Loading...
HomeMy WebLinkAboutNCC220587_Annual Fee NOD Letter (2023 Fee)_20230316ROY COOPER Cavtmor ELIZABETH S. BISER SefrrtIry DOUGLAS R. ANSEL lnrmm Ufre~ 3/16/2023 Parathazathel Mohanan Attn: Parathazathel Mohanana 320-1 Prosperity Church Road Charlotte, NC 28269 ��r o NORTH CAROLINA Environmental Qualify Subject: Notice of Deficiency - Failure to Pay Annual Fee Invoice No. NCC220587-2023 Dear Permittee: You are receiving a Notice of Deficiency because the annual fee of $100.00 for coverage under NPDES General Stormwater Permit NCG010000 for Construction Activities has not been paid as required by N.C. General Statute 143-215.3D(a)(4). The annual fee was billed on 2/1/2023 and was due on 3/1/2023. The annual fee applies to the following construction site: Union Church Road Subdivision Union Church Road, Ironton, NC Lincoln County Certificate of Coverage No. NCC220587 NC Reference No. NCG01-2022-0587 If the project was closed out prior to the invoice due date, please request a Notice of Termination. Follow the instructions on the NPDES Construction Program website (deq.nc.gov/NCG01). If the project was not closed out or sold prior to the invoice due date, please pay the permit fee using the Stormwater ePayment website (deq.nc.gov/SW-ePayments). Failure to address this deficiency within 30 calendar days could result in the issuance of a Notice of Violation and potential civil penalty assessment of up to $25,000 per day for failing to maintain permit coverage. If you have any questions or concerns, please contact me at toby.vinson@ncdenr.gov. Sincerely, William E. Vinson, Jr. Chief of Program Operations Division of Energy, Mineral, and Land Resources D_E QJ Nmth Carulina Department of Envranmental Quallty I DMalon of Energy. Mineral and Land Reaa —s 5U North 5alinbury Street 11612 Mail S—ic Corner I Rakgh. Kurth C—,Ii- rb99 1612 919.707.9200