HomeMy WebLinkAbout20201940 Ver 2_Rosewood Mitigation Bank Parcel - Site Walk Request Memo_20230310ID#* 20201940 Version* 2
Select Reviewer:
Katie Merritt
Initial Review Completed Date 03/20/2023
Mitigation Project Submittal - 3/10/2023
Is this a Prospectus, Technical Proposal or a New Site?* Yes No
Type of Mitigation Project:*
Stream Wetlands Buffer Nutrient Offset
(Select all that apply)
Project Contact Information
Contact Name: * Email Address:
Kaitlyn Hogarth khogarth@wildlandseng.com
Project Information
ID#: * 20201940 Version:* 2
Existing ID# Existing Version
Project Type: DMS Mitigation Bank
Project Name: Rosewood Buffer Mitigation Site
County: Wayne
Document Information
Mitigation Document Type:*
Mitigation Bank Information
File Upload: Rosewood Mitigation Bank Parcel - Site Walk
20.34MB
Request Memo.pdf
Please upload only one PDF of the complete file that needs to be submitted...
Signature
.................................................. ......... ......... ...... ................................ .............................................
Print Name:* Kaitlyn Hogarth
Signature: *
a�1'lJrr �o�rrtN
March 10, 2023
CREDIT RELEASE REQUEST FORM
To: NCDEQ-DWR Nutrient Offset & Buffer Banking Coordinator
From: Kaitlyn Hogarth (khogarth@wildlandseng.com, 540-907-9432)
Through: Wildlands Holdings III, LLC.
We formally request a credit release for the Rosewood Mitigation Bank Parcel (2020-1940v2) for
completion of Task 2 per the approved credit release schedule, which is included in the Attachments
with this request. The following documents have been submitted to NCDWR for Task 2 and are
pending review: Request for Site Walk Memorandum
Credits requested for release are detailed below:
Credit Type % Release Credit Amount
(include Units)
Notes/Comments
Buffer Restoration 20% 143,513.750 ft2 0.20 x 717,568.750 ft2
= 143,513.750 ft2
Buffer Preservation N/A N/A
Buffer Enhancement N/A N/A
Generated Nitrogen Nutrient
Offset 20% 11,582.875 lbs. N 0.20 x 57,914.395 lbs.
N = 11,582.875 lbs. N
Delivered Nitrogen Nutrient
Offset (Jordan sites only) N/A N/A
Generated Nitrogen Nutrient
Offset N/A N/A
Delivered Phosphorus Nutrient
Offset (Jordan sites only) N/A N/A
Signature:
Attachments:
1) BPDP approved Project Credit Table
2)UMBI approved Credit Release Schedule
BPDP approved Project Credit Table
Rosewood Mitigation Bank Parcel
Bank Parcel Development Package
Neuse 03020201 - Outside Falls Lake Project Area
19.16394 N Credit Conversion Ratio (ft2/pound)
N/A P Credit Conversion Ratio (ft2/pound)
Credit Type Location
Subject?
(enter NO if
ephemeral
or ditch 1)
Feature Type Mitigation
Activity
Min-Max
Buffer Width
(ft)
Feature Name Total Area
(ft2)
Total
(Creditable)
Area of Buffer
Mitigation
(ft2)
Initial
Credit
Ratio (x:1)
% Full
Credit
Final
Credit
Ratio (x:1)
Convertible
to Riparian
Buffer?
Riparian
Buffer Credits
Convertible
to Nutrient
Offset?
