Loading...
HomeMy WebLinkAboutSW8051128_HISTORICAL FILE_20140520 (2)STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 05112E DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS X❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE Z.Olyp15 20 YYYYMMDD PIMA NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor May 20, 2014 Robert Masters, Vice President St. James Development Co., LLC. Post Office Box 10879 Southport, NC 28461 Subject: Stormwater Permit No. SW8 051128 St. James Plantation - Bancroft Forest High Density Subdivision Project Brunswick County Dear Mr. Masters John E. Skvarla, III Secretary The Wilmington Regional Office received a complete Stormwater Management Permit Application for St. James Plantation - Bancroft Forest on August 30, 2013. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 051128, dated May 20, 2014, for the construction of the subject project. This permit shall be effective from the date of issuance until September 6, 2021, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed restrictions, and certification of the BMP's, procedures for changes of ownership, transferring the permit, and renewing the permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions, to certify the BMP's, to transfer the permit, or to renew the permit, will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes, and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Chris Baker at (910) 796-7215. Sincerely, C e ,A ?02 Tracy Da s, P. E., Director Division of Energy, Mineral and Land Resources GDS/csb: S:MQSIStormwater\Permits & Projects120051051128 HD12014 05 permit 051128 cc: Christopher Millis, P. E., Paramounte Engineering, Inc. Brusnwick County Inspections Brunswick County Engineering Wilmington Regional Office Stormwater File Division of Energy, Mineral, and Land Resources Land Quality Section - Wilmington Regional Office 127 Cardinal Drive Extension. Wilminoton, North Carolina 28405. (910) 796-7215 / Fax: (910) 350-2004 State Stormwater Management Systems Permit No. SW8 051128 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY SUBDIVISION DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO St. James Development Co., LLC. St. James Plantation — Bancroft Forest Wyndmere Drive, St. James, Brunswick County FOR THE construction, operation and maintenance of two (2) wet detention ponds in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Energy, Mineral and Land Resources and considered a part of this permit. This permit shall be effective from the date of issuance until September 6, 2021 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.5 of this permit. The subdivision is permitted for 59 lots, each allowed a maximum of 6,000 square feet of built -upon area. 3. The runoff from all built -upon area within the permitted drainage area(s) of this project must be directed into the permitted stormwater control system. 4. The tract will be limited to a maximum of 439,422 square feet of built -upon area. The wet pond designated as Pond #1 and the infiltration basin have been designed to treat the runoff from 277,814 and 161,608 square feet of Built -Upon Area, respectively. Page 2 of 9 State Stormwater Management Systems Permit No. SW8 051128 5. The following design elements have been permitted for this stormwater treatment system which utilizes a wet detention pond stormwater and an infiltration basin, and must be provided in the system at all times. Wet Detention Pond Pond #1 a. Drainage Area, acres: Onsite, ftZ: Offsite, ftZ 18.36 799,762 N/A b. Total Impervious Surfaces, ft : Onsite, ftZ: Offsite ftZ 277,814 277,814 N/A C. I Desi n Storm inches: 1.5 d. Average Pond Design Depth, feet: 7.5 e. TSS removal efficiency: 90% f. Permanent Pool Elevation FMSL: 28 9. Permanent Pool Surface Area ft: 76,730 h. Permitted Storage Volume ft: 40,382 i. Tem ora Storage Elevation FMSL: 27.49 j. Pre-dev. 1 r-24 hr. discharge rate, cfs: N/A k. Controlling Orifice, in: 3 I. Orifice flowrate cfs: 0.1 M. Permitted Foreba Volume ft : 108,775 n. Fountain Horsepower 3 o. ReceivingStream/River Basin: Beaverdam Creek / Cape Fear P. Stream Index Number: 18-88-9-1- 0.5 q. Classification of Water Body: SC;SW HQW Infiltration Basin Infiltration Basin #1 a. Drainage Area, acres: Onsite, ftZ: Offsite, ftZ 10.07 438,649 0 b. Total Impervious Surfaces, ft: Onsite, ftZ: Offsite ftZ 161,608 161,608 0 c. Design Storm inches: 1.5 d. I Basin Depth, feet: 5 e. Bottom Elevation FMSL: 24 f. Permitted Surface Area aBottom, ft : 20,323 Permitted Storage Volume, ft : 76,359 h. Storage/Bypass Elevation FMSL: 24.98 i. Wando Fine Sando j. nEx ectediltration Rate in/hr: 6.9 K. Time to Draw Down hours: 5.8 I. Receivin Stream/River Basin: Beaverdam Creek / Cape Fear m. Stream Index Number: 18-88-9-1- 0.5 n. Classification of Water Body: SC;SW;HQW Page 3 of 9 State Stormwater Management Systems Permit No. SW8 051128 It. SCHEDULE OF COMPLIANCE 1. No homeowner/lot owner/developer shall fill in, alter, or pipe any drainage feature (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. 