HomeMy WebLinkAbout20050785 All Versions_Application_20081201µ SUTF o
yd ?' ° °n
STATE OF NORTH CAROLINA
O?
10ee 06
? ?raR• ?q 1 ZO p8
DEPARTMENT OF TRANSPORTATION '
MICHAEL F EASLEY
GovERNOR
November 12, 2008
Mr William Wescott
U S Army Corps of Engineers
Regulatory Field Office
Post Office Box 1000
Washington, NC 27889-1000
LYNDO TIPPETT
SECRETARY
(:) So7Z S v-I?
Subject Request for Extension of the Section 404 Individual Permit, Section 401 Water
Quality Certification, Tar-Pamilico Riparian Buffer Authorization, and CAMA
Consitency Concurrence for Improvements to US 17 From South of SR 1127
(Possum Track Road) to North of SR 1418 (Roberson Road) Beaufort County
State Project No 8 T150601 Federal Aid Project MAF-75-3 (26) WBS
34440 1 1 TIP No R-2510 Debit $570 00 from WBS No 34440 1 1
Reference NCDENR-DWQ 401 Water Quality Certification and Tar-Pamilico Riparian
Buffer Authorization (September 6, 2005) WQC Project No 20050785
USACE Individual Permit (January 17, 2006) Action ID No 199301143
CAMA Consistency Concurrence (October 31, 2005)DCM #20050063
Dear Sir
As you are aware, Sections A & B of this project are currently under construction and the C
section is scheduled for Let on November 17, 2009 The current permits are set to expire on
December 31, 2008, however construction is not expected to be complete until December 31,
2010 Therefore, the Department would like to request a permmt extension to coincide with the
anticipated completion date '
No other changes to the existing permits are being requested at this time The Department will
subnut appropriate permit modification requests for Section C when final plans are complete
REGULATORY APPROVALS
Section 404 Permit The NCDOT requests that the referenced Individual Permit be extended as
described in this letter
Section 401 Permit We also are hereby requesting an extension to the 401 Individual
Certification and In compliance with Section 143-215 3D (e) of the NCAC, we will provide
$570 to act as payment for processing the Section 401 permit We are providing five copies of
MAILING ADDRESS TELEPHONE 919-715-1334 or LOCATION
NC DEPARTMENT OF TRANSPORTATION 919-715-1335 2728 CAPITAL BLVD SUITE 240
PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS RALEIGH NC 27604
NATURAL ENVIRONMENT UNIT FAX 919-715-5501
1598 MAIL SERVICE CENTER
RALEIGH NC 27699-1598 WEBSITE WWW NCDOT ORG
this, `request to thellVorth Carolina Department of Environment and Natural Resources, Division
of Water Quality, for their review and approval
CAMA Consistency The NCDOT requests that the referenced CAMA Consistency
Concurrence be extended if necessary as described in this letter
If you have any questions or need additional information, please call Chris Underwood at (919)
715-1451
Smcerel ,
? - I-L?k
Gregory J Thorpe, PhD
Environmental Management Director, PDEA
cc
Mr Brian Wrenn, NCDWQ (5 Copies)
Ms Kathy Matthews, USEPA
Mr Steve Sollod, NCDCM
Mr Dr David Chang, P E , Hydraulics
Mr Mark Staley, Roadside Environmental
Mr Greg Perfetti, P E , Structure Design
Mr Victor Barbour, P E, Project Services Unit
Mr Neil Lassiter, P E, Division 2
Mr Jay Johnson, Division 2
Mr Travis Wilson, NCWRC
Mr Gary Jordan, USFWS
Ms Anne Deaton, NCDMF
Mr Jay Bennett, P E , Roadway Design
Mr Mai ed Alghandour, P E, Programming and TIP
Mr Art McMillan, P E, Highway Design
Mr Scott McLendon, USACE, Wilmington
Mr Bryan Yamamoto, PE, PDEA Project Engineer
Mr Drew Joyner, PE, Human Environment Unit Head
Mr Clarence W Coleman, P E, FHWA