Loading...
HomeMy WebLinkAboutNCC230733_Site Plan or Location Map_20230320, to] I;01:i9l4aIWL&YyMMI= I Bill Id VICINITY MAP (N.T.S.) General Erosion Control Notes 1. Only the areas shown shall be disturbed. 2. All disturbed areas shall be grassed and mulched as soon as possible and maintained until permanent cover is established. MIN. 10 GA. LINE WIRES N * FOR REPAIR OF SILTCIO FENCE FAILURES, USE No. 57 WASHED STONE. N FOR ANCHOR WHEN SILT FENCE IS PROTECTING CATCH BASIN. 8' MAX FRONT VIEW STEEL POST _--WOVEN WIRE FABRIC 1 SILT FENCE FABRIC SODDING LAY SOD IN A STAGGERED •w'• M PATTERN. BUTTTHESTRIPS TIGHTLY AGAINST EACH OTHER. DO NOT LEAVE SPACES AND DO NOT�'�'� •V h1 MASON ERIPSTRO. A ISA HANDY MASON'S TROWEL IS A HAN DV TOOL FOR TDOWN THE M, M ENDS AND TRIA1 RIMMIN A11NG PIECES. M i BUTTING ANGLEDENDS CAUSED BV ANGIER EN I11-F-Gr MATIC SOD GUTTER MUST BE M M MATCHED CORRECTLY_ GOee-Cr ROLL SOD IMMEDIATELY TO WATER TO A DEPTH OF 4" MOWWHEN THE SOD IS AGHI EVE FIRM CONTACT AS NEEDED. WATER WELL ESTABLISHEDIN2-3 THE SOIL AS SOON AS THE SOD IS WEEKS. SETTHEMOWER LAID. HIGH (2"-3"1 APPEARANCE OF GOOD SOD SHOOTS - OR GRASS BIIDES. GRASS SHOULD BE GREEN AN-_ I HEALTHY. MOWED ATA 2"-3" GUTTING HEIGHT. THATCH - GRASS CLIPPINGS AND DEAD LEAVES. UP TO 1/2"THICK ROOT ZONE - SOIL AND ROOTS SHOULD BE 1/2"-SA THICK VNTH DENSE ROOT MAT FOR STRENGTH. MIN. 12-112 GA. INTERMEDIATE WIRES GRADE NOTE: USE SILT FENCE ONLY WHEN DRAINAGE AREA DOES NOT EXCEED 114 ACRE AND NEVER IN AREAS OF CONCENTRATED FLOW. \-- FILL SLOPE GRADE XX v 8" MIN. COVER OVER SKIRT * ANCHOR SKIRT AS DIRECTED BY ENGINEER MIN. SIDE VIEW NOTES & MAINTENANCE. 1. INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. 2. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. 3. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. 4. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. 5. REMOVE SEDIMENT DEEPER THAN 12". NOT TO SCALE TOWN OF SOUTHERN PINES TEMPORARY SILT FENCE E-6 DATE: JANUARY2009 DETAIL 1. Obtain all necessary permits and plan approvals 2. Install gravel construction entrances first, and then reinforced silt fence outlets, wattles and silt fences. 3. Finish clearing and grubbing any necessary areas on the lots as they are started. 4. Begin lot grading and excavation activities 5. Begin or continue with house construction activities. 6. Finish all rough grading and house construction. 7. Install driveways, walks and patios. 8. Begin fine grading of lot areas 9. Final grassing, mulching and stabilizing of lot. In most cases this will involve the installation of sod on the lot. The silt fence will remain in place until the lots are sodded or grassing is stabilized and takes hold. 10. Inspection and final acceptance letters A "SELF -INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY NCGS 113A-54.1"IS AVAILABLE FOR USE. IT CAN BE COMPLETED BY HAND OR COMPLETED AS AN EXCEL SPREADSHEET. AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE. RULE 15A NCAC 04B. 0131 STATES THAT "... DOCUMENTATION SHALL BE ACCOMPLISHED BY INITIALING AND DATING EACH MEASURE OR PRACTICE SHOWN ON A COPY OF THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING, DATING AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE, PRACTICE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN:' CAkOPINE VENTURES, LL� D\i3, 4198, PG. 260 1-- 366 a 2 \29 MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION Gravel Construction Entrance - The gravel pad should remain in a condition to prevent mud or sediment from leaving the construction site. This may require periodic topdressing with 2-inch stone. After each rainfall, inspect any structure used to trap sediment and clean it out as necessary. Immediately remove all objectionable materials spilled, washed, or tracked onto public roadways. Silt Fence - Sediment fences should be inspected at least once a week and after each rainfall event. Any repairs should be made immediately. Damaged or decomposed fabric should be replacedpromptly. An sediment deposits that build u against the fence should be removed and disposed of properly to insure that the removed sediment does not p Y p p 9 p p p Y wash back against the fence. Adequate storage volume should be provided for behind the fence at tall times. Take care to not undermine the fence during cleanout operations. Sodding - The sod should be properly maintained to insure that the grass take holds in the areas being secured. The sod should be watered as necessary to maintain adequate moisture in the root zone and prevent dormancy of the sod. The sod should not be mowed to close, since this could inhibit adequate growth and stabilization of the root bed. The sod should be limed and fertilized as per soil type recommendations and type of grass recommendations when and if possible. p Yp Yp 9 Grassingand Mulching - The area to receive grassing and mulching should be properly fertilized and limed as necessary as an initial step in soil preparation. Once the grassing has g 9 9 9 p p Y rY p p p 9 9 been laced the area should be maintained as needed to insure that all areas are germinating An bare areas should be repaired, and reseeded as soon as possible. If the placed, 9 9Y p . time of year does not permit the establishment of a permanent grass, then a temporary grassing should be used until the growing season permits the use of a permanent grass. Y p p 9 � p Y9 9 9 9 p p General - All measures will be inspected and corrections made after runoff producing rainfalls, or at least once per week minimum. The builder will insure that the construction activities on any particular lot do not adversely affect any of the installed erosion control measures. If lot construction dictates, measures will be relocated on the lot to insure that the potential for sedimentation runoff is eliminated as much as possible. Silt fences and gravel construction entrances will be maintained as suggested in the erosion control manual. Sodding, seeding and mulching will be maintained to insure proper ground stabilizing cover. Wattles - Wattles shall be inspected after significant rainfall events. Rills or gullies upslope of the wattle and any undercutting is to be repaired. Sediment deposits that impair the filtration capability of the wattle shall be removed when the sediment reaches one-third of the wattles functional freeboard height. Removed sediment shall be deposited within the project in such a way that the sediment is not subject to erosion by wind or