HomeMy WebLinkAboutSW8941203_COMPLIANCE_20190719STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW8 a4 IZ o3
DOC TYPE
❑ CURRENT PERMIT
❑ APPROVED PLANS
❑ HISTORICAL FILE
COMPLIANCE EVALUATION INSPECTION
DOC DATE
2011 07 �q
YYYYMMDD
ROY COOPER
Governor
MICHAEL S. REGAN
Secretory
S. DANIEL SMITH
Director
July 17, 2019
Reserve Development Company, LLC
Tri-Brunswick, LLC (dissolved)
St James Plantation, LLC
St James Development Co., LLC
Attn: John A. Atkinson, Manager
PO Box 10879
Southport, NC 28461
NORTH CAROLINA
Envvaamentai Quality
First St James, Inc. (former legal Homer E. Wright Jr., Inc.)
Brunswick Harbor, Inc.
Attn: Kenan C. Wright, President
PO Box 610
Eden, NC 27289
Subject: Notice of File Review Inspection (not compliant)
And Permit Transfer Process
St James Plantation - Various State Stormwater Permits (see attached list)
Brunswick County
Dear Messrs. Atkinson and Wright
Effective August 1, 2013, the State Stormwater program was transferred from the Division of Water
Quality (DWQ) to the Division of Energy, Mineral and Land Resources (DEMLR). All previous
references to DWQ will remain in older stormwater permits issued prior to August 1, 2013 until
they are modified. Please note that this letter references DEMLR as the Division responsible for
issuance of the state stormwater permits for St James Plantation.
The Wilmington Regional Office of DEMLR has recently fielded several calls regarding Flooding and
the state of compliance with the permitted low density swale conveyance system throughout St
James. As has been relayed in the past to the complainants and to the HOA, flooding is not the
purview of the Division. A swale or ditch that holds water or floods is not a violation of the permit.
The permittee is responsible for restoring the swales to design condition in the event that Hooding
or the normal wear and tear over time cause erosion, deposition of sediment, or slope failure.
This letter is being sent to the main development companies noted above, since they hold the lion's
share of all currently issued stormwater permits in St James. It has come to the attention of
DEMLR that the development will allegedly be turned over to the HOA by the end of 2020. Prior to
that turnover date, all of the permits as listed on the attached, need to be transferred to the HOA. In
recent years, a process to transfer and consolidate the permits was agreed to between the
developers, the consultants, and the Division. However, the Division has received applications to
consolidate or transfer a total of 9 permits in the last S years.
The slowness of the process can be mainly attributed to a lack of a timely response on the part of
the consultant, and the submission of incomplete information, necessitating a couple of rounds of
requests for additional information. Other factors include expired permits that have not been
renewed, a lack of routine maintenance, unapproved changes in the number of lots, or in the lot or
road layout, missing curb outlet swales, piping of swales, overbuilding on the lot, or adding
sidewalks where none were approved.
North thCarolina Department of Envirtmmental Quality I Division of Energy. ASneral and land Resources
Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington. North Carolina 28405
St. James Plantation
Page 2 of 3
In addition to these more common compliance issues, it has come to our attention that the golf
course fairways were purchased by Troon St. James, LLC early last year. If any of these fairways are
part of the project area covered by the low density permits issued for St. James, their sale would be
a compliance issue that would need to be addressed prior to transfer. The Division can accept a
signed agreement from Troon St. James, LLC stating that the golf course fairways will not be
developed with additional built -upon area or developed for any use other than a golf course. If
Troon St. James, LLC does not agree to this, then any of the permits held by the corporate entities
above for St. James that depend on those fairway areas to maintain density, cannot be considered
for transfer as currently permitted.
If the project(s) covered by an existing permit can demonstrate and sustain low density without
including the fairway areas, then modified permits can be issued, consolidated and transferred to
the HOA, following the process described below:
1. No more than S active permits can be proposed for transfer and consolidation at any one
time. The permittee or consultant should pick one of the 5 permit numbers as the
"surviving" permit number going forward.
2. The permittee's consultant should schedule a file review appointment to familiarize himself
or herself with the approved plans and details.
3. The consultant should conduct their own inspection of the 5 sites and address any obvious
compliance issues based on how the as -built project may vary from the permitted/recorded
condition.
