Loading...
HomeMy WebLinkAboutWQ0019907_Minor Modification Staff Report_20230303DocuSign Envelope ID: 8EAA2A7E-02FE-4074-B371-3D5E4BBBC56F State of North Carolina ®r- Division of Water Resources Water Quality Regional Operations Section Environmental Staff Report Quality To: ❑ NPDES Unit ® Non -Discharge Unit Application No.: WQ0019907 Attn: Lauren Plummer Facility name: Holly Ridge WWTF From: Helen Perez Wilmington Regional Office Note: This form has been adapted from the non -discharge fg acili , staff report to document the review of both non - discharge and NPDES permit applications and/or renewals. Please complete all sections as they are pplicable. I. GENERAL AND SITE VISIT INFORMATION 1. Was a site visit conducted? ® Yes or ❑ No a. Date of site visit: 02/15/2023 b. Site visit conducted by: Helen Perez, Geoff Kegley, Mike Petrizzo c. Inspection report attached? ❑ Yes or ® No d. Person contacted: Kart' Herndon and their contact information: (910) 650 - 7883 ext. e. Driving directions: 2. Discharge Point(s): Latitude: Longitude: Latitude: Longitude: 3. Receiving stream or affected surface waters: Classification: River Basin and Subbasin No. Describe receiving stream features and pertinent downstream uses: II. PROPOSED FACILITIES: NEW APPLICATIONS 1. Facility Classification: (Please attach completed rating sheet to be attached to issued permit) Proposed flow: Current permitted flow: 2. Are the new treatment facilities adequate for the type of waste and disposal system? ❑ Yes or ❑ No If no, explain: 3. Are site conditions (soils, depth to water table, etc) consistent with the submitted reports? ❑ Yes ❑ No ❑ N/A If no, please explain: 4. Do the plans and site map represent the actual site (property lines, wells, etc.)? ❑ Yes ❑ No ❑ N/A If no, please explain: 5. Is the proposed residuals management plan adequate? ❑ Yes ❑ No ❑ N/A If no, please explain: FORM: WQROSSR 04-14 Pagel of 5 DocuSign Envelope ID: 8EAA2A7E-02FE-4074-B371-3D5E4BBBC56F 6. Are the proposed application rates (e.g., hydraulic, nutrient) acceptable`? ❑ Yes ❑ No ❑ N/A If no, please explain: 7. Are there any setback conflicts for proposed treatment, storage and disposal sites? ❑ Yes or ❑ No If yes, attach a map showing conflict areas. 8. Is the proposed or existing groundwater monitoring program adequate? ❑ Yes ❑ No ❑ N/A If no, explain and recommend any changes to the groundwater monitoring program: 9. For residuals, will seasonal or other restrictions be required? ❑ Yes ❑ No ❑ N/A If yes, attach list of sites with restrictions (Certification B) Describe the residuals handling and utilization scheme: 10. Possible toxic impacts to surface waters: 11. Pretreatment Program (POTWs only): III. EXISTING FACILITIES: MODIFICATION AND RENEWAL APPLICATIONS 1. Are there appropriately certified Operators in Charge (ORCs) for the facility? ® Yes ❑ No ❑ N/A ORC: Kart' Herndon Certificate #:1012918 Backup ORC: Mark Young Certificate #:1001105 2. Are the design, maintenance and operation of the treatment facilities adequate for the type of waste and disposal system? ® Yes or ❑ No If no, please explain: Description of existing facilities: Same as current permit. Proposed flow: Current permitted flow: 224,673 GPD Explain anything observed during the site visit that needs to be addressed by the permit, or that may be important for the permit writer to know (i.e., equipment condition, function, maintenance, a change in facility ownership, etc.) 3. Are the site conditions (e.g., soils, topography, depth to water table, etc) maintained appropriately and adequately assimilating the waste? ® Yes or ❑ No If no, please explain: 4. Has the site changed in any way that may affect the permit (e.g., drainage added, new wells inside the compliance boundary, new development, etc.)? ❑ Yes or ® No If yes, please explain: 5. Is the residuals management plan adequate? ® Yes or ❑ No If no, please explain: 6. Are the existing application rates (e.g., hydraulic, nutrient) still acceptable? ® Yes or ❑ No If no, please explain: 7. Is the existing groundwater monitoring program adequate? ® Yes ❑ No ❑ N/A If no, explain and recommend any changes to the groundwater monitoring program: 8. Are there any setback conflicts for existing treatment, storage and disposal sites? ❑ Yes or ® No If yes, attach a map showing conflict areas. 