2. The permittee is responsible for verifying that the proposed built -upon area for the entire lot does not exceed the maximum allowed by this permit. Once the lot transfer is complete, the built -upon area may not be revised without approval from the Division of Energy, Mineral and Land Resources, and responsibility for meeting the built -upon area limit is transferred to the individual property owner. 3. If an Architectural Review Board or Committee is required to review plans for compliance with the BUA limit, the plans reviewed must include all proposed built -upon area. Any approvals given by the Board do not relieve the homeowner of the responsibility to maintain compliance with the permitted BUA limit. 4. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 5. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 6. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to the approved plans, regardless of size. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area. e. Further development, subdivision, acquisition, or sale of any, all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 7. The Director may determine that other revisions to the project should require a modification to the permit. 8. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 9. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 10. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and Page 4 of 9 State Stormwater Management Systems Permit No. SW8 051128 specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. 11. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 12. Permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 13. The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of structures, orifice, catch basins and piping. g. Access to all components of the system must be available at all times. 14. Prior to the sale of any lot, the following deed restrictions must be recorded: a. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW8 051128, as issued by the Division of Energy, Mineral and Land Resources under NCAC 2H.1000. b. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the Stormwater Management Permit. C. These covenants are to run with the land and be binding on all persons and parties claiming under them. d. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Energy, Mineral and Land Resources. e. Alteration of the drainage as shown on the approved plans may not take place without the concurrence of the Division of Energy, Mineral and Land Resources. f. The maximum built -upon area per lot is 6,000 square feet. This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. g. All runoff on the lot must drain into the permitted system. This may be accomplished through providing roof drain gutters, which drain to the street, grading the lot to drain toward the street, or grading perimeter swales and directing them into the pond or street. Lots that will naturally drain into the system are not required to provide these measures. h. Built -upon area in excess of the permitted amount will require a permit modification. Page 5 of 9 State Stormwater Management Systems Permit No. SW8 051128 15. Records of maintenance activities must be kept and made available upon request to authorized personnel of DEMLR. The records will indicate the date, activity, name of person performing the work and what actions were taken. 16. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 17. A copy of the recorded deed restrictions must be submitted to the Division within 30 days of the date of recording the plat, and prior to selling lots. The recorded copy must contain all of the statements above, the signature of the Permittee, the deed book number and page, and the stamp/signature of the Register of Deeds. 18. Decorative spray fountains will be allowed in the stormwater treatment pond subject to the following criteria: a. The fountain must draw its water from less than 2' below the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. C. The falling water from the fountain must be centered in the pond, away from the shoreline. d. The maximum horsepower for the fountain's pump is based on the permanent pool volume. The maximum pump power for a fountain in pond #1 is 3 hp. 19. Prior to transfer of the permit, the stormwater facilities will be inspected by DEMLR personnel. The facility must be in compliance with all permit conditions. Any items not incompliance must be repaired or replaced to design condition prior to the transfer. Records of maintenance activities performed to date will be required. III. GENERAL CONDITIONS This permit is not transferable to any person or entity except after notice to and approval by the Director. In the event there is either a desire for the facilities to change ownership, or there is a name change of the Permittee, a completed "Name/Ownership Change Form" must be submitted to the Division of Energy, Mineral and Land Resources, signed by the parties involved, along with the appropriate documentation as listed on page 2 of the form. The project must be in good standing with DEMLR. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all of the terms and conditions of this permit until such time as the Director approves the transfer request. Neither the sale of the project nor the transfer of common area to a third party constitutes legal transfer of the stormwater permit. 3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 4. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Energy, Mineral and Land Resources, in accordance with North Carolina General Statute 143- 215.6A to 143-215.6C. 5. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal), which have jurisdiction. Page 6 of 9 State Stormwater Management Systems Permit No. SW8 051128 6. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 7. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification revocation and re -issuance or termination does not stay any permit condition. 8. The Permittee grants permission to staff of the DEMLR to access the property for the purposes of inspecting the stormwater facilities during normal business hours. 9. The permittee shall notify the Division in writing of any name, ownership or mailing address changes at least 30 days prior to making such changes. 10. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 11. The permittee shall submit a permit renewal application request at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate documentation and the processing fee. Permit issued this the 20th day of September, 2014. CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Division of nergy, Mineral and Land Resources By Authority of the Environmental Management Commission Page 7 of 9 State Stormwater Management Systems Permit No. SW8 051128 St. James Plantation — Bancroft Forest Stormwater Permit No. SW8 051128 Brunswick County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is a part of this Certification. Noted deviations from approved plans and specifications: Signature Registration Number Date SEAL Page 8 of 9 State Stormwater Management Systems Permit No. SW8 051128 Certification Requirements: Page 2 of 2 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, a forebay, and the vegetated filter. 15. The required dimensions of the system are provided, per the approved plan. cc: NCDENR-DEMLR Regional Office Brunswick County Building Inspections Page 9 of 9 DEMLR Received ONLY r,ypucaoie 1<uies: U Coastal SW - 1995 (select all that aPP J) In ❑ Non -Coastal SW- HQW/ORW Walter`s O Universa❑l Storm wa ter Man gem ent Plan ❑ Other WQ Mgmt Plan: State of North Carolina Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be Photocopied for use as an original I• GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): 2. Location of Project (street address): City:N/A County:Brunswick Zip:28461 3. Directions to project (from nearest major intersection): 4. Latitude:33056' 36" N Longitude:78° 05' 43" W of the main entrance to the project. If. PERMIT INFORMATION: 1, a. Specify whether project is (check one): []New ®Modification Renewal w/ Modificationt tRenewals with modifications also requires SbVU-102 - Renewal Application Form b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit numberSW8051128 its issue date (if known)9/6/13 construction: Not Started ®Partially Completed* and the status of ❑ Completed* *Provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density ❑Drains to an Oftsite Stormwater System QOther 3. If this application is being submitted as the result of a previously returned application or a letter from DF,MLR requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): EICAMA Major QSedimentation/Erosion Control: ❑NPDES Industrial Stormwater ac of Disturbed Area 0404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permitSed. / Erosion Control: Bancroft Forest Bruns 2006 142 12/05/05 5. Is the project located within 5 miles of a public airport? If yes, see S.L. 2012-200, Part Vl: httm Unnrrat ..,ao.._ ___ Form SWU-101 Version Oct. 31, 2013 A�-ee ulati if MAY 0 5 2014 0.1 Ill. CONTACT INFORMATION La. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the uroiect): Signing Official & b.Contact information for person listed in item I above: Street Address:K) Rnv InR7o City:Southoort Mailing Address (if applicable): Phone: State:NC�_ Zip:29461 State: Fax: c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑❑ Lessee` (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) Purchaser (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer" (Complete Contact Information, item 2a and 2b below.) 