Loading...
HomeMy WebLinkAbout20230332 Ver 1_USACE More Info Requested_20230314Baker, Caroline D From: Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil> Sent: Tuesday, March 14, 2023 5:46 PM To: hunter.wines@timmons.com; Mark Williams Cc: Homewood, Sue Subject: [External] Request for Additional Information: SAW-2020-00234 (Luck Stone / Sanford Quarry / Lee County) Follow Up Flag: Follow up Flag Status: Flagged CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. on Thank you for your Individual Permit application, dated 11/21/2022 (received 3/3/2023), for the above referenced project. I have reviewed the information provided and determined that the application is not complete per 33 CFR § 325.1(d). Please submit the requested information below (via e-mail is fine, or request a DoD SAFE file exchange link) within 30 days of receipt of this Notification to allow preparation and issuance of a Public Notice as required per 33 CFR § 325.3. Otherwise we will consider your application withdrawn and close the file: 1) Section 5.0 of the "Luck Stone Sanford Quarry Permit Request" document references an "access road... being constructed by others", and that "the Applicant will tie into the terminus of the public road for the primary quarry access." Based on a review of recent aerial photography the Corps is unaware of any previously existing or newly constructed road in the referenced location. Further, although a Nationwide Permit (NWP) 39 verification was issued by our office on 8/3/2018, for infrastructure related to a proposed rock quarry in the same general location (SAW-2015-02582) including what appears to be an access road, this NWP 39 verification expired on 3/18/2022. Lastly, it appears that such an access road would be required for the proposed Luck Stone Sanford Quarry to function, unless additional information were to be provided to justify independent utility. Per 33 CFR § 325.1(d)(2), "All activities which the applicant plans to undertake which are reasonably related to the same project and for which a DA permit would be required should be included in the same permit application. District engineers should reject, as incomplete, any permit application which fails to comply with this requirement." Accordingly, please provide the information necessary to include the associated access road and its potential impacts to waters of the U.S. in the permit application, or provide sufficient information to justify that this access road is a single and complete project with independent utility. 2) Section 8.0 of the "Luck Stone Sanford Quarry Permit Request" document states that "Cross -sections of the proposed impact areas are provided in Appendix C: Selected Design Plans." However, no plans of any kind are included in this Appendix. Please provide the referenced information to fully describe the proposed discharges of dredged or fill material in waters of the U.S. and potentially include in the Public Notice; Please let me know if you have any questions. Sincerely, Dave Bailey David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Mobile: (919) 817-2436 Email: David. E.Bailey2@usace.army.miI We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: https://regulatory.ops.usace.army.mil/customer-service-survey/ Thank you for taking the time to visit this site and complete the survey. From: RaleighNCREG <RaleighNCREG@usace.army.mil> Sent: Friday, March 3, 2023 3:24 PM To: hunter.wines@timmons.com Cc: Bailey, David E CIV USARMY CESAW (USA)<David.E.Bailey2@usace.army.mil> Subject: SAW-2020-00234 (Little River Quarry -Luck Stone / Sanford / Lee County) Good Afternoon, Your IP request for the above project has been received and forwarded to Dave Bailey for further processing. Thank you, Josephine Schaffer From: laserfiche.ncdenr.gov@mccicloud.io <laserfiche.ncdenr.gov@mccicloud.io> Sent: Friday, March 3, 2023 1:27 PM To: RaleighNCREG <RaleighNCREG@usace.army.mil> Cc: SAW-PCN-RG <SAW-PCN-RG@usace.armv.mil> Subject: [Non-DoD Source] More Information Received - Non -DOT - Lee New Project has been received on 3/3/2023 1:26 PM for Luck Stone Sanford Quarry. The link below will take you to the project folder. httos://edocs.dea.nc.eov/laserfiche/index.asox?db=WaterResources#id=546066:view=browse This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses aren't monitored.