HomeMy WebLinkAbout20071134_R-2518Utility_20150406Site
R-2518A
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
R-2518B
1
Total
Type
Restoration
Preservation
Enhancement
Restoration
Restoration
Restoration
Restoration
Preservation
Restoration
Preservation
Preservation
Restoration
Restoration
Preservation
Preservation
Restoration
Restoration
Preservation
Preservation
Preservation
Preservation
Preservation
Enhancement
Linear Feet of Mitigation
239
479
476
184
259
262
833
820
226
1066
1362
787
692
4266
525
276
581
148
2378
164
2297
1831
1749
21900
Linear Feet of Stream Affected by Utilities
Pre-Construction
40
40
0
60
7
323
0
80
50
40
0
202
527
137
0
191
0
933
0
0
0
115
2745
Post Construciton
80
44
43
0
100
7
45
0
93
78
40
189
289
641
25
0
165
0
993
0
0
0
369
3201
Difference between Pre and Post
-40
-4
-43
0
-40
0
278
0
-13
-28
0
-189
-87
-114
112
0
26
0
-60
0
0
0
-254
-456
Permitted Credit Ratio
1:1
4:1
2:1
1:1
1:1
1:1
1:1
4:1
1:1
4:1
4:1
1:1
1:1
4:1
4:1
1:1
1:1
4:1
4:1
4:1
4:1
4:1
2:1
Linear Feet of Stream Affected by Utilities
40
1
21.5
0
40
0
-278
0
13
7
0
189
87
28.5
-28
0
-26
0
15
0
0
0
127
237
Notes
No impacts
Impacts the same pre and post- Not receiving credit for portion of stream where impacts occur since Site was not obtained in ROW
Reduced impacts post construction
Impacts the same pre and post
Reduced impacts post construction
No Pre or Post Utility Impacts
Reduced impacts post construction
No Pre or Post Utility Impacts
Some pre impacts, but retaining wall deleted and portion of stream was piped. Credit for impacts plus loss of preservation credit was provided by EEP. See permit modification for
R-2519A.
Utility lines not moved, so pre and post impacts are the same
Total Loss of credit. This includes the sites were we reduced the post construction impacts
Site
Site A Pre
Site A Post
Site A Post Total
Site C Pre
Site C Pre Total
Site C Post
Site D Pre
Site D Post
Site E Pre
Site E Pre Total
Site E Post
Site F Pre
Site F Pre Total
Site F Post
Site F Post Total
Site G Pre
Site G Post
Site G Post Total
Site H Pre
Site H Post
Site I Pre
Site I Post
Site I Post Total
Site J Pre
Site J Pre Total
Site J Post
Site J Post Total
Site K Pre
Site K Pre Total
Site K Post
Site K Post Total
Site L Pre
Site L Pre Total
Site L Post
Site M
Site N Pre
Site N Pre Total
Site N Post
Site N Post Total
Site O Pre Total
Site O Pre Total
Site O Post
Site O Post Total
Site P
Site Q Pre
Site Q Pre Total
Site Q Post Total
Site R
Site 1 Pre
Site 1 Post
Site 1 Post Total
LF of stream impacted
80
94
30
15
15
13
167
42 LF
8 LF
3 LF
7
60
100
7
7
259
39
10
15
323
45
40
40
80
36
51
6
93
50
20
37
11
10
78
40
40
0
77
38
35
39
189
172
30
202
92
25
100
72
289
30
300
197
527
30
300
197
20
74
20
641
100
37
137
25
35
61
66
22
7
191
115
25
25
165
250
250
58
85
290
933
115
25
25
165
0
23
47
58
23
10
30
191
0
115
115
215
39
369
Calculation
80 LF has entire 30 foot buffer on both sides impacted
90 LF has entire 30 foot buffer on both sides impacted
60 LF has last 24 feet of left buffer impacted - assume entire left buffer impacted so only receive 30 LF of credit for right hand buffer and lost 30 LF since no left buffer
60 LF has last 14 feet of left buffer impacted - receive 30 foot credit for right hand buffer remaining intact and receive 15 foot credit for half of the left buffer remaining - 60 LF
- 45 LF equals 15 LF lost
30 LF has entire left buffer impacted so receive 15 LF credit for right buffer and lose 15 feet for left buffer
52 LF has last 15 feet of left hand buffer impacted, receive 26 LF of credit for right hand buffer and receive 13 LF for left hand buffer since half of buffer remains - 52 LF - 39LF
= 13 LF lost
Total Post Impacts
42 LF has entire 30 foot buffer on both sides impacted
16 LF has entire left buffer impacted so receive 8 LF of credit for right buffer
16 LF has the first 7.5 LF of right hand buffer impacted so receive 8 LF credit for left hand buffer and receive 5 LF of credit for 2/3 of left buffer remaining. So 16 LF - 13 LF =
3 LF lost
27 LF has last 15 feet of left hand buffer impacted so receive 13.5 LF of credit for right hand buffer and receive credit for 6.75 LF for half of left hand buffer remaining. 27LF -
20 LF = 7 LF lost
Total Pre Impacts
100 LF has entire 30 foot buffer on both sides impacted
7LF has entire 30 foot buffer on both sides impacted
7LF has entire 30 foot buffer on both sides impacted- Utility line and stream remained in the same place pre and post
