Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW8000232_CURRENT PERMIT_20220629 (3)
STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 00 02 32 DOC TYPE CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2022 Q b 201 YYYYMMDD ROY COOPER Governor EUZABETH S. BISER secretary BRIAN WRENN Director June 29'", 2022 The Camp Group, LLC Attn: Richard J. Campagna, Member -Manager 311 Judges Road, Suite 12F Wilmington, NC 28405 NORTH CAROLINA EnHronmented Qttaary Subject: Permit Renewal Post -Construction Stormiwater Management Permit No. SW8 000232 United Rentals New Hanover County Dear Mr. Campagna: The Division of Energy, Mineral and Land Resources received a complete 8-year Permit Renewal Application for the subject permit on June 27'", 2022. The Division is hereby notifying you that permit SW8 000232 has been renewed, updated, and re -issued on June 29'", 2022, as attached. Please be aware that the renewal and re -issuance of this stormwater permit does not imply that the site is currently in compliance. This permit shall be effective until March 27", 2030 and does not supersede any other agency permit that may be required. The project shall be subject to the conditions and limitations as specified therein. This permit does not impose new or increased stormwater control requirements; it clarifies the rules and requirements of this program to provide you with a better understanding of your obligations under this permit. Failure to comply with these requirements will result in future compliance problems. Please note that this permit is not transferable except after notice to and approval by the Division. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. This project will be kept on file at the Wilmington Regional Office. If you have any questions concerning this permit, please contact Dylan McPeake in the Wilmington Regional Office at (910) 796-7215 or dylan.mcpcake@ncderLr.gov. Sincerely, Ck, X; Brian Wrenn, Director Division of Energy, Mineral and Land Resources Enclosures: Attachment C — Permitting History Renewal Application Documents DES/DM: %Stornwater\Pernits & Projects\2000\00023211D\2022 06 permit 000232 cc: J. Branch Smith, PE; 122 Cinema Drive, Suite 201; Wilmington, NC 28403 Wilmington Regional Office Stormwater File D_E Q'� North Carolina Department of Environmental Quallty I Division of Energy, N lneal and Land Resources Wilmington Regional Office 1127 Cardinal Drive Extenslon I Wilmington, North Carolina 28405 . ==-.nu - /'� 910.796.7215 Post -Construction Stormwater Management Permit No. SW8 000232 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES POST -CONSTRUCTION STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In compliance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations promulgated and adopted by the North Carolina Environmental Management Commission, including 15A NCAC 02H.1000 amended on January 1, 2017 (2017 Rules) (the "stormwater rules'), PERMISSION IS HEREBY GRANTED TO The Camp Group, LLC United Rentals 5919 Market Street, Wilmington, New Hanover County FOR THE construction, management, operation and maintenance of built -upon area (BUA) draining to one (1) wet detention pond ("stormwater control measures" or "SCMs") as outlined in the application, approved stormwater management plans, supplement, calculations, operation and maintenance agreement, recorded documents, specifications, and other supporting data (the "approved plans and specifications') as attached and/or on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or "DEMLR"). The project shall be constructed, operated and maintained in accordance with these approved plans and specifications. The approved plans and specifications are incorporated by reference and are enforceable part of this permit. This permit shall be effective from the date of issuance until March 27. 2030 and shall be subject to the following specified conditions and limitations. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or rescission; however, these actions do not stay any condition. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al. BUA REQUIREMENTS. The maximum amount of BUA allowed for the entire project is 217.800 square feet. The runoff from all BUA within the permitted drainage area of this project must be directed into the permitted SCM. The BUA requirements and allocations for this project are as follows: a. SCM BUA LIMITS. The SCM has been designed using the runoff treatment method to handle the runoff from 217,800 square feet of BUA within the delineated drainage area. The BUA for the future development is limited to 21,000 square feet. Page 1 of 6 Post -Construction Stormwater Management Permit No. SW8 000232 2. PERVIOUS AREA IMPROVEMENTS. At this time, none of the pervious area improvements listed in G.S. 143-214.7(b2) or the Stormwater Design Manual have been proposed for this project. Pervious area improvements will be allowed in this project if documentation is provided demonstrating those improvements meet the requirements of the stormwater rule. 3. SCM REQUIREMENTS. The SCM requirements for this project are as follows: a. SCM DESIGN. The SCM is permitted based on the design criteria presented in the sealed, signed and dated supplement and as shown in the approved plans and specifications. This SCM must be provided and maintained at the design condition. b. PLANTING PLAN. The SCM landscape planting plan shown in the approved plans shall be followed in its entirety during construction. After the plants are established, the operation and maintenance agreement must be followed. c. FOUNTAINS. At this time, a decorative spray fountain has not been proposed within the wet pond. Decorative spray fountains will be allowed in the wet pond if documentation is provided demonstrating that the proposed fountain will not cause resuspension of sediment within the pond or cause erosion of the pond side slopes. d. IRRIGATION. If the wet pond is to be used for irrigation, it is recommended that some water be maintained in the permanent pool, the vegetated shelf is planted with appropriate species that can handle fluctuating conditions, and human health issues are addressed. 