Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW8041130_HISTORICAL FILE_20050208 (2)
STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 �4 �� .30 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2005 00 $ YYYYMMDD AT,c Michael F. Easley, Governor RQG William G. Ross, Jr., Secretary North Carolina Department of Environment and Natural Resources Y Alan W. Klimek, P.E. Director Division of Water Quality February 8, 2005 Bailey & Southstar, LLC Warren G. Bailey, Member 405-D Western Boulevard Jacksonville, NC 28546 Subject: Stormwater Permit No. SW8 041130 Walgreen's Drugstore - Jacksonville, NC High Density Project Onslow County Dear Mr. Bailey: The Wilmington Regional Office received a complete Stormwater Management Permit Application for Walgreen's Drugstore - Jacksonville, NC on February 4, 2005. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 041130 dated February 8, 2005, for the construction of the subject project. This permit shall be effective from the date of issuance until February 8, 2015, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements In this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Rhonda Hall, or me at (910) 395-3900. Sincerely, Ed Beck Acting Regional Supervisor Surface Water Protection Section ENB/rbh: S:\WQS\STORMWAT\PERMIT\041130.feb05 cc: C. Lawrence Sneeden, Jr. P.E., Andrew & Kuske Consulting Engineers, Inc. Onslow County Building Inspections Rhonda Hall (Wilmington -Regional -Office Central Files North Carolina Division of Water Quality 127 Cardinal Drive Extension Phone (910) 395-3900 Customer Servicel-877.623-6748 One Wilmington Regional Office Wilmington, NC 28405-3845 FAX (919) 733-2496 Internet h2o.encstate.nc.us NorthCarolina An Equal Opportunity/Affirmative Action Employer— 50% Recycled/l0% Post Consumer Paper Naturally State Stormwater Management Systems Permit No. SW8 041130 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Warren G. Bailey, Bailey & Southstar, LLc Walgreen's Drugstore - Jacksonville, NC Onslow County FOR THE construction, operation and maintenance of two dry detention basins in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until February 8, 2015, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 on page 3 of this permit. The stormwater control has been designed to handle the runoff from 63,620 square feet of impervious area. 3. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. Page 2 of 7 State Stormwater Management Systems Permit No. SW8 041130 6. The following design criteria have been provided in the two dry detention basins and must be maintained at design condition: Basin A Basin B a. Drainage Area, acres: 1.18 0.47 Onsite, ft2: 51,510 20,400 Offsite, ft2- None None b. Total Impervious Surfaces, ft2: 46,120 17,500 C. Bottom Elevation, FMSL: 34.0 36.0 d. Permitted Surface Area, ft2: 3,400 590 e Storage Elevation, FMSL: 36.8 36.8 f. Permitted Storage Volume, ft3: 3,430 480 g. Controlling Orifice: 0.75"0 pipe 0.50"0 pipe h. Additional BMP: Grassed Swales Grassed Swales I Receiving Stream Mill Creek Mill Creek j. River Basin: White Oak White Oak k. Stream Index Number: 19-9 19-9 1. Classification of Water Body: "SC; NSW" "SC; NSW" II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowin.9 and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. Page 3 of 7 State Stormwater Management Systems Permit No. SW8 041130 The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 9. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 10. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 11. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 12. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a formal permit transfer request to the Division of Water Quality, accompanied by a completed name/ownership change form, documentation from the parties involved, and other supporting materials as may be appropriate. Page 4 of 7 State Stormwater Management Systems Permit No. SW8 041130 The approval of this request will be considered on its merits and may or may not be approved. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 7. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 8. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 9. The permittee shall notify the Division any name, ownership or mailing address changes within 30 days. Permit issued this the Bch day of February, 2005. INA ENVIRONMENTAL MANAGEMENT COMMISSION 4n A lime , P.E., Director Division of Water Quality By Authority of the Environmental Management Commission Page 5 of 7 State Stormwater Management Systems Permit No. SW8 041130 Walgreen's Drugstore - Jacksonville, NC Stormwater Permit No. SW8 041130 Onslow Countv Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 6 of 7 State Stormwater Management Systems Permit No. SW8 041130 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Regional Office Onslow County Building Inspections Page 7 of 7 NORRIS, KUSKE &TUNSTALL CONSULTING ENGINEERS, INC, February 4, 2005 Ms. Rhonda Hall NC DENR Division of Water Quality Water Quality Section 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Re: Walgreen's Drug Store Jacksonville, NC NKT Project No. 03308 Dear Ms. Hall: J. Phillip Norris, P.E. John A. Kuske, III, P.E. John S. Tunstall, P.E. J.A. Kuske, P.E. of Counsel Per our discussions, we are enclosing two (2) sets of revised plans, the revised Page 2 of 4 of the State Stormwater Permit application (SWU-101), the revised State Stormwater Extended Dry Detention Basin Supplement applications for Basin A & Basin B, and one (1) set of revised calculations. Please contact us if you have any further questions or comments. Thank you for your assistance on this project. Sincerely, NORRIS, KUSKE & TUNSTALL CONSULTING ENGINEERS,, INC.� - -hw ^ u n �_� �\ 1 � � Vn . OOP. C. Lawrence Sneeden, Jr., P.E. YYY CLS/asn 03308 02-04-05-s-sw response-Itr FEB 0 4 21}O5 BY:_____ 902 Market Street • Wilmington, NC 28401-4733 • Phone: 910.343.9653 • Fax: 910.343.9604 NORRIS, KUSKE &TUNSTALL CONSULTING ENGINEERS, INC. December 20, 2004 Ms. Rhonda Hall NC DENR Division of Water Quality Water Quality Section 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Re: Walgreen's Drug Store Jacksonville, NC NKT Project No. 03308 Dear Ms. Hall: J. Phillip Norris, P.E. John A. Kuske, III, P.E. John S. Tunstall, P.E. J.A. Kuske, P.E. of Counsel Per our discussions, we are enclosing two (2) sets of revised plans, the revised Page 2 of 4 of the State Stormwater Permit application (SWU-101), the original State Stormwater Extended Dry Detention Basin Supplement applications for Basin A & Basin B, one (1) set of revised calculations, and one (1) copy of the revised stormwater narrative. Please contact us if you have any further questions or comments. Thank you for your assistance on this project. Sincerely, NORRIS, KUSKE & TUNSTALL CONSULTING^ ENGINEERS, INC. &Lam- U '� ujl -L -L C. Lawrence Sneeden Jr. P.E. I CLS/asn 03308 12-20-04-s-sw response-Itr 902 Market Street • Wilmington, NC 28401-4733 0 Phone: 910.343.9653 • Fax: 910.343.9604 NKT #03308 Permit No. S� g p ¢/ / 3 U (To be provided by D Q) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM EXTENDED DRY DETENTION BASIN SUPPLEMENT This form may be photocopied for use as an original. DWO Stormwater Management Plan Review: A complete stormwater management plan submittal includes a dry detention basin supplement for each basin, design calculations, plans and specification showing all basin and outlet structure details, and a fully executed operation and maintenance agreement. PROJECTINFORMATION (Please complete the following information): Project Name: Walgreen's Drug Store — Jacksonville NC ContaclPerson: Larry Sneeden, ,P.E Phone Number: 910 - 3 4 3- 9 6 5 3 For projects with multiple basins, specify which basin this worksheet applies Design Storm: 1 " (Please choose either the 1 yr, 24 hr storm, or the 1 "storm) Drainage Area: 5 1 , 510 square feet Built -upon Area: 46, 120 square feet Required Volume: 3,550 cubic feet SHWT elevation: 3 5. 0 +/- FMSL Basin Dimensions: * Bottom Elevation: 3 4_ feet, MSL Area: Irregular itlong x ft wide = 6 0 ft 2 Storage Elevation: 3 6_ A feet, MSL Area: I rre u l or t long x ft wide= a, a o o ft 2 Detention Volume Provided: 3 , 4 3 0 cubic feet * Sediment Storage Provided: N/A cubic feet (Equivalent to 20%of the detention volume) Drawdown Orifice: 0.7 5 " Vertica 1 Orifice (please indicate size and type ojorifice) Additional BMP to achieve 85%TSS (checkone): Grassed swale 0 Vegetated Filter 0 Other Permit No. 3 a (To be prodded by DWQ) II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health, and Natural Resources, November, 1995) and Administrative Section 15A NCAC 2H.1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach written justification. Zey a. The basin captures the runoff from the 1 year, 24 hour storm and releases it over a period of 48 hours GGi N/A b. OR the basin captures the runoff from the 1 inch storm and allows it to draw down over a period of 2-5 days. eLF N/A C. d. The minimum flow length ratio is 3:1, L:W. Basin Gil sideslopes are no steeper than 3:1. GN�r e. A small permanent pool has been provided at the outlet to reduce clogging. e- / f. Cleanout access has been provided, sufficient for heavy equipment. "Ie-/ g. A drain has been provided which will completely empty the basin for cleanout. -e r h. Sufficient volume has been provided for any local government peak flow requirements. G �r i. If the basin was used during construction as a sediment basin or trap, it must be cleaned out to design specifications prior to operation as a dry detention basin. Cu 4 j. A vegetation plan has been prepared by a N.C. licensed professional. Consideration must be given to the grasses specified due to the frequent inundation. Gui k. The basin must be stabilized within 14 days of construction. G4 /V k 1. The design provides for the sediment storage in addition to the detention volume that is Gam/ in. equal to 20% of the detention volume. Inlet and outlet channels have been protected from scour during high flows from large eu tz n. storms. In areas of easily erodible soils, an additional plunge pool at the inlet has been provided, or riprap is used as an energy dissipator. «i o. 641 p. A forebay to capture sediment is recommended to make cleanout easier. The basin is located in uncompacted natural soils. ecL_VA q. The seasonal high water table is located at least 1 foot below the bottom of the extended dry detention basin. ev r. An additional BMP (such as a swale or vegetated filter) has been designed to operate in conjunction with this dry detention basin to meet the required minimum 85% TSS removal. Permit No. _�/,J!