518 LF has entire left buffer impacted so receive half credit since right hand buffer not impacted - 518/2 = 259
118 LF has last 23 feet of left buffer impacted so receive half credit for right buffer 59 LF. Receive credit for 1/3 of left buffer so 59/3=20 LF. 118 - (59+20)= 39 LF lost
20 LF has entire right hand buffer impacted so lose 10 LF for left hand buffer
60 LF has the first 15 feet of of left hand buffer impacted. Receive 30 LF of credit for right hand buffer remaining and 15 LF for half of left hand buffer. 60 - (30+15) = 15 LF lost
Total Pre Impacts
45 LF has the entire 30 foot buffer on both sides impacted
121 LF has the the last 20 feet of right hand buffer impacted. Receive half credit of 61 LF for left hand buffer and 20 LF for 1/3 of right hand buffer. 121 - (61+20)= 40 LF lost
40 LF has the entire 30 foot buffer on both sided impacted
Total Pre Impacts
72 LF has the first 25 LF of right hand buffer impacted. Say entire right hand buffer impacted and therefore receive half credit for left hand side, so 36 LF of credit and lose 36
LF
154 LF has the last 20 feet of the right hand buffer so receive half credit of 77 LF for the left hand buffer. Receive 1/3 of the 77 LF for the right hand buffer of 26 LF. So 154 -
(77+26)=
72 LF has the first 5 LF of left hand buffer impacted. Receive half credit for the right hand buffer of 36 LF and receive 5/6 of the left hand buffer of 30 LF. 72 - (36+20)= 6 LF
lost
Total Post Impacts
50 LF has entire 30 foot buffers on both sides impacted
20 LF has entire 30 foot buffers on both sides impacted
148 LF has the last 15 feet of the left buffer impacted. Receive 74LF of credit for right hand buffer and 37 LF for half of left hand buffer. 148 - (74+37)= 37 LF lost
42 LF has first 15 feet of right hand buffer impacted. Receive 21 LF of credit for left hand buffer and 10 LF credit for half of right hand buffer. 42 -(21+10)= 11 LF lost
43 LF has the last 15 LF of the right hand buffer impacted. Receive 21 LF of credit for left hand buffer and 10 LF of credit for half of right hand buffer. 43- (22+11)= 10 LF lost
Total Post Impacts
40 LF has the entire 30 foot buffers on both sides impacted
40 LF has the entire 30 foot buffers on both sides impacted
No impacts
77LF has the entire 30 foot buffers on both sides impacted
76 LF has the entire right buffer impacted so receive half credit of 38 LF
104 LF has the last 20 feet of the right buffer impacted. Receive 52 LF of credit for left buffer and 1/3 credit (17 LF) for the right buffer. 104-(52+17)= 35 LF lost.
118 LF of first 20 feet of right buffer impacted. Receive 59 LF of of credit for left buffer and 1/3 credit (20 LF) for right buffer. 118 - (59+20)= 39 LF lost
Total Post Impacts
690 LF of last 15 feet of left buffer impacted. Receive 345 LF of credit for right buffer. Receive 1/2 of 345 LF (173 LF)for 15 feet of left buffer remaining. 690- (345+173)= 172
LF lost
60 LF has entire left buffer. Receive half credit
Total Pre Impacts
92 LF has the entire 30 foot buffers on both sides impacted
50 LF has the entire left buffer impacted so receive half credit. 25 LF lost
200 LF has the last 25 feet of the left buffer impacted, so assume that only receive half credit. 100 LF lost
288 LF has the last 15 feet o fthe left buffer impacted. Receive 144 LF of credit for the right buffer. Receive 1/2 credit on the left buffer (72 LF). 288 - (144+72)= 72 LF lost
Total Post Impacts
120 LF of last 15 feet of left buffer impacted. Receive 60 LF of credit for right buffer. Receive 30 LF of credit for one half of left buffer. 120 - (60+30)= 30 LF lost
300 LF has entire 30 foot buffer on both sides impacted
395 LF of last 25 feet of right buffer impacted. Receive half credit for left buffer of 198 LF 395 - 198=164 LF lost
Total Pre Impacts
120 LF of last 15 feet of left buffer impacted. Receive 60 LF of credit for right buffer. Receive 30 LF of credit for one half of left buffer. 120 - (60+30)= 30 LF lost
300 LF has entire 30 foot buffer on both sides impacted
395 LF of last 25 feet of right buffer impacted. Receive half credit for left buffer of 198 LF. 395 - 198=197 LF lost
40 LF has entire left buffer impacted
295 LF has the last 15 feet of the right hand buffer impacted. Receive credit for 147 LF for left hand buffer. Receive 1/2 of 147 LF for half of right hand buffer (74 LF). 295 - (147+74)=