4, STORMWATER OUTLETS. The peak flow from the 10-year storm event shall not cause erosion downslope of the discharge point. 5. VEGETATED SETBACKS. A 50-foot wide vegetative setback must be provided and maintained in grass or other vegetation adjacent to all surface waters as shown on the approved plans. The setback is measured horizontally from the normal pool elevation of impounded structures, from the top of bank of each side of streams or rivers, and from the mean high waterline of tidal waters, perpendicular to the shoreline. a. BUA IN THE VEGETATED SETBACK. BUA may not be added to the vegetated setback except as shown on the approved plans. b. RELEASE OF STORMWATER NOT TREATED IN AN SCM. Stormwater that is not treated in an SCM must be released at the edge of the vegetated setback and allowed to flow through the setback as dispersed flow. 6. RECORDED DOCUMENT REQUIREMENTS. The stormwater rules require the following documents to be recorded with the Office of the Register of Deeds: a. EASEMENTS. All SCMs, stormwater collection systems, vegetated conveyances, and maintenance access located on property owned by other persons or entities must be located in permanent recorded easements or drainage easements as shown on the approved plans. b. OPERATION AND MAINTENANCE AGREEMENT. The operation and maintenance agreement must be recorded with the Office of the Register of Deeds. c. FINAL PLATS. If a final plat is recorded, it must reference the operation and maintenance agreement and must also show all public rights -of -way, dedicated common areas, and/or permanent drainage easements, in accordance with the approved plans. Page 2 of 6 Post -Construction Stormwater Management Permit No. SW8 000232 d. DEEDS. The permittee shall record deed restrictions and protective covenants prior to the issuance of a certificate of occupancy to ensure the permit conditions and the approved plans and specifications are maintained in perpetuity. CONSTRUCTION. During construction, erosion shall be kept to a minimum and any eroded areas of the on -site stormwater system will be repaired immediately. a. PROJECT CONSTRUCTION, OPERATION AND MAINTENANCE. During construction, all operation and maintenance for the project shall follow the Erosion Control Plan requirements until the Sediment -Erosion Control devices are converted to SCMs or no longer needed. Once the device is converted to a SCM, the permittee shall provide and perform the operation and maintenance as outlined in the applicable section below. b. SCM RESTORATION. If one or more of the SCMs are used as an Erosion Control device and/or removed or destroyed during construction, it must be restored to the approved state stormwater design condition prior to close-out of the erosion control plan and/or project completion and/or transfer of the state stormwater permit. Upon restoration, a new or updated certification will be required for the SCM(s) and a copy must be submitted to the appropriate DEQ regional office. MODIFICATIONS. No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below. For changes to the project or SCM that impact the certifications, a new or updated certification(s), as applicable, will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification. a. Any modification to the approved plans and specifications, regardless of size including the SCM(s), BUA, details, etc. b. Redesign or addition to the approved amount of BUA or to the drainage area. c. Further development, subdivision, acquisition, lease or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications. d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved SCM(s), stormwater collection system and/or vegetative conveyance shown on the approved plan. e. The construction of any allocated future BUA. f. The construction of any permeable pavement, #57 stone area, public trails, or landscaping material to be considered a permeable surface that were not included in the approved plans and specifications. g. Other modifications as determined by the Director. Page 3 of 6 Post -Construction Stormwater Management Permit No. SW8 000232 DESIGNER'S CERTIFICATION. Upon completion of the project, the permittee shall determine if the project is in compliance with the approved plans and take the necessary following actions: a. If the permittee determines that the project is in compliance with the approved plans, then within 45 days of completion, the permittee shall submit to the Division one hard copy and one electronic copy of the following: i. The completed and signed Designer's Certification provided in Attachment A noting any deviations from the approved plans and specifications. Deviations may require approval from the Division; ii. A copy of the recorded operation and maintenance agreement; iii. Unless already provided, a copy of the recorded deed restrictions and protective covenants; and iv. A copy of the recorded plat delineating the public rights -of -way, dedicated common areas and/or permanent recorded easements, when applicable. b. If the permittee determines that the project is not in compliance with the approved plans, the permittee shall submit an application to modify the permit within 30 days of completion of the project or provide a plan of action, with a timeline, to bring the site into compliance. 10. OPERATION AND MAINTENANCE. The permittee shall provide and perform the operation and maintenance necessary, as listed in the signed operation and maintenance agreement, to assure that all components of the permitted on -site stormwater system are maintained at the approved design condition. The approved operation and maintenance agreement must be followed in its entirety and maintenance must occur at the scheduled intervals. CORRECTIVE ACTIONS REQUIRED. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions. This includes actions required by the Division and the stormwater rules such as the construction of additional or replacement on -site stormwater systems. These additional or replacement measures shall receive a permit from the Division prior to construction. b. MAINTENANCE RECORDS. Records of maintenance activities must be kept and made available upon request to authorized personnel of the Division. The records will indicate the date, activity, name of person performing the work and what actions were taken. 11. PERMIT RENEWAL. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee as outlined in 15A NCAC 02H.1045(3). 12. CHANGES TO THE PROJECT NAME, PERMITTEE NAME OR CONTACT INFORMATION. The permittee shall submit a completed Permit Information Update Application Form to the Division within 30 days to making any one of these changes. 13. TRANSFER. This permit is not transferable to any person or entity except after notice to and approval by the Director. Neither the sale of the project and/or property, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit. Page 4 of 6 Post -Construction Stormwater Management Permit No. SW8 000232 a. TRANSFER REQUEST. The transfer request must include the appropriate application, documentation and the processing fee as outlined in 15A NCAC 02H.1045(2). This request must be submitted within 90 days of the permit holder meeting one or more of the following: i. A natural person who is deceased; ii. A partnership, limited liability corporation, corporation, or any other business association that has been dissolved; iii. A person or entity who has been lawfully and finally divested of title to the property on which the permitted activity is occurring or will occur through foreclosure, bankruptcy, or other legal proceeding. iv. A person or entity who has sold the property, in whole or in part, on which the permitted activity is occurring or will occur;di V. rights to another individual or entity; vi. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of NCGS 143-214.7(c2); TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on -site stormwater system complies with the permit conditions. Records of maintenance activities performed to date may be requested. Projects not in compliance with the permit will not be transferred until all permit and/or general statute conditions are met. 14. COMPLIANCE. The permittee is responsible for complying with the terms and conditions of this permit and the approved plans and specifications until the Division approves the transfer request. a. REVIEWING AND MONITORING FOR COMPLIANCE. The permittee is responsible for verifying that the proposed BUA within each drainage area and for the entire project does not exceed the maximum amount allowed by this permit. The permittee shall review and routinely monitor the project to ensure continued compliance with the conditions of the permit, the approved plans and specifications. b. APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved plans, application, supplement, operation and maintenance agreement, all applicable recorded documents, and specifications shall be maintained on file by the permittee at all times. c. MAINTENANCE ACCESS. SCMs, stormwater collection systems, and vegetated conveyances must be accessible for inspection, operation, maintenance and repair as shown on the approved plans. d. DIVISION ACCESS. The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted project. e. ENFORCEMENT. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. f. ANNUAL CERTIFICATION. The permittee shall electronically submit to the Division an annual certification completed by either the permittee or their designee confirming the projects conformance with permit conditions. Page 5 of 6 Post -Construction Stormwater Management Permit No. SW8 000232 g. OBTAINING COMPLIANCE. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of modified plans and certification in writing to the Director that the changes have been made. OTHER PERMITS. The issuance of this permit does not preclude the permittee from obtaining and complying with any and all other permits or approvals that are required for this development to take place, as required by any statutes, rules, regulations, or ordinances, which are imposed by any other Local, State or Federal government agency having jurisdiction. Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS 143-215.6. Permit renewed and reissued this the 2911 day of June, 2022. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION (Ado" " Brian Wrenn, Director Division of Energy. Mineral and Land Resources By Authority of the Environmental Management Commission Page 6 of 6 Attachment C - Permitting History United Rentals Permit No. SW8 000232 Approval Permit Action BIMS Description of the Changes Date Version This original issuance approved the constriction of 3/27/2000 Original 1.0 105,671 square feet of built -upon area (BUA) treated in Approval a wet detention pond. 1/30/2020 Renewal 2.0 This issuance renewed the permit until March 27, 2022. This issuance transferred the permit from Parkway 5/21/2020 Transfer 2.1 Business Park, LLC to The Camp Group, LLC This issuance approved the modification of the permit to add additional project area and BUA. The wet detention 10/29/2020 Major 2.2 pond is being redesigned to accommodate the additional Modification BUA and the site is being brought up to the 2017 Stormwater Rules with these modifications. 