Delivered
Nutrient
Offset: N
(lbs)
Buffer Rural Yes I / P Restoration 20-29 UT to Charles Branch 193 193 1 75% 1.33333 Yes 144.750 No —
Buffer Rural Yes I / P Restoration 0-100 UT to Charles Branch,
UT1, UT2, UT3 717,424 717,424 1 100% 1.00000 Yes 717,424.000 Yes 37,436.143
Nutrient
Offset Rural Yes I / P Restoration 101-200 UT to Charles Branch,
UT1, UT2, UT3 549,443 - 1 33% 3.03030 No — Yes 28,670.670
Nutrient
Offset Rural No Ditch Restoration 0-100 D1, D2, D3 312,990 - 1 100% 1.00000 No — Yes 16,332.236
Nutrient
Offset Rural No Ditch Restoration 101-200 D1, D2, D3 247,435 - 1 33% 3.03030 No — Yes 12,911.489
Buffer Rural No Ditch NA 0-50 Diffused Flow
Deductions 10,875 - 1 100% 1.00000 No — No —
Totals (ft2): 1,838,360 717,617 717,568.750 95,350.539
Total Buffer (ft2): 728,492 717,617
Total Nutrient Offset (ft2): 1,109,868 N/A
TOTAL AREA OF BUFFER MITIGATION (TABM)
Mitigation Totals Square Feet Credits
Restoration: 717,617 717,568.750
Enhancement: 0 0.000
Preservation: 0 0.000
Total Riparian Buffer: 717,617 717,568.750
TOTAL NUTRIENT OFFSET MITIGATION
Mitigation Totals Square Feet Credits
Nutrient
Offset:
Nitrogen:
1,109,868
57,914.395
Phosphorus: 0.000
UMBI approved Credit Release Schedule
Rosewood Mitigation Bank Parcel
Umbrella Mitigation Banking Instrument
Table 3.0 - Credit Release Schedule for Riparian Buffer and Nutrient Offset Credits
Task Project Milestone
% Credit
Available for
Sale
1 Instrument and BPDP Approved by DWR, Conservation Easement
Recorded*, and Financial Assurance Posted 20
2
All Riparian Earthwork & Mitigation Activities, Planting and
Installation of Monitoring Devices completed, easement boundaries
adequately marked, all applicable permits obtained, site visit
performed by DWR
20
3 Monitoring Financial Assurance Posted and Approval of As-Built
Report 10
4 Monitoring Report #1: Approved by the DWR** & financial
assurance renewed 10
5 Monitoring Report #2: Approved by the DWR** & financial
assurance renewed 10
6 Monitoring Report #3: Approved by the DWR** & financial
assurance renewed 10
7
Item B (I) of Section X in this Instrument has been completed and
approved by DWR 5
No remaining credits will be released until Task 7 has been satisfied, assigning the
conversation easement to an approved land trust or long-term steward.
8
Monitoring Report #4: Approved by the DWR** & financial
assurance renewed 5
9
Monitoring Report #5: Approved by the DWR** and final site visit
by DWR has been conducted 10
Total 100%
* For specification, please see Section V in this Instrument
** DWR Approval provided upon a determination that the site is meeting performance
standards contained within the approved BPDP
Rosewood Mitigation Bank Parcel – Memo
Page 1 Wildlands Engineering, Inc.
March 10, 2023
MEMORANDUM
TO:
FROM:
DATE:
RE:
Katie Merritt, Nutrient Offset & Buffer Banking Coordinator
Andrea Eckardt, Project Manager
Kaitlyn Hogarth, Environmental Scientist
March 10, 2023
Request for Site Visit
MBI Task 2 Site Walk
ROSEWOOD MITIGATION BANK PARCEL- Goldsboro, NC
The Rosewood Mitigation Bank Parcel (Parcel) is in Wayne County approximately 6 miles west of the City
of Goldsboro. The Parcel was restored to provide ecological and water quality enhancements to the
Neuse River Basin by restoring the riparian buffer along UT to Charles Branch, three unnamed tributaries
(UT1, UT2, and UT3), and three ditches (D1, D2, and D3). Buffer widths within the Parcel extend up to
200 feet from the tops of banks of all project features. Prior to mitigation activities, the Parcel was used
to produce row crops. Tables 1 and 2 contain project overview and credit applicability information.
Table 1. Project Overview
Project Name Rosewood Mitigation Bank Parcel
Hydrologic Unit Code 03020201200030
River Basin Neuse (Excluding Falls Lake)
Geographic Location (Lat, Long) 35.406567 W, 78.075854 N
Site Protection Instrument (DB, PG) BK 3752 PG 639-652
Total Credits 717,568.750 ft² buffer mitigation credits; 57,914.395 lbs. N
Types of Credits Riparian Buffer and Nutrient Offset Credits
BPDP Date July 2022
Initial Planting Date January 2023
Baseline Report Date March 2023
MY1 Report Date December 2023
MY2 Report Date December 2024
MY3 Report Date December 2025
MY4 Report Date December 2026
MY5 Report Date December 2027
Rosewood Mitigation Bank Parcel – Memo
Page 2 Wildlands Engineering, Inc.
March 10, 2023
Table 2. Credit Viability
Feature Name
(BPDP)
Feature Name
(NCDWR
Evaluation)
Classification Buffer Credit Viable Nutrient Offset Viable
UT to Charles
Branch
UT to Charles
Branch Stream Yes Yes
(non-forested fields only)
UT1 UT1a Stream Yes Yes
(non-forested fields only)
UT1b Stream Yes
UT2 UT2 Stream Yes Yes
(non-forested fields only)
UT3 UT3 Stream No Yes
(non-forested fields only)
D1 D1 Ditch No Yes
(non-forested fields only)
D2 D2 Ditch No Yes
D3 D3 Ditch No Yes
D4 D4 Ditch No Yes*
*Ditch D4 was evaluated for buffer or nutrient viability but is not being proposed as part of this project therefore not
included in any credit requests.
