Loading...
HomeMy WebLinkAboutSW8000232_HISTORICAL FILE_20201029 (3)STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 oo 02 3Z DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2020 1D 29 YYYYMMDD ROY COOPER Governor. MICHAEL S. REGAN secretary BRIAN WRENN Director October 29, 2020 NORTH CAROLINA Environmental Quality The Camp Group, LLC Attn: Richard J. Campagna, Member -Manager 31 l Judges Road, Suite 12F Wilmington, NC 28405 Subject: State Stormwater Management Permit No. SW8 000232 United Rentals (formerly The Car Mart) High Density Project New Flanover County Dear Mr. Campagna: The Wilmington Regional Office received a complete, modified State Stormwater Management Permit Application for the subject project on October 28, 2020. Staff review of the plans and specifications has determined that the project, as proposed, complies with the Stormwater Regulations set forth in Title 15A NCAC 02H.1000 amended on January 1, 2017 (2017 Rules). We are hereby forwarding modified Permit No. SW8 000232 dated October 28, 2020, for the construction of the built -upon areas (BUA) and stormwater control measures (SCMs) associated with the subject project. This permit shall be effective from the date of issuance until March 27, 2022 and the project shall be subject to the conditions and limitations as specified therein and does not supersede any other agency permit that may be required. Failure to comply with these requirements will result in future compliance problems. Please note that this permit is not transferable except after notice to and approval by the Division. Please refer to Attachment C for a detailed description of the current proposed major modification and a list of all the past modifications approved during the effective period of the permit. This cover letter, attachments, and all documents on file with DEMLR shall be considered part of this permit and is herein incorporated by reference. Please replace the previously approved plan sheets with the attached modified and approved versions. Please replace the previous application (SWU-101), supplement, operation and maintenance agreement with the attached modified versions. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions concerning this permit, please contact Garrett Zorda in the Wilmington Regional Office, at (910) 796-7215 or garrett.zorda@ncdenr.gov. Sincerely, 1(� C v IJ q4& Brian Wrenn, Director Division of Energy, Mineral and Land Resources Enclosures: Attachment A — Designer's Certification Form Attachment C — Permitting History Application Documents DES/gdz:\\\Stormwater\Permits & Projects\2000\000232 HD\2020 10 permit 000232 North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington. North Carolina 28405 on awa w 910.796.7215 r cc: J. Branch Smith, PE, Paramounte Engineering New Hanover County Building Safety Department. New Hanover County Engineering Wilmington Regional Office Stormwater File State Stormwater Permit No. SW8 000232 Page 2 of 2 State Stormwater Management Permit No. SW8 000232 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In compliance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations promulgated and adopted by the North Carolina Environmental Management Commission, including 15A NCAC 02H.1000 amended on January 1, 2017 (2017 Rules) (the "stormwater rules"), PERMISSION IS HEREBY GRANTED TO The Camp Group, LLC United Rentals 5919 Market Street, Wilmington, New Hanover County FOR THE construction, management, operation and maintenance of built -upon area (BUA) draining to one (1) wet detention pond ("stormwater control measures' or "SCMs") as outlined in the application, approved stormwater management plans, supplement, calculations, operation and maintenance agreement, recorded documents, specifications, and other supporting data (the "approved plans and specifications") as attached and/or on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or "DEMLR"). The project shall be constructed, operated and maintained in accordance with these approved plans and specifications. The approved plans and specifications are incorporated by reference and are enforceable part of this permit. This permit shall be effective from the date of issuance until March 27, 2022 and shall be subject to the following specified conditions and limitations. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or rescission; however, these actions do not stay any condition. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al. BUA REQUIREMENTS. The maximum amount of BUA allowed for the entire project is 217,800 square feet. The runoff from all BUA within the permitted drainage area of this project must be directed into the permitted SCM. The BUA requirements and allocations for this project are as follows: a. SCM BUA LIMITS. The SCM has been designed using the runoff treatment method to handle the runoff from 217.800 square feet of BUA within the delineated drainage area. The BUA for the future development is limited to 21,000 square feet. 2. PERVIOUS AREA IMPROVEMENTS. At this time, none of the pervious area improvements listed in G.S. 143-214.7(b2) or the Stormwater Design Manual have been proposed for this project. Pervious area improvements will be allowed in this project if documentation is provided demonstrating those improvements meet the requirements of the stormwater rule. Page 1 of 5 State Stormwater Management Permit No. SW8 000232 3. SCM REQUIREMENTS. The SCM requirements for this project are as follows: a. SCM DESIGN. The SCM is permitted based on the design criteria presented in the sealed, signed and dated supplement and as shown in the approved plans and specifications. This SCM must be provided and maintained at the design condition. b. PLANTING PLAN. The SCM landscape planting plan shown in the approved plans shall be followed in its entirety during construction. After the plants are established, the operation and maintenance agreement must be followed. c. FOUNTAINS. At this time, a decorative spray fountain has not been proposed within the wet pond. Decorative spray fountains will be allowed in the wet pond if documentation is provided demonstrating that the proposed fountain will not cause resuspension of sediment within the pond or cause erosion of the pond side slopes. d. IRRIGATION. If the wet pond is to be used for irrigation, it is recommended that some water be maintained in the permanent pool, the vegetated shelf is planted with appropriate species that can handle fluctuating conditions, and human health issues are addressed. 4. STORMWATER OUTLETS. The peak flow from the 10-year storm event shall not cause erosion downslope of the discharge point. 5. VEGETATED SETBACKS. A 50-foot wide vegetative setback must be provided and maintained in grass or other vegetation adjacent to all surface waters as shown on the approved plans. The setback is measured horizontally from the normal pool elevation of impounded structures, from the top of bank of each side of streams or rivers, and from the mean high waterline of tidal waters, perpendicular to the shoreline. a. BUA IN THE VEGETATED SETBACK. BUA may not be added to the vegetated setback except as shown on the approved plans. b. RELEASE OF STORMWATER NOT TREATED IN AN SCM. Stormwater that is not treated in an SCM must be released at the edge of the vegetated setback and allowed to flow through the setback as dispersed flow. RECORDED DOCUMENT REQUIREMENTS. The stormwater rules require the following documents to be recorded with the Office of the Register of Deeds: a. ACCESS AND/OR EASEMENTS. The entire stormwater conveyance system, including any SCMs, and maintenance accesses must be located in public rights -of -way, dedicated common areas that extend to the nearest public right-of-way, and/or permanent recorded easements that extend to the nearest public right-of-way for the purpose of inspection, operation, maintenance, and repair. b. OPERATION AND MAINTENANCE AGREEMENT. The operation and maintenance agreement must be recorded with the Office of the Register of Deeds. c. FINAL PLATS. The final recorded plats must reference the operation and maintenance agreement and must also show all public rights -of -way, dedicated common areas, and/or permanent drainage easements, in accordance with the approved plans. d. DEEDS. The permittee shall record deed restrictions and protective covenants prior to the issuance of a certificate of occupancy to ensure the permit conditions and the approved plans and specifications are maintained in perpetuity. CONSTRUCTION. During construction, erosion shall be kept to a minimum and any eroded areas of the on -site stormwater system will be repaired immediately. a. PROJECT CONSTRUCTION, OPERATION AND MAINTENANCE. During construction, all operation and maintenance for the project shall follow the Erosion Control Plan requirements until the Sediment -Erosion Control devices are converted to SCMs or no longer needed. Once the device is converted to a SCM, the permittee shall provide and perform the operation and maintenance as outlined in the applicable section below. Page 2of5 State Stormwater Management Permit No. SW8 000232 b. SCM RESTORATION. If one or more of the SCMs are used as an Erosion Control device and/or removed or destroyed during construction, it must be restored to the approved state stormwater design condition prior to close-out of the erosion control plan and/or project completion and/or transfer of the state stormwater permit. Upon restoration, a new or updated certification will be required for the SCM(s) and a copy must be submitted to the appropriate DEQ regional office. 