6/29/2022 Renewal 3.0 Expires on 3/27/2030 Page 1 of 1 BK: RB 6570 III III II II III III IIII I III PG: 279 CCORDED 2022020996 NC FEE $51.00 06-01-2022 NEW HANOVER COUNTY, NC 04:35:39 PM TAMMY THEUSCH PIVER RY. STEPHANIE PEREZ REGISTER OF DEEDS DEPUTY NONSTANDARD DOC FEE STORMWATER POND OPERATION & MAINTENANCE AGREEMENT 5919 MARKET STREET — UNITED RENTALS FACILITY NCDEQ STORMWATER PERMIT SW8 000232 This instrument was prepared by: Paramounte Engineering, Inc. Attn: J. Branch Smith, PE 122 Cinema Drive Wilmington, NC 28409 This instrument was returned to: The Camp Group, LLC Attn: Richard J. Campagna 311 Judges Road, Suite 12F Wilmington, NC 28405 JUN 0 ; 2022 on & Maintenance Project Name: Project Location: United Rentals - Market St 5919 Market St, Wilmington, NC 28405 Maintenance recoras snail ne kept on the ronowing bmFr s). I nis maintenance recora snail De Kept In a log in a renown set iucaua Any deficient BMP elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the BMP(s). The BMP(s) on this project include (check all that apply & cc Bioretention Cell Quantity: Dry Detention Basin Grassed Swale Green Roof Infiltration Basin Infiltration Trench Level SpreaderNFS Permeable Pavement Proprietary System Rainwater Harvesting Sand Filter Stormwater Wetland Wet Detention Basin Disconnected Impervious Area User Defined BMP Quantity: Quantity: Quantity: Quantity: Quantity: Quantity: Quantity: Quantity: Quantity: Quantity: Quantity: Quantity: Present: Present: O&M tables Location) Location) Location) Location) Location) Location) Location) Location) Location) Location) Location) Location) Locationi Location Locationi s): s): s): s): s): s): s): s): s): s): s): s): s): s): s): I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each BMP above, and attached O&M tables. I agree to notify NCDENR of any problems with the system or prior to any changes to the system or responsible party. ` Responsible Party: Title & Organization: Street address: City, state, zip: Phone number(s): Email: Signature: Rick J Campagna Manager 311 Judges Rd, Suite 12F Wilmington, NC 28405 910-338-2409 rick@carolinastorage.com Date: 2 2 I, !SS 7- (C, , a Notary Public for the State of ,A %y-w C�w-L-✓ )a County of f (.1 /G/G do hearby certify that 2'fa' nt7 t �9rtJQ personally appeared before me this day of 224 . Lca 2 and acknowledge the due execution of the Operaf nd Maintenance Agreement. „oonnumnuu� �/, J/ Witness m �M�and�gdFotitigj�I seal,90 a ! 1Ra0 (iyyrtp,✓ T- ory1�TL 0 1 z ue<cY JUN 01 2022 cn, �V BY: �Ck couo STr1RM-F7 I 5/20/2022 Version 1.4 O&M Manual Page 1 of 3 Sea/ My commission expires Wet Detention Pond Maintenance Requirements The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. Important maintenance procedures: Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the BMP Areas of bare soil and/or Regrade the soil if necessary to remove the gully, and then plant a erosive gullies have formed. ground cover and water until it is established. Provide lime and a one- time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of approximately six inches. long. The inlet device The pipe is clogged. Unclog the pipe. Dispose of the sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to smooth it over and provide erosion swale. control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Stone verge is clogged or Remove sediment and replace with clean stone. covered in sediment (if applicable). The forebay Sediment has accumulated to Search for the source of the sediment and remedy the problem if a depth greater than the possible. Remove the sediment and dispose of it in a location where it original design depth for will not cause impacts to streams or the BMP. sediment storage. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional practice show that pruning is needed to maintain optimal plant JUN 0 12022 health. Plants are dead, diseased or Determine the source of the problem: soils, by logy, -disease etc. dying. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. ST verefnn 14 Wet Detention Pond MaiggWMMiRequirements (Continued) P,,,p ter' The main treatment area Sediment has accumulated to Search for the source of the sediment and remedy the problem if a depth greater than the possible. Remove the sediment and dispose of it in a location where it original design sediment will not cause impacts to streams or the BMP. storage depth. Algal growth covers over 50% Consult a professional to remove and control the algal growth. of the area. Cattails, phragmites or other Remove the plants by wiping them with pesticide (do not spray). invasive plants cover 50% of the basin surface. The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and consult a professional to remove beaver activity is present. beavers. A tree has started to grow on Consult a dam safety specialist to remove the tree. the embankment. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. (if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Department of Environment and Natural damage have occurred at the Resources Regional Office. outlet. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. Wet Detention Pond Design Summary I WET POND ID FOREBAY #7j4 MAIN POND Pond 1 - Forebay 2 Permanent Pool El. 27 Permanent Pool El. 27 Temporary Pool El: 28.9 Temporary Pool El: 28.9 Pretreatment other No Clean Out Depth: 4 Clean Out Depth: 7 than forebay7 Sediment Removal El: 23 Sediment Removal El: 20 Has Veg. Filter? Yes Bottom Elevation: 22 Bottom Elevation: 19 F0,r5,try 41-- 1 Cwo+) �. Poo 1, 2 .1- pooU 28'q Sa, REA4r"ArL, OL Z¢.o p;&to to EL 23.0 JUN 0 12022 BY:_ STORM-EZ 5/2012022 Version 1.4 0&M Manual Page 3 of 3 ULMLR UJL UNLY Date eceive Fee Paid Permit Number SU5 cSUJ 1000 NC DEQ Division of Energy, Mineral and Land Resources STATE STORMWATER: PERMIT RENEWAL APPLICATION FORM In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permit 180 days prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781) Section 60.(c). This application form is for permit renewals only. A. PROJECT INFORMATION 1. State Stormwater Permit Number: SW8 000232 2. Project name: United Rentals 3. Project street address: 5919 Market Street City: Wilmington County: New Hanover ZIP: 28403 4. What, if any, changes have been made to the project as permitted? If the project has changed from the original approved plans, please complete SWU-101 for a Major Modification or Minor Modification Application form available at., https://deg.nc.gov/about/divisions/energv- mineral-land-resources/energy-mineral-land-rules/stormwate r-prog ram/post-construction. B. PERMITTEE INFORMATION If changes to the permittee or project name have been made, please complete either the Permit Update form or the Permit Transfer form available at: https://deg.nc.gov/abouUdivisions/energy-mineral-land- tesources/energy-mineral-land-rules/stormwater-program/post-construction. State Stormwater Permits do not automatically transfer with the sale of the property. 