORT Project Name: Project Number: project name project # Water Body: receiving stream Control Measure: Classification: Directions to site, address: cirections to the project 2. Inspection Date: inspect date system type stream class Weather Conditions: weather conditions, ie, cold, hot, rain, sun, snow, ice. 3. Compliance Issues: Y ❑ The drainage area (including offsite) and built -upon area to the permitted �system are per the approved plan. ❑ All the built -upon area associated with the project is graded such that the drunoff drains to the system. ❑ For ponds/infiltration, the outlet/bypass structure relative elevations are per the approved plan. (Must be verified via as -built survey if in question). [`�] ❑ The inlets and outlet structure are located per the approved plans and do Q�'�not cause short-circuiting. A trash rack is provided over the outlet weir an orifi �'°fi �i°SSi'�' All slopes are grassed with permanent vegetation and are not eroding. Vegetated slopes are no steeper than 3:1. © The approximate amount of permitted surface area has been provided. (Must be verified via as -built survey or designer's certification.) ❑ Required drawdown devices are correctly sized per the approved plans. LvJ ❑ II required design depths are provided. ed OV- ❑ All requirarts of the system are provided, such as a vegetated shelf, ,and ore a . u © he de ner's certification has been submitted. e required deed restrictions are correctly recorded and submitted. ❑ The number of lots or outparcels is per the permitted amount. ❑ The built -upon area on the lots or outparcels does not exceed the maximum amount (must be verified via as -built survey if in question) ❑ ❑ Curb outlet swales are constructed, located properly, are 100' long and / have dense vegetated cover. M.LJ The built -upon area dimensions are per the approved plan. �// ❑ Required maintenance is being performed. !"A utparcels have their own offsite permit. �❑ ❑ For low density projects, roadside swales are 3:1, vegetated and stable. A ❑ ❑ For low density projects, there are no unpermitted pipes on the project. Delete above as needed if it does not apply to this site 4. Required Actions: (Each deficiency is explained below and what needs to be done to bring the system back into compliance) Inspector: Steve Pusey Water QualityM/ilmington Regional Office/(910) 796-7215 ENB/sgp: S:\WQS\STORMWAT\INSPECT\filename