4. If there are major differences that only a permit modification will resolve, then the
permittee shall either restore the project to compliance with the approved plans or submit
an application to modify the individual permit.
S. Upon the issuance of any required permit modifications, and the consultant's satisfactory
inspection, an application to consolidate the 5 selected permits can be submitted. The
Division will not conduct a compliance inspection prior to consolidation.
6. Upon issuance of the consolidated permit, the permittee shall submit an application to
transfer the consolidated permit to the HOA. The application must be accompanied by all
the required supporting documentation such as certifications, recorded deed restrictions
and plats for all projects covered by the consolidated permit.
7. The projects covered by the consolidated permit will be inspected by the Division for
compliance. If the inspection indicates that the project is in compliance, the Division will
approve the transfer and issue the permit to the HOA.
8. If the project is not in compliance, then an inspection report will be sent to the permittee
and to the HOA, listing all the items to be addressed. When the necessary actions to restore
compliance have been completed and/or when the requested information is received and
reviewed and found to be complete, the permit will be transferred.
9. If a follow-up inspection is required, it can be completed either by the permittee providing
dated pictures of the finished product (minor issues), or another inspection can be
scheduled (major issues). This is where the process can bog down. It is imperative that the
permittee complete any necessary actions to restore compliance in a timely manner and it is
imperative that the Division reinspect in a timely manner to keep things moving forward.
Please contact the Division by August 17, 2019to discuss this process and to designate a point
person within each respective organization through which all correspondence, pictures, questions,
scheduling of inspections and follow-up inspections, modifications, consolidations and transfers
will go through.
The permit application form (to modify or consolidate) and the permit transfer application form are
available on our website at: htti)s://deq.nc.Rov/about/divisions/enerw-mineral-land-
Please note that any individual or entity found to be in noncompliance with the provisions of a
stormwater management permit or the stormwater rules is subject to enforcement procedures as
set forth in NCGS 143 Article 21. Failure to follow the process described above, or to deal with the
impact to a low density project due to the sale of the fairway area, may initiate enforcement action
including the assessment of civil penalties.
St. James Plantation
Page 3 of 3
If you have any questions, please contact me in the Wilmington Regional Office, at telephone
number (910) 796-7215 or via email at linda lewisC@ncdenr.gov.
Sincerely,'/'
Linda Lewis, E.I.
Environmental Engineer III
7GDS/arl: G:\\\Stormwater\Linda Lewis\St James Plantation\2019 07 CEI deficient St. James
Attachment - Project Owner List
cc: St James Plantation Property Owners Association Inc.
Jay M. McGrath, President Troon St. James, LLC (15044 N Scottsdale Rd. Ste. 300 Scottsdale, AZ 85254)
STATE OF NORTH CAROLINA
Department of Environmental and Natural Resources
127 Cardinal Drive Extension
Wilmington, North Carolina 28405
(910) 796-7215
FILE ACCESS RECORD
SECTION % p/�no✓c2t
TllvIE/llATL' �V
NAME e n e K� ded S /
REPRESENTING
Guidelines for Access: The staff of Wilmington Regional Office is dedicated to making public records in
our custody readily available to the public for review and copying. We also have the responsibility to the
public to safeguard these records and to carry out our day-to-day prog'am obligations. Please read
carefully the following guidelines signing the form:
1. Due to the large public demand for file access, we request that you call at least a day in
advance to schedule an appointment to review60 files. appointments will be scheduled
betwee9:00aand 3:00pm. Viewing time ends at 4:45pm, Anyone arriving with
an
n m
appointment may view the flies to the extent that time and staff SUPnvision is available.
2. You must specify files you want to review by facility name• The number of files that you
may review at one time will be limited to five.
3. You may make copies of a file when the copier is not in use by the staff and if time permits.
Cost per copy is $.05 cents. Payment may be made by cbeck money order, or cash at the
reception desk. Copies totaling $5 00 0r more can be invoiced for your convenience.
4. FILES MUST BE KEPT IN ORDER YOU FOUND THEM. Files may not be. taken from
the office. To remove, alter, deface, mutilate, or destroy material in one of these files is a
misdemeanor for which you can be fined up to $500.00. No briefcases large totes etc. are
permitted in the file review area.