1. Current Permit Holder's Company Name/Organization: The Camp Group, LLC 2. Signing Official's Name: Richard J. Campa[tna 3. Signing Official's Title: Member -Manager 4. Mailing Address: 311 Judges Road, Suite 121' City: Wilmington State: NC ZIP 28405 5. Street Address: City: 6. Phone: (910) 350-0565 Email: rick(g)carolinastorage.com State: ZIP: t= ii o a ti YY 6. JUN 2 7 2022 N BY: Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018 C. SUBMITTAL REQUIREMENTS Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HQW/ORW). Only applications packages that include all required items listed below will be accepted and reviewed. Initial each item below to indicate that the required information is provided in the application package: JBS 1. A permit application processing fee of $505.00 payable to NCDEQ. JBS 2. One original signed hard copy and one electronic copy of this completed form. The signing official named on this application to represent the current permittee must meet one of the following: a. Corporation — a principle executive officer of at least the level of vice-president; b. Limited Liability Company (LLC) — a manager or company official as those terms are defined in G.S. 57D "North Carolina Limited Liability Company Act;" c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee; d. Partnership or limited partnership — the general partner; e. Sole proprietor; or f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the signature of another entity. 11] 3. One hard copy and one electronic copy of recorded documents required by the original permit that have not yet been received by DEMLR, including: deed restrictions, protective covenants, condominium/planned community declaration and easements. If the project has been built, include documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If the project has not been built, include a signed agreement that the final recorded deed restrictions and protective covenants will be submitted at a later date. JBS 4. O&M Agreements, Please select one: ® I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to keep this on file with the permit; or ❑ I do not have a copy of the current recorded O&M Agreement for all SCMs and am requesting a copy be sent to me. I agree to keep this on file with the permit. JBS 5. Designer Certifications, Please select one ® A copy of the certification(s) confirming that the project was built in accordance with the approved plans have been previously provided to the Division; or ❑ A copy of the certification(s) confirming that the project was built in accordance with the approved plans are enclosed, or ❑ The project has not yet been built. S / ) JBS 6. [IF APPLICABLE] If the project has been built, one o gifi * Co and one electronic copy of a signed, sealed, and dated letter from a licensed professional stating that the SCMs have been inspected, and that they have been built and maintained in accordance with the permit. JBS 7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC): Provide one hard copy and one electronic copy of documentation from the NC Secretary of State, or other official documentation, which supports the titles and positions held by the persons listed in Section C.2 per 15A NCAC 2H. 1043(3)(b). httos://www.sosnc.gov/online services/search/by title/ Business Registration JUN 2 7 2022 BY:__ Stormwaler Permit Renewal Application Form Page 2 of 3 May 11, 2018 D. PERMITTEE'S CERTIFICATION rd J"lle, the person legally responsible for the permit, certify that I have a copy of the Permit and O&VAgreement on site (or I will obtain a copy and it will be kept on site), that I am responsible for the performance of the maintenance procedures, and the site has been and will be maintained according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the project, SCMs, or owners II information provided on this permit renewal application is, to the best of my knowledge, correct and co fete. Signature: Date: NOTARIZATION: that KArJW rA V this the .01 day of !JAX'e_ execution of the forgoing instrument. Witness my hand and official seal, (Notary Seal) Notary Signature:QA11i ASlG(F!L✓ My commission expires 02,'c a Notary Public for the State of do hereby certify personally appeared before me 20d?, and acknowledge the due unu �y N0TAR),':9�;^ �c�.• pUBLIC; �G%� .' JUN 27 2W Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018 ;� nn.� r.,� . s1: � '�'%-'�e �- "lr ���i�{�`L .n� �o L� h:r u1r •,. SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name United Rentals 2 Project AreaInc)6.01 3 Coastal Welland Area ac 0 4 Surface Water Area ac 0 5 Is this proiect Hi h or Low Density? High 6 Does this project use an off -site SCM? No COMPLIANCE WITH 02H.1003(4) 7 Width of vegetated setbacks provided feet N/A 8 Will the vegetated setback remain vegetated? No 9 Is BUA other that as listed in .1 0034 c-0 out of the setback? 10 Is streambank Stabilization proposed on this project? No NUMBER AND TYPE OF SCMz: 11 Infiltration System 0 12 Bioretention Cell 0 13 Wet Pond 1 14 Stormwatar Wetland 0 15 Permeable Pavement 0 16 Send Filter 0 17 Rainwater Harvesting (RAH) 0 18 Green Roo( 0 19 Level Spreader -Filter Ship (IS-FS 0 20 Disconnected Impervious Surface (DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 Storm Filter 0 24 Silva Coll 0 25 Bayfilter 0 26 Fillers 0 iORMSLOADED DESIGNER CERTIFICATION 27 Name and Title: Branch Smith PE 28 Organization: Paramounte Engineenng, Inc. 29 Street address: 122 Cinema Orive 30 City, State Zip: Wilmin glen,INC 28403 31 Phone numbers: 910-791.6707 32 Email: bsmilh®pasmounle-eng.com Ce�rtificetlon Statement: II codify, under penalty of law that this Supplement-EZ form and all supporting information were propuetl under my dir( ban or jeuporvlslon: that the Information provided In the form is, to the best of my knowledge and belief, true accurate, and complete; and That ,the engineering plane, specifications, operation and maintenance agreements and other supporting information are consistent with the Inlomutdon pmvidetl here. CARpz1 ��pQ•'ESS/ :a SEAL = 034354 z` •.