8. MODIFICATIONS. No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below. For changes to the project or SCM that impact the certifications, a new or updated certification(s), as applicable, will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification. a. Any modification to the approved plans and specifications, regardless of size including the SCM(s), BUA, details, etc. b. Redesign or addition to the approved amount of BUA or to the drainage area. c. Further development, subdivision, acquisition, lease or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications. d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved SCM(s), stormwater collection system and/or vegetative conveyance shown on the approved plan. e. The construction of any allocated future BUA. f. The construction of any permeable pavement, #57 stone area, public trails, or landscaping material to be considered a permeable surface that were not included in the approved plans and specifications. g. Other modifications as determined by the Director. DESIGNER'S CERTIFICATION. Upon completion of the project, the permittee shall determine if the project is in compliance with the approved plans and take the necessary following actions: a. If the permittee determines that the project is in compliance with the approved plans, then within 45 days of completion, the permittee shall submit to the Division one hard copy and one electronic copy of the following: i. The completed and signed Designer's Certification provided in Attachment A noting any deviations from the approved plans and specifications. Deviations may require approval from the Division; ii. A copy of the recorded operation and maintenance agreement; iii. Unless already provided, a copy of the recorded deed restrictions and protective covenants; and iv. A copy of the recorded plat delineating the public rights -of -way, dedicated common areas and/or permanent recorded easements, when applicable. b. If the permittee determines that the project is not in compliance with the approved plans, the permittee shall submit an application to modify the permit within 30 days of completion of the project or provide a plan of action, with a timeline, to bring the site into compliance. 10. OPERATION AND MAINTENANCE. The permittee shall provide and perform the operation and maintenance necessary, as listed in the signed operation and maintenance agreement, to assure that all components of the permitted on -site stormwater system are maintained at the approved design condition. The approved operation and maintenance agreement must be followed in its entirety and maintenance must occur at the scheduled intervals. a. CORRECTIVE ACTIONS REQUIRED. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions. This includes actions required by the Division and the stormwater rules such as the construction of additional or replacement on - site stormwater systems. These additional or replacement measures shall receive a permit from the Division prior to construction. b. MAINTENANCE RECORDS. Records of maintenance activities must be kept and made available upon request to authorized personnel of the Division. The records will indicate the date, activity, name of person performing the work and what actions were taken. Page 3 of 6 State Stormwater Management Permit No. SW8 000232 11. PERMIT RENEWAL. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee as outlined in 15A NCAC 02H.1045(3). 12. CURRENT PERMITTEE NAME OR ADDRESS CHANGES. The permittee shall submit a completed Permit Information Update Application Form to the Division within 30 days to making any one or more of the following changes: a. A name change of the current permittee; b. A name change of the project; c. A mailing address change of the permittee. 13. TRANSFER. This permit is not transferable to any person or entity except after notice to and approval by the Director. Neither the sale of the project and/or property, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit. a. TRANSFER REQUEST. The transfer request must include the appropriate application, documentation and the processing fee as outlined in 15A NCAC 02H.1045(2) and must be submitted upon occurrence of any one or more of the following events: i. The sale or conveyance of the project and/or property area in whole or in part; ii. Dissolution of the partnership, corporate, or LLC entity, subject to NCGS 55-14-05 or NCGS 57D-6-07 and 08; iii. Bankruptcy; iv. Foreclosure, subject to the requirements of Session Law 2013-121; b. TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on -site stormwater system complies with the permit conditions. Records of maintenance activities performed to date may be requested. Projects not in compliance with the permit will not be transferred until all permit and/or general statute conditions are met. 14. COMPLIANCE. The permittee is responsible for complying with the terms and conditions of this permit and the approved plans and specifications until the Division approves the transfer request. a. REVIEWING AND MONITORING FOR COMPLIANCE. The permittee is responsible for verifying that the proposed BUA within each drainage area and for the entire project does not exceed the maximum amount allowed by this permit. The permittee shall review and routinely monitor the project to ensure continued compliance with the conditions of the permit, the approved plans and specifications. b. APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved plans, application, supplement, operation and maintenance agreement, all applicable recorded documents, and specifications shall be maintained on file by the permittee at all times. c. DIVISION ACCESS. The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted project. d. ENFORCEMENT. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. e. OBTAINING COMPLIANCE. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of modified plans and certification in writing to the Director that the changes have been made. Page 4 of 5 State Stormwater Management Permit No. SW8 000232 OTHER PERMITS. The issuance of this permit does not preclude the permittee from obtaining and complying with any and all other permits or approvals that are required for this development to take place, as required by any statutes, rules, regulations, or ordinances, which are imposed by any other Local, State or Federal government agency having jurisdiction. Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS 143-215.6. Permit modified and reissued this the 291 day of October 2020. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Ma lyc'q 3,;, Brian Wrenn, Director Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Permit Number SW8 000232 Page 5 of 5 State Stormwater Management Permit No. SW8 000232 Attachment A Certification Forms The following blank Designer Certification forms are included and specific for this project: • As -Built Permittee Certification As -Built Designer's Certification General MDC As -Built Designer's Certification for Wet Detention Pond Project A separate certification is required for each SCM. These blank certification forms may be copied and used, as needed, for each SCM andlor as a partial certification to address a section or phase of the project. Page 1 of 1 State Stormwater Management Permit No. SW8 000232 AS -BUILT PERMITTEE CERTIFICATION I hereby state that I am the current permittee for the project named above, and I certify by my signature below, that the project meets the below listed Final Submittal Requirements found in NCAC 02H.1042(4) and the terms, conditions and provisions listed in the permit documents, plans and specifications on file with or provided to the Division. Check here if this is a partial certification. Section/phase/SCM #? Check here if this is part of a Fast Track As -built Package Submittal. Printed County of personally appeared before me this Signature a Notary Public in the State of do hereby certify that day of and acknowledge the due execution of this as -built certification. Witness my hand and official seal My commission expires (SEAL) r� Perrnittee's Certfcation NCAC .1042(4) Completed / Provided N/A A. DEED RESTRICTIONS / BUA RECORDS 1. The deed restrictions and protective covenants have been recorded Y or N and contain the necessary language to ensure that the project is maintained consistent with the stormwater regulations and with the permit conditions. 2. A copy of the recorded deed restrictions and protective covenants Y or N has been provided to the Division. 