HomeMy WebLinkAbout20221509 Ver 1_Public Notice_20230313 (2)ImPUBLIC NOTICE
US Army Corps
Of Engineers
Wilmington District
Issue Date: March 13, 2023
Comment Deadline: April 12, 2023
Corps Action ID Number: SAW-2022-01698
The Wilmington District, Corps of Engineers (Corps) received an application on
November 3, 2022 with additional information received on February 3, 2023 from the
Town of Morehead City seeking Department of the Army authorization to discharge
dredged or fill material into and excavate tidal waters in order to construct a living
shoreline and wave attenuation system, associated with a shoreline protection and
habitat enhancement project at Sugarloaf Island, south of Evans Street, across the
Morehead City waterfront, within the waters of/adjacent to Morehead City Harbor
Channel, in Carteret County, North Carolina.
Specific plans and location information are described below and shown on the attached
plans. This Public Notice and all attached plans are also available on the Wilmington
District Web Site at:
https://www.saw.usace.army.miI/Missions/Regulatory-Permit-Program/Public-Notices/
Applicant: Town of Morehead City
C/o: Christopher Turner, Interim Manager
1100 Bridges Street
Morehead City, NC 28557
AGENT (if applicable):
Authority
Quible & Associates, P.C.
C/o: Brian Rubino
P.O. Drawer 870
Kitty Hawk, NC 27959
The Corps evaluates this application and decides whether to issue, conditionally issue,
or deny the proposed work pursuant to applicable procedures of the following Statutory
Authorities:
❑ Section 404 of the Clean Water Act (33 U.S.C. 1344)
❑ Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403)
❑ Section 103 of the Marine Protection, Research and Sanctuaries Act of 1972 (33
U.S.C. 1413)
Version 10.03.2022 Page 1
Location
Location Description:
Project Area (acres): -3.12-acres
Nearest Town: Morehead City
Nearest Waterway: Morehead City Harbor Channel
River Basin: White Oak
Latitude and Longitude: 34.717127 N,-76.71228 W
Existing Site Conditions
The project site is located along the shoreline of the approximate 14-acre Sugarloaf
Island within Bogue Sound in Morehead City, Carteret County. This property is an
undeveloped island, but contains a restroom facility and a dock for visitors.
The elevation of the high ground on the property is approximately 6' above the normal
high water (nhw) level. Vegetation on the property mainly consists of native shrubs and
Coastal Wetlands. There is approximately 7,743' of shoreline on this 14-acre tract.
Water depths in the project area range from -0.5' to -12.0' normal low water (nlw).
The subaqueous substrate is firm with shell. There is a Federal Channel adjacent to the
project area (Harbor Channel). These estuarine waters are not classified as a Primary
Nursery Area by the North Carolina Division of Marine Fisheries (NC DMF).
According to the application, submerged aquatic vegetation (SAV) is not present within
the project area. However, the project area is within SAV habitat and according to the
North Carolina Division of Coastal Management (NC DCM), historical data suggests the
presence of SAV habitat adjacent to the northwest side of Sugarloaf Island. This
waterbody is closed to shellfish harvest and is classified as SA; HQW by the North
Carolina Division of Water Resources (NC DWR).
Applicant's Stated Purpose
Per the applicant: The island has experienced some erosion conditions as a result of
common wind and wave forces, tropical storm events, sea level rise, strong tidal flow,
and boat generated wake. The island supports a wide variety of coastal habitats and
has become an important protective barrier for the harbors, businesses, residences and
the downtown waterfront area in Morehead City as a whole. Rapid loss of the island
has exposed portions of the downtown to direct wave impacts and this exposure is
expected to continue. In addition to all of the primary needs for island protection and
ecological restoration congruent with the State's Coastal Habitat Protection Plan
(CHPP) goals and protection of Town infrastructure, it should also be noted that
secondary purposes and needs include education and recreation (fishing and
boating/swimming/beachgoing).
Version 10.03.2022 Page 2
Project Description
The applicant proposes to construct a wave attenuation and sill system around the
entire southern portion of the island and also along the eastern and western shorelines,
and conduct dredging within waters adjacent to Harbor Channel.