�'D¢l/ F�() (To be provided by DWQ) EXTENDED DRY DETENTION OPERATION AND MAINTENANCE AGREEMENT The extended dry detention system is defined as the dry detention basin, forebay, and the required additional BMP. This system (check one) 0 does n does not incorporate a vegetated filter. This system (check one) X does 0 does not incorporate non-integrated pretreatment. Maintenance activities shall be performed as follows: 1. All grassed areas of the basin shall be mowed at least twice annually, more frequently as needed. 2. Debris must be removed from the basin, outlet and orifice whenever it accumulates or at least twice annually. 3. Annually- inspect the basin after a rain event to ensure it is functioning properly. 4. Repair any erosion of the side slopes and around the inlets and outlet immediately. 5. Accumulated sediment shall removed if it has reduced the available volume to 75% of the original depth. 6. The emergency spillway shall be kept in good working order. 7. Woody vegetation shall be removed from the banks. 8. Any areas of the system found to be deficient shall be repaired or replaced to design standards. 9. Written records of the inspections and maintenance activities shall be kept on file. I acknowledge and agree by my signature below that I am responsible for the performance of the above maintenance procedures. I agree to notify DWQ of any problems with the system or changes in the name of the project, responsible party, or address. Printname: Warren G. Bailey Title: Member Address: c pailel& TM A Wastern Blvd. JaJ-rnrille, tE 28546 Phone: 910-34 48443 Fax: Signature: e,^ Date: ZO U I, I a Not Public for the State of Q County of V e_�r do hereby certify that f {- personally appeared before me this the Qw''_- day of tyt�e. mh- r and acknowledge the due execution of the forgoing dry detention basin maintenance requirements. Witness my hand and official seal, S. Signature /,,pTA ,9� My Commission expires 0 zci;�, i°C1BL1G V NKT #03308 Permit No. J75GV? 614 // 3() (To be provided by DJVQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM EXTENDED DRY DETENTION BASIN SUPPLEMENT This form may be photocopied for use as an original. DWO Stormwater Management Plan Review: A complete stormwater management plan submittal includes a dry detention basin supplement for each basin, design calculations, plans and specification showing all basin and outlet structure details, and a fully executed operation and maintenance agreement. I. PROJECT INFORMATION (Please complete the following information): ProjeclName: Walgreen's Drug Store - Jacksonville NC Contact Person:_r.arry Sn eA2n P E Phone Number: 910-343-9653 For projects with multiple basins, specify which basin this worksheet applies to: B Design Storm: 1 " (Please choose either the 1 yr, 24 hr storm, or the 1 " storm) Drainage Area: 0 q 0 p square feet Built -upon Area: 17,500 square feet Required Volume: 1, 360 cubic feet SIiWT elevation: 35 /- FMSL Basin Dimensions: *Bottom Elevation: 3 6 feet, MSL AreIrregular long x ft wide = 2 0 R12 Storage Elevation: 36. 8 feet, MSL Are3rregu ft long x R wide= 590 ft 2 Detention Volume Provided: a R n cubic feet *Sediment Storage Provided: N/A cubic feet (Equivalent to 20% of the detention volume) Drawdown Orifice: 0.5 " (Please indicate size and t)pe of orifice) Additional BMP to achieve 85% TSS (check one): O'Grassed swale 0 Vegetated Filter 0 Other Permit No. Slnl $G4l / 3 b (To be provided by DWQ) II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health, and Natural Resources, November, 1995) and Administrative Section 15A NCAC 2H.1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach written justification. 1�4J_ a. The basin captures the runoff from the 1 year, 24 hour storm and releases it over a period of 48 hours Gr-/ t A b. OR the basin captures the runoff from the 1 inch storm and allows it to draw down over a period of 2-5 days. Gcf A C. The minimum flow length ratio is 3:1, L:W. Cu d. Basin sideslopes are no steeper than 3:1. GL.1 e. A small permanent pool has been provided at the outlet to reduce clogging. Gam! f. Cleanout access has been provided, sufficient for heavy equipment. G�f g. A drain has been provided which will completely empty the basin for cleanout. C<< It. Sufficient volume has been provided for any local government peak flow requirements. Cc I i. If the basin was used during construction as a sediment basin or trap, it must be cleaned euj. out to design specifications prior to operation as a dry detention basin. A vegetation has been -p� plan prepared by a N.C. licensed professional. Consideration must A k. be given to the grasses specified due to the frequent inundation. The basin must be stabilized within 14 days of construction. ez2 vk 1. The design provides for the sediment storage in addition to the detention volume that is A equal to 20% of the detention volume. Inlet CtJ N M. and outlet channels have been protected from scour during high flows from large G U n. storms. In areas of easily erodible soils, an additional plunge pool at the inlet has been provided, or riprap is used as an energy dissipator. o. A forebay to capture sediment is recommended to make cleanout easier. p. The basin is located in uncompacted natural soils. q. The seasonal high water table is located at least 1 foot below the bottom of the extended dry detention basin. r. An additional BMP (such as a Swale or vegetated filter) has been designed to operate in conjunction with this dry detention basin to meet the required minimum 85% TSS removal. Permit No. 614J 8 0` 1 f 3 O (To be provided by D{VQ) EXTENDED DRY DETENTION OPERATION AND MAINTENANCE AGREEMENT The extended dry detention system is defined as the dry detention basin, forebay, and the required additional BMP. This system (check one) 0 does does not incorporate a vegetated filter. This system (check one) does 0 does not incorporate non-integrated pretreatment. Maintenance activities shall be performed as follows: 1. All grassed areas of the basin shall be mowed at least twice annually, more frequently as needed. 2. Debris must be removed from the basin, outlet and orifice whenever it accumulates or at least twice annually. 3. Annually- inspect the basin after a rain event to ensure it is functioning properly. 4. Repair any erosion of the side slopes and around the inlets and outlet immediately. 5. Accumulated sediment shall removed if it has reduced the available volume to 75% of the original depth. 6. The emergency spillway shall be kept in good working order. 7. Woody vegetation shall be removed from the banks. 8. Any areas of the system found to be deficient shall be repaired or replaced to design standards. 9. Written records of the inspections and maintenance activities shall be kept on file. I acknowledge and agree by my signature below that I am responsible for the performance of the above maintenance procedures. I agree to notify DWQ of any problems with the system or changes in the name of the project, responsible party, or address. Printname: Warren G. Bailey Title: Member Address: c/o/Bailey s�ssxiat s, Inc. 405-D Western Blvd. Jacksonville NC 28546 Phone: 91(Y 3 4 6- 42� (A I n- 2 11 1 - <I I 2 ri 0 I S a Notary Public for the State of \,J County of NP ll) C "OVQ (- do hereby certify that IiA rre n ,l I ICU ersonally appeared before me this the li �= day of np p p,m f ,� ( , tX1 and acknowledge the due execution of the forgoing dry detention basin maintenance requirements. Witness my hand and official seal, UanngP'141 .A Signature %pTgyY My Commission expires VEk f STORMWATER SYSTEM NARRATIVE JACKSONVILLE WALGREENS ONSLOW COUNTY For Bailey & Southstar, LLC 405-D Western Boulevard Jacksonville, NC 28546 (910)346-8443 OkA C SEAL vit 10972 /a//'F/e¢ November2004 Revised December 14, 2004 — Prepared by: ANDREW & KUSKE CONSULTING ENGINEERS, INC. 902 Market Street Wilmington, North Carolina 28401 (910)343-9653 (910) 343-9604 — (Fax) A & K Project No.03308 li- i NARRATIVE DESCRIPTION: The site is a 1.82-acre tract in the north quadrant of the intersection of Gum Branch Road (SR 1308) and Henderson Drive Extension (SR 1336). The tract is bounded by right-of-way to the southeast and southwest and parking lot to the northeast and northwest. The site is presently vacant, containing remnants of asphalt, concrete and building foundation over the entire area. The site is basically flat and drains to stornwater inlets on the adjacent