HomeMy WebLinkAbout20230411 Ver 1_Site Plan_20230320 (2)CATAWBA RIPARIAN BUFFER NOTIFICATION FORM,
Project Name/addressJJ 0 ty:
0 Owner.
Print Signature
contractor/agent: O-EC Slone W'L_Lr2_(LC�
Print I I �J / signature
The approval is for the purpose and design described in your application. Impacts not indicated in the
application is a violation of the Buffer Rule. Site specific work should be provided in the application. [15A NCAC
02H 0506 and ISA NCAC 02D 0243(8)]
Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation), unless
approved. Exception, those trees that are severely undermined along the immediate shoreline can be removed.
Minimal shaping and sloping along the immediate shoreline is allowed. JISA NCAC 02B .0243J6)1
Benching, grading in the buffer is not allowed. Excessive disturbance of ground cover. (15A NCAC 0213.0244 (Q
Beaches, impervious patios, impervious walkways, etc.are not allowed in the buffer unless specifically approved
by the Division. There are limitation on size for decks. [15A NCAC 028.0243(4) and (6))
Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The
work corridor should be described- The approved access corridor shall be restored. Staging, spoil, construction
material must be outside the buffer. [15A NCAC 02H .0502 and 15A NCAC 02B.0243 (4), (6), (8)]
Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater
dischargesmust be at the natural elevation and discharged prior to entering the buffer directed as diffuse or
sheet flow at non -erosive velocities to the lake. [15A NCAC 02B.0243(5), (6)]
Acknow"llead ement of Notification
hereby state that I have been informed of the Catawba
Riparian Buffer Rule. Any wrk conducted in the buffer, not specifically stated in the application and approved
:by the Division of Water Resources 1;-1sa violation and subject to enforcement. Due diligence will be
taken such that the constructio will be built ithins stantial compliance and intent of the 401 Water
Quality Certification and Bu r Rule5, the a ov an(s) and specification(s), and other supporting
materials.
�/�
...9
S, . nat., . re: (WneO, Date:
", .