HomeMy WebLinkAbout20150266 Ver 1_Maps Revised_20150401 (16)SEEDING SPECIFICATIONS:
SURFACE STABILIZATION MEASURES WILL BE COMPLETED IMMEDIATELY FOLLOWING SITE RECLAMATION AND PRIOR TO PROJECT
COMPLETION. TEMPORARY OR INTERMEDIATE SEEDING, MULCHING, MATTING, OR OTHER SURFACE STABILIZATION MEASURES WILL
BE PLACED ON DISTURBED AREAS FOLLOWING INITIAL SOIL DISTURBANCE. PRIOR TO SEEDING, ALL SURFACES SHALL BE SCARIFIED
TO A DEPTH OF FOUR TO SIX INCHES TO ENHANCE SEED GERMINATION AND HELP IMPEDE STORMWATER RUNOFF. SEEDING
MIXTURES WILL BE TAILORED TO SITE - SPECIFIC CONDITIONS, STEEPNESS OF SLOPES, CLIMATE, LOCATION, AND ELEVATION.
TYPICAL SEEDING GUIDELINES ARE AS FOLLOWS:
CREEPING RED FESCUE 75 LB /ACRE
RED CLOVER 50 LB /ACRE
RYE GRAIN 40 LB /ACRE
IN THE ABSENCE OF SOIL TESTS, FERTILIZER AND LIME WILL GENERALLY BE APPLIED AT THE FOLLOWING RATES:
10 -10 -10 FERTILIZER 500 LB /ACRE
GROUND AGRICULTURAL LIMESTONE 2000 LB /ACRE
LIQUID LIME OR ALTERNATIVE FERTILIZERS MAY BE SUBSTITUTED IN VARIOUS SITUATIONS.
MULCH OR MATTING SHALL BE APPLIED TO ALL SEEDED AREAS TO AID IN THE ESTABLISHMENT OF VEGETATION AND HELP IMPEDE
EROSION. VEGETATIVE MULCH, TYPICALLY WHEAT OR OAT STRAW, SHALL BE APPLIED AT THE RATE OF 3,000 TO 4,000 LBS /ACRE.
NOTE: PROVISIONS SHALL INCLUDE TEMPORARY OR PERMANENT STABILIZATION (WITH GROUND COVER) OF ALL
PERIMETER DIKES, SWALES, DITCHES, AND PERIMETER SLOPES STEEPER THAN 3:1 (HORIZONTAL TO VERTICAL) WITHIN 7
DAYS FOLLOWING THE LAST LAND - DISTURBING ACTIVITY. ALL OTHER DISTURBED AREAS SHALL BE PROVIDED
TEMPORARY OR PERMANENT STABILIZATION (WITH GROUND COVER) WITHIN 14 DAYS FOLLOWING THE LAST
LAND - DISTURBING ACTIVITY.
PROPOSED CONSTRUCTION SEQUENCE:
1. OBTAIN SEDIMENT AND EROSION CONTROL PERMIT FROM NC DENR. NOTE: IMPORT FILL WILL BE REQUIRED TO CONSTRUCT
THE SUBSTATION AND RECYCLING CENTER FACILITIES. HOWEVER, A BORROW SITE HAS NOT YET BEEN ACQUIRED. ONCE THE
BORROW SITE HAS BEEN IDENTIFIED, A REVISE SEDIMENT AND EROSION CONTROL PLAN SHALL BE SUBMITTED TO NC DENR
FOR APPROVAL.
2. INSTALL CONSTRUCTION ENTRANCE FOR ACCESS TO THE SITE.
3. INSTALL ASSOCIATED EROSION CONTROL MEASURES FOR CONSTRUCTION OF THE NEW RIP RAP SWALE. NOTE: RIP RAP
SWALE MUST BE CONSTRUCTED ENTIRELY IN "DRY" CONDITIONS BEFORE RE- CHANNELLING STORMWATER FLOW FROM THE
EXISTING DRAINAGE SWALE.
