Loading...
HomeMy WebLinkAbout20230411 Ver 1_Site Plan_20230320La ke {At Full Pond/ Normal Water Lever 3' belniv X gull Pond/ � Normal Water Level Shoreline i er'no,2 u,-)Jerrri, ned ty-e es 16 ru s h o rs ► m m 2c� � cY.�,--e. 5h � � e1, � �a hose, C C. CL S I Please approximately sketch the following information on this plan, length of shoreline (provide dimensions for each item, such as 10 ft )(100 ft)*: 1. All proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation 3. Location of rip rap or fill to be placed below the Full Pond/ !Normal Water Level elevation 4. Location of any proposed structures such as buildings, retaining walls, docks, etc. 5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation 6. Location of construction access corridors FORM: SSGP 10-2013 Page 3 of 3