Loading...
HomeMy WebLinkAbout20150294 Ver 1_More Info Requested_20150402North Carolina Department of Environment and Natural Resources Pat McCrory Donald R. van der Vaart Governor Secretary April 2, 2015 - DWR.q 15 -0294. Jackson County Balsam Mountain Group, LLC Attn: David C. Carille, Managing Member 81 Preserve Road Sylva, NC 28779 Balsam Mountain Preserve Community Association Attn: Michael Fulbright 3888 Cabin Flats Road Sylva, NC 28779 _ Subject:. REQUEST FOR ADDITIONAL INFORMATION Balsam Mountain Preserve Bridge Replacement at Cashie Branch Dear Mr. Carille and Mr. Fulbright: On March 23, 2015, the Division of Water Resources (Division) received your application dated 1/2015, requesting a 401 Water Quality Certification from the Division for the subject project. The Division has determined that your application is incomplete and cannot be processed. The application is on -hold until all of the following information is received: 1. Signed PCN application and a signed agent authorization letter. 2. Correct coordinates for the project location (coordinates provided are southeast of Lake Lure, NC). 3. Location map showing the project's location in relation to roads, streams, etc. 4. Determine what option will be utilized. Are the proposed 47 linear feet (ft) of stream impacts the same for both Option 1 and Option 2? 5. The area of the proposed stream impacts needs to be clearly depicted on design drawings (figure 5 -2,. etc.). Division of Water Resources -ARO 2090 U.S. Hwy 70, Swannanoa, NC 28776 Phone: 828- 296 -45001 FAX 828- 299 -7043 Internet: w nmaternuality.orq MEqual0,,& Nt, 1 AXrmefive Add Employer -Made In part by -,yded paper Balsam Mountain Group, LLC /Balsam Mountain Preserve Community Association DWR# 15 -0294 Request for Additional information Page 2 of 2 6. Verify that the project will fall under a Nationwide Permit (NWP) 13 -Bank Stabilization with the Corps of Engineers. Pursuant to Title 15A NCAC 02H .0502(e), the applicant shall furnish all of the above requested information for the proper consideration of the application. If all of the requested information is not received in writing within 30 calendar days of receipt of this letter, the Division will be unable to approve the application and it will be returned. The return of this project will necessitate reapplication to the Division for approval, including a complete application package and the appropriate fee. Please respond in writing within 30 calendar days of receipt of this letter by sending three copies of all of the above requested information to the 401 & Buffer Permitting Unit, 1617 Mail Service Center, Raleigh, NC 27699 - 1617:. Please be aware that you have no authorization under the Section 401 of the Clean Water Act for this activity and any work done within waters of the state may be a violation of North Carolina General Statutes and Administrative Code. Please contact Tim Fox at 828 - 296 -4464 or tim.fox @ncdenr.¢ov if you have any questions or concerns. Sincerely, �i G. Lan Regional Supervisor - Water Quality Regional Operations Asheville Regional Office cc: Terry Allen -T.E. Allen Engineering, PC (via email) David Brown - USACE Asheville Regulatory Field Office (via email) Andrea Leslie — NCWRC (via email) DWR ARO RO 401 files DWR401 & Buffer Permitting Unit