2, a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Omanization- Signing Official & b.Contact information for person listed in item 2a above: Street Address: Mailing Address (if Phone: State:_ Zip: State: Fax: ( 1 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/(7roanc»r .nt1A Signing Official & b.Contact information for person listed in item 3a above: Mailing Address: City: Phone: 4. Local jurisdiction for build ng permits: Point of Contact: Fort SWU-101 . Version Oct. 31, 2013 State:_ Fax: Phone #: ( 1 Paget2: of 6 t IV. PROJECT INFORMATION 1.: In the space provided below, briefly summarize how the stormwater runoff will be treated. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit ❑ Other: Issued Date: b.If claiming vested rights, identify the reguladon(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the Cape Fear 4. Total Property Area: 31.96 acres River basin. 5. Total Coastal Wetlands Area: N/A acres 6. Total Surface Water Area: N/A acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area*:31.96 acres Total project area shall be calculated to exclude the folloloiitgg the nwrnal pool of in , o aided structures, the area between the banks of streannrs and rivers, the area below the Nonual Hi h Water (Nl line or Memn High Water (MHW) line, and coastal wetlands lannlward from the NHW (or MHI lane. The resultant pproject area is used to be included percent built upon area (BUA). Non -coastal wetlands landward of the NHW (or MHW) line nnny be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 35.50 9. How many drainage areas does the project have?3 (For high density, count 1 for each proposed engineered % store¢water BMP. For low densihj and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Infnrmnh� Receiving Stream Name ...inu1a a area i Beaverdann Cr Uraina a Area 2 Draina a Area 3 Draina a Area Stream Class * Beaverdam Cr Stream Index Number * SC; SW, HQW SC; SW, HQW Total Drainage Area (SO 18-88-9-1-(0.5) On -site Draina e Area g (s� 799,762 438,649 Off -site Draina a Area (sh 799,762 0 438,649 Proposed Impervious Area** t,n I 277,814 0 161,608 0 L.70 Im ervious Area** total 34. 55 36.84 Inn ervious" Surface Area On -site Buildings/Lots (so Draina a Areal Draina a Area 2 Draina a Area 3 Draina a Area - On -site Streets s (� 222,000 132 On -site Parking (so 57,400 29,138138 Ou-site Sidewalks (so 0 0 0 Other on -site (so 0 4,414 470 Future (so0 0 0 Off -site (sf) 0 0 Existing BUA*** (so 0 0 1n 0 0 rota! (st): 277,814 161,608 Strean Class and Index Number call be determined at: lttty://aorta/ ncdenr orvkoebhwa/vs/csu/clnssifi'cationc `* hnppenvious area is defined as Nee built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. Report only that aunount of existing BUA that will ren±ain after development. Do not report ally existing BUA that is to be removed and which will be replaced by nneeo BUA: Form SWU-IOI Version Oct. 31, 2013 11. How was the off -site impervious area listed above determined? Provide documentation. N/A Projects in Union Count,, Contact DEMLR Central Office stnjfto check if the project is located irithin a Threatened & Endangered Species watershed that aml be subject to more stringenl stornnvater regniretnnents as per I SA NCAC 0211.0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from htt /portal ncdenr org/web/ivgZ s/su/bmp manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Energy, Mineral and Land Resources (DEMLR). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from hR ortal.ncdenr or / eb/wa/� s su/statesw /forms does. The complete application package should be submitted to the appropriate DEMLR Office. (The appropriate office may be found by locating project on the interactive online map at htto: / / portal ncdenr org / web/ wq bi s/ su / mats.) Please indicate that the followin required information have been rovided b initialing in the space provided for each item. All original documents MUST be signe for each submitted application package from d and initialed in blue ink. Download the latest versions ht to//portalncdenror /web/wo/wsu/statesH/forms does. I. Original and one copy of the Stormwater Management Permit Application Form. Initials 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to ham://www envhelped fee . / P / stopexoress html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/managementfor the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the 1/2 mile radius on the map. 7. Sealed, signed and dated calculations (one copy). B. Two sets of plans folded t_ o g_ 5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. I. Scale. g. Revision number and dates. It. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal Haters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as wseparate document). Fonn SWU-101 Version Oct. 31:2013 ..rBage'4of6; P. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"xll" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DEMLR to verify the SHWT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: 2301 Page 854 11. For corporations and limited liability corporations (LLC): Provide documentation a.tio from the NC Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per 15A NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. I'ttR://w%vw.secretarV.state.nc.us/Corl)oratimElCSearch.as x VIL DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from httn://north ncdenr or hveb/Ir/sate forms does. Download the latest versions for each Snbmn ttal. stormwater In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DEMLR, and that they will be recorded prior to the sale of any lot. Vill. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:Tim Clinkscales Consulting Firm: Paramounte Engineering Mailing Address:5911 Oleander Drivp_ Snit. om Ci ty: W i lm ington State:NC Zip:28403 Phone: (910 ) 791-6707 Fax: (910 ) 791-6760 Einail:tclinkscales@paranloiinte-eng.com IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) I, (print or type name of person listed in Contact Information, item 2a) thaown the property identified in this permit application, and thus give permission to (print or h e nnrme o f erson I listed in Contact Information, item la) (p Jg f p with (print or type mm�e of listed in Contact Grfo'nmtion, item In) proposed. coof the lease agreement or pending property sales contract has been provided to develop the w thtthe sub nittta , which ndctas the party responsible for the operation and maintenance of the stormwater system. .Form SWU-]01 ! Version Oct. 3 l.,2013. r,Pa9e5.of6. As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their 'lease agreement, or pending sale, responsibility for compliance with the DEMLR Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DEMLR immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. a Notary Public for the State of do hereby certify that before me this _ day of County of personally appeared . and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission X. APPLICANT'S CERTIFICATION I, (print or hjpe tame of person listed in Contact Information, item[ la) Robert Masters IVice-President) certify that the information included on this permit application form ts, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwater rules under 15A NCAC 21-1.1000 and any other applicable state stormwater requirements. Signature: /1 Date: I" l L i-Ct•R^ L >` a Notary Public for the State of. ✓}tom ���t• Y Countyof Dore m t do hereby certify that _� ✓a. N Q 1 �rJ before me this da of personally appeared -� y -- At-�-- & 14 and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, f QL— "k 11 `OW �p`1SN C�7 NOTARY X m PUBLIC = s'PG O'c �.. * SEAL My commission expires hA4L'1�t U tN Form SWU-101 Version Oct. 31; 2013 . Bage6of. 6• MEMORY TRANSMISSION REPORT TIME :05-20-2014 15:28 FAX NO.1 NAME FILE NO. 205 DATE 05.20 15:25 TO n 97916760 DOCUMENT PAGES 10 START TIME 05.20 15:25 END TIME 05.20 15:28 PAGES SENT 10 STATUS OK 'SUCCESSFUL TX NOTICE' Beaae of Nor<L Cnrollna Deparamea< ar any\rvvmev<.va Ha<ur.\ nsvvr«• wnmtvay.v Realay.\ omee A/ MaGYory, Governor ' / FAX COVER BIIEET Jehn 6SMeHa //lCJ9e<rea.ry T... J/�J•m From: ,L¢S.m Phc o: (9101)" 6-7"6 . -'✓y ef7 �j/ ✓ Fv:c: {91U)350_x004 lie: _ �� T ✓ Fi ES f� 4-A A �•.J ��IJ �J .�T �r.S�s T� .27(tiM:nnl..—RxMnM on.W\\minQton. N,.,-(9\O)796-12\I-M B.{ OppoM nlb AfY\rmntive A.—RmP), Pat McCrory, Governor State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office FAX COVER SHEET John ESkvarla III, Secretary Date: 7 No. Pages (excl. cover): To: ' / / m GL i n From: Jo Casmer Co: /W /l7Dy/r > E �/7gi /I EE/ % Aj Phone: (910) 796-7336 Fax: Cam% /—,5 �%�� ✓ Fax: ((9Q910) 350-2004 Re: ST /71�5 %'Li/1C/O/7— SGv 6�ii z 3' 16/ In / L /fi Q Cl i / i G.lii /O -0 /'.SSy,' �/ — // n �— d 127 Cardinal Drive Extension, Wilmington, NC 28405 • (910) 796-7215 • An Equal Opportunity Affirmative Action Employer P A RAMOUNTE JL -L5 9 t 1 1 E O L E o N 1) E R D t IJ It l V E, S U IIT E 2 0 W I L M I N G T O N, N C 2 8 4 0 3 9 1 0- 7 9 1- G 7 0 7( O) 9 1 0- 7 9 1- G 7 G 0 ( F) Y tJ'g' cult' L E T T E R O F T R A N S M I T T A L To: NCDENR-Land Quality Section Date 5/5/14 127 Cardinal Drive Extension Wilmington, NC 28405 Re: Bancroft Forest Express Review Submittal Cameron Weaver/Chris Baker Project No. I 10121.PE e are sendin ® Originals ® Prints ❑ Shop Draxvings ❑ Calculations Correspondence ® Plans ❑ Specifications ® Other as listed below Phe following items:j Quantity Date Dwg. No. Description 2 5/5/14 Plans (Final Design — Not Released For Construction) 1 Stormwater Narrative I Check (54000.00) 2 Stormwater Permit Application Form l Wet Detention Pond Supplement I Wet Detention O&M 1 Infiltration Basin Supplement I Infiltration Basin O&i\I 1 Soils Report Issue Status: ® For Approval ❑ As Requested ❑ Construction ❑ Bid ❑ For Your Use ❑ For Review and Comment ❑ approved as Noted ❑ See Remarks ction'I'aken: ❑ No Exceptions Taken ❑ Make Corrections Noted ❑ Amend & Resubmit ❑ Rejected - See Remarks ❑ Approved as Submitted ❑ Other Remarks: