HomeMy WebLinkAboutNCG050152_Name-Owner Change Supporting Info (5)_20221222VONDREHLE
Integrity Is Our Most Important Asset
Delegation of Authority for Environmental Matters
Cordova, NC Mill Operations
As Chief Operating Officer of von Drehle Corporation, I hereby ratify and confirm the authority
of each Plant Manager (PM) and Process Engineer (PE) listed below to act as the responsible
official and/or the duly authorized representative for the purpose of overseeing environmental
compliance matters at the facility(ies) they manage (Covered Facility). The Plant Manager will
be the Permittee, and the Process Engineer will be the ORC and will receive training at the
earliest opportunity to receive certification.
This Delegation of Authority includes, without limitation, the authority to execute and submit
all environmental applications, certifications, and reports required by the Covered Facility, as
well as the authority to act with respect to facilities in the United States as the "responsible
official" as that term is defined at 40 C.F.R. § 70.2 and corresponding United States Federal,
State and Local agency regulations.
To the extent allowed by applicable law, the PM or PE may re -delegate this authority, in writing,
to any appropriately trained facility manager for the specific purpose of executing any monthly
discharge monitoring or similar wastewater report that may be required under a National
Pollutant Discharge Elimination Systems (NPDES) or comparable state of local wastewater
discharge permit, any stormwater audits, air monitoring, and /or any other environmental
requirements.
The Delegation of Authority will remain in effect until revoked or superseded.
von Drehle Corporation
Jason Gscheidmeier, Chief Operating Officer
Effective Date: August 15t", 2022
COVERED FACILITY STATE
CORDOVA NC
CORDOVA NC
TITLE
Plant Manager
Process Engineer
NAME
Mike Menning
Mitchell Luckie