Loading...
HomeMy WebLinkAbout20230413 Ver 1_BP4.R011_HYD_SMPv3.01_20230217_20230320 j ligh ay North Carolina Department of Transportation ;pj�C111�V�1tPt'. Highway Stormwater Program STORMWATER MANAGEMENT PLAN (Version 3.00;Released August 2021) FOR NCDOT PROJECTS WBS Element: BP4.R011.1 TIP/Prof No: County(ies): Johnston Page 1 of 2 General Project Information WBS Element: BP4.R011.1 ITIP Number: I Project Type: 1Pipe Replacement I Date: 1/26/2023 NCDOT Contact: Garry Wright Contractor/Desi or: Jerry Lindsey Address:509 Ward Blvd. Address: 1223 Jones Franklin Road PO Box 3165 Raleigh,NC 27606 Wilson,27895 Phone:252-640-6427 Phone:919-851-8077 Email:gNwnqht@ncdot. ov Email:flindsey@wethedllen .com City/Town: Princeton lCount ies: Johnston River Basins: Neuse I CAMA County? No Wetlands within Project Limits? Yes Project Descri lion Project Length lin.miles or feet): 0.13 SurroundingLand Use: Wetland Forest Proposed Project Existing Site Project Built-Upon Area ac. 0.5 1 ac. 0.4 1 ac. Typical Cross Section Description: Two 12'travel lanes with 6'grass shoulders and guardrail. Two 12'travel lanes with variable(T-15')grass shoulders and guardrail. Annual Avg Daily Traffic(veh/hr/day): I Design/Future: 1500 1 Year:12018 Existing:I I Year: General Project Narrative: The scope of this project includes replacing three existing 96"CMP pipes with three 15'4"x 10'-0"Structural Plate Aluminum pipe arches with aluminum endwalls.Impact and (Description of Minimization of Water Minimization Efforts:The project has been designed to minimize wetland and stream impacts.Drainage has been designed so that outlets discharging into wetlands have non- Quality Impacts) erosive velocities to minimize disturbance to the wetlands.The proposed design ties into the existing roadway shoulder minimizing impacts to the wetlands.The existing outfalls consisted of buried pipe ends with little to no rip rap at pipe outlets.When the project is complete the outfalls will be upgraded to have rip rap outlet pads and improved outfall channels. The project is not expected to have a significant impact on water quality or quantity downstream of the project. Highway North Carolina Department of Transportation StUI111�VdtPf Highway Stormwater Program STORMWATER MANAGEMENT PLAN (Version 3.00;Released August 2021) FOR NCDOT PROJECTS WBS Element: BP4.R011.1 TIP/Prof No.: County(ies): Johnston Page 2 of 2 General Project Information Waterbody Information Surface Water Body 1 : Bawd Creek NCDWR Stream Index No.: 27-50-2.5 NCDWR Surface Water Classification for Water Body Primary Classification: Water Supply IV WS-IV Supplemental Classification: Nutrient Sensitive Waters NSW Other Stream Classification: None Impairments: None Aquatic T&E Species? Yes Comments: Neause River Waterdog,Carolina Madtom,Atlantic Pigtoe,Tar River Spinymussel NRTR Stream ID: N/A Buffer Rules in Effect: Neuse Project Includes Bridge Spanning Water Body? No Deck Drains Discharge Over Buffer? INo Dissipator Pads Provided in Buffer? INo Deck Drains Discharge Over Water Body? No (If yes,provide justification in the General Project Narrative) (If yes,describe in the General Project Narrative;if no,justify in the (If yes,provide justification in the General Project Narrative) General Project Narrative) Surface Water Body(2): 1 NCDWR Stream Index No.: NCDWR Surface Water Classification for Water Body Primary Classification: Supplemental Classification: Other Stream Classification: Impairments: Aquatic T&E Species? Comments: NRTR Stream ID: Buffer Rules in Effect: Project Includes Bridge Spanning Water Body? Deck Drains Discharge Over Buffer? Dissipator Pads Provided in Buffer? Deck Drains Discharge Over Water Body? (If yes,provide justification in the General Project Narrative) (If yes,describe in the General Project Narrative;if no,justify in the (If yes,provide justification in the General Project Narrative) I General Project Narrative) Surface Water Body 3: 1 NCDWR Stream Index No.: NCDWR Surface Water Classification for Water Body Primary Classification: Supplemental Classification: Other Stream Classification: Impairments: Aquatic T&E Species? Comments: NRTR Stream ID: Buffer Rules in Effect: Project Includes Bridge Spanning Water Body? Deck Drains Discharge Over Buffer? Dissipator Pads Provided in Buffer? Deck Drains Discharge Over Water Body? (If yes,provide justification in the General Project Narrative) (If yes,describe in the General Project Narrative;if no,justify in the (If yes,provide justification in the General Project Narrative) I General Project Narrative)