HomeMy WebLinkAbout20150289 Ver 1_More Info Letter_20150406NCDENR
North Carolina Department of Environment and Natural Resources
Pat McCrory
Governor
April 6, 2015
Certified Mail
Return Receipt Requested
7012 0470 0001 38412132
Sleepy Hollow Development Company
Attn: Ralph Hodge
2101 Miller Rd.
Wilson, NC 27894
Subject: REQUEST FOR ADDITIONAL INFORMATION
AOI — Hwy 42
Dear Mr. Hodge:
Donald R. van der Vaart
Secretary
DWR #15 -0289
Wilson County
On March 20, 2015, the Division of Water Resources (Division) received your application dated
March 13, 2015 requesting a 401 Water Quality Certification and Riparian Buffer Authorization
from the Division for your project. The Division has determined that your application is
incomplete and cannot be processed. The application is on -hold until the following
information is received:
1. The NWP number being used for this project must be verified by the U.S. Army Corps of
Engineers. [15A NCAC 02H .0502(x)(7)]
2. The U.S. Army Corps of Engineers must verify all stream and wetland locations for this
project. [15A NCAC 02H .0502(a)(7)]
3. The extent of protected riparian buffers within the property must be verified by the
Division of Water Resources. In addition, it appears that the current site plan has the
riparian buffers measured from the centerline of the stream. Riparian buffers are
measured from each bank of the stream. [15A NCAC 02B .0233(8)(b)(iv)]
4. Per the requirements of Attachment Ain GC 3890, please submit two copies of the DWR
Low Density Supplement Form with all required items found at
Division of Water Resources, Raleigh Regional Office, Water Quality Operations Section http: / /portal.ncdenr.org /web /wq /aps
1628 Mail Service Center, Raleigh, NC 27699 -1628 Phone: (919) 791 -4200
Location: 3800 Barrett Drive, Raleigh, NC 27609 Fax: (919) 788 -7159
An Equal Opportunity 1 Affirmative Action Employer — Made in part by recycled paper
AOI — Hwy 42
DWR #15 -0289
ON -HOLD
Page 2 of 2
http: / /Portal.ncdenr.org /web /Ir /state - stormwater -forms docs. [15A NCAC 02H
.0506(b)(5) and (c)(5)]
Pursuant to Title 15A NCAC 02H .0502(c) and Title 15A NCAC 02B .0233 (8), the applicant shall
furnish all of the above requested information for the proper consideration of the application.
If all of the requested information is not received in writing within 30 calendar days of receipt
of this letter, the Division will be unable to approve the application and it will be returned. The
return of this project will necessitate reapplication to the Division for approval, including a
complete application package and the appropriate fee.
Please respond in writing within 30 calendar days of receipt of this letter by sending four copies
of all of the above requested information to the 401 & Buffer Permitting Unit, 1617 Mail Service
Center, Raleigh, NC 27699 -1617.
Please be aware that you have no authorization under the Water Quality Certification Rules or
the Neuse Riparian Buffer Rules for this activity.
Please contact Cherri Smith at 919 - 791 -4251 or cherri.smith @ncdenr.gov if you have any
questions or concerns.
Since ly,
Danny Smith
Supervisor, Water Quality Regional Operations Section
cc: DWR RRO 401 file
Robert Bartlett; Bartlett Engineering & Surveying; 1906 Nash Street N; Wilson, NC
27893
U.S. Army Corps of Engineers; Raleigh Regulatory Field Office; 3331 Heritage Trade
Drive, Set. 105; Wake Forest, NC 27597