properties. There are no wetlands on this tract. The project is new development consisting of clearing, grading, and construction of a building, parking, utilities, and stormwater management system. Design impervious for the entire site is computed at 80%. Approximately 1.94 acres will be disturbed by the construction work. An erosion control permit will be required from the City of Jacksonville. STORMWATER MANAGEMENT MEASURES: The site does not have adequate space to install a wet detention pond nor depth to water table and the soils for an underground infiltration system. Because the new construction will reduce the site impervious surface by 20%, we are employing best management practices and draining most of the runoff through grassed swales prior to discharge to an underground dry detention system, then over two days to a piped system. The exceptions are roof runoff, which will drain directly to detention. All of the new open area will be grassed or landscaped with approximately 13 new canopy trees. The grading contractor and developer will provide maintenance during construction. The tenant will provide maintenance after completion. NORRIS, KUSKE &TUNSTALL CONSULTING ENGINEERS, INC. November 22, 2004 Ms. Rhonda Hall NC DENR Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Re: State Stormwater Permit Submittal Walgreen's Drugstore Jacksonville, NC NKT Project No. 03308 Dear Ms. Hall: J. Phillip Norris, P.E. John A. Kuske, III, P.E. John S. Tunstall, P.E. J.A. Kuske, P.E. of Counsel Enclosed are two (2) sets of plans for the subject project, one (1) set of calculations, the original Division of Water Quality Stormwater Management Permit application, one (1) copy of the stormwater narrative and a $420.00 check for the processing fee. Please review this information for approval and contact us with any questions or comments you may have. Thank you for your assistance on this project. Sincerely, NORRIS, KUSKE, & TUNSTALL CONSULTING ENGINEERS, INC. . 4wu� I , I azk C. Lawrence Sneeden, Jr., P.E. 1 CLS/asn 03300 11.22-04-s-sw-Itr Enclosures cc: Warren Bailey / Bailey & Southstar, LLC RECEIVED NOV2 3 2004 BY: 0*13o 902 Market Street • Wilmington, NC 28401-4733 • Phone: 910.343.9653 • Fax: 910.343.9604 CITE' OF JACKSONVILLE PUBLIC SERVICES DEPARTMENT ENGINEERING P, CA 1,E1VFD DEC U 3 2004 BY: TO: 4'cc M:i-w Lij I Go, +_�4 ®�W R. mces N LETTER OF TRANSMITTAL Division of linvironmental Management 127 Cardinal Drive Factension Wilmington. N.C. 28405 Phone # (910) 395.3900 Linda: WE ARE SENDING YOU _ PRINTS _ COPY OF LETTER DESCRIPTION: Date: December 2, 2004 Attn: Ms. Linda Lewis Ref. Erosion & Sedimentation Walgreens Drugstore XX ATTACHED _ UNDER SEPARATE COVER XX PLANS _ SPECIFICATIONS XX OTHER copy of the financial responsibility statement THESE ARE TRANSMITTED AS CHECKED BELOW: _ FOR APPROVAL _ FOR REVIEW AND COMMENT DOCUMENTS ARE DUE TO BE RETURNED BY: _ PRINTS RETURNED AFTER LOAN TO US OTHER REMARKS: COPIES TO: File —AS REQUESTED XX FOR YOUR USE Tom Anderson, Construction Specialist Post Office Box 128 ♦ Jacksonville, North Carolina 28541 ♦ (910) 938-5245 ♦TDD# (910) 455-8852 ♦ Fax (910) 938-0982 NKT #03308 FINANCIAL RESPONSIBILITY/OWNERSHIP FORM SEDID,'ENTATION POLLUTION CONTROL ACT No person may initiate a land -disturbing activity on one or more acres as covered by the Act before this form and an acceptable erosion and sedimentation control plan have been completed and approved by the Land Quality Section, N.C. Department of Environment, Health, and Natural Resources. (Please type or print and, if question is not applicable, place N/A in the blank). Part A. 1. Project Name WalgreensDrugstore- Jacksonville,NC 2. Location of land -disturbing activity: County Onslow City or Township Jacksonville and Highway/Street Gum Branch Road 3. Approximate date land -disturbing activity will be commenced: December2004 4. Purpose of development (residential, commercial, industrial, etc.): Commercial 5. Total acreage disturbed or uncovered (including off -site borrow and waste areas): 6. Amount of fee enclosed $ 300.00 7. Has an erosion and sedimentation control plan been filed? Yes ® No 0 Enclosed X 8. Person to contact should sediment control issues arise during land -disturbing activity. Name C. Lawrence Sneeden, Jr., P.E. Telephone 910-343-9653 9. Landowner(s) of Record (Use blank page to list additional owners): Bailey & Southstar, LLC Name(s) c/o Bailey & Associates, Inc. 405-D Westem Boulevard Current Mailing Address Jacksonville NC 28546 City State Zip 10. Recorded in Deed Book No. Current Street Address City State Zip Page No. Part B. S7erson(s) or firm(s) who are financially responsible for this land -disturbing activity (Use a blank page to list additional persons or firms): Bailey & Southstar, LLC Name of Person(s) or Firm(s) c% Bailey & Associates, Inc. 405-D Westem Boulevard Mailing Address Jacksonville NC 28546 City State Zip 910-346-8443 Telephone Street Address City State Zip Telephone 2. (a) If the Financially Responsible Party is not a resident of North Carolina give name and street address of a North Carolina Agent Name ling Address Street Address ty State Zip City State Zip Telephone Telephone (b)If the Financially Responsible Party is a Partnership or other person engaging business under an assumed name, attach a copy of the certificate of assumed name. the Financially Responsible Party is a Corporation give name and street address the Registered Agent. in If of Name of Registered Agent Mailing Address Street Address City State Zip City State Zip Telephone Telephone The above information is true and correct to the best of my knowledge and belief and was provided by me under oath. (This form must be signed by the financially responsible person if an individual or his attorney -in -fact or if not an individual by an officer, director, partner, or registered agent with authority to execute instruments for the financially responsible person). I agree to provide corrected information should there be any change in the information provided herein. WarTeV G. Baile c Member Type Ar pript naiKe ' Title or Authority l— l_.i I1/1?Zd Signature// Date I, /A uyy- © a Notary Public of the County of State of North Caroli a, hereby certify that W A P-Un c¢l l � appeared personally before me this day and being duly sworn acknowle ged that the above form was executed by him. Witness my hand and notarial seal, this I day of Seal Notary My commission expires 20 ©�1- A&K #03308 State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORM WATER MANAGEMEN'r PERMIT APPLICATION FORM This form may be photocopied for use as an original 1. GENERAL INFORMATION I. Applicants name (specify the name of the corporation, individual, etc. who owns the project): Bailey & Southstar, LLC 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): Warren G. Bailey, Member 3. Mailing Address for person listed in item 2 above: 405-D Western Boulevard City: Jacksonville State: NC Zip: 28546 Telephone Number: (910) 346-8443 4. Project Name (subdivision, facility, or establishment name — should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Walgreen's Drugstore - Jacksonville, NC 5. Location of Project (street address): 1600 Gum Branch Road City: Jacksonville 6. Directions to project (from nearest major intersection): County: Onslow Proceed NE from intersection of US 17 & NC 24 On us 17 in Jacksonville 1.4 miles, turn left on Gum Branch Road and cio NW 1.6 miles to Intersection wl Henderson. Site on north corner 7. Latitude: 340 47' 06" Longitude: 770 25' 29" of project 8. Contact person who can answer questions about the project: Name: C. Lawrence Sneeden, Jr., P.E. 'relephoneNumber: (910) 343-9653 11. PERMIT INFORMATION Specify whether project is (check one) X New Form SWU-101 Version 3.99 Page 1 of 4 Renewal Modification 2. 3 If this application is being submitted as the result of a renewal or modification to an existing permit, list the Existing permit number N/A And its issue date (if known) N/A Specify the type of project (check one): Low Density X High Density Redevelop General Permit Other 4. Additional Project Requirements (check applicable blanks): _CAMA Major X Sedimentation/Erosion Control _ 404/401 Permit NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. III. PROJL'CT INFORMATION In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. Site is redevelopment of existino paved lot and former aas station. Runoff is directed throuoh swales to dry detention systems, then to the public piped system. Runoff from the roof drains directly though roof drains to detention system. 2. Stornwater runoff from this project drains to the 3. Total Project Area: 1.82 AC White Oak 5. How many drainage areas does the project have? 2 River Basin. 4. Project Built Upon Area: 80 % 6. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area I Drainage Area 2 Receiving Stream Name Mill Creek Mill Creek Receiving Stream Class SC; NSW SC; NSW Drainage Area 51,510 SF / 1.18 AC 20,400 SF / 0.47 AC Existing Impervious * Area 51,510 SF / 1.18 AC 20,400 SF / 0.47 AC Proposed Impervious* Area 46,120 SF / 1.06 AC 17,500 SF / 0.40 AC % Impervious* Area total 90% 85% Irn )ervious* Surface Area Drainage Area 1 Drainage Area 2 On -site Buildings 14,820 SF / 0.34 AC N/A On -site Streets N/A N/A On -site Parking 28,400 SF / 0.65 AC 16,000 SF / 0.37 AC On -site Sidewalks 2,900 SF / 0.07 AC 1,500 SF / 0.03 SF Other on -site 3- 1- N/A N/A Off -site %aO N/A N/A Total: 63;7-96 SF / 1.06 AC Total: 17,500 SF / 0.40 AC * Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas sidewalks, gravel areas, etc. Form SWU-101 Version 3.99 Page 2 of 4 h 3 X (�a How was the off -site impervious area listed above derived? Measurement of proposed walks IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale ofany lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. 