Sills within tidal waters: The first sill would be adjacent to the northwest end of the
island. It would be 5' wide and 840' long (0.09 acre) with 10'-wide openings at 250'
intervals. It would be sited in -2' nlw depth with 6" of exposure at low tide. The second
sill would adjacent to the southern shoreline of the island. It would be 5' wide and 2,764'
long (0.32 acre) with 10'-wide staggering gaps at 230' intervals. It would be sited in 2'
nlw depth approximately 10' waterward of the shoreline, with 6" of exposure at low tide.
Materials proposed for use are Oyster Catcher TablesT"' and Marsh Round sTM.
Wave Attenuator Revetment within tidal waters: The applicant is also proposing a
concrete wave attenuator revetment. It would be constructed predominantly adjacent to
the south side of the island and would wrap around the east and west ends of the
island, ranging from 40' waterward of the shoreline up to 400' offshore. This proposed
revetment would be 18' wide and 3,474' long (1.43 acre) with openings ranging from
27'-wide up to 200'-wide at varying intervals. It would be sited along the -4' nlw depth
contour with 3.6' of exposure at low tide. The wave attenuator revetment would have
pilings with reflectors and lighting in order to alert vessel operators of the structure's
presence during periods of low visibility. These marker pilings would be sited at the
openings and at varying intervals along the wave attenuator.
The proposed wave attenuator revetment would tie into the shoreline on eastern
terminus of the island and transition into a traditional rip rap revetment. It would be
approximately 35' south of the edge of the Federal Channel and within the Federal
Channel setback of Harbor Channel. This revetment would also be 18' wide and 206'
long (-0.08 acre). Materials proposed for use are Wave Attenuation Device (WAD®)
which consists of a concrete pyramidal unit which has holes and gaps.
Dredginq within tidal waters: Immediately waterward of wave attenuator revetment, the
applicant is proposing to excavate approximately 7,000 cubic yards of material (4,000
cubic yards of material below nlw) along the northeast tip of Sugarloaf Island adjacent to
Harbor Channel. This proposed 20,000 square foot excavation would tie into the -12'
nlw depth within the center of the Federal Channel. The purpose of the dredging activity
is to prevent further island migration into the federal channel and source backfill material
for proposed future habitat enhancement activity. The proposed dredge method is
bucket to barge.
Habitat Enhancement: The excavated spoil material would be temporarily contained
within a 3,000 square foot unvegetated area immediately landward of the rip rap
revetment. This spoil material is later proposed for habitat restoration efforts in the
nearshore areas of Sugarloaf Island, landward of the proposed wave attenuator
system's alignment. According to the applicant, the intent of this proposed fill would be
Version 10.03.2022 Page 3
to enhance SAV and Coastal Wetland habitats with associated native coastal riparian
plantings.
Plantings: The applicant proposes incorporate native riparian plantings on sand flats
and areas adjacent to coastal wetlands. Plantings waterward of the MHW mark would
primarily occur after the wave attenuation systems have been installed. Areas above the
mhw mark would be planted sooner.
Avoidance and Minimization
The applicant provided the following information in support of efforts to avoid and/or
minimize impacts to the aquatic environment: The applicant provided no specific details
regarding avoidance and minimization given the nature of the project.
Compensatory Mitigation
The applicant offered the following compensatory mitigation plan to offset unavoidable
functional loss to the aquatic environment: Compensatory mitigation is not proposed as
a part of this project.
Essential Fish Habitat
The Corps' determination is that the proposed project may adversely affect EFH or
associated fisheries managed by the South Atlantic or Mid Atlantic Fishery Management
Councils or the National Marine Fisheries Service.
❑ This notice initiates the Essential Fish Habitat (EFH) consultation requirements of
the Magnuson -Stevens Fishery Conservation and Management Act.
Implementation of the proposed project would impact (marine substrate,
estuarine substrate, water columns, emergent wetlands, submerged aquatic
vegetation) (see project description) utilized by various life stages of the following
species: (coastal migratory pelagics, corals, golden crab, shrimp, snapper
grouper, spiny lobster, Atlantic highly migratory species). Our initial
determination is that the proposed action would not have a substantial individual
or cumulative adverse impact on EFH or fisheries managed by Fishery
Management Councils and the National Marine Fisheries Service (NMFS). Our
final determination relative to project impacts and the need for mitigation
measures is subject to review by and coordination with the NMFS.
❑ The Corps will consult under the Magnuson -Stevens Act and will not make a
permit decision until the consultation process is complete.