Approximately 47.13 acres have been protected under the conservation easement. The mitigation
activity for 41.92 acres was riparian restoration, of which 16.47 acres are proposed for buffer mitigation
credit, while 25.46 acres are proposed for nutrient offset credit. The Buffer Interpretation /Clarification
Memo #2008-019 applies to Ditches D2, D4, D5, and D6 where maintenance of diffuse flow onsite is
unattainable, therefore a total of 0.25 acres have been removed from the creditable area at the top of
Ditches D2, D4, D5, and D6. Other areas within the conservation easement where no credit is claimed
include areas which are over 200 feet from top of bank and the project feature channels.
The land use within 200 feet from top of bank of the project features had been maintained and cleared
for row crop cultivation prior to restoration activities; therefore, soil disturbance during project planting
was minimal. Grading was done on various portions of UT to Charles Branch downstream of the culvert
replacement and within all culvert removal and replacement areas. A small erosion area on the left bank
of UT to Charles Branch in between veg plot 9 and 34 was stabilized by installing rolled matting to
diffuse overland flow, and riprap around the top of bank. The main culvert on UT to Charles Branch was
replaced, and culverts along UT1, D1, and D2 were removed. In areas where grading occurred, two rows
of live stakes were planted along each bank. Additionally, areas with deficient herbaceous cover will be
seeded in April 2023 with a combination of warm season cover crops and permanent species seed mix.
Bare root trees were planted using a dibble bar at a spacing of 7 feet by 12 feet, which resulted in a
stem density of 492 stems per acre. Table 3 includes a list of tree and species planted along with their
density and composition at planting. Shrubs were planted within a portion of the utility easement along
UT to Charles Branch. Table 4 includes a list of shrubs species planted along with associated densities
and compositions.
Table 3. Tree Species Selected for Planting
Species Common Name Number Planted % of Total
Platanus occidentalis American Sycamore 3,267 (74 stems/acre) 15%
Rosewood Mitigation Bank Parcel – Memo
Page 3 Wildlands Engineering, Inc.
March 10, 2023
Species Common Name Number Planted % of Total
Betula nigra River Birch 3,267 (74 stems/acre) 15%
Diospryos virginiana Common Persimmon 2,178 (49 stems/acre) 10%
Prunus serotina Black Cherry 2,178 (49 stems/acre) 10%
Quercus pagoda Cherrybark Oak 2,178 (49 stems/acre) 10%
Quercus falcata Southern Red Oak 1,089 (25 stems/acre) 5%
Populus deltoides Eastern Cottonwood 2,178 (49 stems/acre) 10%
Quercus nigra Water Oak 2,178 (49 stems/acre) 10%
Magnolia virginiana Sweetbay Magnolia 1,089 (25 stems/acre) 5%
Acer negundo Boxelder 2,178 (49 stems/acre) 10%
Table 4. Shrub Species Selected for Planting Within Utility Easement
Species Common Name Number Planted % of Total
Cephalanthus
occidentalis Buttonbush 33 (224 stems/acre) 33%
Hamamelis virginiana Witch Hazel 33 (224 stems/acre) 33%
Sambucus nigra Elderberry 33 (224 stems/acre) 33%
Easement boundaries have been identified in the field to ensure clear distinction between the Parcel
and adjacent properties. Boundaries are identified by 6 foot “t-posts” with attached easement placards.
Signage along Parcel boundaries has been placed at approximately 100-foot intervals.
Attachments:
Credit Service Area Map
Monitoring Components Map
Vegetation Plot Photographs
Erosion Stabilization Photographs
Culvert Removal and Replacement Photographs
Credit Service Area Map
Rosewood Mitigation Bank Parcel
Site Walk Request Memo
Neuse River Basin (03020201)
0 105 Miles
Wayne County, NC
¹
^_
County Boundary
HUC 03020201
Riparian Area for Project's Credits
^_Rosewood Mitigation Bank Parcel Location
2017 Aerial Photography
03020201
Monitoring Components Map
Rosewood Mitigation Bank Parcel
Site Walk Request Memo
Neuse River Basin (03020201)
Wayne County, NC
2017 Aerial Photography
D2
D4
U
T
t
o
C
h
a
r
l
e
s
B
r
a
n
c
h
UT1
D1
D3
UT3
UT2
D5
D64
5
20
19
13
14 3