1. The following covenants are intended to ensure ongoing compliance with state stormwater management permit number as issued by the Division of Water Quality. These covenants may not be changed or deleted without the consent of the State. 2. No mare than N/A square feet ofany lot shall be covered by structures or impervious materials. Impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include wood decking or the water surface of swimmning pools. 3. Swales shall not be filled in, piped, or altered except as necessary to provide driveway crossings. 4. Built -upon area in excess of the permitted amount requires a state stormwater management permit modification prior to construction. 5. All permitted runofff•oin oulparcels or future development shall be directed into the permitted stormwater control system. These connections to the stormwater control system shall be performed in a manner that maintains the integrity and performance of the system as permitted. By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement fonn(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Form SWU-102 Form SWU-103 Dorm SWU-104 Form SWU-105 Form SWU-106 Form SWU-107 Form SWU-108 Form SWU-109 Wet Detention Basin Supplement Infiltration Basin Supplement Low Density Supplement Curb Outlet System Supplement Off -Site System Supplement Underground Infiltration Trench Supplement Neuse River Basin Supplement Innovative Best Management Practice Supplement Form SWU-101 Version 3.99 Page 3 of 4 VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Regional Office. Please indicate that you have provided the following required information by initialing in the space provided next to each item. • Original and one copy of the Stormwater Management Permit Application Form • One copy of the applicable supplement form(s) for each BMP • Permit application processing fee of $420 (payable to NCDEN R) • Detailed narrative description of stornwater treatment / management Two copies of plans and specifications, including: - Development / Project name - Engineer and firm Initials car C-/ - Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property / project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. C. Lawrence Sneeden, Jr., P.E. Designated agent (individual or firm): Andrew & Kuske Consulting Engineers, Inc. Mailing Address: 902 Market Street City: Wilmington State: NC Zip: Phone: (910) 343-9653 Fax: (910) 343-9604 VIII. APPLICANT'S CERTIFICATION 28401 1, Q)rint or type name of person listed in General /nformation, item 2) Warren G. Bailey, Member Certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project wyl be constructs i iformance with the approved plans, that the required deed restrictions and protective coves nts will be rec rded, and the proposed project complies with the requirements of 15A NCAC 21-1.1000. Signature: Form SWU-101 Version 3.99 Page 4 of 4 Date: -u �5 Lcv� Date I d Deslgn GL NORRIS, KUSKE & TUNSTALL 902Market St. CONSULTING ENGINEERS, INC. Wilmington, N.C.28401 Sheet F pf Check Job For Job No, S IOK'- .\'v47-E., cALCr S/i cf<San/vLL�' �vALr;nfG'rt� 03308 S/71:f rDA A ,5,I (5 /-{ R E/.1 # I, E?. 2_ 79/ Zoo IAcrAREA 1-3L0�- 0,? ¢ j4, F20 ( cAI./urY fI l r/.I V 4rZCA) 4v/F?,'C-N7 /,0Z ¢�f ifob \VALKr 0,/o 4f ¢Oa -107i1L I"r' FT6 67,6z .;If o,36 Ac, o;= SITS? 'p ILF I IVr 0 r-S'I-rep S I 0L5 �11.4 �I< J /N Tf/A% A ML'/I Atr -' INc�UIJ�o fN f�p..i/�L�NT 'QAJ/N /n1P /i RfO/ =I spa 2q<�L ?P-41W4I;E Ay 73Ar/� 'D RAI I'AC L' A 17-e4 f ,.�pc•Lvio yr �rL��/ rrunrrrhrr HA CARp��N,,��, 13LD6r v.s� 1�,s32o ;2' tssIpyq•;a': ,0 0 l.'. PA. G Af 7- o,as Ze, 4-oo i SE AL SrpE v�Ll�s ro,07 2/ 10972 To L. I. o G 4-61 1 Z 0' S %s!�/v��%.NCI NEEQ:••'< 90 Innr- I,oc �1,1Q = g o >o a /z $Ta 12A r; Lc VOL, '260 'o 1 REYi7 V v= (4-(rIZ.0 Sr'x 0,9) FCS3Sux0,2) >C I IA? c 3550 CF STo K/74� -P/zo V/OC:U LSEC- P/1Cdn // op C4LCfJ V5ee C',IZASSI✓rj S\VALcs e InfLETS 1471 Af `I AS Forz DItY DE7civT014 SG-6 11 i 7A c/.!E'J cALcs / PG II r F. is sro 2/�CE 14NvC = 3(;. S V = IZS rJ C r 4- Cp,6'z(�9u cr% 34-30 cF < 3SYo cif 72C-DEvcrL0rAt C-"-) G 21r-/cc3 FuK 2-- VA % 9Ji2Awol,•. Q= 343 0 G r J 2. Vn V/ 4 Z 4 Nti/ //J /�Y 1 3Lu u Se'c/Ian (7,02 Crr lucre/ luesign I NORRIS, KUSKE & TUNSTALL pn l c-/902MarketSt. CONSULTING ENGINEERS, INC. Wilmington, N.C.28401 piCheck Job For b No. /\\w4rE�- GAc—e—r 17Aucton,vtL a� O TZI rIC� r-aR PQ-1) A ( e-- ,T'O) 6)= 0.6 A zp! 0ft,rcC E�ti O,oz = 0, (� A 2 E3z•zI�2,I I fF= 010029 Sr x li4 In t/F n.4f IN= 0,41 N` TT-rz rt - o,/_ IN` r = 0,3C IN D _ 0,7Z IN plcA� .A4� -13,95 . 'T3" A s,= T»AIr A�c3l AF-ca 0-4-7 20/4U0 13LDGJ' O d I-/;.vC�MEMT 0.37 l6, 060 \VA LGf 0,03 1 .So 0 To%4z o,¢o 17/5-oo If- 7 STOR/acL VOL. TLEcu'h 1I 033o V'((1-71 -!1 sF x. o. rJ f' l 2900--- = 1-3 cl STJr✓at �� PKO�,/Oi=o �s��E P�SEIZl U5c- Ca45FF0 S\%—qc-C C' 13 Z "FoR DETL-A/T,on- C✓ /-/�v L = 36.s \/ = 12 o c r- _/- o, 8 (4.Yo c r- = 4$o Cl- t134a cT ( APPfevE/J Fo/a REocvELaP^LeA,-r) OIt. IF,cLE C> = 4- go c r= z= 2 g* 3 G o o 0, 0027 cis 2i C. 0,(e A GJ�Z,/ A• c 01 000 I Jr- x 14I- 0.0( It./L Tr L r` C7 r72 / N �- =(3(;,8-3z,r)/2 - o,oz' 2,/ (/ JL' O.S ' I_laL� 'ra P/CE4ENT CLe�,I/N� B 11B AREA TO CURB CUT B 1 B 1A SW BOM CURB cur 1RTO 18-1 B-1 DI B.1 W/ ENTw� B-lICl SWALE FjM CURB OUT B4DIT0 DI B I B-1 D AREA TO CURB CUT B10 B_22 PIPE FROJZFES 8-2 TO DI I r— B-2A o-�(B-2B SWALE FROM CC B-2B TO FES B 2 AREA TO CURB CUT B3B A 55F AREA To C�RB cur A. -SE -SD SWALEF CURB �A-5B CUT A 5F O FES A AREA TOURB BUILDINOLOANOPY A LLLLLL CUT B A_38 --5c — A 5 i a-— -5A AREATO�RBCUT A ROOF DRAIN FROM I� BLOG A50 TO FES PIPEFRO�FESA5 SWALE FROM CURB CUTA58TOFESA-5 O 0.5 Toy IAA A'3D W-3AI A•2A AREA TO URB CUT SWALE JC TOI IIFR M CC A-3A M] AREA TO dURB CUT A-4 AT A2 PIPE FROM DI A O BA-2� �� 3 A2 Ai SWALE FROM CC DI A-2 WIDET TION AREA TO CURB CUT AJC TO DIA3 PIPE FROM DI A-3 TO OI A-2 @DI Ad A-1 PIPE FROM DI A-2 TO EXIST, SO Su4 Reach Aon Llnk 03308 Jacksonville Walgreens Detention R1 Type 111 24-hr 2 Yr Rainfall=4.50" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. Page 2 HydroCADO 7.01 s/n 000479 @ 1986-2004 Applied Microcomputer Systems 2/4/2005 7:49:48 AM Time span=11.00-66.00 hrs, dt=0.01 hrs, 5501 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment A-2A: AREA TO CURB CUT AT DI A-2 Subcatchment A-3B: AREA TO CURB CUT A-3A Subcatchment A-3D: AREA TO CURB CUT A-3C Subcatchment A-4A: AREA TO CURB CUT @ DI A-4 Subcatchment A-5B: AREA TO CURB CUT A-5B Subcatchment A-51): BUILDING & CANOPY Subcatchment A-5F: AREA TO CURB CUT A-51F Subcatchment B-1B: AREA TO CURB CUT B-1A Subcatchment B-1D: AREA TO CURB CUT B-1D Subcatchment B-2B: AREA TO CURB CUT B-2B Runoff Area=2,960 sf Runoff Depth=3.14" Tc=10.0 min CN=92 Runoff=0.24 cfs 0.018 of Runoff Area=8,160 sf Runoff Depth=3.14" Tc=10.0 min CN=92 Runoff=0.66 cfs 0.049 of Runoff Area=5,200 sf Runoff Depth=3.14" Tc=10.0 min CN=92 Runoff=0.42 cfs 0.031 of Runoff Area=4,330 sf Runoff Depth=3.14" Tc=10.0 min CN=92 Runoff=0.35 cfs 0.026 of Runoff Area=6,380 sf Runoff Depth=3.14" Tc=10.0 min CN=92 Runoff=0.52 cfs 0.038 of Runoff Area=15,420 sf Runoff Depth=3.40" Tc=10.0 min CN=98 Runoff=1.37 cfs 0.100 of Runoff Area=9,060 sf Runoff Depth=3.14" Tc=10.0 min CN=92 Runoff=0.74 cfs 0.054 of Runoff Area=8,470 sf Runoff Depth=3.14" Tc=10.0 min CN=92 Runoff=0.69 cfs 0.051 of Runoff Area=7,360 sf Runoff Depth=3.14" Tc=10.0 min CN=92 Runoff=0.60 cfs 0.044 of Runoff Area=4,560 sf Runoff Depth=3.14" Tc=10.0 min CN=92 Runoff=0.37 cfs 0.027 of Reach A-1: PIPE FROM DI A-2 TO EXIST. SD Peak Depth=0.58' Max Vet=4.3 fps Inflow=2.71 cfs 0.317 of D=18.0" n=0.013 L=30.0' S=0.0067'/' Capacity=8.58 cfs Outflow=2.71 cfs 0.317 of Reach A-3: PIPE FROM D1 A-3 TO DI A-2 Peak Depth=0.27' Max Vet=6.2 fps Inflow=1.06 cfs 0.080 of D=12.0" n=0.013 L=34.0' S=0.0353'P Capacity=6.69 cfs Outflow=1.06 cfs 0.080 of Reach A-3A: SWALE FROM CC A-3A TO DI AReak Depth=0.21' Max Vet=3.0 fps Inflow=0.66 cfs 0.049 of n=0.024 L=25.0' S=0.0480 7' Capacity=42.17 cfs Outflow=0.66 cfs 0.049 of Reach A-3C: SWALE FROM CC A-3C TO DI AReak Depth=0.24' Max Vet=1.4 fps Inflow=0.42 cfs 0.031 of n=0.026 L=130.0' S=0.0100'P Capacity=17.77 cfs Outflow=0.41 cfs 0.031 of Reach A4: PIPE FROM DI A4 TO JB A-2 Peak Depth=0.79' Max Vet=3.6 fps Inflow=2.95 cfs 0.219 of D=15.0" n=0.013 L=75.0' S=0.0040'/' Capacity=4.09 cfs Outflow=2.94 cfs 0.219 of 03308 Jacksonville Walgreens Detention R1 Type Ill 24-hr 2 Yr Rainfall=4.50" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. Page 3 HydroCADO 7.01 s/n 000479 © 1986-2004 Applied Microcomputer Systems 2/4/2005 7:49 48 AM Reach A-5: PIPE FROM FES A-5 TO DI A-4 Peak Depth=0.66' Max Vet=4.0 fps Inflow=2.61 cfs 0.193 of D=15.0" n=0.013 L=130.0' S=0.00547 Capacity=4.74 cfs Outflow=2.60 cfs 0.193 of Reach A-5A: SWALE FROM CURB CUT A-5BPeak Depth=0.24' Max Vet=1.8 fps Inflow=0.52 cfs 0.038 of n=0.026 L=50.0' S=0.0180'/' Capacity=23.84 cfs Outflow=0.52 cfs 0.038 of Reach A -BC: ROOF DRAIN FROM BLDG A-51yeak Depth=0.50' Max Vet=3.5 fps Inflow=1.37 cfs 0.100 of D=12.0" n=0.013 L=50.0' S=0.0060'f Capacity=2.76 cfs Outflow=1.36 cfs 0.100 of Reach A -BE: SWALE FROM CURB CUT A-51F Peak Depth=0.29' Max Vet=1.7 fps Inflow=0.74 cfs 0.054 of n=0.026 L=60.0' S=0.0117'/' Capacity=19.19 cfs Outflow=0.73 cfs 0.054 of Reach B-1A: SWALE