❑ The Corps has initiated consultation the Magnuson -Stevens Act and will not
make a permit decision until the consultation process is complete.
Cultural Resources
Version 10.03.2022 Page 4
Pursuant to Section 106 of the National Historic Preservation Act of 1966, Appendix C
of 33 CFR Part 325, and the 2005 Revised Interim Guidance for Implementing Appendix
C, the District Engineer consulted district files and records and the latest published
version of the National Register of Historic Places and initially determines that:
❑ Should historic properties, or properties eligible for inclusion in the National
Register, be present within the Corps' permit area; the proposed activity requiring
the DA permit (the undertaking) is a type of activity that will have no potential to
cause an effect to an historic properties.
❑ No historic properties, nor properties eligible for inclusion in the National
Register, are present within the Corps' permit area; therefore, there will be no
historic properties affected. The Corps subsequently requests concurrence from
the SHPO (or THPO).
❑ Properties ineligible for inclusion in the National Register are present within the
Corps' permit area; there will be no historic properties affected by the proposed
work. The Corps subsequently requests concurrence from the SHPO (or THPO).
❑ Historic properties, or properties eligible for inclusion in the National Register, are
present within the Corps' permit area; however, the undertaking will have no
adverse effect on these historic properties. The Corps subsequently requests
concurrence from the SHPO (or THPO).
❑ Historic properties, or properties eligible for inclusion in the National Register, are
present within the Corps' permit area; moreover, the undertaking may have an
adverse effect on these historic properties. The Corps subsequently initiates
consultation with the SHPO (or THPO).
❑ The proposed work takes place in an area known to have the potential for the
presence of prehistoric and historic cultural resources; however, the area has not
been formally surveyed for the presence of cultural resources. No sites eligible
for inclusion in the National Register of Historic Places are known to be present
in the vicinity of the proposed work. Additional work may be necessary to identify
and assess any historic or prehistoric resources that may be present.
The District Engineer's final eligibility and effect determination will be based upon
coordination with the SHPO and/or THPO, as appropriate and required, and with full
consideration given to the proposed undertaking's potential direct and indirect effects on
historic properties within the Corps-indentified permit area.
Endangered Species
Version 10.03.2022 Page 5
Pursuant to the Endangered Species Act of 1973, the Corps reviewed the project area,
examined all information provided by the applicant and consulted the latest North
Carolina Natural Heritage Database. Based on available information:
❑ The Corps determines that the proposed project would not affect federally listed
endangered or threatened species or their formally designated critical habitat.
❑ The Corps determines that the proposed project may affect federally listed
endangered or threatened species or their formally designated critical habitat.
❑ By copy of this public notice, the Corps initiates consultation under Section 7
of the ESA and will not make a permit decision until the consultation process is
complete.
❑ The Corps will consult under Section 7 of the ESA and will not make a permit
decision until the consultation process is complete.
❑ The Corps has initiated consultation under Section 7 of the ESA and will not
make a permit decision until the consultation process is complete.
❑ The Corps determines that the proposed project may affect federally listed
endangered or threatened species or their formally designated critical habitat.
Consultation has been completed for this type of activity and the effects of the
proposed activity have been evaluated and/or authorized by the National Marine
Fisheries Service (NMFS) in the South Atlantic Regional Biological Opinion or its
associated documents, including 7(a)(2) & 7(d) analyses and Critical Habitat
assessments. A copy of this public notice will be sent to the NMFS.
❑ The Corps is not aware of the presence of species listed as threatened or
endangered or their critical habitat formally designated pursuant to the
Endangered Species Act of 1973 (ESA) within the project area. The Corps will
make a final determination on the effects of the proposed project upon additional
review of the project and completion of any necessary biological assessment
and/or consultation with the U.S. Fish and Wildlife Service and/or National
Marine Fisheries Service.
Other Required Authorizations
The Corps forwards this notice and all applicable application materials to the
appropriate State agencies for review.
North Carolina Division of Water Resources (NCDWR):
❑ The applicant did not provide or satisfy all the elements required for a complete
401 certification request. Therefore, the 401 Certification process has not
started. The Corps will generally not make a final permit decision until the
Version 10.03.2022 Page 6
NCDWR issues, denies, or waives the state Certification as required by Section
401 of the Clean Water Act (PL 92-500).
