HomeMy WebLinkAbout20230411 Ver 1_Site Plan_20230320La ke
{At Full Pond/ Normal Water Lever
3'
belniv X
gull Pond/ �
Normal Water Level
Shoreline
i er'no,2 u,-)Jerrri, ned
ty-e es 16 ru s h o rs
► m m 2c� � cY.�,--e. 5h � � e1, �
�a
hose, C
C.
CL
S
I
Please approximately sketch the following information on this plan, length of shoreline
(provide dimensions for each item, such as 10 ft )(100 ft)*:
1. All proposed vegetation clearing
2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation
3. Location of rip rap or fill to be placed below the Full Pond/ !Normal Water Level elevation
4. Location of any proposed structures such as buildings, retaining walls, docks, etc.
5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation
6. Location of construction access corridors
FORM: SSGP 10-2013 Page 3 of 3