FROM CURB CUT B-1BPeak Depth=0.25' Max Vet=2.2 fps Inflow=0.69 cfs 0.051 of n=0.026 L=30.0' S=0.0233 '/' Capacity=27.14 cfs Outflow=0.69 cfs 0.051 of Reach BA C: SWALE FROM CURB CUT B-1 DPeak Depth=0.25' Max Vet=1.9 fps Inflow=0.60 cfs 0.044 of n=0.026 L=40.0' S=0.0175'/' Capacity=23.51 cfs Outflow=0.60 cfs 0.044 of Reach B-2: PIPE FROM FES B-2 TO DI B-1 Peak Depth=0.18' Max Vet=3.7 fps Inflow=0.37 cfs 0.027 of D=12.0" n=0.013 L=104.0' S=0.0192'/' Capacity=4.94 cfs Outflow=0.37 cfs 0.027 of Reach B-2A: SWALE FROM CC B-28 TO FESPeak Depth=0.17' Max Vet=2.6 fps Inflow=0.37 cfs 0.027 of n=0.026 L=40.0' S=0.0550 T Capacity=41.67 cfs Outflow=0.37 cfs 0.027 of Pond A2: DI A-2 W/DETENTION Peak Elev=37.15' Storage=4,675 cf Inflow=4.22 cfs 0.317 of Outflow=2.71 cfs 0.317 of Pond B-1: DI B-1 W/DETENTION Peak Elev=37.05' Storage=615 cf Inflow=1.65 cfs 0.123 of Outflow=1.60 cfs 0.123 of Total Runoff Area = 1.651 ac Runoff Volume = 0.440 of Average Runoff Depth = 3.20" 03308 Jacksonville Walgreens Detention R1 Type Ill 24-hr 2 Yr Rainfall=4.50" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. Page 4 HydroCADG 7.01 s/n 000479 © 1986-2004 Applied Microcomputer Systems 2/4/2005 7:51:26 AM Subcatchment A-2A: AREA TO CURB CUT AT DI A-2 Runoff = 0.24 cfs @ 12.14 hrs, Volume= 0.018 af, Depth= 3.14" Runoff by SCS TR-20 method, UH=SCS, Time Span= 11.00-66.00 hrs, dt= 0.01 hrs Type III 24-hr 2 Yr Rainfall=4.50" 2,960 92 Urban commercial, 85% imp, HSG B Tc Length Slope Velocity Capacity Description 10.0 Direct Entry, Subcatchment A-3B: AREA TO CURB CUT A-3A Runoff = 0.66 cfs @ 12.14 hrs, Volume= 0.049 af, Depth= 3.14" Runoff by SCS TR-20 method, UH=SCS, Time Span= 11.00-66.00 hrs, dt= 0.01 hrs Type III 24-hr 2 Yr Rainfall=4.50" Area (so CN Description 8,160 92 Urban commercial, 85% imp, HSG B Tc Length Slope Velocity Capacity Description 10.0 Direct Entry, Subcatchment A-31): AREA TO CURB CUT A-3C Runoff = 0.42 cfs @ 12.14 hrs, Volume= 0.031 af, Depth= 3.14" Runoff by SCS TR-20 method, UH=SCS, Time Span= 11.00-66.00 hrs, dt= 0.01 hrs Type III 24-hr 2 Yr Rainfall=4.50" Area (so CN Description 5,200 92 Urban commercial, 85% imp, HSG B Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Subcatchment A-4A: AREA TO CURB CUT @ DI A-4 Runoff = 0.35 cfs @ 12.14 hrs, Volume= 0.026 af, Depth= 3.14" Runoff by SCS TR-20 method, UH=SCS, Time Span= 11.00-66.00 hrs, dt= 0.01 hrs Type III 24-hr 2 Yr Rainfall=4.50" 03308 Jacksonville Walgreens Detention R1 Type 111 24-hr 2 Yr Rainfall=4.50" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. Page 5 HydroCAD® 7.01 s/n 000479 @ 1986-2004 Applied Microcomputer Systems 2/4/2005 7:51:26 AM Area (sf) CN Description 4,330 92 Urban commercial, 85% imp, HSG B Tc Length Slope Velocity Capacity Description 10.0 Runoff = Direct Entry, Subcatchment A-5B: AREA TO CURB CUT A-5B 0.52 cfs @ 12.14 hrs, Volume= 0.038 af, Depth= 3.14" Runoff by SCS TR-20 method, UH=SCS, Time Span= 11.00-66.00 hrs, dt= 0.01 hrs Type III 24-hr 2 Yr Rainfall=4.50" Area (sf) CN Description 6,380 92 Urban commercial, 85% imp, HSG B Tc Length Slope Description 10.0 Direct Entry, Subcatchment A-51): BUILDING & CANOPY Runoff = 1.37 cfs @ 12.13 hrs, Volume= 0.100 af, Depth= 3.40" Runoff by SCS TR-20 method, UH=SCS, Time Span= 11.00-66.00 hrs, dt= 0.01 hrs Type III 24-hr 2 Yr Rainfall=4.50" Area (so CN Description 15,420 98 Paved parking & roofs Tc Length Slope Velocity Capacity Description 10.0 Direct Entry, Subcatchment A-51F: AREA TO CURB CUT A-517 Runoff = 0.74 cfs @ 12.14 hrs, Volume= 0.054 af, Depth= 3.14" Runoff by SCS TR-20 method, UH=SCS, Time Span= 11.00-66.00 hrs, dt= 0.01 hrs Type III 24-hr 2 Yr Rainfall=4.50" Area (so CN Description 9,060 92 Urban commercial, 85% imp, HSG B Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ff) (f /sec) (cfs) 10.0 Direct Entry, 03308 Jacksonville Walgreens Detention R1 Type 111 24-hr 2 Yr Rainfall=4.50" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. Page 6 HydroCADO 7.01 s/n 000479 @ 1986-2004 Applied Microcomputer Systems 2/4/2005 7 51 26 AM Subcatchment BAB: AREA TO CURB CUT B-1A Runoff = 0.69 cfs @ 12.14 hrs, Volume= 0.051 af, Depth= 3.14" Runoff by SCS TR-20 method, UH=SCS, Time Span= 11.00-66.00 hrs, dt= 0.01 hrs Type III 24-hr 2 Yr Rainfall=4.50" Area (sf) CN Description 8,470 92 Urban commercial, 85% imp, HSG B Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Subcatchment B-1 D: AREA TO CURB CUT B-1 D Runoff = 0.60 cfs @ 12.14 hrs, Volume= 0.044 af, Depth= 3.14" Runoff by SCS TR-20 method, UH=SCS, Time Span= 11.00-66.00 hrs, dt= 0.01 hrs Type III 24-hr 2 Yr Rainfall=4.50" Area (sf) CN Description 7,360 92 Urban commercial, 85% imp, HSG B Tc Length Slope Description 10.0 Direct Entry, Subcatchment B-2B: AREA TO CURB CUT B-2B Runoff = 0.37 cfs @ 12.14 hrs, Volume= 0.027 af, Depth= 3.14" Runoff by SCS TR-20 method, UH=SCS, Time Span= 11.00-66.00 hrs, dt= 0.01 hrs Type III 24-hr 2 Yr Rainfall=4.50" Area (sf) CN Description 4,560 92 Urban commercial, 85% imp, HSG B Tc Length Slope Velocity Capacity Description _(min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Reach A-1: PIPE FROM DI A-2 TO EXIST. SD Inflow Area = 1.183 ac, Inflow Depth = 3.22" for 2 Yr event Inflow = 2.71 cfs @ 12.30 hrs, Volume= 0.317 of Outflow = 2.71 cfs @ 12.31 hrs, Volume= 0.317 af, Atten= 0%, Lag= 0.2 min 03308 Jacksonville Walgreens Detention R1 Type 111 24-hr 2 Yr Rainfall=4.50" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. Page 7 HydroCADO 7.01 sln 000479 0 1986-2004 Applied Microcomputer Systems 2/4/2005 7:51:26 AM Routing by Stor-Ind+Trans method, Time Span= 11.00-66.00 hrs, dt= 0.01 hrs Max. Velocity= 4.3 fps, Min. Travel Time= 0.1 min Avg. Velocity = 1.2 fps, Avg. Travel Time= 0.4 min Peak Depth= 0.58' @ 12.31 hrs Capacity at bank full= 8.58 cfs Inlet Invert= 32.50', Outlet Invert= 32.30' 18.0" Diameter Pipe n= 0.013 Length= 30.0' Slope= 0.0067 'P Reach A-3: PIPE FROM D1 A-3 TO DI A-2 Inflow Area = 0.307 ac, Inflow Depth = 3.14" for 2 Yr event Inflow = 1.06 cfs @ 12.16 hrs, Volume= 0.080 of Outflow = 1.06 cfs @ 12.16 hrs, Volume= 0.080 af, Atten= 0%, Lag= 0.2 min Routing by Stor-Ind+Trans method, Time Span= 11.00-66.00 hrs, dt= 0.01 hrs Max. Velocity= 6.2 fps, Min. Travel Time= 0.1 min Avg. Velocity = 2.3 fps, Avg. Travel Time= 0.2 min Peak Depth= 0.27' @ 12.16 hrs Capacity at bank full= 6.69 cfs Inlet Invert= 33.70', Outlet Invert= 32.50' 12.0" Diameter Pipe n= 0.013 Length= 34.0' Slope= 0.0353'P Reach A-3A: SWALE FROM CC A-3A TO DI A-3 Inflow Area = 0.187 ac, Inflow Depth = 3.14" for 2 Yr event Inflow = 0.66 cfs @ 12.14 hrs, Volume= 0.049 of Outflow = 0.66 cfs @ 12.14 hrs, Volume= 0.049 af, Atten= 0%, Lag= 0.2 min Routing by Stor-Ind+Trans method, Time Span= 11.00-66.00 hrs, dt= 0.01 hrs Max. Velocity= 3.0 fps, Min. Travel Time= 0.1 min Avg. Velocity = 1.3 fps, Avg. Travel Time= 0.3 min Peak Depth= 0.21' @ 12.14 hrs Capacity at bank full= 42.17 cfs Inlet Invert= 36.90', Outlet Invert= 35.70' 0.00' x 1.00' deep channel, n= 0.024 Length= 25.0' Slope= 0.0480 '/' Side Slope Z-value= 5.0'/' Reach A-3C: SWALE FROM CC A-3C TO DI A-3 Inflow Area = 0.119 ac, Inflow Depth = 3.14" for 2 Yr event Inflow = 0.42 cfs @ 12.14 hrs, Volume= 0.031 of Outflow = 0.41 cfs @ 12.18 hrs, Volume= 0.031 af, Atten= 2%, Lag= 2.7 min Routing by Stor-Ind+Trans method, Time Span= 11.00-66.00 hrs, dt= 0.01 hrs Max. Velocity= 1.4 fps, Min. Travel Time= 1.6 min Avg. Velocity = 0.6 fps, Avg. Travel Time= 3.6 min 03308 Jacksonville Walgreens Detention R1 Type 11124-hr 2 Yr Rainfall=4.50" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. Page 8 Peak Depth= 0.24' @ 12.15 hrs Capacity at bank full= 17.77 cfs Inlet Invert= 37.00', Outlet Invert= 35.70' 0.00' x 1.00' deep channel, n= 0.026 Length= 130.0' Slope= 0.01007 Side Slope Z-value= 5.0'f Reach A-4: PIPE FROM DI A-4 TO JB A-2 Inflow Area = 0.808 ac, Inflow Depth = 3.26" for 2 Yr event Inflow = 2.95 cfs @ 12.16 hrs, Volume= 0.219 of Outflow = 2.94 cfs @ 12.17 hrs, Volume= 0.219 af, Atten= 0%, Lag= 0.6 min Routing by Stor-Ind+Trans method, Time Span= 11.00-66.00 hrs, dt= 0.01 hrs Max. Velocity= 3.6 fps, Min. Travel Time= 0.3 min Avg. Velocity = 1.4 fps, Avg. Travel Time= 0.9 min Peak Depth= 0.79' @ 12.16 hrs Capacity at bank full= 4.09 cfs Inlet Invert= 32.80', Outlet Invert= 32.50' 15.0" Diameter Pipe n= 0.013 Length= 75.0' Slope= 0.0040'f Reach A-5: PIPE FROM FES A-5 TO DI A-4 Inflow Area = 0.708 ac, Inflow Depth = 3.27" for 2 Yr event Inflow = 2.61 cfs @ 12.15 hrs, Volume= 0.193 of Outflow = 2.60 cfs @ 12.16 hrs, Volume= 0.193 af, Atten= 0%, Lag= 1.0 min Routing by Stor-Ind+Trans method, Time Span= 11.00-66.00 hrs, dt= 0.01 hrs Max. Velocity= 4.0 fps, Min. Travel Time= 0.5 min Avg. Velocity = 1.5 fps, Avg. Travel Time= 1.4 min Peak Depth= 0.66' @ 12.15 hrs Capacity at bank full= 4.74 cfs Inlet Invert= 33.50', Outlet Invert= 32.80' 15.0" Diameter Pipe n= 0.013 Length= 130.0' Slope= 0.0054 'f Reach A-5A: SWALE FROM CURB CUT A-5B TO FES A-5 Inflow Area = 0.146 ac, Inflow Depth = 3.14" for 2 Yr event Inflow = 0.52 cfs @ 12.14 hrs, Volume= 0.038 of Outflow = 0.52 cfs @ 12.15 hrs, Volume= 0.038 af, Atten= 0%, Lag= 0.8 min Routing by Stor-Ind+Trans method, Time Span= 11.00-66.00 hrs, dt= 0.01 hrs Max. Velocity= 1.8 fps, Min. Travel Time= 0.5 min Avg. Velocity = 0.8 fps, Avg. Travel Time= 1.0 min Peak Depth= 0.24' @ 12.14 hrs Capacity at bank full= 23.84 cfs Inlet Invert= 36.90', Outlet Invert= 36.00' 0.00' x 1.00' deep channel, n= 0.026 Length= 50.0' Slope= 0.0180 T Side Slope Z-value= 5.07 03308 Jacksonville Walgreens Detention R1 Type 111 24-hr 2 Yr