9. Is the description of the facilities as written in the existing permit correct? ® Yes or ❑ No If no, please explain: 10. Were monitoring wells properly constructed and located? ® Yes ❑ No ❑ N/A If no, please explain: FORM: WQROSSR 04-14 Page 2 of 5 DocuSign Envelope ID: 8EAA2A7E-02FE-4074-B371-3D5E4BBBC56F 11. Are the monitoring well coordinates correct in BIMS? ® Yes ❑ No ❑ N/A If no, please complete the following (expand table if necessary): Monitoring Well Latitude Longitude O l 11 O I // O / // O I It O l lI O I /I O l lI O I it O l lI O I II 12. Has a review of all self -monitoring data been conducted (e.g., DMR, NDMR, NDAR, GW)? ® Yes or ❑ No Please summarize any findings resulting from this review: NDMR/NDAR: 6/20, 2/21, 6/21 flow limit exceeded. GW-59: No violations in last permit c Provide input to help the permit writer evaluate any requests for reduced monitoring, if applicable. 13. Are there any permit changes needed in order to address ongoing BIMS violations? ❑ Yes or ® No If yes, please explain: 14. Check all that apply: ® No compliance issues ❑ Current enforcement action(s) ❑ Currently under JOC ❑ Notice(s) of violation ❑ Currently under SOC ❑ Currently under moratorium Please explain and attach any documents that may help clarify answer/comments (i.e., NOV, NOD, etc.) If the facility has had compliance problems during the permit cycle, please explain the status. Has the RO been working with the Permittee? Is a solution underway or in place? Have all compliance dates/conditions in the existing permit been satisfied? ❑ Yes ❑ No ® N/A If no, please explain: 15. Are there any issues related to compliance/enforcement that should be resolved before issuing this permit? ❑ Yes ®No❑N/A If yes, please explain: 16. Possible toxic impacts to surface waters: N/A 17. Pretreatment Program (POTWs only): N/A FORM: WQROSSR 04-14 Page 3 of 5 DocuSign Envelope ID: 8EAA2A7E-02FE-4074-B371-3D5E4BBBC56F IV. REGIONAL OFFICE RECOMMENDATIONS 1. Do you foresee any problems with issuance/renewal of this permit? ❑ Yes or ® No If yes, please explain: 2. List any items that you would like the NPDES Unit or Non -Discharge Unit Central Office to obtain through an additional information request: Item Reason 3. List specific permit conditions recommended to be removed from the permit when issued: Condition Reason 4. List specific special conditions or compliance schedules recommended to be included in the permit when issued: Condition Reason 5. Recommendation: ❑ Hold, pending receipt and review of additional information by regional office ❑ Hold, pending review of draft permit by regional office ❑ Issue upon receipt of needed additional information ® Issue ❑ Depy-Wjg4§g, g;ate reasons: ) 0 Signature of report preparer: `1D645B4A39694BE... Signature of regional supervisor: Date: 3/10/2023 M.,dIA Sr dej KC E3ABA14AC7DC434... FORM: WQROSSR 04-14 Page 4 of 5 DocuSign Envelope ID: 8EAA2A7E-02FE-4074-B371-3D5E4BBBC56F V. ADDITIONAL REGIONAL STAFF REVIEW ITEMS This staff report was completed for the Holly Ridge WWTF permit (W00019907) minor modification request. ONWASA has requested construction only of an 8-inch force main to pump treated effluent from the future 1-MGD Southeast Water Reclamation Facility, to be constructed at the Holly Ridge spray field site, to the Summerhouse WWTF's (W00029945) infiltration basin pump station wet well. This line will be installed parallel to the new 16- inch raw wastewater line pumping_from the new Summerhouse Pump Station to the new Southeast WRF that will be permitted by the Fast Track Sewer Extension program. Both lines will be constructed simultaneously to minimize environmental impacts. The 8-inch line will run along easements of Holly Ridge Road and Dolph Everett Road. It should be noted that the line will cross over an unnamed tributary on Dolph Everett Road. Additional permits will be required and submitted, as stated on the modification narrative: Erosion & Sedimentation Control Permit; US Army Corp of Engineers Individual 404 permit and 401 NCDEQ DWR permit; Fast Track Sewer Extension permit. The WIRO has no concerns with this minor modification as long as all necessarypermits and easements are obtained. FORM: WQROSSR 04-14 Page 5 of 5