4. INSTALL ACCESS DRIVE CULVERT AND ASSOCIATED EROSION CONTROL MEASURES. UPON COMPLETION, STORMWATER FLOW
MAY BE RE- DIRECTED FROM THE EXISTING SWALE /CHANNELTO NEW RIP RAP CHANNEL. OLD STORMWATER SWALE
SHALL BE REMOVED (FILLED) AT THIS POINT.
5. INSTALL EROSION CONTROL MEASURES AT THE INLET OF NEW CULVERT AND BEGIN CONSTRUCTION OF THE DIVERSION
SWALE ALONG THE SOUTHERN PERIMETER OF THE CONSTRUCTION SITE.
6. COMPLETE GRADING OF THE DIVERSION SWALE, AND FERTILIZE, SEED AND MAT (WITH EROSION CONTROL FABRIC) THE SWALE
AS SOON AS POSSIBLE. NOTE: THE INTENT IS TO CAPTURE ALL STORMWATER FLOW UPSLOPE FROM THE CONSTRUCTION SITE
(FROM GOLF COURSE AREA) AND DIRECT IT THROUGH THE CONSTRUCTION SITE CLEANLY VIA THE NEW CULVERT, RIP RAP
7 CHANNEL AND DIVERSION SWALE.
8. INSTALL REMAINING EROSION CONTROL MEASURES FOR GRADING /SITE DEVELOPMENT OF THE SUBSTATION PAD AND
RECYCLING CENTER LOT.
9. CLEAR AND GRUB THE SUBSTATION PAD AND THE RECYCLING CENTER LOT.
10. INSTALL SUB - SURFACE SYSTEM /SYSTEMS (AS NEEDED) FOR POSSIBLE SEEPAGE FROM SPRING HEADS.
11. BEGIN CONSTRUCTION OF THE SUBSTATION RETAINING WALL AND FILL OPERATIONS FOR CONSTRUCTION OF THE SUBSTATION
AND RECYCLING CENTER PADS.
12. COMPLETE RETAINING WALL AND SUBSTATION /RECYCLING CENTER GRADING.
13. COMPLETE CONSTRUCTION OF SUBSTATION ACCESS DRIVE (GRAVEL PAVING).
14. FERTILIZE, SEED AND MULCH ALL DISTURBED AREAS.
15. CONSTRUCT RECYCLING CENTER AMMENITIES (CONCRETE PAD FOR DUMPSTERS AND ACCESS DRIVE).
16. BEGIN SUBSTATION CONSTRUCTION (INSTALLATION OF STRUCTURES AND EQUIPMENT).
17. COMPLETE SUBSTATION CONSTRUCTION AND BEGIN INSTALLATION OF DISTRIBUTION CIRCUIT LINES.
18. RE- INSPECT SEEDED AREAS MAKING NECESSARY REPAIRS AND /OR RESEEDING
WHERE VEGETATION HAS NOT ESTABLISHED.
19. PRIOR TO THE REMOVAL OF EROSION CONTROL MEASURES AN INSPECTION OR APPROVAL BY A REPRESENTATIVE OF THE
LAND QUALITY SECTION (ASHEVILLE, NC), AND APPROVAL MUST BE OBTAINED.
20. REMOVE SEDIMENT AND EROSION CONTROL MEASURES FOR SITE.
SYNTHETIC FILTER ABRIC
STEEL POST -
1.33 LB. /LINEAR FT. STEEL WITH A
MINIMUM LENGTH OF 5FT.
c
FLOW
7- 8 FT. MAXIMUM STANDARD STRENGTH FABRIC WITH
WIRE FENCE.