❑ The Corps will generally not make a final permit decision until the NCDWR
issues, denies, or waives the state Certification as required by Section 401 of
the Clean Water Act (PL 92-500). The receipt of the application and this public
notice at the NCDWR Central Office in Raleigh constitutes initial receipt of an
application for a 401 Certification. Unless NCDWR is granted a time review
extension, a waiver will be deemed to occur if the NCDWR fails to act on this
request for certification within 120 days of the date of this public notice.
Additional information regarding the 401 Certification may be reviewed at the
NCDWR Central Office, 401 and Buffer Permitting Unit, 512 North Salisbury
Street, Raleigh, North Carolina 27604-2260. All persons desiring to make
comments regarding the application for a 401 Certification should do so, in
writing, by April 3, 2023 to:
NCDWR Central Office
Attention: Ms. Stephanie Goss, 401 and Buffer Permitting Unit
(USPS mailing address): 1617 Mail Service Center, Raleigh, NC 27699-
1617
Or,
(physical address): 512 North Salisbury Street, Raleigh, North Carolina
27604
North Carolina Division of Coastal Management (NCDCM):
❑ The application did not include a certification that the proposed work complies
with and would be conducted in a manner that is consistent with the approved
North Carolina Coastal Zone Management Program. Pursuant to 33 CFR 325.2
(b)(2) the Corps cannot issue a Department of Army (DA) permit for the proposed
work until the applicant submits such a certification to the Corps and the
NCDCM, and the NCDCM notifies the Corps that it concurs with the applicant's
consistency certification. As the application did not include the consistency
certification, the Corps will request, upon receipt„ concurrence or objection from
the NCDCM.
❑ Based upon all available information, the Corps determines that this application
for a Department of Army (DA) permit does not involve an activity which would
affect the coastal zone, which is defined by the Coastal Zone Management
(CZM) Act (16 U.S.C. § 1453).
Evaluation
Version 10.03.2022 Page 7
The decision whether to issue a permit will be based on an evaluation of the probable
impacts including cumulative impacts of the proposed activity on the public interest.
That decision will reflect the national concern for both protection and utilization of
important resources. The benefit which reasonably may be expected to accrue from the
proposal must be balanced against its reasonably foreseeable detriments. All factors
which may be relevant to the proposal will be considered including the cumulative
effects thereof; among those are conservation, economics, aesthetics, general
environmental concerns, wetlands, historic properties, fish and wildlife values, flood
hazards, flood plain values (in accordance with Executive Order 11988), land use,
navigation, shoreline erosion and accretion, recreation, water supply and conservation,
water quality, energy needs, safety, food and fiber production, mineral needs,
considerations of property ownership, and, in general, the needs and welfare of the
people. For activities involving the discharge of dredged or fill materials in waters of the
United States, the evaluation of the impact of the activity on the public interest will
include application of the Environmental Protection Agency's 404(b)(1) guidelines.
Section 408
Interested parties are hereby notified that an application has been received for
Department of the Army Section 408 (Section 14 of the Rivers and Harbors Act of 1899;
33 U.S.C. 408) approval to conduct proposed work at the federally constructed
Morehead City Harbor channel, as described above and shown on the attached maps.
Written comments are being solicited from anyone having an interest in the requested
alteration. Comments received will become part of the U.S. Army Corps of Engineers'
(USACE) administrative record and will be considered in determining whether to
approve the request. Comments supporting, opposing, or identifying concerns that
should be considered by the USACE in its decision process are welcome. Comments
providing substantive information and/or a rationale for the commenter's position are the
most helpful.
This public notice is not a paid advertisement and is for public information only.
Issuance of this notice does not imply USACE endorsement of the project as described.
The decision whether to grant the requested permission for federal project modification
under Section 408 will be based on several factors and will reflect the national concern
for both protection and utilization of important resources. The benefit which reasonably
may be expected to accrue from the proposal must be balanced against its reasonably
foreseeable detriments. Review of the request for modification will be reviewed by a
USACE technical review team and will consider, but not necessarily be limited to, the
following factors:
1. Impair the Usefulness of the Project Determination. The review team will
determine if the proposed alteration would limit the ability of the project to
function as authorized, or would compromise or change any authorized project
conditions, purposes, or outputs. The decision whether to approve a request for
modification would be based on a determination of no impairments.