•GIN•. 44�� Signs re of Designer (a- Date rulu l 1 Y d020 BY: DRAINAGE AREAS 1 1Is this a high density project? i Yes 2 1 If so number of drainage areas/SCMs I 1 3 Its allipart of this project subject to previous rule versions? I No (OfiA LOADED DRAINAGE AREA INFORMATION Entire Site 1 4 Typo of SCM Pond p1 5 Total BUA in project (ag it 217800 of 6 New BUA on subdivided lots (subject to permitting) eq 1t NIA NIA 7 New BUA outside of subdivided lots (subject to permitfln cf N/A 8 Was -total area (ag it 80500 at N/A 9 O6sito BUA fail III 45000 sf N/A 10 Breakdown of now BUA outside subdivided lots: Parking s fl -Sidewalk (sq fi - Roof fisq 6 1800 at Roadway a If - Future fisq fl 21000 at - Other, please specify in the comment box below e fi 44000 at New infiltrating permeable pavement on subdivided lots aq ft 12 New infiltrating permeable pavement outside of subdivided Iota (sq tt 13 Exisitrg BUA that will remain (not subject to emitting) (sq ftIf 106000 at 14 Emsfina BUA that is already ermitted s fl 15 ExistingBUA that will be removed s 6 16 Percent BUA 76% 17 Deai n storm inches 1.5 in 18 Deai n volume of SCM cu ft 29614 of 19 Calculafien method for design volume Simple ADDITIONAL INFORMATION 20 drPlease use this apace to provide any additional information about the drman o ama s 44,000 5f of now BUA to be gravel equipment storage and gravel driveway, ppI YEIgVE U L p LULU BY:_-------- WET POND 1 Draimgo area number 1 2 Design volume of SCM Ica fl) 29614 of Is the SCM sized to treat the SW from all surfaces at build-oul7 =fee 3 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM (H:V)7 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No 7 Are the inlets, outlets, and receiving stream protected from erosion (10 year storm)? Yes 8 Is there an overflow of bypass for inflow volume in excess of the design volume? Yea —(preferred) 9 What is the method for dowatering the SCM for maintenance? Pump 10 If applicable, will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC (8)7 Yes 12 Does the drainage easement comply with General MDC (9)7 Yes 13 If the SCM is on a single family lot, does (wi117) the plat comply with General MDC (10)? No 14 Is there an 01 Agreement that complies with General MDC If 1)? Yes 15 Is there on 08M Plan that complies with General MUG (12)7 Yes 16 Does the SCM follow the device specific MDC7 Yes 17 Was the SCM designed by an NC licensed professional? - C RO - o--- ----- WMET NO FROM 53 Yes SAIDA 18 Method used 19 Has a stage/storage table been provided in the calculations? Yoe 20 Elevation of the excavated main pool depth (bottom of sediment removal) (Intel) 19.00 21 Elevation of the main pool bottom -(lop of sediment removal) (lmsl) 2000, 22 Elevation of the bottom of the vegetated shelf Qmsl) 26.00 23 Elevation of the permanent pool (fmsl) 27.00 24 Elevation of the lap of the vegetated! shelf (fmsl) 27.00 25 Elevation of the temporary pool (fmsp 29.00 20 Surface area of the main permanent pool (square feet) 10726 of 27 Volume of the main permanent pool (cubic feet) 39224 of 28 Average depth of the main pool (feet) 4.70 8 29 Average depth equation used Equation 3 30 it using equation 3, main pool perimeter (feet) 397.0 It 31 If using equation 3, width of submerged veg. shelf (feet) 6.0 it 32 Volume of the forebay (cubic foot) 6823 of 33 Is this 15.20%of the volume in the main pool? Yes 34 Clean -out depth for forebay (inches) 36/48 35 Design volume of SCM Ica ft) 29614 cf 36 Is the outlet an orifice or a weir? Orifice 37 If orifice, orifice diamstar (inches) 2.5 in 38 If wait, weir height (inches) 39 If weir, weir length (inches) 40 Drawdown time for the temporary pool (days) 2.6 41 Are the inlat(s) and outlet located in a manner that avoids shod. circuiting? Yes 42 Ara berme or baffles provided to improve the flow path? No 43 Depth of forebay at entrance (inches) 48 / 60 44 Depth of forebay at exit (inches) 30 / 30 45 Does water JIM out of the larceny in a non -erosive manner? Yes 46 Width of the vegetated shelf (feet) 6 It 47 Slope of vegetated shelf (H'.V) 6:1 48 Does the ofifico drawdown Irom below the top surface of Iho permanent pool? Yes 49 Does the bond minimize impacts to the receiving channel from the 1- yr. 24-hr storm? Yes 50 Are fountains proposod7 (It Y, please provide documentation that MOC(9) Is mat.) No 51 Is a (rash rack or other device provided to protect the outlet system? Yes 52 to Iho tlam and ambankment planted in non -clumping turf grass? Vos 53 Species of cud that will be used on the dam and embankment Bermuda Mix 4 esns 9 pplan in —I gulp anbeen provide or a vegetated shelf? oa ADDITIONAL INFORMATION 55 Pleaso use this space to provide any additional information about the wet pond(e): C E ZIV OCT 2 8 2020 BY: DAYS t i ,'il..'i�; x� �� . Pr:'i C,. vurrEo �-AJrXi,4 �bo Permit # SW8 Project Name AS-BUILT PERMITTEE CERTIFICATION I hereby state that I am the current permittee for the project named above, and I certify by my signature below, that the project meets the below listed Final Submittal Requirements found in 15a NCAC 02H.1042(4) and the terms, conditions and provisions listed in the permit documents, plans and specifications on file with or provided to the Division. ❑ Check here if this is a partial certification. Section/phase/SCM # Pond 1 ❑ Check here if this is part of a Fast -Track As -Built Package Submittal per 15A N Printed Name Richard Campa/ona Signature I, a Notary Public in the State of County of 29U.15LJ1CA do hereby certify that 2C personally appeared before me this e23 en day of ur, , 20 1 2 and acknowledge the due execution of this as -built certification. Witness my ttk r and official seal My commission expires /e Ll zn2N c N e1yC a C G fCOUNoz Pennittee's Certification 15A NCAC 02FI .1042(4) DEED RESTRICTIONS / BUA RECORDS Completed / Provided N/A 1. The deed restrictions and protective covenants have been recorded and Y or N contain the necessary language to ensure that the project is maintained consistent with the stormwater regulations and with the permit conditions. 