STEEL FENCE POS
" -24" FABRIC HEIGHT
SILT FENCE CONSTRUCTION SPECIFICATIONS:
1. SILT FENCE SHALL BE PLACED ON SLOPE CONTOURS TO MAXIMIZE PONDING EFFICIENCY.
2. SILT FENCE DRAINAGE AREA OF 1/4 ACRE OR LESS PER 100 LF.
3. SILT FENCE WITH ROCK OUTLET SHALL BE APPLICABLE FOR DRAINAGE AREAS OF 1/2 ACRE OR LESS.
4. WIRE MESH REINFORCEMENT SHALL CONSIST OF 14 GAUGE WIRE X 6" SPACING.
5. SYNTHETIC FILTER FABRIC MIN. REQUIREMENTS:
A. TENSILE STRENGTH - 90 LBS
B. PERMITTIVITY - 0.05 SEC -1
C. APPARENT OPENING SIZE - 30 US STD. SIEVE
D. ULTRAVIOLET STABILITY - 70%
6. FILTER FABRIC SHALL BE FASTENED TO THE UP -SLOPE SIDE OF THE FENCE POSTS, SUPPORTED BY WIRE MESH.
EXTEND WIRE MESH TO THE BOTTOM OF THE TRENCH. WIRE OR PLASTIC TIES SHOULD BE USED TO SECURE THE
FABRIC AND WIRE MESH TO THE FENCE POSTS.
7. DO NOT ATTACH FILTER FABRIC TO EXISTING TREES.
VEGETATION OR RIP RAP
LINED FOR STABILIZATION
RIP RAP SWALES SHALL HAV
3'
3'
DIVERSION SWALE
NOT TO SCALE
INSTALLATION:
SLOPES: PROPERLY PREPARE, FERTILIZE AND SEED AREA TO BE COVERED BEFORE BLANKET IS APPLIED.
MATTING MAY BE INSTALLED EITHER VERTICALLY OR HORIZONTALLY ON SLOPES. OVERLAP ADJOINING MAT
SECTIONS APPROXIMATELY 3".
SWALES AND WATERCOURSES: PROPERLY PREPARE, FERTILIZE AND SEED AREA TO BE COVERED BEFORE
BLANKET IS APPLIED. MATTING SHALL BE INSTALLED IN THE DIRECTION OF WATER FLOW. OVERLAP
ADJOINING MAT SECTIONS APPROXIMATELY 4 " -6 ".
STAPLING INSTRUCTIONS:
USE WIRE STAPLES, .091" IN DIAMETER OR GREATER, "U" SHAPED WITH LEGS 6" LONG OR LONGER AND 1"
CROWN. SIZE AND GAUGE OF STAPLES USED WILL VARY WITH SOIL CONDITIONS. DRIVE STAPLES
VERTICALLY INTO THE GROUND. USE FOUR STAPLES ACROSS AT THE START OF EACH ROLL. FOR SLOPE
INSTALLATIONS, STAPLE ALONG THE LENGTH OF THE ROLL AT 6 FT. INTERVALS, ALTERNATING THE
PLACEMENT OF THE STAPLES AS SHOWN. FOR DITCH LINERS, STAPLE ALONG THE LENGTH OF THE ROLL AT 4
FT. INTERVALS, ALTERNATING THE PLACEMENT OF THE STAPLES AS SHOWN. USE A COMMON ROW OF
STAPLES ON ADJOINING BLANKETS.
TYPICAL STAPLING PATTERN FOR SLOPES
\
AND SWALES /DRAINAGE CHANNELS.
Un
USE 4 STAPLES ACROSS AT THE START OF
1 \ \
EACH ROLL AND CONTINUE TO STAPLE
THROUGHOUT THE LENGTH OF THE ROLL.
\ \
3. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND
ACES
TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT.
SW
FOO SLOPES 1
\ 4�
4. ONCE THE DRAINAGE AREA HAS BECOME PERMANENTLY STABILIZED, ALL THE FENCE MATERIALS, AND ANY
FT_
EROSION CONTROL FABRIC SPECIFICATIONS:
�
NORTH AMERICAN GREEN OR APPROVED EQUAL PRODUCTS - S75 AW BLANKET -
FOR SLOPES AND SENSITIVE AREAS. S150 DOUBLE NET STRAW
BLA ET - FOR SWALES AND
HIGH VELOCITY AREAS.