Rainfall=4.50" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. Page 9 HydroCADO 7.01 s/n 000479 © 1986-2004 Applied Microcomputer Systems 2/4/2005 7:51:26 AM Reach A-5C: ROOF DRAIN FROM BLDG A-513 TO FES A-5 Inflow Area = 0.354 ac, Inflow Depth = 3.40" for 2 Yr event Inflow = 1.37 cfs @ 12.13 hrs, Volume= 0.100 of Outflow = 1.36 cfs @ 12.14 hrs, Volume= 0.100 af, Atten= 0%, Lag= 0.4 min Routing by Stor-Ind+Trans method, Time Span= 11.00-66.00 hrs, dt= 0.01 hrs Max. Velocity= 3.5 fps, Min. Travel Time= 0.2 min Avg. Velocity = 1.3 fps, Avg. Travel Time= 0.6 min Peak Depth= 0.50' @ 12.14 hrs Capacity at bank full= 2.76 cfs Inlet Invert= 33.80', Outlet Invert= 33.50' 12.0" Diameter Pipe n= 0.013 Length= 50.0' Slope= 0.0060'P Reach A-5E: SWALE FROM CURB CUT A-5F TO FES A-5 Inflow Area = 0.208 ac, Inflow Depth = 3.14" for 2 Yr event Inflow = 0.74 cfs @ 12.14 hrs, Volume= 0.054 of Outflow = 0.73 cfs @ 12.15 hrs, Volume= 0.054 af, Atten= 0%, Lag= 1.0 min Routing by Stor-Ind+Trans method, Time Span= 11.00-66.00 hrs, dt= 0.01 hrs Max. Velocity= 1.7 fps, Min. Travel Time= 0.6 min Avg. Velocity = 0.7 fps, Avg. Travel Time= 1.4 min Peak Depth= 0.29' @ 12.14 hrs Capacity at bank full= 19.19 cfs Inlet Invert= 36.70', Outlet Invert= 36.00' 0.00' x 1.00' deep channel, n= 0.026 Length= 60.0' Slope= 0.0117 T Side Slope Z-value= 5.07 Reach B-1A: SWALE FROM CURB CUT B-1BT0 DI B-1 Inflow Area = 0.194 ac, Inflow Depth = 3.14" for 2 Yr event Inflow = 0.69 cfs @ 12.14 hrs, Volume= 0.051 of Outflow = 0.69 cfs @ 12.14 hrs, Volume= 0.051 af, Atten= 0%, Lag= 0.4 min Routing by Stor-Ind+Trans method, Time Span= 11.00-66.00 hrs, dt= 0.01 hrs Max. Velocity= 2.2 fps, Min. Travel Time= 0.2 min Avg. Velocity = 0.9 fps, Avg. Travel Time= 0.5 min Peak Depth= 0.25' @ 12.14 hrs Capacity at bank full= 27.14 cfs Inlet Invert= 36.80', Outlet Invert= 36.10' 0.00' x 1.00' deep channel, n= 0.026 Length= 30.0' Slope= 0.0233 T Side Slope Z-value= 5.07 03308 Jacksonville Walgreens Detention R1 Type /// 24-hr 2 Yr Rainfall=4.50" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. Page 10 HydroCADO 7.01 s/n 000479 © 1986-2004 Applied Microcomputer Systems 2/4/2005 7:51:26 AM Reach B-1C: SWALE FROM CURB CUT B-1D TO DI B-1 Inflow Area = 0.169 ac, Inflow Depth = 3.14" for 2 Yr event Inflow = 0.60 cfs @ 12,14 hrs, Volume= 0.044 of Outflow = 0.60 cfs @ 12.15 hrs, Volume= 0.044 af, Atten= 0%, Lag= 0.6 min Routing by Stor-Ind+Trans method, Time Span= 11.00-66.00 hrs, dt= 0.01 hrs Max. Velocity= 1.9 fps, Min. Travel Time= 0.4 min Avg. Velocity = 0.8 fps, Avg. Travel Time= 0.8 min Peak Depth= 0.25' @ 12.14 hrs Capacity at bank full= 23.51 cfs Inlet Invert= 36.80', Outlet Invert= 36.10' 0.00' x 1.00' deep channel, n= 0.026 Length= 40.0' Slope= 0.0175 T Side Slope Z-value= 5.07 Reach B-2: PIPE FROM FES B-2 TO DI B-1 Inflow Area = 0.105 ac, Inflow Depth = 3.14" for 2 Yr event Inflow = 0.37 cfs @ 12.14 hrs, Volume= 0.027 of Outflow = 0.37 cfs @ 12.16 hrs, Volume= 0.027 af, Atten= 0%, Lag= 0.8 min Routing by Stor-Ind+Trans method, Time Span= 11.00-66.00 hrs, dt= 0.01 hrs Max. Velocity= 3.7 fps, Min. Travel Time= 0.5 min Avg. Velocity = 1.4 fps, Avg. Travel Time= 1.3 min Peak Depth= 0.18' @ 12.15 hrs Capacity at bank full= 4.94 cfs Inlet Invert= 35.00', Outlet Invert= 33.00' 12.0" Diameter Pipe n= 0.013 Length= 104.0' Slope= 0.0192'/' Reach B-2A: SWALE FROM CC B-213 TO FES B-2 Inflow Area = 0.105 ac, Inflow Depth = 3.14" for 2 Yr event Inflow = 0.37 cfs @ 12.14 hrs, Volume= 0.027 of Outflow = 0.37 cfs @ 12.14 hrs, Volume= 0.027 af, Atten= 0%, Lag= 0.4 min Routing by Stor-Ind+Trans method, Time Span= 11.00-66.00 hrs, dt= 0.01 hrs Max. Velocity= 2.6 fps, Min. Travel Time= 0.3 min Avg. Velocity = 1.1 fps, Avg. Travel Time= 0.6 min Peak Depth= 0.17' @ 12.14 hrs Capacity at bank full= 41.67 cfs Inlet Invert= 37.20', Outlet Invert= 35.00' 0.00' x 1.00' deep channel, n= 0.026 Length= 40.0' Slope= 0.0550 T Side Slope Z-value= 5.0 7' 03308 Jacksonville Walgreens Detention Prepared by Norris, Kuske, & Tunstall Consultir HydroCADO 7.01 s/n 000479 © 1986-2004 Applied M R1 Type Ill 24-hr 2 Yr Rainfall=4.50" g Engineers, Inc. Page 11 Pond A2: DI A-2 WIDETENTION Inflow Area = 1.183 ac, Inflow Depth = 3.22" for 2 Yr event Inflow = 4.22 cfs @ 12.16 hrs, Volume= 0.317 of Outflow = 2.71 cfs @ 12.30 hrs, Volume= 0.317 af, Atten= 36%, Lag= 8.3 min Primary = 2.71 cfs @ 12.30 hrs, Volume= 0.317 of Routing by Stor-Ind method, Time Span= 11.00-66.00 hrs, dt= 0.01 hrs / 3 Peak Elev= 37.15' @ 12.30 hrs Surf.Area= 4,115 sf Storage= 4,675 cf Plug -Flow detention time= 478.7 min calculated for 0.317 of (100% of inflow) Center -of -Mass det. time= 479.0 min ( 1,304.1 - 825.1 ) # Invert Avail.Storage Storage Description 1 34.00' 8,740 cf Custom Stage Data (Prismatic�isted below Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 34.00 60 0 0 35.00 480 270 270 36.00 1,540 1,010 1,280 37.00 3,840 2,690 3,970 38.00 5,700 4,770 8,740 # Routing Invert Outlet Devices 1 Primary 32.40' 18.0" x 30.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 32.30' S= 0.0033'/' n= 0.013 Cc= 0.900 2 Device 1 32.50' 0.7" Vert. Orifice/Grate C= 0.600 3 Device 1 36.80' 4.0' long x 2.5' high Sharp -Crested Rectangular Weir 2 End Contraction(s) 1.00' Rise Primary OutFlow Max=2.71 cfs @ 12.30 hrs HW=37.15' (Free Discharge) t1=Culvert (Passes 2.71 cfs of 17.01 cfs potential flow) �2=Orifice/Grate (Orifice Controls 0.03 cfs @ 10.3 fps) 3=Sharp-Crested Rectangular Weir (Weir Controls 2.68 cfs @ 2.0 fps) Pond B-1: DI B-1 W/DETENTION Inflow Area = 0.468 ac, Inflow Depth = 3.14" for 2 Yr event Inflow = 1.65 cfs @ 12,15 hrs, Volume= 0.123 of Outflow = 1.60 cfs @ 12.17 hrs, Volume= 0.123 af, Atten= 3%, Lag= 1.6 min Primary = 1.60 cfs @ 12.17 hrs, Volume= 0.123 of Routing by Stor-Ind method, Time Span= 11.00-66.00 hrs, dt= 0.01 hrs Peak Elev= 37.05' @ 12.17 hrs Surf.Area= 709 sf Storage= 615 cf Plug -Flow detention time= 97.9 min calculated for 0.123 of (100% of inflow) Center -of -Mass det. time= 98.0 min ( 923.0 - 825.0 ) # Invert Avail.Storage Storage Description 1 35.00' 1,570 cf Custom Stage Data (Prismatic�isted below 03308 Jacksonville Walgreens Detention R1 Type 111 24-hr 2 Yr Rainfall=4.50" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. Page 12 HydroCADO 7.01 s/n 000479 @ 1986-2004 Applied Microcomputer Systems 2/4/2005 7:51:26 AM Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 35.00 20 0 0 36.00 220 120 120 37.00 680 450 570 38.00 1,320 1,000 1,570 # Routing Invert Outlet Devices 1 Primary 32.40' 15.0" x 20.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 32.20' S= 0.0100'P n= 0.013 Cc= 0.900 2 Device 1 32.50' 0.5" Vert. Orifice/Grate C= 0.600 3 Device 1 36.80' 4.0' long x 3.0' high Sharp -Crested Rectangular Weir 2 End Contraction(s) 1.00' Rise Primary OutFlow Max=1.59 cfs @ 12.17 hrs HW=37.04' (Free Discharge) L1=Culvert (Passes 1.59 cfs of 11.85 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.01 cfs @ 10.2 fps) t 3=Sharp-Crested Rectangular Weir (Weir Controls 1.58 cfs @ 1.6 fps) 03308 Jacksonville Walgreens Detention R1 Type 11124-hr 10 Yr Rainfall=7.00" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. Page 13 HydroCADO 7.01 s/n 000479 © 1986-2004 Applied Microcomputer Systems 2/4/2005 7:52:03 AM Time span=11.00-66.00 hrs, dt=0.01 hrs, 5501 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment A-2A: AREA TO CURB CUT AT DI A-2 Subcatchment A-313: AREA TO CURB CUT A-3A Subcatchment A-3D: AREA TO CURB CUT A-3C Subcatchment A-4A: AREA TO CURB CUT @ DI A-4 Subcatchment A-513: AREA TO CURB CUT A-56 Subcatchment A-51): BUILDING & CANOPY Subcatchment A-51F: AREA TO CURB CUT A-5F Subcatchment B-1B: AREA TO CURB CUT B-1A Subcatchment B-1D: AREA TO CURB CUT B-1D Subcatchment 13-26: AREA TO CURB CUT B-26 Runoff Area=2,960 sf Runoff Depth=5.11" Tc=10.0 min CN=92 Runoff=0.39 cfs 0.029 of Runoff Area=8,160 sf Runoff Depth=5.11" Tc=10.0 min CN=92 Runoff=1.08 cfs 0.080 of Runoff Area=5,200 sf Runoff Depth=5.1 V Tc=10.0 min CN=92 Runoff=0.69 cfs 0.051 of Runoff Area=4,330 sf Runoff Depth=5.11" Tc=10.0 min CN=92 Runoff=0.57 cfs 0.042 of Runoff Area=6,380 sf Runoff Depth=5.11" Tc=10.0 min CN=92 Runoff=0.85 cfs 0.062 of Runoff Area=15,420 sf Runoff Depth=5.31" Tc=10.0 min CN=98 Runoff=2.13 cfs 0.157 of Runoff Area=9,060 sf Runoff Depth=5.11" Tc=10.0 min CN=92 Runoff=1.20 cfs 0.089 of Runoff Area=8,470 sf Runoff Depth=5.11" Tc=10.0 min CN=92 Runoff=1.12 cfs 0.083 of Runoff Area=7,360 sf Runoff Depth=5.11" Tc=10.0 min CN=92 Runoff=0.98 cfs 0.072 of Runoff Area=4,560 sf Runoff Depth=5.11" Tc=10.0 min CN=92 Runoff=0.60 cfs 0.045 of Reach A-1: PIPE FROM DI A-2 TO EXIST. SD Peak Depth=0.86' Max Vet=5.1 fps Inflow=5.40 cfs 0.509 of D=18.0" n=0.013 L=30.0' 5=0.0067'P Capacity=8.58 cfs Outflow=5.40 cfs 0.509 of Reach A-3: PIPE FROM D1 A-3 TO DI A-2 Peak Depth=0.35' Max Vet=7.2 fps Inflow=1.74 cfs 0.130 of D=12.0" n=0.013 L=34.0' 5=0.0353'/' Capacity=6.69 cfs Outflow=1.73 cfs 0.130 of Reach A-3A: SWALE FROM CC A-3A TO DI AFeak Depth=0.25' Max Vet=3.4 fps Inflow=1.08 cfs 0.080 of n=0.024 L=25.0' S=0.0480'/' Capacity=42.17 cfs Outflow=1.08 cfs 0.080 of Reach A-3C: SWALE FROM CC A-3C TO DI AFeak Depth=0.29' Max Vet=1.6 fps Inflow=0.69 cfs 0.051 of n=0.026 L=130.0' S=0.0100 V Capacity=17.77 cfs Outflow=0.68 cfs 0.051 of Reach A-4: PIPE FROM DI A-4 TO JB A-2 Peak Depth=1.25' Max Vet=3.8 fps Inflow=4.72 cfs 0.350 of D=15.0" n=0.013 L=75.0' S=0.0040 '/' Capacity=4.09 cfs Outflow=4.25 cfs 0.350 of 03308 Jacksonville Walgreens Detention R1 Type 11124-hr 10 Yr Rainfall=7.00" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. Page 