3. Records which track the BUA on each lot are being kept. (See Note Y or N 1 B. MAINTENANCE ACCESS 1. The SCMs are accessible for inspection, maintenance and repair. Y or N 2. The access is a minimum of 10 feet wide. Y or N 3. The access extends to the nearest public right-of-way. Y or N C. EASEMENTS 1. The SCMs and the components of the runoff collection / conveyance Y N system are located in recorded drainage easements. or 2. A copy of the recorded plat(s) is provided. Y or N D. SINGLE FAMILY RESIDENTIAL LOTS - Plats for residential lots that Y N have an SCM include the following: or 1. The specific location of the SCM on the lot. Y or N 2. A typical detail for the SCM. Y or N 3. A note that the SCM is required to meet stormwater regulations and that the lot owner is subject to enforcement action as set forth in Y N NCGS 143 Article 21 if the SCM is removed, relocated or altered or without prior approval. E. OPERATION AND MAINTENANCE AGREEMENT Y or N 1. The O&M Agreement is referenced on the final recorded plat. Y or N 2. The O&M Agreement is recorded with the Register of Deeds and Y N a ears in the chain of title. or F. OPE TION AND MAINTENANCE PLAN — maintenance records are being kept in a known set location for each SCM and are available for Y or N review. G. DESIGNER'S CERTIFICATION FORM — has been provided to the Y N Division. or Page 1 of 6 State Stormwater Management Permit No. SW8 000232 Note 1- Acceptable records include ARC approvals, as -built surveys, and county tax records. Provide an explanation for every requirement that was not met, and for every "N/A" below. Attach additional sheets as needed. Page 2 of 6 State Stormwater Management Permit No. SW8 000232 AS -BUILT DESIGNER'S CERTIFICATION GENERAL MDC I hereby state that I am a licensed professional and I certify by my signature and seal below, that I have observed the construction of the project named above to the best of my abilities with all due care and diligence, and that the project meets the below listed General MDC found in NCAC 02H.1050 in accordance with the permit documents, plans and specifications on file with or provided to the Division, except as noted on the "AS -BUILT" drawings, such that the intent of the stormwater rules and statutes has been preserved. Check here if this is a partial certification. Section/phase/SCM #? Check here if this is a part of a Fast -Track As -Built Package Submittal per .1044(3). Check here if the designer did not observe the construction, but is certifying the project. Check here if pictures of the SCM are provided. Printed NC Registration Number SEAL: Signature Consultant's Mailing Address: City/State/ZIP Phone Number Consultant's Email address: OO Circle N if the as -built value differs from the Plan. If N is circled, provide an explanation on Page 2. OO N/E = not evaluated (provide explanation on page 2) ON/A = not applicable to this SCM or project. Consultant's Certification NCAC .1003((3) & General MDC OAs-built ON/E ON/A .1050 A. TREATMENT REQUIREMENTS 1. The SCM achieves runoff treatment. Y or N 2. The SCM achieves runoff volume match. Y or N 3. Runoff from offsite areas and/or existing BUA is Y or N bypassed. 4. Runoff from offsite areas and/or existing BUA is directed Y or N into the permitted SCM and is accounted for at the full build -out potential. 5. The project controls runoff through an offsite permitted Y or N SCM that meets the requirements of the MDC. 6. The net area of new BUA increase for an existing project Y or N has been accounted for at the appropriate design storm level. 7. The SCM(s) meets all the specific minimum design Y or N criteria. B. VEGETATED SETBACKS / BUA 1. The width of the vegetated setback has been measured Y or N from the normal pool of impounded waters, the MHW line of tidal waters, or the top of bank of each side of rivers or streams. 2. The vegetated setback is maintained in grass or other Y or N vegetation. 3. BUA that meets the requirements of NCGS 143-214.7 Y or N b2 2 is located in the setback. Page 3 of 6 State Stormwater Management Permit No. SW8 000232 4. BUA that does not meet the requirements of NCGS 143- Y or N 214.7 (b2)(2) is located within the setback and is limited to: a. Publicly funded linear projects (road, greenway sidewalk) b. Water -dependent structures c. Minimal footprint uses (utility poles, signs, security lighting and appurtenances) 5. Stormwater that is not treated in an SCM is released at Y or N the edge of the setback and allowed to flow through the setback as dispersed flow. OO As -built ON/E GN/A C. STORMWATER OUTLETS — the outlet handles the peak Y N Flow from the 10 year storm with no downslope erosion. or D. VARIATIONS 1. A variation (alternative) from the stormwater rule Y N provisions has been implemented. or 2. The variation provides equal or better stormwater control Y N and equal or better protection of surface waters. or E. COMPLIANCE WITH OTHER REGULATORY PROGRAMS Y N has been met. or F. SIZING -the volume of the SCM takes the runoff from all surfaces into account and is sufficient to handle the required Y or N storm depth. G. CONTAMINATED SOILS — infiltrating SCM's are not Y or N located in or on areas with contaminated soils. H. SIDE SLOPES 1. Vegetated side slopes are no steeper than 3H:1V. Y or N 2. Side slopes include retaining walls, gabion walls, or Y or N other surfaces that are steeper than 3H:1 V. 3. Vegetated side slopes are steeper than 3H:1 V (provide Y or N supporting documents for soils and vegetation). 1. EROSION PROTECTION 1. The inlets do not cause erosion in the SCM. Y or N 2. The outlet does not cause erosion downslope of the Y or N discharge point during the peak flow from the '10 year storm. J. EXCESS FLOWS — An overflow / bypass has been Y N rovided. or K. DEWATERING — A method to drawdown standing water has Y or N been provided to facilitate maintenance and inspection. L. CLEANOUT AFTER CONSTRUCTION — the SCM has been Y or N cleaned out and converted to its approved design state. M. MAINTENANCE ACCESS 1. The SCM is accessible for maintenance and repair. Y or N 2. The access does not include lateral or incline slopes Y or N >3:1. N. DESIGNER QUALIFICATIONS (FAST -TRACK PERMIT) — The designer is licensed under Chapters 89A, 89C, 89E, or Y or N 89F of the General Statutes. Provide an explanation for every MDC that was not met, and for every item marked "N/A" or "N/E", below. Attach additional pages as needed: Page 4 of 6 State Stormwater Management Permit No. SW8 000232 AS -BUILT DESIGNER'S CERTIFICATION FOR WET DETENTION POND PROJECT I hereby state that I am a licensed professional and I certify by my signature and seal below, that I have observed the construction of the project named above to the best of my abilities with all due care and diligence, and that the project meets all of the MDC found in NCAC 02H.1053, in accordance with the permit documents, plans and specifications on file with or provided to the Division, except as noted on the "AS -BUILT" drawings, such that the intent of the stormwater rules and the general statutes has been preserved. Check here if this is a partial certification. Section/phase/SCM #? Check here if this is part of a Fast -Track As -Built Package Submittal per .1044(3). Check here if the Designer did not observe the construction, but is certifying the project. Check here if pictures of the SCM are provided. Printed Name Signatu NC Registration Num SEAL: Consultant's Mailing Address: City/State/ZIP Phone Number Consultant's Email address: O Circle N if the as -built value differs from the Plan/permit. If N is circled, provide an explanation on page 2 OO N/E = not evaluated (provide explanation on page 2) ON/A = not applicable to this project or SCM. This Certification must be completed in conjunction with the General MDC certification under NCAC 02H.1050 Consultant's Certification (MDC .f053) OO As -built ®N/E ©N/A A. Forebay / Depths / Fountain 1. The available Sediment storage is consistent with the Y N approved plan and is a minimum of 6 in. or 2. Water flow over the forebay berm into the main pond Y N occurs at a non -erosive velocity. or 3. The provided Forebay Volume is 15%-20% of the main Y N pool volume. or 4. The Forebay entrance elevation is deeper than the exit Y N elevation into the pond. or 5. The Average Design Depth of the main pond below the permanent pool elevation is consistent with the permitted Y or N value? 