Loading...
HomeMy WebLinkAbout20150266 Ver 1_General Correspondence_20150401Moore, Andrew W From: Lynn Mathis <LMathis @ucseng.com> Sent: Wednesday, April 01, 2015 3:45 PM To: Moore, Andrew W Subject: Mountain Electric's Sugar Mountain Substation... Attachments: SUGAR MTN_040115 -SEC PLAN.pdf, SUGAR MTN_040115 -SITE DETAILS.pdf Andrew, attached are the Grading /Sediment and Erosion Control Plan and Site Details drawings for the Sugar Mountain Substation with the associated revisions we discussed for the site permitting. Note, I have pulled the silt fence back to the edge of the wall at Wetland #2, and have added a "French" drain for the leg of the wetland area that will be disturbed. The "French" drain is detail on the Site Details sheet, Detail #6. Hope this takes care of the modifications. If not, please contact me and will revise as needed. Thanks so much for working with me in making the revisions. Lynn E. Mathis UC SYNERGETIC 123 North White Street Fort Mill, SC 29715 (803) 835 -7923 (0) (803) 835 -7825 (F) Imathis(ftcseng.com The information contained in this electronic message is information intended for the use of only the individual or entity named above and may be PRIVILEGED and CONFIDENTIAL. If the reader of this message is not the intended recipient or the employee or agent responsible for delivering it to the recipient, you are hereby notified that any review, disclosure, dissemination, distribution, or copying of this communication is strictly prohibited. If you received this electronic message in error, please notify the sender immediately by replying to this e -mail and permanently delete the original message. Thank you.