2
18
16
17
15
6
7
8 28
26
27
24
22
21
1
23
25
9
10
30
29
11
12
34
32
31
33
R
a
b
T
r
l
B r a s w e l l R d
581
581
Rab Trl
Trappers Wood D r
Glenwood Dr
Connies
Cir
NC
581
Hwy
S
B ra s wel l R d
Project Location
Bank Parcel Conservation Easement
Project Stream
Project Ditch
Non-Project Ditch
Existing Utility Easement
Riparian Restoration for Buffer Credits
Riparian Restoration for Nutrient Offset Credits
Not for Credit
Vegetation Plot
Existing Utility Line
0 150 300 Feet ¹
2019 Aerial Photography
VEGETATION PLOT PHOTOGRAPHS
Rosewood Mitigation Bank Parcel
Site Walk Request Memo – Vegetation Plot Photographs
VEG PLOT 1 (1/24/2023) VEG PLOT 2 (1/24/2023)
VEG PLOT 3 (1/24/2023) VEG PLOT 4 (1/24/2023)
VEG PLOT 5 (1/24/2023) VEG PLOT 6 (1/24/2023)
Rosewood Mitigation Bank Parcel
Site Walk Request Memo – Vegetation Plot Photographs
VEG PLOT 7 (1/24/2023) VEG PLOT 8 (1/24/2023)
VEG PLOT 9 (1/24/2023) VEG PLOT 10 (1/24/2023)
VEG PLOT 11 (1/24/2023) VEG PLOT 12 (1/24/2023)
Rosewood Mitigation Bank Parcel
Site Walk Request Memo – Vegetation Plot Photographs
VEG PLOT 13 (1/24/2023) VEG PLOT 14 (1/24/2023)
VEG PLOT 15 (1/24/2023) VEG PLOT 16 (1/24/2023)
VEG PLOT 17 (1/24/2023) VEG PLOT 18 (1/24/2023)
Rosewood Mitigation Bank Parcel
Site Walk Request Memo – Vegetation Plot Photographs
VEG PLOT 19 (1/24/2023) VEG PLOT 20 (1/24/2023)
VEG PLOT 21 (1/24/2023) VEG PLOT 22 (1/24/2023)
VEG PLOT 23 (2/23/2023) VEG PLOT 24 (1/24/2023)
Rosewood Mitigation Bank Parcel
Site Walk Request Memo – Vegetation Plot Photographs
VEG PLOT 25 (1/24/2023) VEG PLOT 26 (1/24/2023)
VEG PLOT 27 (1/24/2023) VEG PLOT 28 (1/24/2023)
VEG PLOT 29 (1/24/2023) VEG PLOT 30 (1/24/2023)
Rosewood Mitigation Bank Parcel
Site Walk Request Memo – Vegetation Plot Photographs
VEG PLOT 31 (1/24/2023) VEG PLOT 32 (1/24/2023)
VEG PLOT 33 (1/24/2023) VEG PLOT 34 (1/24/2023)
EROSION STABILIZATION PHOTOGRAPHS
Rosewood Mitigation Bank Parcel
Site Walk Request Memo – Erosion Stabilization Photographs
UT to Charles Branch – Bank stabilization via mechanical grading & live staking (2/23/2023)
UT to Charles Branch – Bank stabilization via mechanical grading & live staking (2/23/2023)
Rosewood Mitigation Bank Parcel
Site Walk Request Memo – Erosion Stabilization Photographs
UT to Charles Branch – Bank stabilization via mechanical grading & live staking (2/23/2023)
UT to Charles Branch – Bank stabilization via mechanical grading & live staking (2/23/2023)
Rosewood Mitigation Bank Parcel
Site Walk Request Memo – Erosion Stabilization Photographs
UT to Charles Branch – Bank stabilization via mechanical grading & live staking (2/23/2023)
UT to Charles Branch – Bank stabilization via mechanical grading & live staking (2/23/2023)
Rosewood Mitigation Bank Parcel
Site Walk Request Memo – Erosion Stabilization Photographs
UT to Charles Branch – Bank stabilization via mechanical grading & live staking (2/23/2023)
UT to Charles Branch – Bank stabilization via mechanical grading & live staking (2/23/2023)
Rosewood Mitigation Bank Parcel
Site Walk Request Memo – Erosion Stabilization Photographs
UT to Charles Branch – Bank stabilization via mechanical grading & live staking (2/23/2023)
UT to Charles Branch – Bank stabilization via mechanical grading & live staking (2/23/2023)
Rosewood Mitigation Bank Parcel
Site Walk Request Memo – Erosion Stabilization Photographs
UT to Charles Branch – Bank stabilization via mechanical grading & live staking (2/23/2023)
UT to Charles Branch – Erosion reduction via overland flow diversion, rip-rap installation, & live staking
(2/23/2023)
CULVERT REMOVAL AND REPLACEMENT PHOTOGRAPHS
Rosewood Mitigation Bank Parcel
Site Walk Request Memo – Culvert Removal and Replacement Photographs
UT to Charles Branch – Culvert Replacement (2/23/2023)
UT to Charles Branch – Culvert Replacement (2/23/2023)
Rosewood Mitigation Bank Parcel
Site Walk Request Memo – Culvert Removal and Replacement Photographs
UT1 – Culvert Removal (2/23/2023)
D1 – Culvert Removal (2/23/2023)
Rosewood Mitigation Bank Parcel
Site Walk Request Memo – Culvert Removal and Replacement Photographs
D2 – Culvert Removal (2/23/2023)