6. Fountain documentation is provided. Y or N B. Side slopes I Banks I Vegetated Shelf 1. The width of the Vegetated Shelf is consistent with the Y N approved plans and is a minimum of 6 feet. or 2. The slope of the Vegetated Shelf is consistent with the Y N approved plans and is no steeper than 6: 1. or C. As -built Main Pool / Areas I Volumes I Elevations 1. The permanent pool surface area provided is consistent Y N with the permitted value. or 2. The Temporary Pool Volume provided is consistent with Y N the permitted value. or Page 5 of 6 State Stormwater Management Permit No. SW8 000232 3. The permanent pool elevation is consistent with the Y N permitted value. or 4. The temporary pool elevation is consistent with the Y N permitted value. or OO As -built ®N/E ON/A D. Inlets / Outlet / Drawdown 1. The design volume draws down in 2-5 days. Y or N 2. The size of the Orifice is consistent with the permitted Y N value. or 3. A trash rack is provided on the outlet structure. Y or N 4. Hydrologic impacts to the receiving channel are minimized Y N from the 1 r 24 hr storm discharge? or 5. The inlets and the outlet location are situated per the Y N approved plan and avoid short-circuiting. or E. Ve etation 1. The vegetated shelf has been planted with a minimum of 3 Y N diverse species. or 2. The vegetated shelf plant density is consistent with the approved plans and is no less than 50 plants per 200 sf or Y or N no less than 24 inches on center. Provide an explanation for every MDC that was not met, and for every item marked "N/A" or "N/E" below. Attach additional pages as needed: Page 6 of 6 State Stormwater Management Permit No. SW8 000232 Attachment C - Permitting History United Rentals Permit No. SW8 000232 Approval Permit BIMS Description of the Changes Date Action Version This original issuance approved the construction of 3/27/2000 Original 1.0 105,671 square feet of built -upon area (BUA) Approval treated in a wet detention pond. 1/30/2020 Renewal 2.0 This issuance renewed the permit until March 27, 2022. 5/21/2020 Transfer 2.1 This issuance transferred the permit from Parkway Business Park, LLC to The Camp Group, LLC This issuance approved the modification of the permit to add additional project area and BUA. The 10/29/2020 Major 2 2 wet detention pond is being redesigned to Modification accommodate the additional BUA and the site is being brought up to the 2017 Stormwater Rules with these modifications. Page 1 of 1 PARAMOUNTE OCT 2 8 2020 p ';_ -_ E N C3 I N E E R I N G. I N G. 1 2 2 C I N E M A D R I V E, S U I T E 2 0 1 W I L M I N G T O N, N C 2 8 4 0 3 9 1 0- 7 9 1- 6 7 0 7( O) 9 1 0- 7 9 1- 6 7 6 0 ( F) I F T T W R n R T R A N S M I T T A 1. To: NCDEQ Date I October 28, 2020 Stormwater Department 127 Cardinal Drive Extension Re: United Rentals Wilmington, NC 28405 SW8 000232 Mod Response Attn: Garret Zorda Pro'ect No. 19320.PE e are sendin gI ❑ Originals ® Prints ❑ Shop Drawings ❑ Calculations Phe following items: ❑ Correspondence ® Plans ❑ Specifications ® Other as listed below Quantity Date Dwg. No. Description 1 08/14/20 Plan Set 1 Revised Supplement Issue Status: ® For Approval ❑ As Requested ❑ Construction ❑ Bid ❑ For Your Use ❑ For Review and Comment ❑ Approved as Noted ❑ See Remarks etion Taken: ❑ No Exceptions Taken ❑ Make Corrections Noted ❑ Amend & Resubmit ❑ Rejected - See Remarks ❑ Approved as Submitted ❑ Other Remarks: For any questions, please contact Branch Smith at 910-791-6707 or b mlth aramounte-en .com Thank vou for vour attention to this matter, Garrett, this addresses your email from 10/22 regarding these 2 items. Cc: Signed: of bq lVhcA Smith Zorda, Garrett D From: Zorda, Garrett D Sent: Thursday, October 22, 2020 11:19 AM To: Branch Smith; EJ Gwin; Rick Campagna Subject: United Rental (SW8 000232) - Request for Additional Information Good Morning All, I have reviewed the additional information received on August 14, 2020 for the subject project. Everything appears to be almost good to go, however, there are a couple minor items that I need before I am able to issue the modification. These items are listed below: 1. Only one set of the revised plan set was submitted. Please submit a second copy of the revised plan set. 2. It is noted that Item #29 of the Wet Pond supplement was updated to reflect Equation 3 being used to calculate average depth. Items #30-31, however, were not updated to reflect the use of Equation 3. Please update Items #30-31 of the Wet Pond supplement to reflect the correct information. Due to the minor nature of the above items, I will begin drafting the permit so it should be mostly ready to go once the requested items are received. With that said, please ensure these items are received by November 6, 2020. In the meantime, if you have any additional questions, please let me know. Thanks, Garrett Zorda Environmental Engineer Division of Energy, Mineral and Land Resources — State Slormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7343 direct "Please note the change to my direct phone number" aarrettzorda(a ncdenr.00v 127 Cardinal Drive Ext. Wilmington, NC 28405 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. PARAMOUNTS-- E N G I N E E Ft I N O, I N C. 122 CINEMA DRIVE, SUITE 2011, AUG 192920 W I L M I N G T O N, NC 2 8 4 0 3 1 9 1 0 - 7 9 1 - 6 7 0 7 ( 0) 9 1 0 - 7 9 1 - 6 7 6 0 ( F:)- 1. F T T F R 0 F T R A N S M I T T A L To: NCDF-Q Date I August 14, 2020 Stormwater Department 127 Cardinal Drive Extension Re: United Rentals Wilmington, NC 28405 SW Modification Attn: Garret Zorda Project No. I 19320.PE e are sendin ❑ Originals ® Prints ❑ Shop Drawings ❑ Calculations ❑ Correspondence ® Plans ❑ Specifications ® Other as listed below rp he following items: Quantity Date Dwg. No. Description 2 08/14/20 Plan Set I Comment Response Letter 1 Application 1 Operation and Maintenance Agreement 1 Wet Pond Supplement I Property Deed Issue Stains: ® For Approval ❑ As Requested ❑ Construction ❑ Bid ❑ For Your Use ❑ For Review and Comment ❑ Approved as Noted ❑ See Remarks etion Taken: ❑ No 1?xceptions Taken ❑ Make Corrections Noted ❑ Amend & Resubmit ❑ Rejected - See Remarks ❑ Approved as Submitted ❑ Other Remarks: For any questions, Tease contact Branch Smith at 910-791-6707 or bsm Thank you for your attention to this matter. h a ramounte-en .corn Cc: Signed: I w E.J. Gwin, El PARAMOUNTE E N C3 1 N E E R I N O. 1 N C. August 14, 2020 Garrett Zorda NCDEQ 127 N. Cardinal Drive Wilmington, NC 28405 RE: Request for Additional Information Stormwater Project No. SW8 000232 United Rentals on Market Street New Hanover County Dear Garrett, On behalf of Rick Campagna, we are submitting a response to your comments emailed 8/7/2020. Please find your comments listed below with our response provided in bold. 15A NCAC 02H.1042(2)(a)(vii): a. The first line of Section 111.l.a of the application lists the applicant/organization as Richard J. Campagna (individual). The current permittee, however, is The Camp Group, LLC. Mr. Campagna, Member -Manager of The Camp Group, LLC, should be listed in the line below labeled "Signing Official & Title". • Application revised to show The Camp Group, LLC as application/organization b. Please provide complete contact information for the applicant, including phone number and e-mail address, in Section III. Lb of the application. • Contact Information updated c. The cover page of submitted plans indicate the property owner is Carolina Storage Investors, LLC. The remaining plan sheets, other submitted documents as well as the New Hanover County GIS database indicate the property owner is The Camp Group, LLC. Please confirm the correct property owner and ensure they are listed consistently throughout the entire application package. • Cover sheet updated to show The Camp Group, LLC as property owner 2. 15A NCAC 02H.1040(4)(c): Section VI.10 indicates that a copy of the most recent deed has been previously provided. The only deed previously submitted was the deed for the originally permitted parcel. Deeds supporting the ownership of the additional parcels proposed to be added to this project have not been submitted. To support the identified property owners of the property, please provide a copy of the most recent deed(s) for the additional parcels. 1 2 2 C IN E M A D R I V E, W I L M I N D T O N, N C 2 B 4 D 3 P H: 1 9 1❑ 1 7 9 1- 6 7 0 7 F A X: 1 9 1 D 1 7 9 1- 6> 6 D PARAMOUNTE E N 13 1 N E E R 1 N O. 1 N C. • Most recent deeds for additional parcels included with submittal 3. 15A NCAC 02H.1042(2)(g)(iii): Please provide the boundaries of all surface waters, protected vegetated setbacks, and protected riparian buffers, or a note on the plans that none exist. If a note is already provided on the plans, please provide a citation of where it can be located. • Wetland area is now shown on plans. There are no vegetated setbacks on the ditch in the rear. 15A NCAC 02H. I 042(2)(g)(iv): Please provide additional proposed contours and drainage patterns to support that all of the of the proposed built -upon area is being collected and treated. Recommendation: In the case where the contour interval on a "topographic" map is too large to adequately reflect the existing and proposed drainage patterns of a relatively flat property, spot elevations and/or a site -specific elevation survey may be needed. • Additional contours and spot elevations added to grading and drainage plan 5. 15A NCAC 02H.1042(2)(g)(vii): Please provide the details of the stormwater collection system, including the inverts of the piped collection system into Forebay #2. • Invert elevations added to pond detail sheet C-4.0 6. 