E-
EROSION CONTROL
FABRIC
GRAVEL (8" MIN. COMPACTED THICKNESS -
CRUSHER- RUN /"ABC" TYPE)
COMPACTED AT 95% MOD. PROCTOR
2' 1 10'
8"
10' 1 2'
MAINTENANCE NOTES:
1. INSPECT SILT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REPAIRS REQUIRED
Un
IMMEDIATELY.
ROAD SHOULDER ROAD SHOULDER
2. SHOULD THE FABRIC OF THE SILT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT
PROMPTLY.
3. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND
TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT.
w
4. ONCE THE DRAINAGE AREA HAS BECOME PERMANENTLY STABILIZED, ALL THE FENCE MATERIALS, AND ANY
SEDIMENT DEPOSITS ARE TO BE REMOVED. THE DISTURBED AREA SHALL THEN BE GRADED SMOOTH AND
�
PROPERLY SEEDED AND MULCHED.
SILT FENCE WITH WIRE MESH BACK I N C
NOT TO SCALE
ACCESS DRIVE
NOT TO SCALE
FACE UPSTREAM SIDE
WITH NCDOT #57 WASH
STONE
TIE STONE INTO EMBEDMENT
PIPE AROUND CULVERT
INLE
JR.
WATER
FLOW
STONE SECTION
FACE UPSTREAM SIDE WITH NC DOT #57
WASHED STONE
CULVERT INLET
,a 2:1
2:1 MAX.
MAX. WATER
FLOW
CULVERT INLET PROTECTION
NOT TO SCALE
#57 WASHED STONE BACKFILL AROUND PIPE
6" SCHEDULE 40 PVC PERFORATED PIPE
MIRAFI 180N- SERIES OR
APPROVED EQUAL (NON -WOVEN FABRIC)
d
d
MIRAFI 180N- SERIES FABRIC (NON - WOVEN) OR
APPROVED EQUAL. FABRIC SHALL ENVELOPE THE "WASHED
EARTHEN FILL FOR SUBSTATION /RECYCLING CENTER STONE" ( #57 WASHED STONE) AND PIPING TO FORM A CONDUIT
PADS. FILL SHOULD BE APPROXIMATELY 4' TO 10' FOR POTENTIAL SPRING FLOW. EARTHEN FILL WILL BE PLACE
OVER THE WASHED STONE /PIPE CONDUIT.
6" SCHEDULE 40 PVC PERFORATED PIPE a .rg MIN. STONE FILL
I I
APPROX. 18" TRENCH
SUB - SURFACE DRAIN
NOT TO SCALE
DESIGN CRITERIA
AGGREGATE SIZE: 2 -3" DIAMETER WASHED STONE
PAD THICKNESS: 6" MINIMUM
PAD WIDTH: 15' MINIMUM
PAD LENGTH: 50' MINIMUM
NOTE: LOCATE CONSTRUCTION ENTRANCES AND EXITS TO LIMIT SEDIMENT FROM
LEAVING THE SITE AND TO PROVIDE MAXIMUM UTILITY BY ALL CONSTRUCTION
VEHICLES. AVOID STEEP GRADES AND ENTRANCES AT CURVES IN PUBLIC ROADS.
UNDERLAY STONE WITH FILTER FABRIC LINER.
THE FILTER FABRIC MAY BE MADE OF WOVEN OR NON -WOVEN
MONOFILAMENT YARNS, AND SHOULD MEET THE FOLLOWING REQUIREMENTS:
A: THICKNESS: 20 - 60 MILS;
B: GRAB STRENGTH: 90 - 120 LB; and,
C: CONFORM TO ASTM D -1682 OR ASTM D -177.
