Loading...
HomeMy WebLinkAboutCredit Release Task 8 -SouthFork.docxROY COOPER Governor ELIZABETH S. BISER Secretary RICHAM E. ROGERS, JR. Director NORTH CAROLINA Environmental Quality March 16, 2023 John Hutton DWR Project #: 2016-0225v2 Wildlands Holdings IV, LLC Alamance County 312 West Millbrook Rd, Suite 225 Raleigh, NC 27609 (via electronic mail: jhutton@wildlandseng.com ) Re: Cane Creek Umbrella Mitigation Banking Instrument (UMBI) South Fork Nutrient Offset & Buffer Mitigation Bank Credit Release— Task 8 Dear Mr. Hutton: On October 17, 2022, the Division of Water Resources (DWR) received a Year 4 Monitoring Report from Wildlands Engineering, Inc. on behalf of Wildlands Holdings IV, LLC (Wildlands) for the South Fork site. Vegetative plot data confirms that success criteria throughout the site is greater than the required 260 stems/acre. Additionally, no encroachment within the easement boundaries was observed. Vigor data was not included in the report but is required to be submitted in future monitoring reports. DWR received a continuation certificate and bond rider for the performance bond (# 107063164) in the amount of $20,000 issued to Wildlands from Travelers Casualty and Surety Company of America, to cover monitoring and maintenance at the subject site. The term of this bond applies beginning February 21, 2023 and ends with DWR approval of the Year 5 Monitoring Report. Future credit releases will be dependent on both the renewal of this performance bond and the annual monitoring reports. In accordance with the UMBI, signed on March 6, 2018, the following Project Milestones have been met and the corresponding credits shall be released: Task/Milestones Credit 8) Monitoring Report 94: Approved by the DWR & financial assurance renewed 5% By copy of this correspondence, DWR confirms that you have satisfied the above requirements for the above -referenced tract. Therefore, 5% of your Jordan Lake riparian buffer Restoration and Enhancement credits (0.05 x 30,955 ft2 = 1,547.75 ft2) as well as 5% of your Jordan Lake riparian buffer Enhancement (via cattle exclusion) and Preservation credits (0.05 x 187,561 ft2 = 9,378.05 ft2) are being released and are now available to sell. North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 1 1611 Mail Service Center I Raleigh, North Carolina 27699-1611 NOR1H CAROL Na 919.707.9000 South Fork Site Wildlands March 16, 2023 Additionally, 5% of your generated nitrogen offset credits (0.05 x 11,066.85 = 553.34 lb-N) and 5% of your generated phosphorus credits (0.05 x 707.55 = 35.38 lb-P) are now released. Generated credits are credits that have not been applied to the appropriate delivery factor. The delivery factors applied to this bank due to its location in the 14-digit HUC 03030002050050 are 71% for nitrogen and 67% for phosphorous. Therefore, the total amounts of delivered nutrient offset credits for this site are 7,857.46 lb-N and 474.06 lb-P. By copy of this correspondence, 5% of your delivered nitrogen offset credits (0.05 x 7,857.46 lb-N = 392.87 lb-N) and 5% of our delivered phosphorus credits (0.05 x 474.06 = 23.70 lb-P) are being released and are now available to sell. Please note that of the nutrient offsets, only the delivered nutrient offset credits can be sold from this bank and used for impacts in the Haw River Arm of Jordan Lake within the Cape Fear River Basin in accordance with 15A NCAC 02B .0703, which became effective on April 1, 2020. Additionally, riparian buffer credits can only be used to offset impacts located in the Haw River Sub Watershed of Jordan Lake according to 15A NCAC 02B .0295, which became effective on November 1, 2015. Upon receipt of this correspondence, update all credit ledgers accordingly. Please feel free to call Katie Merritt at (919) 707-3637 if you have any questions regarding this correspondence. Sincerely, EDocJu�Siigneddby_- A43C72700BD543E... Katie Merritt 401 & Buffer Permitting Branch cc:File Copy (Katie Merritt) Camden Brunick — Wildlands (via electronic mail) Page 2 of 2