14 HydroCADO 7.01 s/n 000479 © 1986-2004 Applied Microcomputer Systems 2/4/2005 7:52:03 AM Reach A-5: PIPE FROM FES A-5 TO DI A-4 Peak Depth=0.91' Max Vet=4.4 fps Inflow=4.17 cfs 0.307 of D=15.0" n=0.013 L=130.0' 5=0.0054'P Capacity=4.74 cfs Outflow=4.16 cfs 0.307 of Reach A-5A: SWALE FROM CURB CUT A-SBPeak Depth=0.29' Max Vet=2.1 fps Inflow=0.85 cfs 0.062 of n=0.026 L=50.0' 5=0.0180 T Capacity=23.84 cfs Outflow=0.84 cfs 0.062 of Reach A -SC: ROOF DRAIN FROM BLDG A-51[peak Depth=0.66' Max Vet=3.9 fps Inflow=2.13 cfs 0.157 of D=12.0" n=0.013 L=50.0' S=0.0060'/' Capacity=2.76 cfs Outflow=2.13 cfs 0.157 of Reach A-5E: SWALE FROM CURB CUT A-51F Peak Depth=0.35' Max Vet=1.9 fps Inflow=1.20 cfs 0.089 of n=0.026 L=60.0' S=0.0117'/' Capacity=19.19 cfs Outflow=1.20 cfs 0.088 of Reach B-IA: SWALE FROM CURB CUT B-1 BPeak Depth=0.30' Max Vet=2.4 fps Inflow=1.12 cfs 0.083 of n=0.026 L=30.0' S=0.0233'/' Capacity=27.14 cfs Outflow=1.12 cfs 0.083 of Reach B-1C: SWALE FROM CURB CUT B-1DPeak Depth=0.30' Max Vet=2.1 fps Inflow=0.98 cfs 0.072 of n=0.026 L=40.0' S=0.0175'/' Capacity=23.51 cfs Outflow=0.97 cfs 0.072 of Reach B-2: PIPE FROM FES B-2 TO DI B-1 Peak Depth=0.24' Max Vet=4.3 fps Inflow=0.60 cfs 0.045 of D=12.0" n=0.013 L=104.0' S=0.0192 T Capacity=4.94 cfs Outflow=0.60 cfs 0.045 of Reach B-2A: SWALE FROM CC B-219 TO FESPeak Depth=0.20' Max Vet=2.9 fps Inflow=0.60 cfs 0.045 of n=0.026 L=40.0' S=0.0550 'P Capacity=41.67 cfs Outflow=0.60 cfs 0.045 of Pond A2: DI A-2 W/DETENTION Peak Elev=37.35' Storage=5,653 cf Inflow=6.30 cfs 0.509 of Outflow=5.40 cfs 0.509 of Pond B-1: DI B-1 W/DETENTION Peak Elev=37.14' Storage=712 cf Inflow=2.70 cfs 0.199 of Outflow=2.63 cfs 0.199 of Total Runoff Area = 1.651 ac Runoff Volume = 0.709 of Average Runoff Depth = 5.15" 03308 Jacksonville Walgreens Detention R1 Type 11124-hr 25 Yr Rainfall=&00" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. Page 15 HydroCAD® 7.01 s/n 000479 © 1986-2004 Applied Microcomputer Systems 2/4/2005 7:52:04 AM Time span=11.00-66.00 hrs, dt=0.01 hrs, 5501 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment A-2A: AREA TO CURB CUT AT DI A-2 Subcatchment A-313: AREA TO CURB CUT A-3A Subcatchment A-31): AREA TO CURB CUT A-3C Subcatchment A-4A: AREA TO CURB CUT @ DI A-4 Subcatchment A-513: AREA TO CURB CUT A-513 Subcatchment A-51): BUILDING & CANOPY Subcatchment A-5F: AREA TO CURB CUT A-51F Subcatchment B-1B: AREA TO CURB CUT B-1A Subcatchment B-1D: AREA TO CURB CUT B-1D Subcatchment B-2B: AREA TO CURB CUT B-213 Runoff Area=2,960 sf Runoff Depth=5.89" Tc=10.0 min CN=92 Runoff=0.45 cfs 0.033 of Runoff Area=8,160 sf Runoff Depth=5.89" Tc=10.0 min CN=92 Runoff=1.25 cfs 0.092 of Runoff Area=5,200 sf Runoff Depth=5.89" Tc=10.0 min CN=92 Runoff=0.80 cfs 0.059 of Runoff Area=4,330 sf Runoff Depth=5.89" Tc=10.0 min CN=92 Runoff=0.66 cfs 0.049 of Runoff Area=6,380 sf Runoff Depth=5.89" Tc=10.0 min CN=92 Runoff=0.98 cfs 0.072 of Runoff Area=15,420 sf Runoff Depth=6.08" Tc=10.0 min CN=98 Runoff=2.44 cfs 0.179 of Runoff Area=9,060 sf Runoff Depth=5.89" Tc=10.0 min CN=92 Runoff=1.39 cfs 0.102 of Runoff Area=8,470 sf Runoff Depth=5.89" Tc=10.0 min CN=92 Runoff=1.30 cfs 0.095 of Runoff Area=7,360 sf Runoff Depth=5.89" Tc=10.0 min CN=92 Runoff=1.13 cfs 0.083 of Runoff Area=4,560 sf Runoff Depth=5.89" Tc=10.0 min CN=92 Runoff=0.70 cfs 0.051 of Reach A-1: PIPE FROM DI A-2 TO EXIST. SD Peak Depth=0.90' Max Vet=5.2 fps Inflow=5.78 cfs 0.585 of D=18.0" n=0.013 L=30.0' S=0.0067 '/' Capacity=8.58 cfs Outflow=5.78 cfs 0.585 of Reach A-3: PIPE FROM D1 A-3 TO DI A-2 Peak Depth=0.38' Max Vet=7.4 fps Inflow=2.01 cfs 0.150 of D=12.0" n=0.013 L=34.0' S=0.0353'/' Capacity=6.69 cfs Outflow=2.00 cfs 0.150 of Reach A-3A: SWALE FROM CC A-3A TO DI AReak Depth=0.27' Max Vet=3.5 fps Inflow=1.25 cfs 0.092 of n=0.024 L=25.0' S=0.0480 '/' Capacity=42.17 cfs Outflow=1.25 cfs 0.092 of Reach A-3C: SWALE FROM CC A-3C TO DI AReak Depth=0.31' Max Vet=1.6 fps Inflow=0.80 cfs 0.059 of n=0.026 L=130.0' S=0.0100'/' Capacity=17.77 cfs Outflow=0.78 cfs 0.059 of Reach A-4: PIPE FROM DI A-4 TO JB A-2 Peak Depth=1.25' Max Vet=3.8 fps Inflow=5.42 cfs 0.402 of D=15.0" n=0.013 L=75.0' S=0.0040'P Capacity=4.09 cfs Outflow=4.20 cfs 0.402 of 03308 Jacksonville Walgreens Detention R1 Type 11124-hr25 Yr Rainfall=&00" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. Page 16 HydroCAD® 7.01 s/n 000479 © 1986-2004 Applied Microcomputer Systems 2/4/2005 7:52:04 AM Reach A-5: PIPE FROM FES A-5 TO DI A-4 Peak Depth=1.03' Max Vet=4.4 fps Inflow=4.79 cfs 0.353 of D=15.0" n=0.013 L=130.0' S=0.0054'/' Capacity=4.74 cfs Outflow=4.77 cfs 0.353 of Reach A-5A: SWALE FROM CURB CUT A-5BPeak Depth=0.30' Max Vet=2.1 fps Inflow=0.98 cfs 0.072 of n=0.026 L=50.0' S=0.0180'P Capacity=23.84 cfs Outflow=0.97 cfs 0.072 of Reach A -SC: ROOF DRAIN FROM BLDG A-5131eak Depth=0.73' Max Vet=4.0 fps Inflow=2.44 cfs 0.179 of D=12.0" n=0.013 L=50.0' S=0.0060'/' Capacity=2.76 cfs Outflow=2.44 cfs 0.179 of Reach A-5E: SWALE FROM CURB CUT A-5F Peak Depth=0.37' Max Vet=2.0 fps Inflow=1.39 cfs 0.102 of n=0.026 L=60.0' S=0.0117 '/' Capacity=19.19 cfs Outflow=1.38 cfs 0.102 of Reach B-1A: SWALE FROM CURB CUT B-1BPeak Depth=0.32' Max Vet=2.5 fps Inflow=1.30 cfs 0.095 of n=0.026 L=30.0' S=0.0233'P Capacity=27.14 cfs Outflow=1.29 cfs 0.095 of Reach B-IC: SWALE FROM CURB CUT B-1DPeak Depth=0.32' Max Vet=2.2 fps Inflow=1.13 cfs 0.083 of n=0.026 L=40.0' S=0.0175'/' Capacity=23.51 cfs Outflow=1.12 cfs 0.083 of Reach B-2: PIPE FROM FES B-2 TO DI B-1 Peak Depth=0.25' Max Vet=4.4 fps Inflow=0.70 cfs 0.051 of D=12.0" n=0.013 L=104.0' S=0.0192'/' Capacity=4.94 cfs Outflow=0.70 cfs 0.051 of Reach B-2A: SWALE FROM CC B-26 TO FESPeak Depth=0.22' Max Vet=3.0 fps Inflow=0.70 cfs 0.051 of n=0.026 L=40.0' S=0.0550 T Capacity=41.67 cfs Outflow=0.70 cfs 0.051 of Pond A2: DI A-2 W/DETENTION Peak Elev=37.38' Storage=5,776 cf Inflow=6.54 cfs 0.585 of Outflow=5.78 cfs 0.585 of Pond B-1: DI B-1 W/DETENTION Peak Elev=37.18' Storage=747 cf Inflow=3.11 cfs 0.230 of Outflow=3.04 cfs 0.230 of Total Runoff Area = 1.651 ac Runoff Volume = 0.815 of Average Runoff Depth = 5.93" 03308 Jacksonville Walgreens Detention R1 Type 111 24-hr 50 Yr Rainfall=9.00" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. Page 17 HydroCADO 7.01 s/n 000479 © 1986-2004 Applied Microcomputer Systems 2/4/2005 7:52:05 AM Time span=11.00-66.00 hrs, dt=0.01 hrs, 5501 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment A-2A: AREA TO CURB CUT AT DI A-2 Subcatchment A-36: AREA TO CURB CUT A-3A Subcatchment A-313: AREA TO CURB CUT A-3C Subcatchment A-4A: AREA TO CURB CUT @ DI A-4 Subcatchment A-56: AREA TO CURB CUT A-513 Subcatchment A-51): BUILDING & CANOPY Subcatchment A-5F: AREA TO CURB CUT A-5F Subcatchment B-1B: AREA TO CURB CUT B-1A Subcatchment B-1 D: AREA TO CURB CUT B-1 D Subcatchment B-2B: AREA TO CURB CUT B-2B Runoff Area=2,960 sf Runoff Depth=6.66" Tc=10.0 min CN=92 Runoff=0.51 cfs 0.038 of Runoff Area=8,160 sf Runoff Depth=6.66" Tc=10.0 min CN=92 Runoff=1.41 cfs 0.104 of Runoff Area=5,200 sf Runoff Depth=6.66" Tc=10.0 min CN=92 Runoff=0.90 cfs 0.066 of Runoff Area=4,330 sf Runoff Depth=6.66" Tc=10.0 min CN=92 Runoff=0.75 cfs 0.055 of Runoff Area=6,380 sf Runoff Depth=6.66" Tc=10.0 min CN=92 Runoff=1.11 cfs 0.081 of Runoff Area=15,420 sf Runoff Depth=6.84" Tc=10.0 min CN=98 Runoff=2.75 cfs 0.202 of Runoff Area=9,060 sf Runoff Depth=6.66" Tc=10.0 min CN=92 Runoff=1.57 cfs 0.115 of Runoff Area=8,470 sf Runoff Depth=6.66" Tc=10.0 min CN=92 Runoff=1.47 cfs 0.108 of Runoff Area=7,360 sf Runoff Depth=6.66" Tc=10.0 min CN=92 Runoff=1.28 cfs 0.094 of Runoff Area=4,560 sf Runoff Depth=6.66" Tc=10.0 min CN=92 Runoff=0.79 cfs 0.058 of Reach A-1: PIPE FROM DI A-2 TO EXIST. SO Peak Depth=0.94' Max Vet=5.3 fps Inflow=6.15 cfs 0.662 of D=18.0" n=0.013 L=30.0' S=0.0067'/' Capacity=8.58 cfs Outflow=6.15 cfs 0.662 of Reach A-3: PIPE FROM D1 A-3 TO DI A-2 Peak Depth=0.40' Max Vet=7.7 fps Inflow=2.27 cfs 0.170 of D=12.0" n=0.013 L=34.0' S=0.0353 '/' Capacity=6.69 cfs Outflow=2.27 cfs 0.170 of Reach A-3A: SWALE FROM CC A-3A TO DI AReak Depth =0.28' Max Vet=3.6 fps Inflow=1.41 cfs 0.104 of n=0.024 L=25.0' S=0.0480'/' Capacity=42.17 cfs Outflow=1.41 cfs 0.104 of Reach A-3C: SWALE FROM CC A-3C TO DI AReak Depth=0.33' Max Vet=1.7 fps Inflow=0.90 cfs 0.066 of n=0.026 L=130.0' S=0.0100 T Capacity=17.77 cfs Outflow=0.89 cfs 0.066 of Reach A-4: PIPE FROM DI A-4 TO JB A-2 Peak Depth=1.25' Max Vet=3.8 fps Inflow=5.80 cfs 0.454 of D=15.0" n=0.013 L=75.0' S=0.0040'/' Capacity=4.09 cfs Outflow=4.20 cfs 0.454 of 03308 Jacksonville Walgreens Detention R1 Type 111 24-hr 50 Yr Rainfall=9.00" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. Page 18 HydroCADO 7.01 s/n 000479 © 1986-2004 Applied Microcomputer Systems 2/4/2005 7:52:05 AM Reach A-5: PIPE FROM FES A-5 TO DI A4 Peak Depth=1.25' Max Vet=4.4 fps Inflow=5.41 cfs 0.398 of D=15.0" n=0.013 L=130.0' S=0.0054'f Capacity=4.74 cfs Outflow=5.05 cfs 0.398 of Reach A -BA: SWALE FROM CURB CUT A-SBPeak Depth=0.32' Max Vet=2.2 fps Inflow=1.11 cfs 0.081 of n=0.026 L=50.0' S=0.0180 '/' Capacity=23.84 cfs Outflow=1.10 cfs 0.081 of Reach A-5C: ROOF DRAIN FROM BLDG A-5(Yeak Depth=0.82' Max Vet=4.0 fps Inflow=2.75 cfs 0.202 of D=12.0" n=0.013 L=50.0' S=0.0060 T Capacity=2.76 cfs Outflow=2.74 cfs 0.202 of Reach A-5E: SWALE FROM CURB CUT A-5F Peak Depth=0.39' Max Vet=2.1 fps Inflow=1.57 cfs 0.115 of n=0.026 L=60.0' S=0.0117 ? Capacity=19.19 cfs Outflow=1.57 cfs 0.115 of Reach B-1A: SWALE FROM CURB CUT B-1BPeak Depth=0.33' Max Vet=2.6 fps Inflow=1.47 cfs 0.108 of n=0.026 L=30.0' 