01
p s
001?/ /
124' DIAMETER
COARSE AGGREGATE STONE
6" DEPTH MIN.
PERSPECTIVE VIEW
J
MAINTENANCE REQUIREMENTS:
INSPECT CONSTRUCTION ENTRANCES AFTER EACH RAINFALL AND MAINTAIN THE
GRAVEL PADS IN A CONDITION SO AS TO PREVENT MUD OR SEDIMENT FROM
LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC CLEAN UP AND
TOPDRESSING WITH 2 -INCH STONE. IMMEDIATELY REMOVE ALL OBJECTIONABLE
MATERIALS SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS.
CONSTRUCTION ENTRANCE
NOT TO SCALE
GENERAL CONSTRUCTION NOTES:
1. PRIOR TO BEGINNING ANY CONSTRUCTION, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO UTILIZE A
LOCATOR SERVICE TO HELP IDENTIFY POTENTIAL UNDERGROUND CABLES, WIRES AND UTILITIES THAT MIGHT EXIST
ON THE SITE. SHOULD ANY OBSTRUCTIONS BE ENCOUNTERED, THE CONTRACTOR SHALL CONTACT THE
OWNER /ENGINEER IMMEDIATELY.
2. THE CONTRACTOR SHALL VERIFY FIELD CONDITIONS PRIOR TO COMMENCEMENT OF WORK AND DURING
CONSTRUCTION, AND NOTIFY THE ENGINEER IMMEDIATELY IF ANY DISCREPANCIES EXIST BETWEEN THE
CONSTRUCTION PLANS AND ACTUAL FIELD CONDITIONS.
3. IN GENERAL, MAXIMUM SLOPES SHALL BE 2:1 FOR CUT SLOPES AND 3:1 FOR FILL SLOPES, UNLESS OTHERWISE
NOTED.
4. THE CONTRACTOR SHALL CLEAR /GRUB ALL VEGETATION, TOPSOIL, ORGANIC MATERIALS, ROCKS, AND OTHER
UNSUITABLE MATERIALS FROM THE SITE PRIOR TO BEGINNING SITE GRADING ACTIVITIES TO A DEPTH OF 6" BELOW
NATURAL GRADE, OR AS NEEDED TO PROVIDE A SOUND BASE FOR GRADING ACTVITIES. THE REMOVAL AND
DISPOSAL OF ALL CLEARED DEBRIS AND UNDERCUT MATERIAL SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
ALL SPOIL /WASTE MATERIALS SHALL BE DISPOSED OF IN A MANNER AS TO MEET ALL
MUNICIPAL /COUNTY /STATE /FEDERAL REGULATIONS.
5. IMPORT FILL WILL BE REQUIRED FOR GRADING /CONSTRUCTION OF THE SITE. IT SHALL BE THE RESPONSIBILITY OF
THE CONTRACTOR TO LOCATE A BORROW SITE WITH ADEQUATE FILL MATERIAL THAT MEETS THE REQUIREMENTS
FOR CONSTRUCTION OF THE FACILITY PADS AND THE ASSOCIATED RETAINING WALL. IT SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE "QUALIFYING" SOIL TESTING.
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SURVEYING SUPPORT FOR CONSTRUCTION /PLACEMENT OF FILL
MATERIAL. HE SHALL PROTECT REFERENCE BENCHMARKS AND SURVEY CONTROL POINTS FROM EXCAVATING AND
VEHICULAR TRAFFIC, AND DAMAGE.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSTALLATION OF ALL INDICATED SEDIMENT AND EROSION
CONTROL MEASURES, AND THE MAINTENANCE OF SUCH UNTIL SITE STABILIZATION HAS BEEN ACHIEVED. DURING
GRADING OPERATIONS, THE CONTRACTOR SHALL CONTINUALLY DO ALL THAT IS POSSIBLE TO LIMIT OFF -SITE
SEDIMENT RUNOFF. ANY /ALL PROBLEMS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER.