2. A copy of the recorded deed restrictions and protective covenants has been Y or N provided to the Division. J 3. Records which track the BUA on each lot are being kept. (See Note 1) YorN MAINTENANCE ACCESS Completed/ ovided N/A I. The SCMs are accessible for inspection, maintenance and repair. YorN or N 2. The access is a minimum of 10-feet wide. or N 3. The access extends to the nearest public right -of --way. JUN 0 12022 BY: NCDFQ 2/9/2018 Project Name Permit # SW8 EASEMENTS Completed / Provided I . The SCMs and the components of the runoff collection / conveyance system Y or NO are located in recorded drainage easements. 2. A copy of the recorded plaits) is provided. Y or&N SINGLE-FAMILY RESIDENTIAL LOTS 01 Completed / Plats for residential lots that have an SCM include t1 e following: Provided I . The specific location of the SCM on the lot. Y or N 2. A typical detail for the SCM. Y or N 3. A note that the SCM is required to meet stormwater regulations and that the lot owner is subject to enforcement action as set forth in NCGS 143 Article Y or N 21 if the SCM is removed relocated or altered without irior approval. OPERATION AND MAINTENANCE AGREEMENT Completed / Provided 1. The O&M Agreement is referenced on the final recorded plat. Y or 2. The O&M Agreement is recorded with the Register of Deeds and appears in O N the chain of title. or OPERATION AND MAINTENANCE PLAN Completed / Provided I. Maintenance records are being kept in a known, set location for each SCM ® or N and are available for review. DESIGNER'S CERTIFICATION FORM Completed / Provided 1. A completed designer's certification form has been provided to the N e Division. or Provide an explanation below for every requirement that was not met, and for every item marked "N/A." Attach additional pages as needed. _AtP O&-EA A*57WVlo4f5 6R. 4uE55 &ifSE/iENTS 1W9- NE.ED&'Q JU;J 0 1 2022 ' BY_ NCDEQ 2/9/2018 Project Name IWcre0/-� Permit # SW8 Poo Z�z AS -BUILT DESIGNER'S CERTIFICATION FOR WET DETENTION POND PROJECT I hereby state that I am a licensed professional and I certify by my signature and seal below, that I have observed the construction of the project named above to the best of my abilities with all due care and diligence, and that the project meets all of the MDC found in 15A NCAC 02H.1053, in accordance with the permit documents, plans and specifications on file with or provided to the Division, except as noted on the "AS -BUILT" drawings, such that the intent of the stormwater rules and the general statutes has been preserved. ❑ Check here if this is a partial certification. Section/phase/SCM # Pond 1 ❑ Check here if this is part of a Fast -Track As -Built Package Submittal per 15A NCAC 02H .1044(3). ❑ Check here if the Designer did not observe the construction but is certifying the project. ❑ Check here if pictures of the SCM are provided. Printed Name J. Branch Smith Signature NC Registration Number 034354 Date • is• �-� SEAL: \\�ttlClAff/ll�i - ESS/". ��i �. of 04'' 9 ;a SEAL 034354 *,VG I NE� C���� Consultant's Mailing Address: 122 Cinema Drive City:Wilmington State:NC Zip:28409 Phone:(910)-7916707 Consultant's Email address: bsmithlaDparamounte-eng com OO Circle N if the as -built value differs from the Plan/permit. If N is circled, provide an explanation on page 2. ® N/E = Not Evaluated (provide explanation on page 2). ®N/A = Not Applicable to this project or SCM. This Certification must be completed in conjunction with the General MDC certification under 15A NCAC 02H.1050. Consultant's Certification (MDC 15A NCAC 02H .1053) Forebay / Depths / Fountain OO As -built ®N/E ®N/A 1. The available Sediment storage is consistent with the approved plan and is a minimum of 6 in. U/ or N 2. Water flow over the forebay berm into the main pond occurs at a non -erosive velocity. i or N 3. The provided Forebay Volume is 15%-20% of the main pool volume. V/ or N 4. The Forebay entrance elevation is deeper than the exit elevation into the pond. ,� or N 5. The Average Design Depth of the main pond below the permanent pool elevation is consistent with the permitted value? or N 6. Fountain documentation is provided. Y or N 20 N" %I..a IS. a W A. !UN 01 2022 NCDEQ 2/9/2018 BY: Project Name Permit # SW8 Side slopes / Banks / Vegetated Shelf OAs-built ®N/E ®N/A 1. The width of the Vegetated Shelf is consistent with the approved or N plans and is a minimum of 6 feet. 2. The slope of the Vegetated Shelf is consistent with the approved fle or N plans and is no steeper than 6:1. As -built Main Pool / Areas / Volumes / Elevations ()As -built mN/E ©N/A 1. The permanent pool surface area provided is consistent with the toe or N permitted value. 2. The Temporary Pool Volume provided is consistent with the 6e, or N permitted value. 3. The permanent pool elevation is consistent with the permitted W10, or N value. 4. The temporary pool elevation is consistent with the permitted N value. or Inlets / Outlet / Drawdown OAs-built OWE ©N/A 1. The design volume draws down in 2-5 days. L"Veoor N 2. The size of the Orifice is consistent with the permitted value. k1r or N 3. A trash rack is provided on the outlet structure. W'V� or N 4. Hydrologic impacts to the receiving channel are minimized from &' or N the 1 yr 24-hr storm discharge? 