74 LF lost
40 LF has entire right hand buffer impacted. Receive 20 LF for left hand buffer.
Total Post Impacts
100 LF of entire 30 foot buffers on both sides
56 LF of first 20 feet of both buffers. Receive 1/3 of credit since only 10 foot buffers on both sides. 56/3= 19 LF. 56 -19= 37 LF lost
Total Pre Impacts
100 LF has last 15 feet of right buffer impacted. Receive 50 LF for left hand buffer. Receive 1/2 of credit for right buffer since only last 15 feet impacted (25 LF). 100-(50+25)=25
LF lost
No Pre or Post Impacts
139 LF of last 15 feet of left buffer. Receive 69 LF of credit for right buffer and 1/2 credit for left buffer since last 15 feet impacted (35 LF). 139 - (69+35) = 35 LF lost
123 LF has entire left buffer impacted. Receive 62 LF of credit for right buffer, so 61 LF lost.
66 LF has both buffer impacted so 66 LF lost
44 LF has the first 25 feet of right buffer impacted so assume entire right buffer impacted. Only receive 22 LF for left buffer. 22 LF lost
44 LF has the first 7 feet of the right buffer impacted. Receive 22 LF of credit for left buffer and 2/3 credit for right buffer (15 LF). 44 - (22+15) = 7 LF lost
115 LF has both entire buffer on both sided impacted
100 LF has the last 15 feet of right buffer impacted. Receive 50 LF credit for left buffer plus 1/2 right buffer (25 LF). 100 - (50+25)= 25 LF lost
50 LF has the entire left buffer impacted. Receive 25 LF credit for right buffer. 50 - 25 = 25 LF lost
1000 LF has the last 15 feet of left buffer impacted. Receive 500 LF for right buffer and 1/2 credit for left buffer (250LF). 1000- (500+250)= 250 LF lost
500 LF has the entire left buffer impacted. Receive credit for 250 LF for right buffer. 250 LF lost due to left buffer impacts.
115 LF has the first 15 feet of both buffers impacted. Receive 1/2 credit. 58 LF lost
170 LF has the entire right buffer impacted. Receive 85 LF credit for left buffer. 170 - 85 = 85 LF lost
290 LF has the entire 30 feet of both buffers impacted.
115 LF has the entire 30 feet of both buffers impacted
100 LF has the last 15 feet of right buffer impacted. Receive 50 LF for left buffer and 1/2 credit for right buffer. 100 - (50+25) = 25 LF lost
50 LF has the entire left buffer impacted. Receive 25 LF of credit. 25 LF lost
No Pre or Post Utility Impacts
140 LF has the last 10 feet of right buffer impacted. Receive 70 LF for left buffer. Receive 2/3 credit for right buffer (47 LF). 140 - (70+47)= 23 LF lost
140 LF has the last 20 feet of right buffer impacted. Receive 70 LF for right buffer. Receive 1/3 credit for right buffer (23 LF). 140 - (70+23) = 47 LF lost
115 LF of entire right buffer impacted. Receive credit for left buffer of 57 LF . 58 LF lost
90 LF has the first 15 feet of left buffer impacted. Receive credit for 45 LF for right buffer. Receive 1/2 credit for left buffer (22LF)
20 LF has the entire left buffer impacted. Receive 10 LF credit for right buffer
90 LF has the first 20 feet of right buffer impacted. Receive 45 LF credit for left buffer. Receive 1/3 credit for right buffer (15 LF). 90 - (45+15)= 30 LF lost
Due to retaining wall deletion, stream was piped. Credit for stream and loss of mitigation was acquired through EEP.
Did not calculate since pre and post impacts remained the same since no new line was installed.
115 LF has the entire 30 foot buffer on both sides impacted
115 LF has the entire 30 foot buffer on both sides impacted
430 LF has the entire left buffer impacted. Receive 215LF for right buffer. 215 LF lost
155 LF has the last 15 feet of left buffer impacted. Receive 77 LF of credit for the right buffer and 1/2 credit for right buffer (39 LF). 155 - (77+39) =