8. The Contractor shall BE RESPONSIBLE FOR OBTAINING /TRANSPORTING /PLACEMENT OF ALL IMPORT FILL NECESSARY
TO GRADE /CONSTRUCT the substation AND RECYCLING CENTER FACILITIES TO THE INDICATED ELEVATIONS and
contours. NOTE: INDICATED ELEVATIONS REFLECT "FINISHED GRADE" ELEVATIONS FOR GRADING /SITE
DEVELOPMENT. THE RECYCLING CENTER SHALL BE GRAVEL PAVED UPON COMPLETION (6" COMPACTED "ABC
STONE), THUS, THE CONTRACTOR MUST DEDUCT FILL MATERIAL FOR SUCH GRAVELLING.
9. ANY /ALL PROVIDED CUT /FILL VOLUMES ARE INTENDED TO SERVE AS AN ESTIMATE ONLY. THE CONTRACTOR SHALL
PERFORM HIS OWN CALCULATIONS TO DETERMINE ACTUAL CUT /FILL VOLUMES FOR GRADING /CONSTRUCTION AND
COST ESTIMATING.
10. ALL GRADING SHALL BE PERFORMED SO AS TO MAINTAIN POSITIVE DRAINAGE AT THE SITE AT ALL TIMES,
BLENDING /SMOOTHING CUT /FILLS TO EXISTING CONTOURS. THE CONTRACTOR SHALL AVOID ANY
STRIPPING /CLEARING /GRADING OUTSIDE THE INDICATED LIMITS, AS CLEARING OF EXISTING VEGETATION IS STRICKLY
ENFORCED VIA PERMITTING.
11. ALL SITE DEVELOPMENT GRADING AND CONSTRUCTION SHALL BE PERFORMED IN ACCORDANCE WITH LOCAL AND
STATE REGULATIONS AND STANDARDS.
12. ALL FILL MATERIAL SHALL BE PLACED IN LIFTS NO GREATER THAN 8 INCHES (UNCOMPACTED THICKNESS) AND
CONSTRUCTED TO THE ELEVATIONS INDICATED ON THE CONSTRUCTION PLANS. FILL MATERIAL SHALL BE
COMPACTED TO THE DENSITY OF NATURAL AND UNDISTURBED SOILS TO APPROXIMATELY 95% OF MAXIMUM
DENSITY, IN ACCORDANCE WITH ASTM D698. PROPER CARE SHALL BE GIVEN TO OPTIMUM MOISTURE CONTENT OF
THE FILL MATERIAL AS COMPACTION IS BEING PERFORMED.
13. UPON COMPLETION OF SITE GRADING ACTITIES, THE RETAINING WALL SHALL BE COMPLETE AND THE SUBSTATION
PAD SHALL BE GRADED SMOOTH, COMPACTED AND SLOPED TO PREVENT WATER PONDING.
14. THE CONTRACTOR SHALL SUSPEND GRADING OPERATIONS WHEN CLIMATIC CONDITIONS DO NOT ALLOW FOR WORK
TO BE PERFORMED SAFELY, PREVENT ADEQUATE PLACEMENT /COMPLACEMENT OF SOIL, OR IF CONTINUED WORK
CAUSES SITE DAMAGE. ALL WEATHER EXCEPTIONS SHALL BE DOCUMENTED BY THE CONTRACTOR.
15. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SEEDING, FERTILIZING AND MULCHING ALL DISTURBED AREAS (NOT
RECEIVING STONE) FOR STABILIZATION PER THE INDICATED SEEDING SPECIFICATIONS, UPON COMPLETING
GRADING /CONSTRUCTION ACTIVITIES. ALL SLOPES SHALL BE "TRACKED" PRIOR TO SEEDING TO HELP PROVIDE
SEED -BED SUPPORT.
16. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AT ALL TIMES TO HELP PREVENT EROSIVE CONDITIONS AND
OFF -SITE SEDIMENTATION FROM DEVELOPING ON THE CONSTRUCTION SITE. THE CONTRACTOR SHALL INSTALL ALL
SEDIMENT AND EROSION CONTROL MEASURES PER THE CONSTRUCTION PLANS AND MAINTAIN THESE MEASURES
THROUGHOUT PROJECT CONSTRUCTION AND STABILIZATION. ADDITIONAL MEASURES COULD BE NEEDED TO HELP
PREVENT EROSIVE CONDITIONS. SHOULD THIS SITUATION DEVELOP, THE CONTRACTOR SHALL CONTACT THE PROJECT
ENGINEER FOR ASSISTANCE.
17. WHILE "ON SITE ", THE CONTRACTOR SHALL PERFORM ANY /ALL SITE INSPECTIONS FOR THE SITE, PER LOCAL, STATE
AND /OR FEDERAL REGULATIONS.
18. ALL SEDIMENT AND EROSION CONTROL MEASURES SHALL BE INSPECTED AT LEAST ONCE EVERY 7 DAYS AND WITHIN
24 HOURS AFTER ANY SIGNIFICANT RAINFALL EVENT (1/2" OR GREATER). FAILURE TO INSTALL OR MAINTAIN
EROSION CONTROL MEASURES MAY RESULT IN ALL CONSTRUCTION BEING STOPPED ON THE JOB UNTIL SUCH
MEASURES ARE CORRECTED TO REQUIRED STANDARDS.
19. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO REMOVE ALL SEDIMENT AND EROSION CONTROL
MEASURES AFTER SITE STABILIZATION HAS BEEN ACHIEVED.
20. THE CONTRACTOR SHALL BE RESPONSILE FOR THE GRAVELLING OF THE ACCESS ROAD UP TO THE "WALLED'
ENTRANCE OF THE SUBSTATION PAD, AND GRAVELLING OF THE RECYCLING CENTER PAD.
WWF 4 "X4 "X10" GAGE
1
r
3,000 PSI CONCRETE
EXTEND BASE COURSE 6"
BEYOND EDGE OF CONCRETE
6" COMPACTED CRUSHER RUN GRAVEL BASE
GENERAL NOTES:
1. ALL PAVING WORKMANSHIP AND MATERIALS SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF
THE TRANSPORTATION CABINET STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES.
2. STONE BASE THICKNESS SHALL BE AFTER COMPACTION.
3. SUBGRADE AND STONE BASE SHALL BE MECHANICALLY COMPACTED (ROLLED) TO THE DENSITY OF
NATURAL AND UNDISTURBED SOILS (APPROX. 95% OF THE MAXIMUM DENSITY IN ACCORDANCE WITH ASTM
D698, MODIFIED PROCTOR).
4. ALL CONCRETE CONSTRUCTION SHALL BE PERFORMED PER THE MOST CURRENT EDITION OF THE ACI CODE
FOR CONCRETE CONSTRUCTION.
CONCRETE PAVING
NOT TO SCALE
0 ~� �1 'O• vf�,��
O"; -•p��
d1
e �
U S t
p °
°i Off, W °••....• ®• �,, y ?°
,9 ®e��dd�raaaaasaa }tiy����'
W
W
Z
>0
m
w
U
Q
IL
LLI
ch
z
w
z
0
O
Un
w
0
w
�
�
E-
w
�
Z
o
w
U
z
0 o C
Q
IL
o
>
�
w
Elf
o
w
U
w
�
�
z
Q
w
�
J
z
U
w
0
m
w
w
o
w
w
U�
w
>
m
w
�
0
w
w
w
�
m
�
ON
<
Q
0
\
CND
\
\
0
d
r-)
03
0
0
0
m
m
Q
:5
z
w
w
w
o
JJJo
0
a�aa
Li
0
z
w
z
0
O
E-
0
w y'
U
z
0 o C
Q
IL
o
SHEET
5 of 5