Version 10.03.2022 Page 8
2. Injurious to the Public Interest Determination. Proposed alterations will be
reviewed to determine the probable impacts, including cumulative impacts, on
the public interest. Evaluation of the probable public interest impacts of the
proposed alteration to the USACE requires a careful weighing of all relevant
factors in each particular case. Factors that may be relevant to the public interest
depend upon the type of USACE project being altered and may include, but are
not limited to, conservation, economic development, historic properties/cultural
resources, environmental impacts, water supply, water quality, flood hazards,
floodplains, residual risk, induced damages, navigation, shore erosion or
accretion, and recreation. The decision whether or not to approve an alteration to
a federal project will be determined by the consideration of whether benefits are
commensurate with risks. If the potential detriments are found to outweigh the
potential benefits, then it may be determined that the proposed alteration is
injurious to the public interest.
3. Environmental Compliance. A decision on a Section 408 request is a federal
action, and therefore subject to the National Environmental Policy Act (NEPA)
and other environmental compliance requirements. While ensuring compliance is
the responsibility of the USACE, the requester provides all information necessary
to satisfy applicable federal laws, executive orders, regulations, policies,
ordinances, and any other environmental requirements. The NEPA and other
analyses completed to comply with environmental statutes, such as the
Endangered Species Act, should be commensurate with the scale and potential
effects of the activity that would alter the federal project. The scope of analyses
for the NEPA and environmental compliance evaluations pursuant to Section 408
are limited to the area of alteration and adjacent areas that may be directly or
indirectly affected by the alteration. A preliminary determination has been made
that an environmental impact statement is not required for the proposed action.
4. Technical Analysis. The USACE will ensure that the requester provides all
technical plans, maps, drawings, and specifications to facilitate a thorough review
of the proposal. A USACE-led Agency Technical Review (ATR) is being
conducted to determine any potential adverse impacts to the federal project.
Any comments received will be considered by the USACE in determining
whether to issue, modify, condition or deny a permission for this proposal if
received before the comment period expiration date. To make its decision, the
USACE will review comments received to supplement and inform its assessment
of impacts on endangered species, historic properties, water quality, general
environmental effects, and other public interest factors listed above. Comments
will be taken into consideration in the preparation of an appropriate document
pursuant to the NEPA (e.g. Environmental Assessment). Comments will also be
used to determine the need for a public hearing and to determine overall public
interest in the proposed action.
It should be noted that materials submitted as part of Section 408 requests
become part of the public record and will be available to the general public under
the provisions of the Freedom of Information Act (FOIA). Individuals may submit
Version 10.03.2022 Page 9
a written request to obtain materials under the FOIA or make an appointment to
view the project file at the USACE Wilmington District's Office of Counsel.
Commenting Information
The Corps of Engineers is soliciting comments from the public; Federal, State and local
agencies and officials, including any consolidated State Viewpoint or written position of
the Governor; Indian Tribes and other interested parties in order to consider and
evaluate the impacts of this proposed activity. Any comments received will be
considered by the Corps of Engineers to determine whether to issue, modify, condition,
or deny a permit for this proposal. To make this decision, comments are used to assess
impacts on endangered species, historic properties, water quality, general
environmental effects and the other public interest factors listed above. Comments are
used in the preparation of an Environmental Assessment (EA) and/or an Environmental
Impact Statement (EIS) pursuant to the National Environmental Policy Act (NEPA).
Comments are also used to determine the need for a public hearing and to determine
the overall public interest of the proposed activity.
Any person may request, in writing, within the comment period specified in this notice,
that a public hearing be held to consider the application. Requests for public hearings
shall state, with particularity, the reasons for holding a public hearing. Requests for a
public hearing will be granted, unless the District Engineer determines that the issues
raised are insubstantial or there is otherwise no valid interest to be served by a hearing.
The Corps of Engineers, Wilmington District will receive written comments pertinent to
the proposed work, as outlined above, until 5pm, April 12, 2023. Comments should be
submitted to Liz Hair, Wilmington Regulatory Field Office, 69 Darlington Avenue,
Wilmington, North Carolina 28403, at sarah.e.hair(a-),usace.army. mi1. Comments may
also be submitted to WilmingtonNCREG@usace.army.mil
Version 10.03.2022 Page 10