HomeMy WebLinkAboutNCC204023_NOT Closeout Documents_20230314SEDIMENTATION INSPECTION REPORT
New Hanover County
Engineering Department
230 Government Center Drive • Suite 160
Wilmington, North Carolina 28403
TELEPHONE (910)-798-7139
Beth E. Wetherill, C.P.E.S.C.
Soil Erosion Specialist
Email: bwetherill@nhcgov.com
Project Name & Location: Trinity Express Oil- 8128 Market Street
Grading Permit #: 60-18
Financially Responsible Party & Address: Trinity Express Coastal LLC, Michael Soignet- 5508 Middleton Road,
Durham, NC 27713
Pictures: ❑ Yes ❑X No
Weather & Soil Conditions: Sunny, Dry Conditions, 66F
Inspection Type: ❑ Initial ❑ Periodic N Final
Date Report Sent:
12/1/2021
Contact Made With: Tori on site.
Inspection report to be sent/given, including financially responsible party: Michael Soignet-
msoignet@live.com , Tori Jahn- tori@victoriconstruction.com , Michael B.- mike@msbdev.or�
Has this project been issued a NOV? ❑ Yes ❑X No
Potential NPDES violation? ❑ Yes ❑X No
Degree:
NPDES Type:
Is there offsite sediment? ❑ Yes ❑X No
Degree:
Location:
Part 1: Please take immediate corrective action for the following items within 7-10 days of this inspection for
the site to be in compliance with the Erosion and Sedimentation Control Ordinance:
N N/A
Part 2: Please take corrective action for the following items prior to next periodic inspection for the site to be
in compliance with the Erosion and Sedimentation Control Ordinance:
N N/A
Part 3: Additional Comments: Permanent ground cover sufficient to restrain erosion has been established.
No additional self -monitoring or self -inspections are required. Project is in compliance and released under
the SPCA. The New Hanover County Land Disturbance Permit is now closed.
Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCG01)
must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at:
https://edocs.deq.nc.gov/Forms/NCGO1-Termination. Please note that this correspondence must be
uploaded as part of completing the NOT process.
Report by: Beth Furr
Date of Inspection: 12/1/2021
Others Present: N/A
Bfurr@nhcgov.com
Contact this office with any questions and/or comments about this report and/or project.