15A NCAC 02H.1042(2)0): The submitted operation and maintenance agreement only references one forebay. This project, however, proposed two forebays with varying depths. Please update the operation and maintenance agreement to reflect the design condition of both forebays. • Operation and maintenance agreement revised to include design conditions of both forebay 15A NCAC 02H.1050(6): Item #9 of the wet pond supplement indicates that a drawdown orifice is provided to draw down any standing water in the SCM for maintenance. However, for a wet pond, the orifice typically only draws down to the permanent pool elevation. On Plan sheets C-4.0, note #2 of the Pond Outlet Structure Detail indicates that a pump will be provided to facilitate dewatering the system. If this is true, please reflect this information in Item #9 of the wet pond section of the supplement. • A pump will be used to drawdown pond for maintenance. Item #9 of the wet pond section has been updated 8. 15A NCAC 02H.1053(2): The Wet Pond Supplement indicates that Equation 2 in Chapter C-3 of the Stormwater Design Manual was used. Based on the provided volume and surface area of the main pool, the reported average depth is not consistent with the use of Equation 2. Please provide additional calculations to support the average depth. If it desired to exclude the submerged potion of the vegetated shelf from the average depth calculation, Equation 3 on page 8 in Chapter C-3 should be used. Please ensure any revisions are represented constantly throughout the entire application package. 1 22 CINEMA ❑ R I V E. W I L M I N G T❑ N, NC 2 B 40 3 P N: 1 9 1 G 1 7 9 1- 6 7❑ 7 FAX: 1 9 1❑ 1 7 9 1- 6 7 6❑ pARAMOUNTE E N G 1 N E E R 1 N O, 1 N C. Equation 3 was used for average depth calculation. Wet Pond Supplement has been revised to show Equation 3. 15A NCAC 021-1. 1 053(5)(b): Per the cited rule, the forebay entrance shall be deeper than the forebay exit. The submitted plans and supplement indicated that this minimum design criteria is not being met. Please confirm the intended design and ensure it is represented consistently throughout the entire application package. • Forebay Spillway detail and Structural Berm Note added to detail sheet. Forebay exit will include 2.5' spillway which is shallower than the forebay entrances. Supplement form updated to show 30" as forebay exit depth. Thank you for your attention to this matter. If you have any questions regarding any of this information or require additional material, please feel free to call. Thank you for your time and effort. Sincerely, Paramounte Engineering, Inc. E.J. Gwin, El 1 2 2 C 1 N E M A C R I V E. W I L M I N O T C N, N C 2 6 4 C 3 P H: 1 9 1 0 1 7 9 1- 6 7 0 7 G A X: 1 9 1 C 1 9 9 1- 6 9 6 C ROY COOPER covemar MICHAEL S. REGAN .secretary BRIAN WRENN August 7, 2020 Via email only: rich carolinastorape.com The Camp Group, LLC Attn: Richard J. Campagna, Member -Manager 311 Judges Rd. Suite 12F Wilmington, NC 28405 NORTH CAROLINA Environmental Quattry Subject: Request for Additional Information Stormwater Project No. SW8 000232 United Rentals on Market Street New Hanover County Dear Mr. Campagna: The Wilmington Regional Office accepted a modified State Stormwater Management Permit Application for the subject project on May 22, 2020. A preliminary in-depth review of that information has determined that the application is not complete and that additional information is needed. To continue the review, please provide the followini additional information in a single, hard copy submittal package: 1/ 15A NCAC 02H.1042(2)(a)(vii): a. The first line of Section 111. La of the application lists the applicant/organization as Richard J. Campagna (individual). The current permittee, however, is The Camp Group, LLC. Mr. Campagna, Member -Manager of The Camp Group, LLC, should be listed in the line below JJabeled "Signing Official &'rifle". b /Plcase provide complete contact information for the applicant, including phone number and e- mail address, in Section Ill.l.b of the application. The cover page of submitted plans indicate the property owner is Carolina Storage Investors, LLC. The remaining plan sheets, other submitted documents as well as the New Hanover County GIS database indicate the property owner is The Camp Group, LLC. Please confirm the correct / property owner and ensure they are listed consistently throughout the entire application package. E/ 15A NCAC 021-1.1040(4)(c): Section VI.10 indicates that a copy of the most recent deed has been previously provided. The only deed previously submitted was the deed for the originally permitted parcel. Deeds supporting the ownership of the additional parcels proposed to be added to this project have not been submitted. To support the identified property owners of the property, please provide a copy of the most recent deed(s) for the additional parcels. 3,./15A NCAC 02H.1042(2)(g)(iii): Please provide the boundaries of all surface waters, protected vegetated setbacks, and protected riparian buffers, or a note on the plans that none exist. If a note is already provided on the plans, please provide a citation of where it can be located. 4/1 5A NCAC 02H.1042(2)(g)(iv): Please provide additional proposed contours and drainage patterns to support that all of the of the proposed built -upon area is being collected and treated. Recommendation: In the case where the contour interval on a 'topographic" snap is too large to adequately reflect the existing and proposed drainage patterns of a relatively, fat property, spot elevations and/or a site -specific elevation survey may be needed. ' 5A NCAC 02H.1042(2)(g)(vii): Please provide the details of the stormwater collection system, including the inverts of the piped collection system into Forebay #2. G!/15A NCAC 02H.1042(2)0): The submitted operation and maintenance agreement only references one forebay. This project, however, proposed two forebays with varying depths. Please update the operation and maintenance agreement to reflect the design condition of both forebays. North Carolina Department of Environmental Qualhy I DNlsion of Energy. Mineral and Land Resources D E p W Irvington Regional Office 1127 Cardinal Drive Extension I Wilmington. North Carolina 28405 _ta+� / 410.7467215 State Stormwater Permit No. SW8 000232 Page 2 of 2 Y 15A NCAC 02H.1050(6): Item 89 of the wet pond supplement indicates that a drawdown orifice is provided to draw down any standing water in the SCM for maintenance. However, for a wet pond, the orifice typically only draws down to the permanent pool elevation. On Plan sheets C-4.0, note #2 of the Pond Outlet Structure Detail indicates that a pump will be provided to facilitate dewatering the system. If this is true, please reflect this information in Item #9 of the wet pond section of the supplement. a(/15A NCAC 02H.1053(2): The Wet Pond Supplement indicates that Equation 2 in Chapter C-3 of the Stormwater Design Manual was used. Based on the provided volume and surface area of the main pool, the reported average depth is not consistent with the use of Equation 2. Please provide additional calculations to support the average depth. If it desired to exclude the submerged potion of the vegetated shelf from the average depth calculation, Equation 3 on page 8 in Chapter C-3 should be used. Please /ensure any revisions are represented constantly throughout the entire application package. 9 15A NCAC 02H. I 053(5)(b): Per the cited rule, the forebay entrance shall be deeper than the forebay exit. The submitted plans and supplement indicated that this minimum design criteria is not being met. Please confirm the intended design and ensure it is represented consistently throughout the entire application package. Please remember to confirm that any revised information is presented consistently throughout the application documents including calculations, supplements, narrative, and plans. Please also remember to provide two hard copies of any updated documents per 15A NCAC 02H.10,12(2). All of the requested information listed above should be received in this Office by August 24, 2020, or the application will be returned as incomplete. If additional time is needed to submit the requested information, please email your extension request prior to this due date to the email address provided below with ajustification and a date of when the requested information will be submitted, which shall be no later than 15 days past the original due date. Please note that only two letters requesting additional information is allowed in the State Stormwater Program for a total of 30 days to submit the requested additional information. /f the information is not satisfactorily provided after either the second request or 30 days, the project will be returned. If the project is returned and you wish to re -submit later, you will need to resubmit all required items at that time, including the application fee. The construction of any impervious surfaces, other than it construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. If you have any questions concerning this matter, please feel free to call me at (910) 796-7215 or email me at garrett.zorda@ncdenr.gov. Sincerely, � ^^aaww Garrett Zorda Environmental Engineer DES/gdz: \\\Stormwater\Permits & Projects\2000\000232 HD\2020 08 addinfo 000232 cc: J. Branch Smith, PE, Paramounte Engineering; via email: bsmith@paramounte-eng.com Wilmington Regional Office Stormwater File i Zorda, Garrett D From: Zorda, Garrett D Sent: Friday, August 7, 2020 12:25 PM To: Rick Campagna; Branch Smith Subject: United Rentals on Market Street (SW8 000232) - Request for Additional Information Attachments: 2020 08 addinfo 000232.pdf All, Attached is a pdf of the request for additional information for the subject project. There are just a few items that need to be addressed. Please let me know if you have any questions or concerns. Thanks, Garrett Zorda Environmental Engineer Division of Energy, Mineral and Land Resources — State Stormwaler Program Department of Environmental Quality 910 796 7215 office 910 796 7343 direct "Please note the change to my direct phone number' garrett.zorda(Z ncdenr.gov 127 Cardinal Drive Exl. Wilmington, NC 28405 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Burd, Tina J From: Burd, Tina 1 Sent: Friday, May 29, 2020 12:04 PM To: rick@carolinastorage.com; Branch Smith Subject: SW8 000232 - United Rentals on Market Street The Wilmington Regional Office of the Division of Energy, Mineral and Land Resources (Stormwater Section) accepted the Stormwater Permit Application and $505.00 fee for the subject project on May 22, 2020. The project has been assigned to Garrett Zorda and you will be notified if additional information is needed. Please be advised that the construction of built -upon area may not commence until the Starmwater Permit is issued. Best Regards, Tina Burd Administrative Associate II Wilmington Regional Office Division of Environmental Assistance & Customer Service Phone 910-796-7215 NCDEQ Wilmington Regional Office 127 Cardinal Drive Ext. Wilmington, NC 28405 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to thrrd parties. rA/Rplicatioln Completeness Review Checklist (Non` -Transfers) - Short Version Project Name: ( ( �°\,C.�.�r.�,\ �.,cy e�- Date Delivered to WIRO: y//S 247D Project County/Location: d� was1 -r ! V,,,). - yc� RIMS Received/Accepted Date: S'�blQ p2070 Rule(s): F-12017 Coastal �2008 Coastal f;P5 Coastal BIMS Acknowledged Datet: Phase II Universal 198E Coastal Permit Action: New alor Mo Minor Mod /Renewal Permit Type: LD / LD Overall / HD &LD Combo General Permit / Offsite / Exempt / Rescission Development Type: ommercia / Residential / Other Subdivided?: Subdivision oringle Lot Permittee Type & Documents Needed: LlProperty Owner(s) Purchaser Lessee Viable? Viable? Viable? Deed Purchase Agmt Lease E]NotSubdivided: Deed Subdivision: Common Area Deed New Permit #2 ® Existing Permit#: SW300033a Expriation Date 3: FlOffsite to SW8: Lot is in Master Permit? FIFE Cent on File? E]HOA El Developer Viable? Viable? Election Minutes Paperwork Application Fee: MS505 (within 6mo) Check#(s): Supplement' (1 new form or for older forms: 1 original per SCM) E]O&M 2 Soils Report (Infil or PP) Calculations (signed/sealed) Deed Restrictions, if subdivided Project Narrative MUSGS Map (or on file?) Subject to SA?: Y / N Subject to ORW?: ❑Plans (2 Sets) MPE Certification Electronic Copies Easements, Recorded (2017 Rules) NOTES: ]Enter RIMS Acknowledged Date on this Sheet 2For New Projects -Enter New Permit # on Supplements & Deed Resticl:on Templates. 3If w/in 6 months and they are requesting a mod, STOP. Needs a rene Nal first. EMAILED ENGINEER DATE: Comments: REVIEWER NAME: G: W Q\\\Reference Library\Procedures\Checklists\Completeness Review Checklist_20: 0 01 31 1:1No Fee Y / N DEMLR USE ONLY Date Rece'ved Fee Paid Permit Number Applicable Rules: ❑ Coastal SW -1995 ❑ Coastal SW - 2008 ❑ Ph 11 - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ M mt Plan: State of North Carolina Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications,. letters, operation and maintenance agreements, etc.): 2. Location of Project (street address): 5919 Market Street City:Wilmington County:New Hanover Zip:28405 3. Directions to project (from nearest major intersection): 1 mile north from Intersection of US 17 and Eastwood Rd. (US 74) 4. Latitude:34° 15' 06" N Longitude:77° 51' 21" W of the main entrance to the project. II. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ❑New ®Modification ❑ Renewal w/ Modificationt tRenewals with modifications also requires SINU-102 - Renewal Application Forin b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit numberSW8 000232 , its issue date (if known)March 2000 and the status of construction: ❑Not Started ®Partially Completed* ❑ Completed* *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DEMLR requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ❑NPDES Industrial Stormwater ®Sedimentation/Erosion Control: 6.01 ac of Disturbed Area Z404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: 5. Is the project located within 5 miles of a public airport? [—]No ®Yes If yes, see S.L. 2012-200, Part VI: htto•///12ortalTicdenr ororg/web/Ir/rules-and-regulations Form SWU-101 Version Oct. 31, 2013 Page I of 6 III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organization:The Camp Group LLC Signing Official & Title: Richard I Camlaena Member -Manager b. Contact information for person listed in item la above: Street Address: 3"I1 Judges Rd Suite 12F City: Wilmington State: NC Zip: 28405 Mailing Address (if applicable): same City: Phone: (910 ) 350-0565 Eiiiail:rick@carolinastorage.com State: Fax: (910 1 392-7093 c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2, a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/, Signing Official & b. Contact information for person listed in item 2a above: Street Address: City: Mailing Address (if City: Phone: ( ) Email: State: Fax: Zip: 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: Signing Official & Title: b. Contact information for person listed in item 3a above: Mailing Address: Phone: State: Fax: Zip: 4. Local jurisdiction for building permits: New Hanover County Point of Contact: Inslections Dept Phone q: (910 1 798-7308 Form SWU-101 Version Oct. 31, 2013 Page 2 of 6 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. An existing wet fond will be modified to account for additional drainage from both pipes and swales 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW - 1995 ❑ Ph 11 - Post Construction 3. Stormwater runoff from this project drains to the NE Cape Fear River basin. 4. Total Property Area: 6.01 acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area+:6.01 acres Total project area shall be calculated to exclude the following the normal pool of imppounded structures, the area b epnr the banks of streams and rivers, the area below the Normal High Water (NHW) line or Mean High Water (MHW) line, and coastal wetlands landward from the NHW (or MHM line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NHW (or MHW) line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 76.1 9. How many drainage areas does the project have?1 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for (lie whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area _ Drainage Area _ Drainage Area _ Receiving Stream Name Spring Branch Stream Class * C; Sw Stream Index Number * 18-74-63 Total Drainage Area (sf) 286100 On -site Drainage Area (sf) 225600 Off -site Drainage Area (sf) 60500 Proposed Impervious Area** (so 217800 % Impervious Area** total 76.1 Impervious" Surface Area Drainage Area 3 Drainage Area _ Drainage Area _ Drainage Area _ On -site Buildings/ Lots (sf) 1800 On -site Streets so On -site Parkin (so G-rqqpJ 44000 On -site Sidewalks (so Other on -site (so Future (so 21000 Off -site (sf) 1 45000 Existing BUA*** (sf) 1 106000 Total (sf): 1 217800 * Stream Class and Index Number can be determined at: httpy/yortat nedenr org/web/wq[ps/cswcrossincanons *" Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. Form SWU-101 Version Oct. 31, 2013 Page 3 of 6 'Report only that amount of existing BUA that will remain q%ter development. Do not report any existing BUA that is to be removed and which will be replaced by new BUA. 11. How was the off -site impervious area listed above determined? Provide documentation. The adjacent property at 5929 Market St is to be permiitted 75% impervious Projects in Union County: Contact DEMLR Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements as per 15A NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded fromhtto://t)ortal.ncdenr.oriz/web/wQ/ws/su/bmP-manuiil. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Energy, Mineral and Land Resources (DEMLR). A complete package includes al l of the items listed below. A detailed application instruction sheet and BMP checklists are available from http•//2oortal.ncdenr.ory/web/wq/ws/so/statesw/forms_docs. The complete application package should be submitted to the appropriate DEMLR Office. (The appropriate office may be found by locating project on the interactive online map at httl2://12ortal.ncdenr.org/web/wq/ws/su/maps.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http•//portaI.ncdenr org/web/wq/ws/so/statesw/forms_docs. Initials 1. Original and one copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants WA Form. (if required as per Part VU below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to http://www.envhelp.org/12ages/onestol2e 12ress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/management 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the 1/2 mile radius on the map. 7. Sealed, signed and dated calculations (one copy). 