5=0.0233 '/' Capacity=27.14 cfs Outflow=1.47 cfs 0.108 of Reach B-1C: SWALE FROM CURB CUT B-1DPeak Depth=0.34' Max Vet=2.3 fps Inflow=1.28 cfs 0.094 of n=0.026 L=40.0' S=0.0175 7' Capacity=23.51 cfs Outflow=1.27 cfs 0.094 of Reach B-2: PIPE FROM FES B-2 TO DI B-1 Peak Depth=0.27' Max Vet=4.6 fps Inflow=0.79 cfs 0.058 of D=12.0" n=0.013 L=104.0' S=0.0192 T Capacity=4.94 cfs Outflow=0.79 cfs 0.058 of Reach B-2A: SWALE FROM CC B-26 TO FESPeak Depth=0.23' Max Vet=3.1 fps Inflow=0.79 cfs 0.058 of n=0.026 L=40.0' S=0.0550'/' Capacity=41.67 cfs Outflow=0.79 cfs 0.058 of Pond A2: DI A-2 W/DETENTION Peak EIev=37.40' Storage=5,894 cf Inflow=6.86 cfs 0.662 of Outflow=6.15 cfs 0.662 of Pond B-1: DI B-1 W/DETENTION Peak EIev=37.21' Storage=781 cf Inflow=3.52 cfs 0.260 of Outflow=3.45 cfs 0.260 of Total Runoff Area = 1.651 ac Runoff Volume = 0.922 of Average Runoff Depth = 6.70" 03308 Jacksonville Walgreens Detention R1 Type 111 24-hr 100 Yr Rainfall=10.00" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. Page 19 HydroCADO 7.01 s/n 000479 © 1986-2004 Applied Microcomputer Systems 2/4/2005 7:52:06 AM Time span=11.00-66.00 hrs, dt=0.01 hrs, 5501 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment A-2A: AREA TO CURB CUT AT DI A-2 Subcatchment A-313: AREA TO CURB CUT A-3A Subcatchment A-3D: AREA TO CURB CUT A-3C Subcatchment A-4A: AREA TO CURB CUT @ DI A-4 Subcatchment A-513: AREA TO CURB CUT A-5B Subcatchment A-5D: BUILDING & CANOPY Subcatchment A -SF: AREA TO CURB CUT A-5F Subcatchment B-1B: AREA TO CURB CUT B-1A Subcatchment BAD: AREA TO CURB CUT BAD Subcatchment B-2B: AREA TO CURB CUT B-26 Runoff Area=2,960 sf Runoff Depth=7.44" Tc=10.0 min CN=92 Runoff=0.57 cfs 0.042 of Runoff Area=8,160 sf Runoff Depth=7.44" Tc=10.0 min CN=92 Runoff=1.58 cfs 0.116 of Runoff Area=5,200 sf Runoff Depth=7.44" Tc=10.0 min CN=92 Runoff=1.01 cfs 0.074 of Runoff Area=4,330 sf Runoff Depth=7.44" Tc=10.0 min CN=92 Runoff=0.84 cfs 0.062 of Runoff Area=6,380 sf Runoff Depth=7.44" Tc=10.0 min CN=92 Runoff=1.23 cfs 0.091 of Runoff Area=15,420 sf Runoff Depth=7.60" Tc=10.0 min CN=98 Runoff=3.05 cfs 0.224 of Runoff Area=9,060 sf Runoff Depth=7.44" Tc=10.0 min CN=92 Runoff=1.75 cfs 0.129 of Runoff Area=8,470 sf Runoff Depth=7.44" Tc=10.0 min CN=92 Runoff=1.64 cfs 0,121 of Runoff Area=7,360 sf Runoff Depth=7.44" Tc=10.0 min CN=92 Runoff=1.42 cfs 0.105 of Runoff Area=4,560 sf Runoff Depth=7.44" Tc=10.0 min CN=92 Runoff=0.88 cfs 0.065 of Reach A-1: PIPE FROM DI A-2 TO EXIST. SD Peak Depth=0.98' Max Vet=5.3 fps Inflow=6.51 cfs 0.737 of D=18.0" n=0.013 L=30.0' S=0.0067 '/' Capacity=8.58 cfs Outflow=6.51 cfs 0.737 of Reach A-3: PIPE FROM D1 A-3 TO DI A-2 Peak Depth=0.43' Max Vet=7.9 fps Inflow=2.54 cfs 0.190 of D=12.0" n=0.013 L=34.0' S=0.0353 '/' Capacity=6.69 cfs Outflow=2.54 cfs 0.190 of Reach A-3A: SWALE FROM CC A-3A TO DI AReak Depth=0.29' Max Vet=3.7 fps Inflow=1.58 cfs 0.116 of n=0.024 L=25.0' S=0.0480'/' Capacity=42.17 cfs Outflow=1.58 cfs 0.116 of Reach A-3C: SWALE FROM CC A-3C TO DI AReak Depth=0.34' Max Vet=1.7 fps Inflow=1.01 cfs 0.074 of n=0.026 L=130.0' S=0.0100'/' Capacity=17.77 cfs Outflow=0.99 cfs 0.074 of Reach A-4: PIPE FROM DI A-4 TO JB A-2 Peak Depth=1.25' Max Vet=3.8 fps Inflow=5.76 cfs 0.505 of D=15.0" n=0.013 L=75.0' S=0.0040'/' Capacity=4.09 cfs Outflow=4.16 cfs 0.505 of 03308 Jacksonville Walgreens Detention R1 Type 111 24-hr 100 Yr Rainfall=10.00" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. Page 20 HydroCAD® 7.01 s/n 000479 © 1986-2004 Applied Microcomputer Systems 2/4/2005 7:52:06 AM Reach A-5: PIPE FROM FES A-5 TO DI A-4 Peak Depth=1.25' Max Vet=4.4 fps Inflow=5.74 cfs 0.444 of D=15.0" n=0.013 L=130.0' S=0.0054 T Capacity=4.74 cfs Outflow=4.97 cfs 0.444 of Reach A-5A: SWALE FROM CURB CUT A-5BPeak Depth=0.33' Max Vet=2.3 fps Inflow=1.23 cfs 0.091 of n=0.026 L=50.0' S=0.0180'P Capacity=23.84 cfs Outflow=1.23 cfs 0.091 of Reach A-5C: ROOF DRAIN FROM BLDG A-5CPeak Depth=1.00' Max Vet=4.0 fps Inflow=3.05 cfs 0.224 of D=12.0" n=0.013 L=50.0' S=0.0060'/' Capacity=2.76 cfs Outflow=2.91 cfs 0.224 of Reach A-5E: SWALE FROM CURB CUT A-5F Peak Depth=0.41' Max Vet=2.1 fps Inflow=1.75 cfs 0.129 of n=0.026 L=60.0' S=0.0117'P Capacity=19.19 cfs Outflow=1.75 cfs 0.129 of Reach B-1A: SWALE FROM CURB CUT B-1BPeak Depth=0.35' Max Vet=2.7 fps Inflow=1.64 cfs 0.121 of n=0.026 L=30.0' S=0.0233 'P Capacity=27.14 cfs Outflow=1.64 cfs 0.120 of Reach B-1C: SWALE FROM CURB CUT B-1DPeak Depth=0.35' Max Vet=2.3 fps Inflow=1.42 cfs 0.105 of n=0.026 L=40.0' S=0.0175'r Capacity=23.51 cfs Outflow=1.42 cfs 0.105 of Reach B-2: PIPE FROM FES B-2 TO DI B-1 Peak Depth=0.29' Max Vet=4.8 fps Inflow=0.88 cfs 0.065 of D=12.0" n=0.013 L=104.0' S=0.0192'/' Capacity=4.94 cfs Outflow=0.88 cfs 0.065 of Reach B-2A: SWALE FROM CC B-213 TO FESPeak Depth=0.24' Max Vet=3.2 fps Inflow=0.88 cfs 0.065 of n=0.026 L=40.0' S=0.0550 '/' Capacity=41.67 cfs Outflow=0.88 cfs 0.065 of Pond A2: DI A-2 W/DETENTION Peak Elev=37.43' Storage=6,005 cf Inflow=7.19 cfs 0.737 of Outflow=6.51 cfs 0.737 of Pond B-1: DI B-1 W/DETENTION Peak Elev=37.24' Storage=813 cf Inflow=3.94 cfs 0.290 of Outflow=3.85 cfs 0.290 of Total Runoff Area = 1.651 ac Runoff Volume = 1.028 of Average Runoff Depth = 7.47" State of North Carolina Department of the Secretary of State Limited Liability Company ARTICLES OF ORGANIZATION SOSID: 735478 Date Filed: 7/22/2004 2:25:00 PM Elaine F. Marshall North Carolina Secretary of State C200420400023 Pursuant to §57C-2-20 of the General Statutes of North Carolina, the undersigned does hereby submit these Articles of Organization for the purpose of forming a limited liability company. The name of the limited liability company is:Bailey & Southstar, LLC 2. If the limited liability company is to dissolve by a specific date, the latest date on which the limited liability company is to dissolve: (If no dale for dissolution is specified, there shall be no limit on the duration of the limited liability company.) 3. The name and address of each person executing these articles of organization is as follows: (State whether each person is executing these articles of organization in the capacity of a member, organizer or both. Note: This document must be signed by all persons listed here). Charles S. Lanier ORGANIZER 114 Old Bridge Street Jacksonville, North Carolina 28540 4. The street address and county of the initial registered office of the limited liability company is: Number and Street 405-D Western Blvd. City, Slate, Zip Code Jacksonville, North Carolina 28540 County Onslow 5. The mailing address, if different from the street address, of the initial registered office is: 6. The name of the initial registered agent is: Warren G. Bailey 7. Principal office information: (Select either a or b) a. ❑✓ The limited liability company has a principal office. The street address and county of the principal office of the limited liability company is Number and Street 405-D Western Blvd. City, State, "Lip Code Jacksonville, North Carolina 28541-0400 County Onslow The mailing address, if differentfrom the street address, of the principal office of the corporation is: b. 0 The limited liability company does not have a principal office. S. Check one of the following: ✓ (i) Member -managed LLC: all members by virtue of their status as members shall be managers of this limited liability company. (ii) Manager -managed LLC: except as provided by N.C.G.S. Section 57C-3-20(a), the members of this limited liability company shall not be managers by virtue of their status as members. Any other provisions which the limited liability company elects to include are attached. 10. These articles will be effective upon filing, unless a date and/or time is specified: This is the 20 day of July 20 04 Signature Charles S. Lanier, Organizer Type or Print Name and Tille NOTES: I. Filing fee is S125. This document must be filed with the Secretary of Slate. CORPORATIONS DIVISION P.O. Box 29622 RALEIGH, NC 27626-0622 (Revised January 2002) (Form L-01) Instructions for Filing Page 1 of 1 Elaine F. Marshall •Corporations Home "Important Notice *Corporate Forms/Fees °Corporations FAQ *Tobacco Manufacturers 'Dissolution Reports 'Non -Profit Reports OVerify Certification •Online Annual Reports Links •Secretary Of State Home *Register for E-Procurement *Dept. of Revenue Legislation 01999 Senate Bills 02001 Bill Summaries *Annual Reports 1997 *Corporations 1997 *Other Legislation Search •ey Corporate Name *For New Corporation •By Registered Agent Online Orders *Start An Order •New Payment Procedures Contact Us *Corporations Division *Secretary of State's web sit( Secretary Click here to: DEPARTMENT OFTI-IE SECRETARY OF STATE PO Box 29622 Raleigh, NC 27626-0622 t919j807-2000 Date: 2/7/2005 View Document Filings 1 Print apre-populated Annual Report Form I File an Annual Report I Corporation Names Name Name Type NC Bailey & Southstar, LLC Legal Limited Liability Company Information SOSID: 0735478 FID: Status: Current-Active Date Formed: 7/22/2004 Citizenship: Domestic State of Inc.: NC Duration: Perpetual Registered Agent Agent Name: Bailey, Warren G Registered Office Address: 405-D Western Blvd. Jacksonville NC 28540 Registered Mailing 405-D Western Blvd. Address: Jacksonville NC 28540 Principal Office Address: 405-D Western Blvd. Jacksonville NC 28540 Principal Mailing Address: 405-D Western Blvd. Jacksonville NC 28540 For questions or comments about the North Carolina Secretary of State's web site, please send e-mail to Webmaster. http://www.secretary.state.nc.us/Corporations/Corp.aspx?Pltemld=6497760 2/7/2005