5. The inlets and the outlet location are situated per the approved `¢' or N plan and avoid short-circuiting. Vegetation OAs-built ®N/E ®N/A 1. The vegetated shelf has been planted with a minimum of 3 N diverse species. or 2. The vegetated shelf plant density is consistent with the approved plans and is no less than 50 plants per 200 sf or no Ll< or N less than 24 inches on center. Provide an explanation below for every MDC that was not met, and for every item marked "N/A" or "N/E." Attach additional pages as needed. rU0 0 1202.2 NCDEQ2/9/2ols By: Project Name U't'fre-l) Ate' Permit # SW8 �Z''Z A4,* sr S r AS -BUILT DESIGNER'S CERTIFICATION FOR GENERAL MDC I hereby state that I am a licensed professional and I certify by my signature and seal below, that I have observed the construction of the project named above to the best of my abilities with all due care and diligence, and that the project meets all of the below listed General MDC found in 15A NCAC 02H.1050, in accordance with the permit documents, plans and specifications on file with or provided to the Division, except as noted on the "AS -BUILT" drawings, such that the intent of the stormwater rules and the general statutes has been preserved. ❑ Check here if this is a partial certification. Section/phase/SCM # Pond 1 ❑ Check here if this is part of a Fast -Track As -Built Package Submittal per 15A NCAC 02H .1044(3). ❑ Check here if the Designer did not observe the construction but is certifying the project. ,&Check here if pictures of the SCMs are provided. Printed Name J. Branch Smith Signature NC Registration Number034354 Date S• s 5 1` SEAL:D4,7//�i :i SEAL 034354 %SrBRII AN��x��� Consultant's Mailing Address: 122 Cinema Drive City:Wilmington State:NC Zip:28409 Phone:(910)-7916707 Consultant's Email address: bsmith(a)paramounte-eng com O Circle N if the as -built value differs from the Plan/permit. If N is circled, provide an explanation on page 3. ® N/E = Not Evaluated (provide explanation on page 2). ®N/A = Not Applicable to this project or SCM. Consultant's Certification 15A NCAC 02H .1003(3) & General MDC 15A NCAC 02H .1050 TREATMENT REQUIREMENTS OO As -built OO N/E ®N/A I. The SCM achieves runoff treatment. or N 2. The SCM achieves runoffvolume match. or N or N 3. Runoff from offsite areas and/or existing 13UA is bypassed. 4. Runoff from offsite areas and/or existing BUA is directed into �jf or N the permitted SCM and is accounted for at the full build -out potential. 5. The project controls runoff through an offsite permitted SCM Y or I.X that meets the requirements of the MDC. 6. The net area of new BUA increase for an existing project has IiP or N been accounted for at the appropriate design storm level. r NCDEQ 2/9/2018 U110 1 20- '' Project Name Permit # SW8 or N 7. The SCM(s) meets all the specific minimum design criteria. VEGETATED SETBACKS / BUA OAs-built QN/E ©N/A 1. The width of the vegetated setback has been measured from Y or N the normal pool of impounded waters, the MHW line of tidal ✓ waters or the top of bank of each side of rivers or streams. 2. The vegetated setback is maintained in grass or other Y or N vegetation. 3. BUA that nnects the requirements of NCGS 143-214.7 (b2)(2) Y or N is located in the setback. 4. BUA that does not meet the requirements of NCGS 143-214.7 Y or N (b2)(2) is located within the setback and is limited to: • Publicly funded linear projects (road, greenway sidewalk) • Water -dependent structures f • Minimal footprint uses (utility poles, signs, security lighting and appurtenances) 5. Storniwatcr that is not treated in an SCM is released at the Y or N edge of the setback and allowed to Flow through the setback as ✓ dispersed now. STORMWATER OUTLETS OAs-built QN/E ©N/A 1. the outlet handles the peak now from the 10-year storm with L-Ir or N no downslope erosion. VARIATIONS OO As -built QN/E ©N/A I. A variation (alternative) from the stormwater rule provisions Y N ✓ has been implemented. or 2. The variation provides equal or better stormwater control and Y N equal or better protection of surface waters. or ✓� COMPLIANCE WITH OTHER REGULATORY PROGRAMS OAs-built QN/E ON/A 1. The project is compliant with other applicable regulatory W'or N programs. SIZING OO As -built QN/E ©N/A 1. The volume of the SCM takes the runoff from all surfaces into Vr or N account and is sufficient to handle the required storm depth. CONTAMINATED SOILS OO As -built QN/E ©N/A 1. Infiltrating SCM's are not located in or on areas with Y N contaminated soils. or SIDE SLOPES (!)As -built QN/E ©N/A 1. Vegetated side slopes arc no steeper than 3H:1 V. or N rJUR0 2022 BY: NCDEQ 2/9/2018 Project Name Permit # SW8 2. Side slopes include retaining walls, gabion walls, or other surfaces that are steeper than 3H: IV. Y or 3. Vegetated side slopes are steeper than 3H:1 V (provide supporting documents for soils and vegetation). Y or LP EROSION PROTECTION OAs-built ON/E ON/A 1. The inlets do not cause erosion in the SCM. or N 2. The outlet does not cause erosion downslope of the discharge point during the peak flow from the 10-year storm. k_�' or N EXCESS FLOWS OAs-built ON/E OO N/A 1. An overflow / bypass has been provided. tJi or N DEWATERING OO As -built ON/E ON/A I. A method to drawdown standing water has been provided to facilitate maintenance and inspection. yP or N CLEANOUT AFTER CONSTRUCTION OAs-built ON/E ON/A 1. The SCM has been cleaned out and converted to its approved design slate. y� or N MAINTENANCE ACCESS OAs-built ON/E ON/A 1. The SCM is accessible for maintenance and repair. or N 2. The access does not include lateral or incline slopes >3:1. iX or N DESIGNER QUALIFICATIONS (FAST -TRACK PERMIT) OAs-built ON/E ON/A 1. The designer is licensed under Chapters 89A, 89C, 89E, or 89F of the General Statutes. 1r or N Provide an explanation below for every MDC that was not met, and for every item marked "N/A" or "N/E." Attach additional pages as needed. NCDEQ 2/9/2018 TAMMY THEUSCH PIVER New Hanover County Register of Deeds Register of Deeds 320 CHESTNUT ST SUITE 102 t WILMINGTON, NORTH CAROLINA 28401 Telephone 910-798-4530 f Farc 910-798-7716 01 `r Nl ! A `� �,,:1 `�r-.-t,ue!-6y: G0k)Nir, tir C 5 z � I i 9• �'�'euswn'y ***#R*ti*#RH Ht#f lfflx lxflf4#ff##f11f #f#if llffif if ff HflflH 111f H#Hf4xH 111fxfiffllx#lfxfxxifx***1f*f**** State of North Carolina, County of NEW HANOVER Filed For Registration: 06/01/2022 04:35:39 PM Book: RB 6570 Page: 275-279 5 PGS $51.00 Real Property $51.00 Recorder: STEPHANIE PEREZ Document No: 2022020996 +++++++++**xxtxf**x***fxtlx*fff+:lf#1f:#f1f+#f+ffff++:#+#f#1R♦f##fxfffaf:#f:#++++++:++:#ffffflff#af#ffxaf+lx DO NOT REMOVE! This certification sheet is a vital part of your recorded document. Please retain with original document and submit when re-recording. I JUN 6 12022