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. I. Scale. g. Revision number and dates. It. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. I. Details of roads, drainage features, collection systems, and stormwater control measures. in. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). for Form SWU-101 Version Oct. 31, 2013 Page 4 of 6 p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"x11" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DEMLR to verify the SHWTprior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: 6268 Page No: 784 S bm;+}e� 11. For corporations and limited liability corporations (LLC): Provide documentation from the NCPr SI 3ori;i )g Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item 1a, 2a, and/or 3a per 15A NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. http://www.secretary.state.nc.us/Corporations/CSe,irch.asl2x VIL DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed 13UA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http,/Iportal.ncdenr.org/­web/Ir/state- stormwater-forms does. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DEMLR, and that they will be recorded prior to the sale of any lot. Vlll. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer: I Branch Smith Consulting Firm: Paramounte Engineering Inc Mailing Address: 122 Cinema Drive City: Wilmington State:NC Zip:28409 Phone: (r910 1 791-6707 Fax: ( 1 Email:—bsmith@paramounte-eng.com IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) I, (print or type name of person listed in Contact Information, item 2a) NA certify that 1 own the property identified in this permit application, and thus give permission to (print or type name ofperson listed in Contact Information, item 1a) with (print or type name of organization listed in Contact Information, item la) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. Form SWU-101 Version Oct. 31, 2013 Page of As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DEMLR Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DEMLR immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. 1 understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. a Notary Public for the State of County of do hereby certify that before me this _ day of personally appeared and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission e X. APPLICANT'S CERTIFICATION I, (print or type name of person listed in Contact Information, item 1a) Rick I Cam agna certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective cov nants will be recorded, and that the proposed project complies with the requirements of the applicable stormw I;E r 15A NCAC 2H .1000 and any other applicable state stormwater requirements. Signature Date: 2 Zin20 a Notary Public for the State of %fay'kA �Oa-a(iY1G County of 1 P-V JkCAfhNC✓ , do hereby certify that {Z-\CAL am(2Q JnGt personally appeared before me this 3r�'day of )OrtACWJ uw . and acknowledge the due execution oftheapplication for a stormwater permit. Witness my hand and official seal,MfLLC NOTARY PUBLIC 2 .OVER COJ SEAL My commission expires tI L-L— ( zoas Form S WU-101 Version Oct. 31, 2013 Page 6 of 6 19 United Rental CITY OF WILMI ivGTON NEW HANOVER COUNTY NORTH CAROLINA STORMWATER AND EROSION CONTROL NARRATIVE Prepared for. Camp Construction, LLCC 311 Judges Rd 12F f p�' j Wilmington, NC 28405 t4Ai 2 2 2020 By.•� Prepared by: Pz RAMOL7NTE 122 Cinema Drive Wilmington, NC 28403 (910) 791-6707 NC License #: C-2846 Project No.18458.PE ����` CARo///,,, 0 :9 v SEAL _ February 2020 = 034354 = _�•, vGINE..•'IZ- 1-2 S. to UNITED RENTAL CITY OF WILMINGTON NEW HANOVER COUNTY NORTH CAROLINA Table of Contents PROJ ECT NARRATIVE PROPOSED EROSION CONTROL MEASURES PROPOSED STORMWATER CONTROL MEASURES ATTACHMENTS: Soils Map USGS Map Grassed Swale Calculations Drainage Area Map PROJECT NARRATIVE United Rentals is planning to construct additional equipment storage areas, a maintenance building and a new driveway on three parcels of land located near the intersection of Market St. and Judges Road. The total site area is 6.01 AC. The address of the existing United Rental is 5919 Market St. This expansion will include addresses 5923 Market St. and 211 Judges Rd. The existing property at 5919 is partially in City of Wilmington Jurisdiction and partially in New Hanover County jurisdiction. 5923 Market St. and 211 Judges Rd are both within New Hanover county jurisdiction. 'There is an existing stormwater pond on the north end of 5919 Market St. which is to be expanded to capture and treat stormwater from the proposed expansion as well as off site stormwater from 5929 Market St. The outfall for the storm system is a ditch north of the property which drains to Spring Branch (Class C;Sw & Stream Index #18-74-63) which leads to Smith Creek. Site elevations range from 39-29 fmsl (NAVD-88). Existing conditions on 5923 Market St. and 211 Judges Rd are light brush on undeveloped land. The soils are mostly Seagate Fine sand with a small portion of Johnston soils at the north end of the site according to NRCS Web Soil Survey. A soils test was not complete for this property. No jurisdictional wetlands, ditches or streams will be impacted as part of the proposed project. PROPOSED EROSION CONTROL MEASURES A. TEMPORARY SILT (SEDIMENT) FENCE (DENR PRACTICE 6.62) Temporary silt fence will be used to control sediment runoff from fill areas and to prevent any construction sediment or trash from leaving the property or entering drainage features. B. RIP -RAP OUTLET PROTECTION (DENR PRACTICE 6.41) Outlet protections are shown on the pipe outfalls into pond. The rip -rap will prevent scour and erosion from washing bottoms and slopes of earthwork. C. TEMPORARY INLET PROTECTION (DENR PRACTICE 6.51) Inlet protections are shown on the proposed inlets to prevent sediment -runoff from clogging the storm drain inlets and pipes and reduce sediment into the future wet pond. D. TEMPORARY TREE PROTECTION FENCING (DENR PRACTICE 6.05) Temporary tree protection fencing shall be used on selected trees and areas to remain undisturbed per City of Wilmington tree and landscape requirements. E. TEMPORARY SKIMMER SEDIMENT BASIN (PRACTICE 6.64) A sediment basin will be used to control drainage areas and disturbed areas with a skimmer dewatering device through the future wet pond. PROPOSED STORMWATER CONTROL MEASURES (1) Proposed Wet Pond (Pond 1) Pond is designed to the NC State Coastal Stormwater MDC Rules (2017) for the 1.5-inch rainfall - runoff and the City of Wilmington Stormwater Ordinance for peak discharge control to at or below pre -developed peak discharge for the 2, 10, and 25-yr design storms. The retention requirements for the 1.5-inch rainfall runoff were calculated using the Simple Method and the SA/DA Method and the pond storage depth is designed per the Average Pond Depth of 3-ft to 8-ft below the permanent pool elevation (M DC Rule 15A NCAC 21-1.1053). The ponds will be used to treat the proposed built -upon area (BUA) allocation. • Starting HGL conditions (tailwater conditions) for Pond 1 was set based on temp. pool volume, which is sufficient engineering practice and stormwater routing software used by the engineer. • Pre -development and Post -development drainage areas considered to be equal for the storm analysis. • A new stormwater pipe will pickup existing drainage from the adjoining property to convey the natural drainage in this area. Post -Developed Drainage Area Wet Pond (Pond-!) Reference Appendix HydmCAD Report Port -Development Pond DA = 286,100 sf (6.57 ac) Proposed Total BUA = 217,800 sf Future BUA = 21,000 for future development Assume HSG Type A for both pre -post Composite CN = 89 Tc=13.5min Pond Routing Peak Elev (4AVD 88): WSI711-2 = 29.67 WSEL10 = 30.03 > Riser =29.50 WSEL25 = 30.31 < Em. Spwy = 30.50 WSEL100 = 30.74 < Top of Pond = 31.00 Pond Routing Peak Discharge: Q2 = 7.84 cfs Q10 = 29.57 cfs Q25 = 32.73 cfs Principal Outlet Blocked — Emergency Overflow Analysis WSEL50 = 31.29 >Top of Pond = 31.00 WSE1,100 = 31.35 > Top of Pond = 31.00 Building FFE = 35.00+/- (No Flooding of Structures) Pre -Developed Drainage Area Reference Appendix HydmCAD Report DA = 286,100 sf Existing 13UA to be removed = 0 sf Assume HSG Type A for both pre -post Composite CN = 86 Tc = 14.5 min Pre-Dev Peak Discharge: Q2 = 18.56 cfs Q70 = 32.19 cfs Q25 = 41.92 cfs United Rental Wet Pond Objective: Design a wet retention basin with the following characteristics: a permanent water pool depth between 3- and 8-feet with a temporary water pool sized to detain the design storm (1.5" coastal depth or 1-yr pre -post vol) depending on which watershed the project drains into. The stormwater flow path shall be adequate for water quality and discharges in non -erosive manner Long Term Pond Performance is up to the permitee's responsibility In regards to the O&M standards per the permit conditions. Step 1: Determine the surface area required based on SAIDA Ratio Coastal TandAverage Dept. MDC I & 2. Post -Development Conditions Total Drainage Area 