5. In accordance with General Statue 25-3-512, a $25.00 processing fee will be charged and
collectedfor checks on which payment has been refused.
FACILITY NAME
3.
4.
Signature and Name of Firm/Business
Please attach a business card to this form
COPIES MADE PAID
S:Admin.file access
COUNTY
16•3( Zo/C, oft 10:164-q
Date Time In Time Out
INVOICE
0
J
Compliance Inspection Report
PermiC SW8941203 Effective: 03/25/14 Expiration: 03/20/21
Project: St James By The Sea Subdivision and Beach Club
Owner: Harbor Development Corporation
County: Brunswick Adress: 123 Se 72nd St
Region: Wilmington
CitylState/Zip: Oak Island NC 28465
Contact Person: Virginia McHenry Title: Reg. Agent Phone:
Directions to Project:
From int. of NC 211 and NC 133, take NC 133 to Oak Island right one Oak Island site on left btw. 71st and 72nd Street.
Type of Project: State Stormwater- HD - Detention Pond
Drain Areas: 1 - (Atlantic Ocean) (03-06-17) ( SB)
Oh -Site Represenlalive(s):
Related Permits:
Inspection Date: 08/17/2016 Entry Time: 12:45PM
Primary Inspector: Alida R Lewis
Secondary Inspector(s):
Reason for Inspection: Other
Permit Inspection Type: State Stormwater
Facility Status: ❑ Compliant ❑ Not Compliant
Question Areas:
E] Slate Stormwater
(See attachment summary)
0
Exit Time: 01:OOPM
Phone: 910-796-7215
Inspection Type: Transfer Renewal
I
page: 1
Permit: SVV8941203 Owner - Project: Harbor Development Corporation
Inspection Date: 08/17/2016 Inspection Type Transfer Renewal Reason for Visit: Other
Inspection Summary:
The project was inspected for transfer to the HOA.
There were no observed physical compliance issues.
The permittee still needs to verify that no lot has exceeded the 4000 sf maximum BUA limit. Brunswick County tax
records are a good place to get that information.
The permit needs to be corrected to cover 21 lots (not 20 as currently written). The last modification was intended to
cover 21 lots, but the reviewer did not change the number of lots in the permit from 20 to 21,
:7
page: 2
r permit SW8941203 Owner - ProjecC Harbor Development Corporation
Inspection Date: 08/17/2016 Inspection Type Transfer Renewal Reason for Visit: Other
File Review Yes No NA NE
Is the permit active? 0 ❑ ❑ ❑
Signed copy of the Engineer's certification is in the file? Q ❑ ❑ ❑
Signed copy of the Operation & Maintenance Agreement is in the file? Q ❑ ❑ ❑
Copy of the recorded deed restrictions is in the file? 0 ❑ ❑ ❑
Comment: 1. All required certifications and recorded deed restrictions have been provided.
Built Upon Area Yes No NA NE
Is the site BUA constructed as per the permit and approval plans? ❑ ❑ ❑
Is the drainage area as per the permit and approved plans? 13 ❑ ❑ ❑
Is the BUA (as permitted) graded such that the runoff drains to the system? 0 ❑ ❑ ❑
Comment: 2. The Dermittee needs to provide verification that no lot has exceeded it's maximum BUA limit.
SW Measures Yes No NA NE
Are the SW measures constructed as per the approved plans? Ea ❑ ❑ ❑
Are the inlets located per the approved plans? 9 ❑ ❑ ❑
Are the outlet structures located per the approved plans? ❑ ❑ 0 ❑
Comment: 3. The ponds are in place as per the approved plans.
Operation and Maintenance Yes No NA NE
Are the SW measures being maintained and operated as per the permit requirements? E ❑ ❑ ❑
Are the SW BMP inspection and maintenance records complete and available for review or provided to ❑ ❑ ❑ El
DWO upon request?
Comment
If
Other Permit Conditions Yes No NA NE
Is the site compliant with other conditions of the permit? ❑ ®❑ ❑
Comment: 4. The permit has not vet been transferred to the HOA. We're not sure the correct HOA was listed on
the application as the proposed permitlee.
5. The permit needs to be corrected to reflect the fact that there are 21 lots each limited to 4,000 sf of
BUA. The current permit is written for 20 lots.
page: 3