HomeMy WebLinkAbout20230094 Ver 1_Proposed Impacts Inventory Revision Spreadsheet_2023Mar_20230315Revised Proposed Impacts Inventory
Wetland Impacts
2a. Site #
2a1. Reason
2b. Impact type
2c. W. name
2e. Forested
2f. Type of Jurisdiction
2g. Impact area
WA
Pipe crossing 1
T
PFO
Yes
Both
0.28
WB
Maintenance corridor
P
PFO
Yes
Both
0.53
We
Pipe crossing 2
T
PEM
No
Both
0.08
WD
Pipe crossing 3
T
PEM
No
Both
0.07
Stream Impacts
3a. Reason for impact
3b. Impact type
3c. Type of impact
3d. S. name
3e. Stream type
3f. Type of jurisdiction
3g. S. width
3h. Impact length
S1
Pipe crossing 1
T
Excavation
SA
Perennial
Both
7
82
S2
Intake impact 1
T
Dewatering
Cape Fear River
Perennial
Both
247
133
S3
Intake impact 2
P
Fill
Cape Fear River
Perennial
Both
5
52