water. Reinforced Silt Fence Outlet - Remove sediment deposits as necessary to provide adequate storage volume for the next rain to reduce pressure on the fence/outlet. Take care to avoid undermining the fence during cleanout. Remove and replace stone as necessary as it becomes clogged with sediment. Remove all fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been properly stabilized. WATTLE CONSTRUCTION 1. Use a hand tool such as a mattox or pick to score the ground. Using a shovel,dig the trench to the needed depth. Soil from excavating the trenches can be placed on the uphill, or flow side, of the trench to be used during installation. For soft, loamy soils dig a 3-5 inch trench. For hard, rocky soils dig a 2-3 inch trench. 2. Lay the first straw wattle snuggly in the trench. No daylight should be seen under the wattle. Pack soil from trenching against the wattle on the uphill side. When installing running lengths of straw wattles, butt the second wattle tightly against the first. DO NOT overlap the ends. Stake the straw wattles at each end and four foot on center. 3. Stakes should be driven through the middle of the wattle, leaving 2-3 inches of the stake protruding above the wattle. A heavy sediment load will tend to pick the wattle up and could pull it off the stakes if the are driven down too low. It may be necessary to make a hole in the P Y Y Y wattle with the pick end of your mattox in order to get the stake through the straw. When straw wattles are used for flat ground applications, drive the stakes straight down, when installing wattles on slopes, drive the stakes perpendicular to the slope. 4. Drive the first end of the stake of the second wattle at an angle toward the first wattle in order to help abut them tightly together. If you have difficulty driving the stake into extremely hard or rocky slopes, a pilot bar may be needed to begin the stake hole. STRAW WATTLE CROSS SECTION STRAW WATTLE WOOD STAKE " DEEP TRENCH (TYP.) STRAW WATTLE: SHOWN IN 2" DEEP TRENCH WOOD STAKE 1 D. B. 4198, PG. 260 \ 5 1 � I Lot Plan i COMBINATiION \ OF \\ "All & FD11 / I j j• / CON ETRUCT10 IT / LIMS I i / / J I C4 I r 31 ` �\ i I ' 1 � A. ( FLOW TO THE REAR) B. ( FLOW TO THE FRONT ) PROPERTY LINE PROPERTY LINE X - F SILT FENCE x FLOW x LOT ♦ x LOT FLOW z x > > x z z z z xw HOUSE a -o -o HOUSE c Q. rJ xa a B_xa- J J J N - N - fn fn x CENTSRANCE ION x ENT ♦ Scr FLOW ti" R WFLOR W R W SILT FEN�J R/W nnn nnn I 1 J / / / l C. ( FLOW TO THE LEFT PROPERTY LINE X SILT FENCE FLOW x ♦ LOT w Z W Z D'ZI w a. o HOUSE o Q. r a U5 x CO Er FLOW EROSION CONTROL CONSTRUCTION SEQUENCE (REVISE AS NECESSARY TO ADDRESS SITE SPECIFIC ISSUES) 1. INSTALL TEMPORARY CONSTRUCTION ENTRANCE. 2. INSTALL TEMPORARY EROSION CONTROL MEASURES AT LOCATIONS SHOWN ON PLAN. 3. CALL FOR ON -SITE INSPECTION BY TOWN OF SOUTHERN PINES CONSTRUCTION INSPECTOR. 4. INITIATE GRUBBING AND TOPSOIL STRIPPING OF THE SITE. 5. AS CONSTRUCTION PROGRESSES, REMOVE SILT AND SEDIMENT BUILDUPS AT ALL MEASURES TO MAINTAIN ADEQUATE EROSION CONTROL. 6. WITHIN 7 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING AND ON SLOPES GREATER THAN 3. 1, GROUND COVER SHALL BE PROVIDED ON EXPOSED SLOPES AND PERMANENT GROUND COVER SHALL BE PROVIDED FOR ALL DISTURBED AREAS WITHIN 14 CALENDAR DAYS FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. 7. CONTINUE WITH FINE GRADING OF SITE. 8. WHEN CONSTRUCTION ACTIVITIES ARE COMPLETE AND ALL SOIL AREAS STABILIZED, CALL FOR ON -SITE INSPECTION BY TOWN OF SOUTHERN PINES CONSTRUCTION INSPECTOR. 9. IF SITE IS APPROVED, REMOVE TEMPORARY EROSION CONTROL MEASURES AS DIRECTED, SEED, FERTILIZE AND MULCH RESULTING DISTURBED AREAS. CLEAR ALL DEBRIS AND SEDIMENT ACCUMULATION. ESTABLISH PERMANENT STABILIZING VEGETATION DURING THE APPROPRIATE TIME OF YEAR. 10. UPON ESTABLISHED AND STABILIZED VEGETATION, CALL FOR FINAL INSPECTION BY TOWN OF SOUTHERN PINES CONSTRUCTION INSPECTOR. 1. SEED BED PREPARATION 2. RIP THE ENTIRE AREA TO 6 INCH DEPTH. 3. REMOVE ALL LOOSE ROCK, ROOTS, AND OTHER OBSTRUCTIONS LEAVING SURFACE REASONABLY SMOOTH AND UNIFORM. 4. APPLY AGRICULTURAL LIME, FERTILIZER AND SUPERPHOSPHATE IN ACCORDANCE WITH "SEEDING SCHEDULE" AND MIX WITH SOIL. 5. CONTINUE TILLAGE UNTIL A WELL -PULVERIZED, FIRM, REASONABLY UNIFORM SEED BED IS PREPARED 4 TO 6 INCHES DEEP. 6. SEED ON A FRESHLY PREPARED SEED BED AND COVER SEED LIGHTLY WITH SEEDING EQUIPMENT OR CULTIPACK AFTER SEEDING. SEED ACCORDING TO "SEEDING SCHEDULE". 7. MULCH IN ACCORDANCE WITH "SEEDING SCHEDULE" IMMEDIATELY AFTER SEEDING. B. INSPECT ALL SEEDING FOR COMPLIANCE WITH THE REQUIREMENTS OF THE "SEEDING SCHEDULE". MAKE NECESSARY REPAIRS AND RESEED WITHIN THE PLANTING SEASON, IF POSSIBLE, OR THE DAMAGED AREA SHALL BE REESTABLISHED FOLLOWING THE ORIGINAL LIME, FERTILIZER AND SEEDING REQUIREMENTS. NOT TO SCALE SEEDING SCHEDULE NOTE; - TEMPORARY SEED MIX SHALL BE USED FOR ALL AREAS EXPOSED GREATER THAN ONE WEEK AND SUBJECT TO FURTHER DISTURBANCE. PERMANENT SEED MIX SHALL BE CHECKED FOR ADEQUACY ON JULY 15. AN ADEQUATE COVER SHALL HAVE 50 SPRIGS OF BERMUDA OR SERICEA LESPEDEZA PER ONE SQUARE FOOT. TEMPORARY SEEDING RECOMMENDATION for SUMMER (TO BE FOLLOWED BY PERMANENT FALL SEED MIX) SPECIES RATE (LB / ACRE) APR. 15 - AUG. 15 GERMAN MILLET40 SOIL AMENDMENTS APPLY ZOOO LB / ACRE GROUND AGRICULTURAL LIMESTONE and 750 LB / ACRE 10-10-10 FERTILIZER OR FOLLOW RECOMMENDATIONS OF SOIL TESTS. MULCH APPLY 4,000 LB / ACRE GRAIN STRAW OR EQUIVALENT COVER. ANCHOR STRAW BY ROVING, NETTING OR BY TACKING WITH ASPHALT EMULSION AT A RATE OF 400 GAL / ACRE. MAINTENANCE RE -FERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, RE -FERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. TEMPORARY SEEDING RECOMMENDATION for FALL (TO BE FOLLOWED BY PERMANENT FALL SEED MIX) SPECIES RATE (LB / ACRE) AUG. 15 - DEC. 15 WINTER RYE (GRAIN)120 SOIL AMENDMENTS APPLY 2,000 LB / ACRE GROUND AGRICULTURAL LIMESTONE and 1,000 LB/ACRE 10-10-10 FERTILZER OR FOLLOW RECOMMENDED SOIL TESTS. MULCH APPLY 4,000 LB / ACRE GRAIN STRAW OR EQUIVALENT COVER. ANCHOR STRAW BY ROVING, NETTING OR BY TACKING WITH ASPHALT EMULSION AT A RATE OF 400 GAL / ACRE. MAINTENANCE REPAIR AND RE -FERTILIZE DAMAGED AREAS IMMEDIATELY. TOPDRESS WITH 50 LB / ACRE OF NITROGEN IN MARCH. IF IT IS NECESSARY TO EXTEND TEMPORARY COVER BEYOND JUNE 15, OVERSEED WITH 50 LB / ACRE KOBE LESPEDEZA IN LATE FEBRUARY OR EARLY MARCH. TEMPORARY SEEDING RECOMMENDATION for LATE WINTER and EARLY SPRING (TO BE FOLLOWED BY PERMANENT FALL SEED MIX) SPECIES RATE (LB / ACRE) DEC. 1 - APR. 15 WINTER RYE (GRAIN)120 ANNUAL KOBE LESPEDEZA 50 OMIT LESPEDEZA WHEN DURATION OF TEMPORARY COVER IS NOT TO EXTEND BEYOND JUNE. SOIL AMENDMENTS APPLY 2,000 LB / ACRE GROUND AGRICULTURAL LIMESTONE and 750 LB / ACRE 10-10-10 FERTILIZE OR FOLLOW RECOMMENDATIONS OF SOIL TESTS. MULCH APPLY 4,000 LB / ACRE GRAIN STRAW OR EQUIVALENT COVER. ANCHOR STRAW BY ROVING, NETTING OR BY TACKING WITH ASPHALT EMULSION AT A RATE OF 400 GAL / ACRE. MAINTENANCE RE -FERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, RE-FERILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. PERMANENT SPRING SEED MIX SPECIES RATE (LB / ACRE) MARCH 1 - JULY 1 COMMON BERMUDA 30 SERICEA LESPEDEZA 30 PERMANENT SPRING SEED MIX SPECIES RATE (LB / ACRE) SEPT. 1 - NOV. 1 COMMON BERMUDA 30 SERICEA LESPEDEZA (UNSCARIFIED) 30 KOBE LESPEDEZA 10 WATER MINIMUM OF 1 INCH OF RAINFALL A WEEK (IF NOT SUPPLIED NATURALLY, CONTRACTOR SHALL SUPPLY THE REMAINING AMOUNT UNTIL GROUND COVER HAS BEEN ESTABLISHED. NOT TO SCALE TOWN OF SOUTHERN PINES EROSION CONTROL [_2 DATE: JANUARY2009 SEEDING NOTES � 1 1 / 346 \\ CAROPINE VENTURES, LLC- \\ D. B. 4198, PG. 260 ' kO \ �n \ \ I / / / 12 I / 13 i i i i 14 _--------__- �/' Provisions ground cover on exposed slopes must be accomplished within 21 calendar days following completion of any phase of grading. Provisions for permanent ground cover sufficient to restrain erosion must be accomplished for all disturbed areas within 15 working days or 90 calendar days following completion of construction or development, whichever is shorter. For HQW ZONES, ground cover shall be provided within 15 working days or 60 calendar days following completion of construction or development, whichever is shorter. GROUND STABILIZATION SITE AREA STABILIZATION EXCEPTIONS DESCRIPTION TIME FRAME PERIMETER DIKES, 7 DAYS NONE SWALES, DITCHES & SLOPES HIGH QUALITY 7 DAYS NONE WATER ZONES (HQW) SLOPES STEEPER 7 DAYS IF SLOPES ARE THAN 3:1 10' OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED SLOPES 3:1 OR 14 DAYS 7 DAYS FOR FLATTER SLOPES GREATER THAN 50' IN LENGTH ALL OTHER AREAS 14 DAYS NONE (EXCEPT WITH SLOPES FOR PERIMETERS FLATTER THAN 4:1 AND HQW ZONES) PAGE 1 of 2 TOTAL DISTURBED ACREAGE: 0.43 ACRES LOT EROSION CONTROL PLAN FOR LOT 6 D. ( FLOW TO THE RIGHT) E. ( FLOW TO THE FRONT & REAR > CAROPINES PHASE 12 PROPERTY LINE PROPERTY LINE XSILT FENCE X SILT FENCE x FOR LOT y x x LOT ♦ DREAM FINDERS HOMES, LLC w FLOW W w FLOW W x M W MOORE COUNTY, N.C. McNEILL TOWNSHIP L ?� D'w w xw W FEBRUARY 2023 SCALE: 1"= 60' 0 a HOUSE a F J o a a a HOUSE J J o a vr N Ul I CONSTRUCTION x CONSTRUCTI( ENTRANCE Mill'.ENTRANCE FLOW R W FLOW SILT ENCE OFR W R W X SILT FYCE 02Q% R/W nnn nnn STREET STREET STREET STREET STREET R/W R/W R/W R/W R/W EROSION CONTROL DETAIL FOR SINGLE FAMILY LOTS-(N.T.S.) CaI-,',-IYHIC' SCALE 60 0 30 60 120 240 ( IN FEET ) I inch = 60 ft. MOORMAN, KIZER & REITZEL, INC. 115 BROADFOOT AVE. FAYETTEVILLE, N.C. 28305 PHONE (910) 484-5191 FAX (910) 484-0388 LICENSE #: F-0106 LAST SAVED: 2/14/2023 8:25 AM LAST PLOTTED: 2/14/2023 8:51 AM PLOTTED BY: Dennis Gilbert FILENAME: G:ACURRENT JOBS\H & H CONSTRUCTORS\16-1367-01 CAROPINES-EC\PLANS\CAROPINES PH-12 LOT 06.DWG