6.570 ACRE Valun from CAD Impervious Drainage Area 5.000 ACRE Value from CAD Impervious Cover -(Impervious Drainage Impervious Cover 76.1 % Area)/(Total Drainage Area)"100% Elevation of Permanent Pool Surface 27.0 FT Value selected by designer Elevation of Wet Detention Pond Bottom 19.0 FT Value selected by designer (Excludes Sao. Storage) Depth of Permanent Pool 8.0 FT Avg. Depth of Permanent Pool Required SA/DA Ratio 4.7 FT Value from Avg. Depth Calculation [MDC 2; Equation 3] 3.720 Value from Coastal NC Chart Required Permanent Pool Surface Area 10,646 SF Required Surface Area=(Required SAIDA Ratio) -(Total Drainage Area) Provided Main Pond Perm. Pool Surface Area 10,726 SF From stage -storage calculations Step 2- Determine the Design Storage Elevation within the wet detention pond. MDC 2 and MDC 3. Runoff Coefficient, Rv 0.735 IN/IN Rv=0.0S+0.009'(%Impervious) Required 1.5" Runoff Volume 26,291 CF 1.5' Runoff Volume=1.SlnchaRv'1 foof/12 (Volume of Temporary Pool) inch -(Total Drainage Area) 1-yr, 24-hr Pre-Dev Volume N/A CF HydruCAD SCS Hydrographs 1-yr, 24-hr Post-Dev Volume N/A CF HydroCAD SCS Hydrographs Required Runoff Volume 1.1.1.5" Runoff Volume or 1-yr, 24-hr Pre/Post 'Volume of Temporary Pool) --'-"- -' Volume Difference as applicable Storage Elevation at Required Volume 28.80 FT Value from stage -storage table. Storage Elevation Provided 29.00 FT Value selected by designer Storage Volume Provided Value is based upon stage -storage values. 29,614 CF Step 3: Calculate the required frebay volume (15-20% of perm, pool volume). MDC 5. Main Pond Volume 39,224 CF Main PPOoI Volume 15% Main Pond Volume 5,884 CF Forebay Volume -(Main Pond Volume)-15% 20% Main Pond Volume 7,845 CF Forebay Volume -(Main Pond Volume)-20% >rovldod Forebay Volume 6,823 CF Value from stage -storage tables rorebay Percentage 17.4 % Step 4: Verifv the time required to drawdown the provided runoff volume is within 2 to 5 days. MDC 7 Diameter of Proposed Law -flaw Orifice 2.50 IN Value chosen by designer Storage Elev at Next Highest Outlet 29.00 F7 Value from above (Ho)=(Design Storm Staging Elev)-(Centroid of Head (He) 1 90 FT orifice elevation) Driving Head (Ho) for Orifice Equation (Ho/3) 0.63 FT H0/3 Cd, Coefficient of Discharge 0.60 Value chosen by designer Q=Cd'(Pi)*[(Diameter of Orifice)*]fV12 Q, Flowrate Through Law -flow Orifice 0.13 CFS in)J 214"[2.32.2'(Averge Head)J 1/2 (Dlawdown Time) -provided Runoff Drawdown Time for Provided WQV 2.63 DAYS 1 of United Rental - Wet Pond #1 Stage -Area -Storage Calculations StagolSlorage Above Permanent Pool (Including Forebay) Cumulative Contour Incremental Volume, S Contour Area (SF) Volume (CF) (CF) 27.0 10,726 0 0 -Permanent Pool 28.0 15,548 13,137 13,137 29.0 17,406 16,477 29,614 30.0 19,320 18,363 47,977 31.0 21,297 20,309 68,286 --Top of Pond StagelStorago Main Pond Cumulative Contour Incremental Volume, S Contour Area (SF) Volume (CF) (CF) 19.0 1,459 0 0 Pond Bottom 20.0 2,158 0 0 --Sediment Storage 21.0 2,971 2,564 2,564 22.0 3,880 3,425 5,990 23.0 4,858 4,369 10,359 24.0 5,899 5,378 15,737 25.0 7,004 6,451 22,188 26.0 8,171 7,587 29,775 -Bottom of Shelf 27.0 10,726 9,449 39,224 -Permanent Pool Forobay#1 Cumulative Contour Incremental Volume, S Contour Area (SF) Volume (CF) (CF) 23.0 364 0 0Forebay Bottom 24.0 614 0 0 Sediment Storage 25.0 895 754 754 26.0 1,208 1,052 1,806 27.0 1,554 1,381 3,187 -Forebay Volume Forebay#2 Cumulative Contour Incremental Volume, S Contour Area (SF) Volume (CF) (CF) 1 22.0 239 0 0 Forebay Bottom 23.0 424 0 0 Sediment Storage 24.0 640 532 532 25.0 886 763 1,296 26.0 1,163 1,025 2,320 27.0 1,469 1,316 3,636 -Forebay Volume Forebay total 6,823 Soil Map —New Hanover County, North Carolina MAP LEGEND MAP INFORMATION Area of Interest (AD]) Spoil Area The soil surveys that comprise your AOI were mapped at O Area of Interest (AOI) Q Stony Spot Y P° 1:15,800. Soils Very Stony Spot Warning: Soil Map may not be valid at this scale. 0 Soil Map Unit Polygons Wet Spot Enlargement of maps beyond the scale of mapping can cause i.y Soil Map Unit Lines misunderstanding of the detail of mapping and accuracy of soil 6 Other line placement. The maps do not show the small areas of E3 Soil Map Unit Points contrasting soils that could have been shown at a more detailed Special Line Features Special Point Features scale. Blowout Water Features „_. Streams and Canals Please rely on the bar scale on each map sheet for map ® Borrow Pit measurements. Transportation Xr Clay Spot Rails Source of Map: Natural Resources Conservation Service f-r-t Web Soil Survey URL: Closed Depression �y Interstate Highways Coordinate System: Web Mercator (EPSG:3857) Gravel Pit co US Routes Maps from the Web Soil Survey are based on the Web Mercator • •, Gmvelly Spot Major Roads projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the �j Landi•lu Local Roads Albers equal-area conic projection, should be us.d If mar. A Lava Flow accurate calculations of distance or area are required. Background Marsh or swamp ® Aerial Photography This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Mine or Quarry Sail Survey Area: New Hanover County, North Carolina Q Miscellaneous Water Survey Area Data: Version 20, Sep 16, 2019 ® Perennial water Soil map units are labeled (as space allows) for map scales y Rock Outcrop 1:50,000 or larger. } Saline Spot Date(s) aerial images were photographed: Nov 21, 2018—Nov 28, 2018 • Sandy Spot The orthophoto or other base map on which the soil lines were Severely Eroded Spot compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor Sinkhole shifting of map unit boundaries may be evident. ?� Slide or Slip Boric Spot USDA Natural Resources Web Soil Survey 2/14/2020 Conservation Service National Cooperative Soil Survey Page 2 of 3 Soil Map —New Hanover County, North Carolina Map Unit Legend Map Unit Symbol Map Unit Name Acres In AOI Percent of AOI JO Johnston soils Mu MurvilIs fine and Se Seagate fine sand Totals for Area of Interest 3.8 1.3 24.9 30.0 12.7 4.5% 82.9 % 100.0% �)n Natural Resources Web Soil Survey 2/14/2020 Conservation Service National Cooperative Soil Survey Page 3 of 3 Project Name: United Rentals Client: United Rentals Project Number: 19320, PE Prepared By: JBS Data: 2J24)19 VARIABLES: C= i= A, b= x= d= in A, _ GIVEN: APPLICABLE EQUATIONS: CALCULATIONS: GRASSED SWALE CALCULATIONS PARAMOUNTE runoff coefficient rainfall intensity area draining to channel channel bottom width channel aide slope (Cl) depth of now in channel channel roughness coefficient (Manning's) channel wetted area P = channel wetted perimeter R = channel hydraulic radius S = channel longitudinal slope Qrq, = runoff flowing to channel 0— - channel flow capacity Vd = maximum albxable veleciry t0 prevent scour V, — channel flow velocity C. see below i = 2.0 i1 10yr Storm b= 1 If = 3 in 0035 Grass Channel Design Depth = 1.2 ff V„e„u,= 3,0 fps Grane Qw.,=CIA, Vim,,,,_(1,49m) F Sm A, -Ws& Q_=V__A, (must meet or exceed 0.) P = b s 2d(1 rZ)m 2124QC20 Page 1 of 1 PARAMOUNTE E N G I N E E R 1 N G, I N C. February 26, 2020 Garret Zorda NC Department of Environmental Quality — Stormwater Permitting 127 Cardinal Drive Extension Wilmington, INC 28405 Re: 5919 Market Street United Rentals —formerly The Car Mart State SW Permit SW8 000232 Dear Mr. Zorda: The Camp Group is proposing a major modification to the stormwater permit. Given the project is expanding to the current proposed conditions, we have revised the stormwater pond in the rear of the site to meet the current 2017 Stormwater Rules. The pond as designed will serve the current and expanded uses onsite and additional one offsite tract. Therefore, this will answer Item #1 on your letter dated 2/25/20. Once we obtain all approvals the pond will be reconstructed and outlet device rebuilt to conform to current standards. In regards to Item #2, the attached newly signed Operation and Maintenance Agreement for the new permittee is attached as well. Thank you for your attention to this matter. Please feel free to contact me if you have any questions or require additional information. We have submitted the new permit application without the check for $505, so if we need to provide that additional fee, just let us know. Sincerely, Paramounte Engineering, Inc. EJ Gwin, El � MAY 2 2 2020 Cc: Richard J. Campagna, The Camp Group BY: J. Branch Smith, Paramounte Engineering, Inc. 1 2 2 C I N E M A ❑ R I V E, W I L M I N❑ T❑ N, N C 2 0 40 3 P H: 1 9 1 ❑ 1 7 9 1. 5 7 ❑ 7 F A%: 1 9 1❑ 1 7 9 1- 6 7 6❑ m. is Ir. W IS I-N s Soil Map —New Hanover County. North Carolina 3 k >, N 2b�tl ZBBN 23�W � Z�® b1DW 3 Map Sale: 1:Z630ip1ikadon A Wdsa (11".BS)1eer. � N Mies 0 35 70 140 210 Feet A 0 0 ,00 ?D![I 400 HI0 Map Proj�': Web Maalor Cm>er C o drt , WGS84 Edge UrM Zm 1814 WGS84 USDA Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey M K s+ P A°IS I-N Z im ZSrta) Zf/!A IIT�1 Fi 3 4 k 2/14/2020 Page 1 of 3 J ` �g ,Branch y ' o •' sea* • ` • O .74 0 SITE COORDINATES: LAT: 34- 15' 06- '� \ LON: 77- 51' 21.4" Dee 123.20 PARAMOUNTE USGS MAP United Rentals - Market St III Cmema NY, Wilmington, KS 7�03 (91�.791-6707 CNc: TOC NC Lk m N: C-I846 Pml_ Na. iB320.PE